SCADA, SeCurity & AutomAtion newSletter · • ClearSCADA & TelePACE Training • Free SCADA...

8
Inside This Issue SCADA vs. IT Advanced ClearSCADA Training ISaGRAF IEC 61131-3 Training ClearSCADA & TelePACE Training Free SCADA Seminars Trio ER45e Ethernet Radios Utility Demand Response Top 3 SCADA System Criteria MS4 Permit Software Volume 21, Issue 1 • Spring/Summer 2011 A Publication of Sage Designs, Inc. 150 Shoreline Hwy., Suite #8A • Mill Valley, CA 94941-3634 • 1-888-ASK-SAGE (1-888-275-7243) • 1-888-FAX-SAGE • www.SageDesignsInc.com SCADA, SECURITY & AUTOMATION NEWSLETTER Continued on page 6 Continued on page 2 Free June SCADA Seminars radio and how you can have both IP connectivity and long range for your radio system. Finally, get a tour of the greatly improved user interface in this Windows 7 compatible version of TelePACE Studio. See how the new browser-based menu system and drag-and-drop function library reduce programming time and ease access to all of the program’s features. See the registration form in this newsletter or go online to www.scadawise.com to register. In our June 14 & 15 seminars, we will address two of the problems so often faced by SCADA systems planners: data throughput speeds and the single remote sensor conundrum. See how Firetide can address the Bandwidth question with their MIMO mesh network technology, and how Accutech can make reaching those small remote sites affordable. For those who need the Ethernet but not the bandwidth, get a look at Trio’s licensed UHF narrow-band Ethernet Water utilities have been using Supervisory Control and Data Acquisition (SCADA) for many years, during which SCADA systems have evolved from simple tone telemetry to web-centric solutions. A SCADA system’s primary function is to monitor and control the conditions of remote assets, such as pump and lift stations, distribution networks, and treatment plants while ensuring data integrity, overall system visibility, and security. If you are expanding, upgrading, or developing a new SCADA system, selecting the right hardware and software components can help you cope with ever changing demands in securing your infrastructure and improving data collection and reporting. Here are the top three criteria to focus on when specifying an advanced SCADA system: 1. Intelligent Field Controllers Everyone claims that they offer intelligent hardware, but are they really that “smart”? Remote programming and configuration over the SCADA network is no longer an indication of smartness. An integrated hardware and software solution that is able to detect and adapt to changes as they happen across the infrastructure represents the intelligence many utilities are looking for. For example, bringing a new remote pump station online in a traditional SCADA system would require Sage Designs, Inc. Passes 20 Year Mark When we opened our doors in May of 1991, we could not have imagined how quickly the time would pass. Starting out with a number of sensor lines and an unknown product called the TeleSAFE from Control Microsystems, we forged ahead. While it was tempting to stay in our comfort zone selling flow meters and other sensors, this whole concept of SCADA was what caught our attention. After all, look at how much more fun it is to demonstrate software than it is to lug around heavy products. Looking back, we see that we did well to move into the SCADA market as early as we did. It was really less of our choice than that of our customers, there being a great deal of forward thinking in our territory. Innovation comes naturally out west and all you have to do is listen to what your customers want. As we reflect back, we have to acknowledge the risk our early customers took in being willing to work with such an unknown representative and for the most part, unknown products. We hope you feel as we do, that your gamble has paid off. As we look forward, we count on you to keep us pointing in the right direction. Thank you for 20 great years. manual downloading of the control logic application, customizing the HMI/SCADA host software at the central monitoring station to accommodate the new site, and manually integrating the pump station in all reports. An intelligent SCADA system has the ability to detect the newly added remote controller and automatically download the proper control application, provided that a communication link is available. Using templates, the existing screens and reports can be easily adapted to integrate the new site. Other daily events such as losing the communication link between the remote controller and the control center would be immediately detected by the remote controller. To mitigate the risk of losing critical data and facing possible fines from regulatory agencies, the controller will log and time stamp data in its non-volatile memory during the time communication is down. Once the communication link is re-established, the controller will automatically upload the logged data to the SCADA host software to populate trend and event files based on actual time of occurrence rather than time of receipt of the data. If the communication loss persists for a longer period of time, the controller may automatically report critical data to an alternate server or even a mobile operator. Top Three Criteria to Look For in Your Next Water/Wastewater SCADA System CBI Systems Ltd’s MS4 Permit Manager™ software is designed to serve as a comprehensive Storm Water Management Program (SWMP) designed specifically to assist Phase I and II MS4’s in meeting centralized records and annual reporting requirements. This software provides an integrated tool which can be used by all permitees to develop required permit application materials, track and maintain data associated with implementation tasks, and simply generate annual reports required by the permitting authorities. With MS4 Permit Manager™, you can easily track outfalls, construction sites, structural controls, facilities, illicit discharges, citizen reports, and training records. Features include SWMP development and implementation, field data collection for field inspections with simple “one button” synchronization, linking unlimited photos and documents, and built-in GIS map functionality. The map is based on the U.S. Census Bureau TIGER/ Line 2000 maps. The map base is ready for viewing, editing, addition of outfall locations and printing or plotting and consists of hydrology, roads, highways, urbanized area boundaries, and state and county boundaries. Use of the MS4 Permit Manager™ will drastically reduce the time and effort required to apply for, manage and MS4 Permit Manager™

Transcript of SCADA, SeCurity & AutomAtion newSletter · • ClearSCADA & TelePACE Training • Free SCADA...

Page 1: SCADA, SeCurity & AutomAtion newSletter · • ClearSCADA & TelePACE Training • Free SCADA Seminars ... automatically report critical data to an alternate ... the standard for PLC

I ns ide Th is I ssue• SCADAvs.IT• AdvancedClearSCADATraining• ISaGRAFIEC61131-3Training• ClearSCADA&TelePACETraining• FreeSCADASeminars• TrioER45eEthernetRadios• UtilityDemandResponse• Top3SCADASystemCriteria• MS4PermitSoftware

Volume 21, Issue 1 • Spring/Summer 2011 A Publication of Sage Designs, Inc.

150 Shoreline Hwy., Suite #8A • Mill Valley, CA 94941-3634 • 1-888-ASK-SAGE (1-888-275-7243) • 1-888-FAX-SAGE • www.SageDesignsInc.com

S C A DA , S e C u r i t y & Au to m At i o n n e w S l e t t e r

Continued on page 6

Continued on page 2

Free June SCADA SeminarsradioandhowyoucanhavebothIPconnectivityandlongrangeforyourradiosystem.Finally,getatourofthegreatlyimproveduserinterfaceinthisWindows7compatibleversionofTelePACEStudio.Seehowthenewbrowser-basedmenusystemanddrag-and-dropfunctionlibraryreduceprogrammingtimeandeaseaccesstoalloftheprogram’sfeatures.Seetheregistrationforminthisnewsletterorgoonlinetowww.scadawise.comtoregister.

