SBI Infra Management Solutions Pvt Ltd · 2018. 4. 20. · Architects & Engineers 859, Banjara...

20
(WHOLLY OWNED SUBSIDIARY OF SBI) INVITES TENDERS ON BEHALF OF CAG BRANCH, HYDERABAD IN A SINGLE BID SYSTEM THROUGH E-TENDERING PROCESS INTERIOR Contractors who are on the panel of SBI, Hyderabad Circle, (LHO) in the appropriate category AND the existing interior contractor, who is executing the interior work at CAG branch are only eligible (Contractors should submit proof of the same) FOR PROPOSED INTERIOR WORKS (ADDITIONAL WORKS) FOR SBI CAG HYDERABD BRANCH AT NSL-ICON BUILDING, 8-2-684/21/A (FF & SF), ROAD NO.12, BANJARA HILLS, HYDERABAD Last date of submission of E-Tender: 3.00 P.M (IST) on 30/4/2018 Opening of E Tenders: 3.30 P.M (IST) on 30/4/2018 CONSULTANTS : MURTY & MANYAM Architects & Engineers 859, Banjara Avenue, (6-3-597/A/12/A/6B), Hyderabad-500004 040-23318020 SR VICE PRESIDENT SBI INFRA MANAGEMENT SOLUTIONS PVT LTD, HYDERABAD. 040-23466310 SBI Infra Management Solutions Pvt Ltd

Transcript of SBI Infra Management Solutions Pvt Ltd · 2018. 4. 20. · Architects & Engineers 859, Banjara...

Page 1: SBI Infra Management Solutions Pvt Ltd · 2018. 4. 20. · Architects & Engineers 859, Banjara Avenue, (6-3-597/A/12/A/6B), Hyderabad-500004 040-23318020 SR VICE PRESIDENT SBI INFRA

(WHOLLY OWNED SUBSIDIARY OF SBI)

INVITES TENDERS ON BEHALF OF CAG BRANCH, HYDERABAD

IN A SINGLE BID SYSTEM THROUGH E-TENDERING PROCESS

INTERIOR Contractors who are on the panel of SBI, Hyderabad Circle, (LHO) in the

appropriate category AND the existing interior contractor, who is executing the

interior work at CAG branch are only eligible (Contractors should submit proof of

the same)

FOR

PROPOSED INTERIOR WORKS (ADDITIONAL WORKS) FOR SBI CAG

HYDERABD BRANCH AT NSL-ICON BUILDING, 8-2-684/21/A (FF & SF), ROAD

NO.12, BANJARA HILLS, HYDERABAD

Last date of submission of E-Tender: 3.00 P.M (IST) on 30/4/2018

Opening of E Tenders: 3.30 P.M (IST) on 30/4/2018

CONSULTANTS : MURTY & MANYAM

Architects & Engineers

859, Banjara Avenue,

(6-3-597/A/12/A/6B),

Hyderabad-500004

040-23318020

SR VICE PRESIDENT

SBI INFRA MANAGEMENT SOLUTIONS PVT LTD,

HYDERABAD.

040-23466310

SBI Infra Management Solutions Pvt Ltd

Page 2: SBI Infra Management Solutions Pvt Ltd · 2018. 4. 20. · Architects & Engineers 859, Banjara Avenue, (6-3-597/A/12/A/6B), Hyderabad-500004 040-23318020 SR VICE PRESIDENT SBI INFRA

EMPLOYER CONTRACTOR 1

INDEX

1. NOTICE INVITING TENDER (NIT) ......................................................................................... 2

2. TENDER FORM .......................................................................................................................... 3

3. INSTRUCTIONS TO CONTRACTORS..................................................................................... 5

4. NOTICE TO CONTRACTOR ..................................................................................................... 6

5. ARTICLES OF AGREEMENT ................................................................................................. 10

6. APPENDIX TO GENERAL CONDITIONS OF CONTRACT ................................................ 12

Page 3: SBI Infra Management Solutions Pvt Ltd · 2018. 4. 20. · Architects & Engineers 859, Banjara Avenue, (6-3-597/A/12/A/6B), Hyderabad-500004 040-23318020 SR VICE PRESIDENT SBI INFRA