InourJune14&15seminars,wewilladdresstwooftheproblemssooftenfacedbySCADAsystemsplanners:datathroughputspeedsandthesingleremotesensorconundrum.SeehowFiretidecanaddresstheBandwidthquestionwiththeirMIMOmeshnetworktechnology,andhowAccutechcanmakereachingthosesmallremotesitesaffordable.ForthosewhoneedtheEthernetbutnotthebandwidth,getalookatTrio’slicensedUHFnarrow-bandEthernet

WaterutilitieshavebeenusingSupervisoryControlandDataAcquisition(SCADA)formanyyears,duringwhichSCADAsystemshaveevolvedfromsimpletonetelemetrytoweb-centricsolutions.ASCADAsystem’sprimaryfunctionistomonitorandcontroltheconditionsofremoteassets,suchaspumpandliftstations,distributionnetworks,andtreatmentplantswhileensuringdataintegrity,overallsystemvisibility,andsecurity.Ifyouareexpanding,upgrading,ordevelopinganewSCADAsystem,selectingtherighthardwareandsoftwarecomponentscanhelpyoucopewitheverchangingdemandsinsecuringyourinfrastructureandimprovingdatacollectionandreporting.HerearethetopthreecriteriatofocusonwhenspecifyinganadvancedSCADAsystem:

1. Intelligent Field ControllersEveryoneclaimsthattheyofferintelligenthardware,butaretheyreallythat“smart”?RemoteprogrammingandconfigurationovertheSCADAnetworkisnolongeranindicationofsmartness.Anintegratedhardwareandsoftwaresolutionthatisabletodetectandadapttochangesastheyhappenacrosstheinfrastructurerepresentstheintelligencemanyutilitiesarelookingfor.Forexample,bringinganewremotepumpstationonlineinatraditionalSCADAsystemwouldrequire

Sage Designs, Inc. Passes 20 Year MarkWhenweopenedourdoorsinMayof1991,wecouldnothaveimaginedhowquicklythetimewouldpass.StartingoutwithanumberofsensorlinesandanunknownproductcalledtheTeleSAFEfromControlMicrosystems,weforgedahead.Whileitwastemptingtostayinourcomfortzonesellingflowmetersandothersensors,thiswholeconceptofSCADAwaswhatcaughtourattention.Afterall,lookathowmuchmorefunitistodemonstratesoftwarethanitistolugaroundheavyproducts.Lookingback,weseethatwedidwelltomoveintotheSCADAmarketasearlyaswedid.Itwasreallylessofourchoicethanthatofourcustomers,therebeingagreatdealofforwardthinkinginourterritory.Innovationcomesnaturallyoutwestandallyouhavetodoislistentowhatyourcustomerswant.Aswereflectback,wehavetoacknowledgetheriskourearlycustomerstookinbeingwillingtoworkwithsuchanunknownrepresentativeandforthemostpart,unknownproducts.Wehopeyoufeelaswedo,thatyourgamblehaspaidoff.Aswelookforward,wecountonyoutokeepuspointingintherightdirection.Thankyoufor20greatyears.

manualdownloadingofthecontrollogicapplication,customizingtheHMI/SCADAhostsoftwareatthecentralmonitoringstationtoaccommodatethenewsite,andmanuallyintegratingthepumpstationinallreports.AnintelligentSCADAsystemhastheabilitytodetectthenewlyaddedremotecontrollerandautomaticallydownloadthepropercontrolapplication,providedthatacommunicationlinkisavailable.Usingtemplates,theexistingscreensandreportscanbeeasilyadaptedtointegratethenewsite.Otherdailyeventssuchaslosingthecommunicationlinkbetweentheremotecontrollerandthecontrolcenterwouldbeimmediatelydetectedbytheremotecontroller.Tomitigatetheriskoflosingcriticaldataandfacingpossiblefinesfromregulatoryagencies,thecontrollerwilllogandtimestampdatainitsnon-volatilememoryduringthetimecommunicationisdown.Oncethecommunicationlinkisre-established,thecontrollerwillautomaticallyuploadtheloggeddatatotheSCADAhostsoftwaretopopulatetrendandeventfilesbasedonactualtimeofoccurrenceratherthantimeofreceiptofthedata.Ifthecommunicationlosspersistsforalongerperiodoftime,thecontrollermayautomaticallyreportcriticaldatatoanalternateserverorevenamobileoperator.

Top Three Criteria to Look For in Your Next Water/Wastewater SCADA System

CBISystemsLtd’sMS4PermitManager™softwareisdesignedtoserveasacomprehensiveStormWaterManagementProgram(SWMP)designedspecificallytoassistPhaseIandIIMS4’sinmeetingcentralizedrecordsandannualreportingrequirements.Thissoftwareprovidesanintegratedtoolwhichcanbeusedbyallpermiteestodeveloprequiredpermitapplicationmaterials,trackandmaintaindataassociatedwithimplementationtasks,andsimplygenerateannualreportsrequiredbythepermittingauthorities.WithMS4PermitManager™,youcaneasilytrackoutfalls,constructionsites,structuralcontrols,facilities,illicitdischarges,citizenreports,andtrainingrecords.FeaturesincludeSWMPdevelopmentandimplementation,fielddatacollectionforfieldinspectionswithsimple“onebutton”synchronization,linkingunlimitedphotosanddocuments,andbuilt-inGISmapfunctionality.ThemapisbasedontheU.S.CensusBureauTIGER/Line2000maps.Themapbaseisreadyforviewing,editing,additionofoutfalllocationsandprintingorplottingandconsistsofhydrology,roads,highways,urbanizedareaboundaries,andstateandcountyboundaries.UseoftheMS4PermitManager™willdrasticallyreducethetimeandeffortrequiredtoapplyfor,manageand

MS4 Permit Manager™

Page 2: SCADA, SeCurity & AutomAtion newSletter · • ClearSCADA & TelePACE Training • Free SCADA Seminars ... automatically report critical data to an alternate ... the standard for PLC

150 Shoreline Hwy., Suite #8A • Mill Valley, CA 94941-3634 • 1-888-ASK-SAGE (1-888-275-7243) • 1-888-FAX-SAGE • www.SageDesignsInc.com

Itseemsthattherearetwoseparateanddistinctdisciplinesatworkhere:theSCADApeopleononesideandtheITpeopleontheother.Ialmosthatetosayit,butalsogladtosayit:thetwodisciplinesarerapidlyconverging.EthernetisquicklybecomingthestandardforPLCandothertypesofSCADAcommunication.ThismeansITismorethanhappytogiveitsexpertisetotheSCADAgroup,sometimeswithoutbeingasked.Therearetwodifferentandslightlybiasedviewsfrombothcamps.ITviewsSCADAassimplyadatabase,whileSCADAviewsITassimplyasecurityfirewall.IfonlyITfolkssawtheSCAinadditiontotheDA,andifSCADAfolkssawnetworksecurityaswaymorethanfirewallrules,perhapswecouldgetalongbetter.SCADAnetworksseemtobeoftheKISSphilosophy(KeepItSimpleStupid)andforgoodreason.SCADAsystemsarecomplexenoughwithoutaddingnetworkcomplexitythatdecreasesreliability.IhaveheardwaytoomanytimesthataSCADAsystemworkedfineforyearsuntilIT‘secured’ittodeath.Unfortunately,SCADAcan’tignoresecurityforever.TherecentStuxnetvirusspecificallytargetedSCADAsystems.Yesitexploited4zero-dayWindowsvulnerabilities,usedaConfickerstyleattack,andthepayloadonlyaffectedStep7softwareandSiemen’sS7-300PLCs.Furthermore,theyhadtohavebeenusingthedefaultpasswordandhadveryspecificVFD’sattachedbeforethevirusdiditsdamage.ThetargetforStuxnetmighthavebeenextremelyspecific,butvariationsareboundtocometoasystemnearyou.Moreimportantly,itwasthefirstvirusthatinfecteddownintothePLClevel,andonceaviruslikethisisreleasedintothewild,italmostcertainlyinspiresotherstooneuptheoriginal.Stuxnetisverysophisticatedandundoubtedlythefirstofmoretocome.MediareportsgavetheimpressionthatonlysystemsinIran(specificallycentrifugesusedforenrichinguranium)werecompromised,buttherewereatleast2,913infectedsystemsreportedintheUSA(mostofwhichweren’tenrichinguranium).OnewaytoincreasesecuritywhileallowingtheflexibilityforSCADAtocontinuerunningreliablyistosplittheSCADAandbusinessnetworks.Aphysicalsplitisthemostsecure,butalsoverycostly.SomesmallerSCADAnetworksarenearlyphysicallysplit

already;afirewallbetweenthebusinessandSCADAnetworksisallthat’sneeded.Byaphysicalsplit,Idon’tmeangoingroguefromtheITpeopleandhavinganisolatednetwork.I’msuggestingworkingwithITandutilizingtheirsecurityexpertise,aslongastheyarereceptivetoyourcontrolsystemexpertise.IfyourSCADAnetworkiscurrentlyrogue,IimploreyoutoworkwithyourITpeople,orhiresomeonewhocanprovidesecurityexpertiseifyouhaven’talready.Believeitornot,ITsecurityandSCADAreliabilitycan(anddo)coexist.Alogicalsplitismoreaffordableandcanbeaseffectiveasaphysicalsplit,ifconfiguredproperly.AnetworkthatislogicallysplitisusuallylargerthanonelocationandusesVPN‘tunnels’forSCADAtraffictoflowthroughthebusinessnetwork,inadditiontooneormorefirewallsseparatingSCADAfrombusinesstraffic.AfirewallthatseparatestheSCADAandbusinessnetworkstypicallyhasaDMZ,aplacefortraffictoflowintooroutoftheSCADAnetwork.TheDMZisagoodplaceforservicessuchasahistoriantolive,thatwaybusinessuserscanaccessSCADAdatawithouttappingintotheSCADAnetworkdirectly.AfteryourSCADAnetworkhasgonethoughasecurityremodel,itishighlyrecommendedtohirean‘ethicalhacker’topokeandprodyourbusinessandSCADAnetworkstoseejusthowsecurethenewnetworkreallyis(orisn’t).Iknowtherearevulnerabilitiesthatcansometimes(thoughrarely)beoverlookedbythebestnetworkpeopleandsomeonetakingafreshviewfromahackersperspectivewouldalmostcertainlydiscoverthem.ThekeytoasecureSCADAnetworkthatisalsoreliableisallintheplanning.Understandingwhereyouarenow,whatyouneedtodoandhowyou’regoingtodoit.Anddon’tforgetbackoutstrategies;ifaSCADAnetworksecurityupgradegoeshorriblywrongyoudon’twanttowishyouhadarecoveryscenarioinplace.TrustyourITteam.ItmaynotseemlikeSCADAneedstheirsecurityexpertisenow,butyoudon’twanttoendupwishing,“If we had only realized”... IfthewallbetweenITandSCADAcanbelowered,bothcampswillbegladtheyworkedtogetherforthecommongoodinthefuture.—Rolland Domer, Network Analyst & SCADA Engineer, Sonoma County Water Agency

SCADA vs. IT – Can’t we just get along?

developreportsforcompliancewithPhaseIandIIMS4stormwaterpermits.Thetraditionalmethodforsimilaractivitiesinvolvesmanualdocumentdevelopmentanddatamanagement.Moreefficientpermitimplementationwillpromotebettercompliancewiththegoalofstormwaterpollutionreductionand

Sage advice

MS4 Permit Manager™ Continued from page 1

prevention.MS4PermitManager™hasbeenknowntoreducepermitapplicationdevelopmentcostsby80%forsimilardevelopmentworkwithoutthetechnology.HaveyourMS4PermitManagercalltogetascheduleofonlinewebinarsorvisitwww.cbi-systems.com.

TheTrioteamhasintroducedtheEthernetE-SeriesfamilyoflicensedradioproductsbasedontheTrioER45eadvancedLINUXEthernetradioplatform.TheER45eradioprovidesbothEthernetandserialconnectivityforthemostcomplexanddemandingrequirementsinPoint-to-PointandPoint-to-Multipoint(MultipleAddressRadio)SCADAandTelemetrysystems.FeaturessuchasChannelShare™,datacompression,lowlatencyandover-the-airfirmwareupgradesmaketheEthernetE-SeriesacompletefamilyoflicensedEthernetradiosthatcanbeusedwithallleadinghostsystemsandremoteEthernetRTU/PLCs.Inaddition,theEthernetE-SeriesfeaturesaflexibleembeddedterminalserverwhichprovidesasmoothtransitionfromserialbasedinfrastructuretoIP/Ethernet.BasedonthehighlysuccessfulTrioER450serialradio,theER45ecanintegratedirectlyintoexistingE-SeriessystemsandisalsocomplimentedbythefullduplexEB45eBase/Repeaterandthe1+1redundantEH45eHotStandbyoptions.

• AdvancedtechnologyDSP-basedGMSKdigitaldatamodemfeaturingerror-checkedhighdatathroughput

• True19,200bpsover-the-airdatarates• Modbus,DNP3.0andIEC60870-5-

101,andEthernet/IPprotocols-UDP,TCP,DHCP,ARP

• Localorremoteconfigurationofallradiosinasystem

• MultistreamTMsimultaneousdatastreamsupport

• AdvancedcommissioningtoolsandremotediagnosticsincludingSNMP

• 128-bitAESencryption• 3-yearwarranty(partsandlabor)

Control Microsystems Introduces the Trio ER45e Remote Ethernet Radio

Page 3: SCADA, SeCurity & AutomAtion newSletter · • ClearSCADA & TelePACE Training • Free SCADA Seminars ... automatically report critical data to an alternate ... the standard for PLC

150 Shoreline Hwy., Suite #8A • Mill Valley, CA 94941-3634 • 1-888-ASK-SAGE (1-888-275-7243) • 1-888-FAX-SAGE • www.SageDesignsInc.com