EMPLOYER CONTRACTOR 2

1. NOTICE INVITING TENDER (NIT)

Online E-Tenders are invited from competent INTERIOR Contractors who are on the banks

approved panel of Hyderabad LHO in the appropriate category as per eligibility for

PROPOSED INTERIOR WORKS (ADDITIONAL WORKS) AT CAG BRANCH AT

NSL-ICON BUILDING, 8-2-684/21/A(FF & SF), ROAD NO.12, BANJARA HILLS,

HYDERABAD by SBI Infra Management Solutions Pvt Ltd (SBIIMS)

1 Estimated cost of work Rs.26.48 Lakhs (Excluding GST) GST will be paid as

applicable.

2 Time of Completion 30 Days

3 Date of download of tender

documents form Bank’s web

site http://www.sbi.co.in

under “procurement news”

From 20/4/2018 to 30/4/2018

4 Last date and time for

submission of online e-tender

Date :30/4/2108 by 3.00 P.M at https://sbi.abcprocuremcom

5 Earnest Money Deposit

(EMD)

Rs.25,000/- (Rupees Twenty Five Thousand only) in favour

of ‘Senior Vice President, SBI Infra Management Solutions

Pvt Ltd, Hyderabad’

6 Tender Cost Rs 500/- favouring ‘Senior Vice President, SBI Infra

Management Solutions Pvt Ltd, Hyderabad.’

7 EMD and Tender Cost to be

submitted at:

EMD and Tender cost amount DD should be submitted

physically at SBI Infra Management Solutions Pvt Ltd,

Office, 3rd Floor, SBI LHO Building, Bank Street, Koti,

Hyderabad – 500 095 before 30/4/2018 by 3.00 pm

Contact : Sr.Vice President / Vice President

040-23466310, [email protected]

8 Date and Time of opening of

e-Tenders : (Technical Bid

and Price Bid)

Date 30/4/2018 at 3.30 P.M (IST) at above office address.

E-tenders of those firms / contractors who do not submit

EMD shall be rejected

Representatives of Bidder may be present during opening of

Bids. However Bids would be opened even in the absence

of any or all the bidder’s representatives.

9 Bidder Contact Details Bidder to provide following information

1) Name of the Company

2) Contact Person

3) Mailing address with Pincode

4) Telephone Number and Fax Number

5) Mobile Number and email

10 Agency for arranging online

bidding

M/s e-procurement Technologies Limited, Ahmedabad. E-

tendering guidelines may be obtained from Mr.Yashraj

Sinha Rathod, Business Development Executive. Phone :

079-40016815 / 24 / 26 / 14, Cell : 9879996111

Email : [email protected]

The SBIIMS reserves the right to accept or reject any or all the tenders without assigning

any reason whatsoever.

Page 4: SBI Infra Management Solutions Pvt Ltd · 2018. 4. 20. · Architects & Engineers 859, Banjara Avenue, (6-3-597/A/12/A/6B), Hyderabad-500004 040-23318020 SR VICE PRESIDENT SBI INFRA

EMPLOYER CONTRACTOR 3

2. TENDER FORM

PROJECT: PROPOSED INTERIOR WORKS (ADDITIONAL WORKS) FOR SBI

CAG OFFICE AT NSL- ICON BUILDING, 8-2- 684/21A (FF & SF) ROAD NO 12

BANJARA HILLS HYDERABAD.

REF : INTERIOR WORKS

Dear Sirs,

I/We the undersigned have carefully gone through and clearly understood after visiting the

site and the Tender drawings and tender documents comprising of the tender form, Notice to

contractors, and conditions for building contract, Special Conditions, Specifications and

Schedule of Probable quantities and Draft Agreement prepared by your Architects

M/s MURTY & MANYAM, Architects & Engineers, Hyderabad.

I/We do hereby undertake to execute and complete the whole or part of the work (as desired

by you) at the respective rates which/I/We have quoted for the respective items of the

Probable Bill of Quantities and at which rate the items specified amount to approx around

Rs.26.48 Lakhs (GST Extra)

In the event of this Tender being accepted I/We agree to enter into an agreement as and

when required and execute the contract according to your form of Agreement, within a

month of receipt of work order, in default thereof, I/We do hereby bind my-self/ourselves to

forfeit the aforesaid initial security deposit.