150 Shoreline Hwy. #8A � Mill Valley, CA 94941-3634 � 1-888-ASK-SAGE or 415-331-8826 � 1-888-FAX-SAGE � www.SageDesignsInc.com

F r e e S C A D A S e m i n a r A S p e c t r u m o f P o s s i b i l i t i e s

J u n e 1 4 , 2 0 1 1 J u n e 1 5 , 2 0 1 1 8AM – Noon 8AM – Noon Ayres Boutique Suites Ontario Airport SpringHill Suites by Marriott 204 N. Vineyard Avenue 10593 Fairway Drive

Ontario, CA 91764 Roseville, CA 95678

8:00 – 8:15 Continental Breakfast & Introductions

8:15 - 9:00 Accutech Tether-Free Wireless Instrumentation Greg Ochs, Western Regional Manager, Control Microsystems, will present the Accutech wireless network of true “tether free”, battery powered, wireless instruments which allows for deployment of measurements in locations best suited for accountability and performance in over-the-air systems. Suitable for outdoor and indoor use and with approvals for hazardous locations, the Accutech system meets a wide range of conditions. The scope of “tether free” instruments includes pressure, temperature, flow and other parameters that can be tied into a scalable wireless network from 1 to 25,000+ real-time

measurements. Greg will discuss the characteristics of industrial wireless instrumentation that have been successfully installed in industrial applications.

9:00 – 10:00 Broadband Wireless Mesh Technology Mike Anderson, Regional Sales Manager, Western U.S., Firetide, Inc. will discuss design considerations for IP wireless networking, wireless technology

options and how to pick the right one for the project, as well as Installation and performance expectations.

10:00 – 10:15 Break

10:15 – 11:00 Trio UHF Ethernet As more and more devices are moving from serial to Ethernet, customers face the challenge of deploying a cost-effective, wireless infrastructure that link their remote asset over a secure, reliable and scalable network. Trio’s new ER45e is an Ethernet solution in the Licensed 370 to 520 MHz bands. Greg Ochs, Western Regional Manager, Control Microsystems, will discuss the features and capability of this radio that offers an IP communication network with

reliability and coverage.

11:15 - Noon First look at the Version 5 Release of TelePACE Studio Get a tour of the greatly improved user interface in this Windows 7 compatible version of TelePACE Studio. See how the new browser-based menu system and drag-and-drop function library reduce programming time and ease access to all of the program's features.

_____________________________________________________________________________________________________________________  

Pre-registration Required

To Register: Call 1-888-275-7243 to reserve your seat. Then complete the information below and send to us via fax to 1-888-329-7243 or by email

[email protected]. A confirmation will be emailed to you. Hotel Directions can be found on the Events Page of our website: http://www.sagedesignsinc.com/events.

□ Register me for the free seminar in Ontario on Tuesday, June 14, 2011

□ Register me for the free seminar in Roseville on Wednesday, June 15, 2011

Name (please print):

Title:

Company:

Phone:

Address:

Fax:

Email:

City/State/Zip:

Dietary Restrictions:

* * * Registration Deadline: June 10, 2011 * * *

There is no charge for this event, but we would appreciate notification if you must cancel your reservation.

Page 4: SCADA, SeCurity & AutomAtion newSletter · • ClearSCADA & TelePACE Training • Free SCADA Seminars ... automatically report critical data to an alternate ... the standard for PLC

150 Shoreline Hwy., Suite #8A • Mill Valley, CA 94941-3634 • 1-888-ASK-SAGE (1-888-275-7243) • 1-888-FAX-SAGE • www.SageDesignsInc.com

ClearSCADA Training CourseMay 16-19, 2011 - Palm Springs, CA October 24-27, 2011 - Mill Valley, CA

Day1(8AM–4PM) InstallingClearSCADA,IntroductiontoClearSCADA, Components,UsingViewX,UsingWebX,ClearSCADAHelp

Day2(8AM-4PM) ConfiguringusingViewX,DatabaseOrganization,BasicTelemetryConfiguration,CreatingMimics,CreatingTrends

Day3(8AM-4PM) ConfiguringusingViewX,Templates&Instances,LogicLanguages,Security,CommunicationsDiagnostics

Day4(8AM-4PM) Reports,SystemConfiguration,SystemArchitecture,Questions

Cost: ClearSCADATrainingCourse $1,890

SCADAPack TelePACE Studio Training CourseMay 3-5, 2011 - Palm Springs, CA November 1-3, 2011 - Mill Valley, CAAn optional SCADAPack 350, SCADAPack 334 or SCADAPack 32 is available at a special price* with the course—an excellent way to get started using Control Microsystems’ Controllers.

Day1(8AM-4PM) SCADAPackcontrolleroperation,Series5000I/O,TelePACEStudiointroduction

Day2(8AM-4PM) TelePACEStudioadvancedprogrammingtechniquesandadvancedfunctions

Day3(8AM-2PM) Controllercommunications,ModbusMaster/Slaveprotocol,Diagnostics,Modems

Cost: SCADAPackTelePACEStudioCourse$1,340*OptionalSCADAPack350TrainingKit–adds$1040*OptionalSCADAPack334TrainingKit–adds$1040*OptionalSCADAPack32TrainingKit–adds$1,100

Instructors: ClearSCADA&SCADAPackTelePACEclasseswillbetaughtbyTonySannellla,SageDesigns,aControlMicrosystems’Factory-CertifiedInstructor.TheClearSCADATestDriveswillbeconductedbyIanMetcalfe,USClearSCADASales,ControlMicrosystems.Location:Seeindividualcourseregistrationform.Thoserequiringovernightaccommodationsshouldcallthehoteldirectlyforreservations.

What should I bring?LaptopcomputerwithminimumofWin2KorXPwith15mbfreediskspace,CDROM,mousewithascrollwheel,workingserial,USBorEthernetport,andnecessarypermissionstoinstallsoftwareonyourcomputer.

What is provided?Lunchandcoffee,softdrinksandsnackseachday.

*Optional Training Kits at special course pricing (TelePACE class only): Limit one (1) for every two (2) students per organization. Training Kits will be shipped N/C to training facility, provided your registration is received approximately 4 weeks before the first day of the course, or shipped to you after the course when available. Training kits include a SCADAPack 350, SCADAPack 334 or SCADAPack 32 Controller, TelePACE Studio Software, Hardware Manual (on CD-ROM), I/O Simulator board, AC/2 Transformer, & programming cable. Prices do not include applicable California sales taxes.

TM Training Classes

Download the Registration form at: http://www.sagedesignsinc.com/events/index.htm

Please send me the Registration Form ClearSCADA: ❑ May 16-19, 2011 - Palm Springs, CA ❑ October 24-27, 2011 - Mill Valley, CA SCADAPack TelePACE: ❑ May 3-5, 2011 - Palm Springs, CA ❑ November 1-3, 2011 - Mill Valley, CA

Name(please print): Title:Company: Phone:Address: Fax:

Email:City/State/Zip:

* * * Registration Deadline: 2 weeks before 1st day of course * * *Allregistrationsaresubjecttocancellationfees.Aconfirmationnoticewillbesenttoallregistrantsonorbeforethedeadlinedate.

Schedule Your Own

Free Hands-On Test DriveCalltoScheduleaTestDriveCall 1-888-ASK-SAGEemail:[email protected]

Page 5: SCADA, SeCurity & AutomAtion newSletter · • ClearSCADA & TelePACE Training • Free SCADA Seminars ... automatically report critical data to an alternate ... the standard for PLC

Represented by

Mill Valley . Newport BeachContact us: 1-888-ASK-SAGE • www.SageDesignsInc.com

www.accutechinstruments .com

Simply Works

Accutech Wireless Instruments provide quick installation and easy con� guration. Save money now and throughout the life of your wireless network.

Trying to con� gure your wireless network?

CONTROLMICROSYSTEMS

It doesn’t haveto be complicated.

is becoming

ControlMicrosystems

CMI+SE-AccutechAd-Equations_6.08x6.83_V001.indd 1 3/1/11 3:51 PM

Represented by

Mill Valley . Newport BeachContact us: 1-888-ASK-SAGE • www.SageDesignsInc.com

www.accutechinstruments .com

Simply Works

Accutech Wireless Instruments provide quick installation and easy con� guration. Save money now and throughout the life of your wireless network.

Trying to con� gure your wireless network?

CONTROLMICROSYSTEMS

It doesn’t haveto be complicated.

is becoming

ControlMicrosystems

CMI+SE-AccutechAd-Equations_6.08x6.83_V001.indd 1 3/1/11 3:51 PM

Represented by

Mill Valley . Newport BeachContact us: 1-888-ASK-SAGE • www.SageDesignsInc.com

www.accutechinstruments .com

Simply Works

Accutech Wireless Instruments provide quick installation and easy con� guration. Save money now and throughout the life of your wireless network.

Trying to con� gure your wireless network?

CONTROLMICROSYSTEMS

It doesn’t haveto be complicated.

is becoming

ControlMicrosystems

CMI+SE-AccutechAd-Equations_6.08x6.83_V001.indd 1 3/1/11 3:51 PM

150 Shoreline Hwy., Suite #8A • Mill Valley, CA 94941-3634 • 1-888-ASK-SAGE (1-888-275-7243) • 1-888-FAX-SAGE • www.SageDesignsInc.com

Why Your Business Should Migrate to ClearSCADAn Reduceengineering,operation,

andmaintenancecostsn Integrateopenstandardsinto

yourSCADAenvironment

Visit www.clearscada.comto learn more about the industry leading SCADA host software

CONTROLMICROSYSTEMS www.c ontrolmicrosystems .com

Represented by

Bakersfield.MillValley.NewportBeachContact us: 1-888-ASK-SAGE • www.SageDesignsInc.com

n Investinanarchitecturethatgrowsandadaptstoyourchangingneeds

n Flexiblerichclientandwebinterfaces

n CompellingROI

Advanced ClearSCADA Training May 24-25, 2011 – Roseville, CAThis2-daytrainingcourseisforexperiencedClearSCADAuserswhowanttolearnmoreaboutunderstandingthearchitectureofClearSCADA,projectdesignconsiderations,usingODBCandSQLwithClearSCADA,andmore:• Advancedmimicandsymboldesign• Advancedreportingandtrending• TheClearSCADALogicEngine• DataGridsandDataTables• Advancedsystemtroubleshootingandfinetuning** PRE-REQUISISTES APPLY: To participate in this class, attendees must have completed the introductory 4-day ClearSCADA class. No exceptions permitted. ** Who should attend? SCADAengineers,systemintegratorsandanyotherSCADArelatedpersonnelwhohavecompletedthe4-dayClearSCADAIntroductoryCourseanddesireadvancedtraining.What should I bring?LaptopComputerwithminimum1GBoffreediskspaceandminimumof512MBRam(1GBpreferred)withserialport.What is provided? Continentalbreakfast,lunch,coffeeandrefreshmentsbreaks,&trainingmaterials,plusSCADAPackcontrollerforcourseuse.Instructor:JeffKlumpp,SCADASystemsAnalyst,ControlMicrosystemsCourse Fees: $945.00(plustaxes)Control Microsystems Online Registration & more info: http://www.controlmicrosystems.com/resources-2/training-1/event-calendar/index.cfm?view=daily&m=5&d=24&y=2011&eid=31133

ISaGRAF Training ClassMay 10-12, 2011 – Roseville, CA3-DaysessionincludestopicssuchasSCADAPackhardwareinstallation,maintenanceandsystemoverview.• IntroductiontoISaGRAFWorkbenchandControlMicrosystems’custom

extensions(functions).• ISaGRAFprogramminglanguages.• SCADAPackcommunicationmethodsandprotocols.

Who should attend? Individualsinterestedinparticipatinginanintroductory,in-depthcourseonISaGRAFProgrammingLanguageandhowitappliestoControlMicrosystemsproducts.Optional Training Kits: Trainingkits,whichincludeaSCADAPack&I/Osimulator,arenotrequiredtoparticipateinthecourse;however,theyareonlyofferedinconjunctionwithcertaincoursesandcannotbepurchasedseparately.Ifyouareinterestedinone,pleaseinquire.What is provided? Continentalbreakfast,lunch,coffeeandrefreshmentsbreaks,&trainingmaterials,plusSCADAPackcontrollerforcourseuse.Instructor: JohnnyGutierrez,ApplicationsSupportSpecialist,ControlMicrosystemsCourse Fees:$1580.00(plustaxes)Control Microsystems Online Registration & more info:http://www.controlmicrosystems.com/resources-2/training-1/event-calendar/?C=5331&i=31132

 

  

(Maybe you could make an “Advanced” that works with above “logo”)

Advanced ClearSCADA Training  

May 24-25, 2011 – Roseville, CA

** PRE-REQUISISTES APPLY: To participate in this class, attendees must have completed

the introductory 4-day ClearSCADA class. No exceptions permitted. **

What should I bring? Laptop Computer with minimum 1 GB of free disk space and minimum

of 512MB Ram (1 GB preferred) with serial port.

What is provided?

•Training materials, controllers will be provided for course use.

•Daily light breakfast, lunch, coffee and refreshment breaks.

•Soft drinks & snacks during afternoon break.

Instructor: Johnny Gutierrez , SCADA Systems Analyst, Control Microsystems

Control Microsystems Online Registration & more info:    

http://www.controlmicrosystems.com/resources-2/training-1/event-

calendar/index.cfm?view=daily&m=5&d=24&y=2011&eid=31133

Training

ISaGRAF Training Class

May 10-12, 2011 – Roseville, CA

3-Day session includes topics such as SCADAPack hardware installation, maintenance and system overview.

• Introduction to ISaGRAF Workbench and Control Microsystems’ custom extensions (functions). • ISaGRAF programming languages. • SCADAPack communication methods and protocols.

Who should attend? Individuals interested in participating in an introductory, in-depth course on ISaGRAF Programming Language and how it applies to Control Microsystems products.