I/We further agree to complete the work covered in the said schedule of quantities within

1 month from the 7th day reckoned from the date of issue of the work order to commence

the work or on which contractor is instructed to take possession of the site, whichever is

later.

I/We agree not to employ Sub-contractors other than those that may be specifically

approved by your Architects for this contract work.

I/We agree to pay the Government, General, Excise and Octroi duties, Insurance, labour

cess and all other taxes including GST etc., as the prevailing from time to time, on such

items for which the same are leviable, and to get the work, workers, employees (of

contractor, Architect & Employer) engaged on the work at site and all materials at site for

execution of the work shall be insured comprehensive insurance including fire/accidents/

rain/ floods/riots/CAR policy (contractor’s all risk insurance policy) and the insurance shall

cover the period from date of start of work to date of actual completion of work plus 3

months. In case part work is taken over by the Employer before final completion of the

whole work, such parts may not be covered by the insurance from the date of taking over

that part of work by the Employer. Draft Insurance deed will be got vetted by the Architect,

before obtaining the same. All the rates quoted by me/ us are inclusive of the same in full

and nothing extra shall be claimed anytime on account of any of these.

Page 5: SBI Infra Management Solutions Pvt Ltd · 2018. 4. 20. · Architects & Engineers 859, Banjara Avenue, (6-3-597/A/12/A/6B), Hyderabad-500004 040-23318020 SR VICE PRESIDENT SBI INFRA

EMPLOYER CONTRACTOR 4

I/We agree to pay Income tax, to be deducted at source, at the rate prevailing from time to

time on the Gross value of the work done, and the rates quoted by me/we are inclusive of

same.

I/We agree to pay seigniorage fee to be deducted at source, at the rates prevailing from time

to time as per Telangana Govt. Act, as amended and rates quoted by me/us are inclusive of

the same.

Yours faithfully,

Contractor’s Signature

Address: Date:

___________________________

___________________________

___________________________

___________________________

Page 6: SBI Infra Management Solutions Pvt Ltd · 2018. 4. 20. · Architects & Engineers 859, Banjara Avenue, (6-3-597/A/12/A/6B), Hyderabad-500004 040-23318020 SR VICE PRESIDENT SBI INFRA

EMPLOYER CONTRACTOR 5

3. INSTRUCTIONS TO CONTRACTORS

1. This tender is for the “INTERIOR Works (Additional Works)for STATE BANK OF

INDIA, CAG OFFICE NSL-ICON BUILDING, 8-2-684/21/A(FF & SF), ROAD

NO.12, BANJARA HILLS, HYDERABAD

In their own interest the contractors are advised to use their own specific seals and

desist from using currency coins for the purpose. Tenders with incomplete or broken

seals are liable to be rejected, the matter solely resting at the discretion of the

EMPLOYER / ARCHITECTS. If a Contractor does not quote for one or more items,

the Tender will be considered as incomplete and will be rejected.

2. Clients / Architects reserve to itself the right to accept or reject any tender without

assigning any reason for doing so and does not bind itself to accept the lowest or any

other tender.

3. General Specifications are for guidance only. The latest ISI codes and Specifications

and mode of measurements will be referred to during execution.

4. The term “THE ARCHITECTS” in the said conditions shall mean M/s Murty &

Manyam, Architects & Engineers, 859, Banjara Avenue, (6-3-597/A/12/A/6B),

Hyderabad-500004

5. Employer or Client shall mean Sr.Vice President, State Bank of India Infra

Management Solutions Pvt Ltd

6. Tenders are to be uploaded directly to M/s e-procurement Technologies Limited.

E-mail : [email protected]

Page 7: SBI Infra Management Solutions Pvt Ltd · 2018. 4. 20. · Architects & Engineers 859, Banjara Avenue, (6-3-597/A/12/A/6B), Hyderabad-500004 040-23318020 SR VICE PRESIDENT SBI INFRA

EMPLOYER CONTRACTOR 6

4. NOTICE TO CONTRACTOR

ADDRESS:

_________________________

_________________________

_________________________

PROJECT : ADDITIONAL INTERIOR WORKS FOR SBI CAG OFFICE AT NSL

ICON BUILDING, 8-2-684/21A ( FF & SF ) ROAD NO 12 BANJARA

HILLS HYDERABAD .