Course Fees: ISaGRAF 3-Day Product Training: $1580.00 (plus taxes)

Optional Training Kits: Training kits are not required to participate in a product training session; however these kits are offered only in conjunction with a product training session and cannot be purchased separately. Please inquire if you are interested in purchasing a training kit.

Instructor: Jeff Klumpp, Technical Support Team, Control Microsystems

Control Microsystems Online Registration & more info:    

http://www.controlmicrosystems.com/resources‐2/training‐1/event‐calendar/?C=5331&i=31132 

 

 

 

ISaGRAF Training Class

May 10-12, 2011 – Roseville, CA

3-Day session includes topics such as SCADAPack hardware installation, maintenance and system overview.

• Introduction to ISaGRAF Workbench and Control Microsystems’ custom extensions (functions). • ISaGRAF programming languages. • SCADAPack communication methods and protocols.

Who should attend? Individuals interested in participating in an introductory, in-depth course on ISaGRAF Programming Language and how it applies to Control Microsystems products.

Course Fees: ISaGRAF 3-Day Product Training: $1580.00 (plus taxes)

Optional Training Kits: Training kits are not required to participate in a product training session; however these kits are offered only in conjunction with a product training session and cannot be purchased separately. Please inquire if you are interested in purchasing a training kit.

Instructor: Jeff Klumpp, Technical Support Team, Control Microsystems

Control Microsystems Online Registration & more info:    

http://www.controlmicrosystems.com/resources‐2/training‐1/event‐calendar/?C=5331&i=31132 

 

 

 

Page 6: SCADA, SeCurity & AutomAtion newSletter · • ClearSCADA & TelePACE Training • Free SCADA Seminars ... automatically report critical data to an alternate ... the standard for PLC

150 Shoreline Hwy., Suite #8A • Mill Valley, CA 94941-3634 • 1-888-ASK-SAGE (1-888-275-7243) • 1-888-FAX-SAGE • www.SageDesignsInc.com

2. Tight Security SuiteWaterutilities,largeandsmall,arepartofthenationalcriticalinfrastructure.Cybersecuritythreatsagainstthisinfrastructurecantakedifferentforms:• Potentialdestructivecybermalware

includingviruses,Trojans,andwormattacks.

• Networkspoofingand“denialofservice”threatscausingnetworkperformanceimplications.

• Confidentialitybreachwitheavesdroppingandpasswordcracking.

• Dataintegrityincludingdatatamperingandpacketmodification.

Intelligentfieldcontrollersarenowcapableofencryptingdatabeforeitistransmittedoverthecommunicationlinkusingindustrystandard,government-gradeencryptionalgorithms.Thecontrollercanalsoauthenticatemessagesreceivedfromexternaldevicesandrejectthosefromunidentifiedsources.Thisprotectstheinfrastructurefromeavesdropping,interception,andintrusionattacks.

3.Integrated Host SoftwareAnintegratedhostsoftwareisdesignedfromthegrounduptomanagesmallandlargeWideAreaSCADAsystemsandaddresscriticalissuessuchasunreliablecommunicationlinks,security,dataintegrity,andeaseofdeployment.Itincludes,asastandard,alltheneededcomponentsrequiredtoeffectivelyoperateaSCADAsystemsuchas:

• Alarmredirectionenginetoalertmobileusersofoperationdisruptionsviaemailandmobilephones;

• Efficienttrendingandaudittrailenginesthatarecapableofdealingwithcommunicationlinkinterruptionsanddataretrievaldelays;

• Integratedreportingenginecapableofmeshing-updatafrommultiplesourcestoproduceoperationandcompliancereportswithease.

Forthepast30years,ControlMicrosystemshasbeentheleaderindevelopingintelligentfieldcontrollersfortelemetry,SCADA,andremoteassetmonitoring.TheControlMicrosystemsSCADAPackSeriesofrugged,cost-effective,programmablefieldcontrollersisdesignedspecificallytooperateinharshremoteenvironments.ControlMicrosystems’offeringalsoincludesClearSCADA,anadvancedSCADAHostSoftwareplatform.EventhoughSCADAPackcontrollersandClearSCADAsoftwarecanbeintegratedwithavarietyofthirdpartyHMI/SCADAsoftwareandPLCsrespectively,anintegratedsolutioncombiningthetwoproductsdrivessubstantialcostsavingsanddramaticallyincreasessystemefficiency.TheSCADAPackE-Seriesisalineofremotefieldcontrollersthathasanembeddedhistorian,allowingtime-stampedeventloggingforextendedperiodsoftime.Eventscanbeloggedintheunit’sinternalmemoryandareeasilyaccessibletotheuser.WithmultipleserialandEthernetportson-board,

Eliminatinggapsindatahelpsuserstocomplywithregulatoryrequirementsbyprovidingaccuratereportingandmaintainingahighlevelofdataavailability.MultiplesecuritymodelsareavailableinClearSCADA.Securityisconfiguredtotheobjectlevelwhereawiderangeofpermissionsareappliedtodiscretesystempoints.Forexample,dependingonthepermissionpolicies,agroupofusersmayseedetailsonascreenwhicharenotavailabletoanothergroupwithalowerlevelofsecuritypermissions.Thislevelofintelligenceandflexibilityallowsuserstoofferaccesstoamuchlargergroupofinternalandexternalstakeholderswithoutcompromisingsystemsecurityandintegrity.Furthermore,toreducedeploymenttimeandongoingmaintenance,ClearSCADAoffersazero-configurationWebclientthatisidealformonitoringandcontrollingtheSCADAsystemthroughastandardwebbrowser.Allfeatures,includingfullmimicdisplaysupport,controlandtrendingcapabilities,andalarmsandreporting,aremadeaccessiblethroughasecureSSLconnectionthatismanagedbysecurityloginprivileges.FormoreinformationonControlMicrosystems’products,pleasevisitwww.controlmicrosystems.com

About the author:Hany Fouda is the VP of Marketing at Control Microsystems Inc. He holds a Masters degree in Engineering from Carleton University, Ottawa, Canada and has over 20 years experience in industrial automation, SCADA, and telecommunications.

Top Three Criteria to Look For in Your Next Water/Wastewater SCADA System Continued from page 1

theSCADAPackE-Seriesiswell-suitedforconcurrentcommunicationswithmultiplefielddevices.Itcansimultaneouslyreporttoseveralmasterserversbasedonuserpreferences.Additionally,itcanshareinformationwithotherpeerunitsinthefield,therebyreducingnetworktraffictothemainserverandincreasingthesystem’soverallreliability.ControlalgorithmsaredevelopedusinganIEC61131-compliantprogrammingpackageanddownloadedtothefieldcontrollerremotelyoveranycommunicationlink.TheSCADAPackE-Seriesusesasecure,standardcommunicationprotocolanddatatransfermechanismthattransfersthedatabasedonpriorityandeventchanges.Thisfreesupcommunicationlinkstobeusedforotherdemandingservicessuchasremoteassetvideosurveillance.Datavaluesincludedataqualityflags,atimestampwithmillisecondresolutiontoindicatewhentheeventoccurred,andaclass/prioritytoindicatehowitshouldbehandledbytheSCADAhost.TorealizetheconceptofIntelligentSCADA,ClearSCADAwasdesignedfromthegrounduptomanagesmallandlargeWideAreaSCADAsystemsandaddresscriticalissuessuchasunreliablecommunicationlinks,security,dataintegrity,andeaseofdeployment.Theproductisoptimizedforlowandhighbandwidthcommunicationlinksoverpublicnetworks,suchasdial-uplandlines,mobilenetworks,andWiMAX.Itisalsowell-suitedforprivateserialandEthernetradionetworks.Extensivediagnosticsfeaturesareavailableformonitoringtheperformanceofthecommunicationnetwork.ClearSCADAsupportsmainandstandbycommunicationlinkstoremotedevicesforuninterruptedmonitoringandcontrol.Dataintegrityismaintainedacrossthesystemasaresultofitsinherentabilitytosynchronizehistoricaleventsinitsdatabaseafteracommunicationlosswiththeintelligentfieldcontrollers,suchasSCADAPackE-Series.Sincealldataistimestampedintheintelligentfieldcontroller,lessimportantdatacanbebufferedbythecontrolleruntilitisconvenientfortheSCADAhosttoreceiveit.Inaddition,time-stampeddataallowsthesystemtotoleratefailureofthecommunicationlinks.

FiretideMeshNode

Firetide BackhaulWireless Mesh

Firetide HotPort® 6000-900Wireless Mesh Nodes

• Reliable, High-Performance Networks in Challenging Wireless Environments

• Street-Level Connectivity• Encryption for End-to-End Security

UtilityCompany

Smart UtilityMeter

DataCollectionUnit

Page 7: SCADA, SeCurity & AutomAtion newSletter · • ClearSCADA & TelePACE Training • Free SCADA Seminars ... automatically report critical data to an alternate ... the standard for PLC

150 Shoreline Hwy., Suite #8A • Mill Valley, CA 94941-3634 • 1-888-ASK-SAGE (1-888-275-7243) • 1-888-FAX-SAGE • www.SageDesignsInc.com

OverthepastfiveyearsIhavesurveyedscoresofcommercialandindustrialfacilitiesfortheirdemandresponsepotential.I’vedonethisworkonbehalfofSouthernCaliforniaEdisonCompany,whichprovidespowertooveraquartermillionbusinesses.Manyofmysurveyshavebeenproductive,identifyingmanymegawattsofdemandthatcanbetakenofftheelectricgridwhenitisunderstressorwhenenergypricesareparticularlyhigh.Theterm“demandresponse”isfirmlyestablishedintheutilityindustry,butIthinkitiswidelymisunderstoodamongutilitycustomers.Atleast,manybusinessesIapproachhavetheimpressionthatdemandresponsemeanstheutilitywillturnthemoffwhentheymostneedthepower.Infact,mostprogramsarevoluntary,andparticipantscanoptoutofanycalltoreducedemand,evenifdemandresponseisautomated.Secondly,mostparticipantsturndowntheirusageratherthanshutdownentirely—variable-speedpumpscanbeslowed,airconditionerscanbecycled,andsoon.Electricityisunlikeanyothercommodityinthatitswholesalepricecanvarybyafactorof20ormorewithinagivenday.Thefamiliartime-of-useratesmasktheextremevariations.Theprincipleofdemandresponseissimple:makeelectricratesmoretransparenttothesevariations,therebygivingparticipantsastrongincentivetotakedemandoffthegridatcriticaltimes.Theseoccasionsarerare—occupyingonly50to100hoursperyear—buttheycanaccountfor10to20percentofautility’sannualcosts.1Bypartneringwiththeutilitytoreducethesecosts,participantsnotonlyreducetheirownbills,butthebillsofallratepayers.Demandresponsecostslessthanbuildingmorepeakerplantsandstringingmorewires.Figure1comparestheenergychargesofEdison’sstandardlarge-userrate

(TOU-8)overthecourseofadaywithtwodemandresponseprograms—CriticalPeakPricing(CPP)andReal-TimePricing(RTP)—andtheincreasingtransparencyoftheprogramsisevident.OtherutilitiesacrosstheU.S.andCanadaoffersimilarlystructuredprograms.Theobviousquestionis:whywouldanyonewanttoenrollinaprogramthatchargesover$1.00perkilowatt-hour,evenifonlyafewhoursperyear?Theansweristhattheprogramincludescompensatingchangesatothertimes.Thebreathtakinglyhighcostsnowbecomelucrativeopportunitiestosave,bysheddingloadwhiletheyareineffect.

Water, Water EverywherePart-timeworkasaSCADAintegratorequippedmetomakewaterdistrictsaspecialtyinmydemandresponsework.Storageandoperatingflexibilitymakewaterdistrictsparticularlygoodcandidates.Furthermore,theSCADAsystemsthatmostwaterdistrictsemploycanbeharnessedforautomateddemandresponse(Auto-DR).ThiscanbeassimpleastyingasignalfromthestatewideDemandResponseAutomationServer(DRAS)intotheSCADAsystem.TheSCADAsystemcangivetheoperatingstaffaheads-up,sincemanyprogramsprovideday-aheadnotification,andtoallowanyorallofthefacilitiestooptoutofagivenevent.Edisonoffersrebatesforautomatingdemandresponseupto$300perkilowattofverifieddemandreduction.OtherCaliforniautilitiesoffersimilarincentives.IfawaterdistrictiscontemplatingSCADAupgrades—asmanyare—thecasecanoftenbemadethatthattheycanincreasedemandresponsepotentialorimproveAuto-DRreliability.TheserebatesareastrongdriverofAuto-DR.Demandresponsestrategiesforwaterdistrictsincludetheobvious:drawingdownstoragealittlefurtherduringthepeak,ortoppingupreservoirsjustahead

ofthepeaktominimizeapump’son-peakoperation.Aburstofworkinlate2010gavemesomeinsightsthatmyworktodatehadnot.OneisaconceptthatIcall“hydraulicvs.economicefficiency.”Normally,thesearecloselyaligned.A1,000HPboosterstationthatIevaluatedpusheswaterthroughthreemilesofhydraulicallyconstrainedmains.The1.5ratioofon-peaktomid-peakenergychargesisnotsufficientlyhighenoughtoovercomethehydraulicpenaltyofsqueezingpumpingintothemid-andoff-peakhours.Thatis,thehydraulicallyandeconomicallyefficientthingtodoistopumparoundtheclock.Demandresponseincreasesthisratiotonearly20:1,andthehydraulicandeconomicefficienciesdivergesharply.Operatorsincurthehydraulicpenalty,andsave$1.36perkilowatthourduringthefour-hourcriticalpeak.Similarly,operatorscanliftwateroverazonewithleanstorage,andsupplythezonebygravityduringthepeak.

A Science Project InJanuaryEdisonaskedmetobuildatabletopAuto-DRdisplay.ItwastoincludeaclientdevicethatcommunicateswiththeDRAS,alow-endenergymanagementsystem,andminiatureloadsthatrepresenttheprimarycandidatesfordemandresponse—pumping,lighting,HVAC,andsoon.ThedisplaywaswellreceivedattheannualexpothatEdisonhostsforitssmallarmyof300customerservicerepresentatives.Whilethesefolkspromotedemandresponseandenergyefficiencyonadailybasis,fewofthemhadseenanAuto-DRsystemworkingend-to-end.FortheEMS,IoptedforaSCADAPack350becausethestandardI/Owerewell-matchedtothetask.Digitaloutputs,wiredinparallelwiththethermostat’sbuttons,raisedandloweredthesetpoint.Analogoutputscontrolledthelampbrightnessandpumpspeed,anddigitaloutputscontrolledtheotherloads.Edison’sdemandresponsestaffwalkedtheonlookersthroughtheprocess,tracingsignalsthroughthevisiblewiring.Thedisplaywasactuallyon-linewiththe

DRASwhichtriggeredsimulatedevents.Whenthe“heads-up”camethrough,theSCADAPackloweredthethermostatsettingbytwodegrees,apre-coolingstrategythatmaximizesHVACdemandreduction.Whentheeventstarted,thesettingwasraisedtofourdegreesabovenormal,andthelittleair-conditionershutdown.TheLEDlampdimmedvisiblyandthepump’sspeedandflowratedropped.Acell-phonechargercycledonandoff.Alleyesthenshiftedtothepowermeter,whichregisteredthedrop.Attheendoftheevent,everythingreturnedtonormal.Voila!

High-Hanging FruitEdisonisinterestedinidentifyingcost-effectiveAuto-DRsolutionsforthe280,000facilitiesitservesthathavedemandslessthan500kilowatts.Tothatend,theutilityismovingtostreamlineitsAuto-DRassessmentandqualificationprocess.Low-costcontrollersliketheSCADAPackhavearolehere.Residentialcustomersarenottobeignored.TheparadeofpeopleleavingWalMartandBestBuywithlarge-screenTVsisnowhavinganimpactonCalifornia’sstatewidedemandcurves.Asecondpeakshowsupatabout7:00PMeveryevening,andit’sthedominantpeakduringthewinter.Whilenooneissuggestinggivingup“AmericanIdol”fordemandresponse,anotherpotentiallylargerresidentialloadislooming—electricvehiclechargers.Whowouldn’tdriveseveralblockstosave5centsagallonongasoline?Now,thinkaboutthedailyvariationsinenergycostsandhowtheymighttranslatetothe“fuel”costofaplug-invehicle.Ifwenormalizepowerpricesto$3.50pergallon,awallpluginourgaragemightoffer“gas”forlessthan$2.00pergallonduringmostnights.Considerwhatthatmightdoforplug-invehiclesales.Chargingportsarealsoshowingupattheworkplace,whichcandoublethecommutingrangeofthesevehiclesandcreatemoredemandresponsepotentialthere.Demandresponsehasbecomeanintegralandessentialpartofthe21stCenturypowergrid.Fornow,ithelpsreducepowerbillsandmakesthegridmoreresilientandreliable.Renewableslikewindandsolararegrowingdramatically,anddemandresponsecanbecomeakeyregulatingtechnologytoaccommodatetheirintermittencies.I’vespentmyentirecareerworkingintheutilityindustry,andIcanhonestlythatsayit’safarmoreinterestingandexcitingplacethanitwastothatfresh-out-of-collegeengineerfourdecadesago.— John Howard, P.E. Power & Process Engineers Ventura, CA

Demand Response — A Journey

Figure 1: Forsimplicity,onlytwoofthefivepossibleRTPcurvesareshown.

1. NPR, “All Things Considered”, interview with Dan Delurey, president of the Demand Response Smart Grid Coalition,, July 7, 2010 http://www.npr.org/templates/story/story.php?storyId=128365808

Page 8: SCADA, SeCurity & AutomAtion newSletter · • ClearSCADA & TelePACE Training • Free SCADA Seminars ... automatically report critical data to an alternate ... the standard for PLC

WIRELESS Spread Spectrum & Licensed Radios

Broad-band Mesh Networks

Wireless Instruments

SCADA Enterprise Software

Field Controllers &FlowStation Pump Controller

WIN-911 Alarm Notification Software from Specter Instruments

SECURITYAnalog & IP Cameras, Video Surveillance

Hardware & Software

PureActiv Video Analytics & Camera Management

MS4 PERMITTING SOFTWARE CBI Systems, Ltd MS4 Permit Manager™

& MS4web™ software

1-888-ASK-SAGE • 1-888-FAX-SAGEwww.SageDesignsInc.com

Acknowledgements: SCADAPack™, FlowStation™, and ClearSCADA™ are trademarks of Control Microsystems Inc. Win-911® is a registered trademark of Specter Instruments. HotPort™, HotClient™, and HotView™ are trademarks of Firetide, Inc.. Firetide® is a registered trademark of Firetide, Inc. MS4 Permit Manager™ and MS4web™ are trademarks of CBI Systems, Ltd.

S C A DA , S e C u r i t y & Au to m At i o n n e w S l e t t e rCa lendar of Events

SAvE A TREE

150 Shoreline Hwy., Suite #8AMill Valley, CA 94941-3634

Return Service Requested

STANDARD MAILuS poSTAGE pAID

pERMIT 191SANTA RoSA CA

March28-31,2011 CA-NV/AWWA 2011 Spring Conference,LongBeach,CA

April12-15,2011 CWEA Annual Conference 2011, Ontario,CA

April26-28,2011 CA Rural Water Association EXPO 2011, SouthLakeTahoe,NV

May3-5,2011 SCADAPack - TelePACE Studio Ladder Logic Training*,PalmSprings,CA.

May10-12,2011 Control Miscrosystems’ SCADAPack - ISaGRAF Training*,Roseville,CA.

May16-19,2011 ClearSCADA Training*,PalmSprings,CA.

May24-25,2011 Control Microsystems Advanced ClearSCADA Training*,Roseville,CA.

May24-25,2011 ENTELEC,Houston,TX.Visit Control Microsystems’ booth.

June8,2011 Wine Country Water Works Assoc. 25th Annual Symposium, Healdsburg,CA

June14,2011 Free SCADAWise Seminar*, Ontario,CA

June15,2011 Free SCADAWise Seminar*,Roseville,CA

August18,2011 I&C Expo 2011,SanDiego,CA

September21,2011 CWEA Northern Regional Training,Redding,NV

September22-24,2011 Tri-State Seminar on the River,Primm,NV

October17-20,2011 CA-NV AWWA 2011 Fall Conference,Reno,NV

October24-27,2011 ClearSCADA Training*,MillValley,CA

November1-3,2011 SCADAPack - TelePACE Studio Ladder Logic Training*,MillValley,CA

November15-18,2011 USCID Sixth International Conference on Irrigation & Drainage,SanDiego,CA

*Downloadtheregistrationformfromourwebsiteorcallformoreinformation.