REF : INTERIOR WORKS (ADDITIONAL WORKS)

Dear Sirs,

1. Already main work is in progress, you have to coordinate with the main

Contractor in execution. Please visit the site before quoting.

2. On behalf of our clients, M/s SBIIMS Hyderabad, we have pleasure in inviting you

to tender for the aforesaid work.

3. The scope of work broadly as given below is for Proposed Interiors (Additional

works) for SBI CAG office at NSL ICON Building, Road no 12 Banjara hills

Hyderabad.

4. Tender Documents can be downloaded from website from 20/4/2018 to 30/4/2018.

5. Sealed tenders in the prescribed form, in a sealed envelope should be addressed to

the Sr.Vice President SBIIMS, 3rd floor, LHO building, Bank street Hyderabad and

superscribed tender for the Proposed Interior works (Additional works) for SBI

CAG office at NSL ICON Building , Road no 12 Banjara hills Hyderabad.

6. And to be submitted to the Sr.Vice President SBIIMS, 3rd floor, LHO building, Bank

street Hyderabad not later than 3.00 p.m on 30/4/2018. Tender will be opened on

the same day at 3.30 p.m in the presence of the contractors, who may be present.

6. The tenderer must obtain for himself, on his own responsibility and at his own

expenses, all the information which may be necessary for the purpose of filling this

tender and for entering into a contract for the execution of the same and must

examine the drawings and inspect the site of the work and acquaint himself with all

local conditions and matters pertaining thereto.

7. Each of the tender documents page is required to be signed by the person or persons

submitting the tender in token of his/their having acquainted himself/themselves

with the General conditions etc., as laid down. Any tender with any of the

documents not so signed will be rejected.

Page 8: SBI Infra Management Solutions Pvt Ltd · 2018. 4. 20. · Architects & Engineers 859, Banjara Avenue, (6-3-597/A/12/A/6B), Hyderabad-500004 040-23318020 SR VICE PRESIDENT SBI INFRA

EMPLOYER CONTRACTOR 7

8. The tender documents must be filled in English and all the entries must be made by

hand and written in ink. If any of the documents are missing or un-signed, the

tender shall be considered invalid.

9. Each and every one of all erasures and additions/alterations made, while filling the

tender, must be attested by initials of the tenderer. Over-writing of figures must be

attested by initials of the tenderer. Overwriting of figures is not permitted. Failure

to comply with either of these conditions will render the tender void. After

submission of the tender no advice or any change in rate or conditions will be

entertained. All the rates should be quoted both in figures and words. In-case of

any discrepancy in rates quoted in words/figures and the amounts, the rate quoted in

words shall be taken as final and binding.

10. The tender shall be valid for a period of 90 days from the date of opening the

Envelope No.1

11 TOTAL SECURITY DEPOSIT: shall comprise of:

a. Earnest Money deposit

b. Initial Security deposit

c. Retention money

11.1 The intending tenderer shall deposit with SBIIMS, HYDERABAD, by Demand

Draft a sum of Rs.25,000/- favouring “Sr.Vice President, SBIIMS, Hyderabad” as

the Earnest Money, as a guarantee of good faith, which amount shall be forfeited as

liquidated damages, in the event of any evasive/direct refusal or delay in starting the

work and or signing the contract. The deposit of the unsuccessful tenderers will be

returned, without interest, immediately after a decision is taken regarding the award

of the contract. The Earnest money of the successful tenderer will be adjusted

towards Security Deposit. A tender not accompanied by Earnest money deposit will

not be considered. No concession will be made to Public sector companies from

payment of earnest money deposit.

11.2 The successful tenderer will have to pay further sum equivalent to 2% of his contract

value, less EMD already paid, as initial Security Deposit (ISD) by means of a

D.D./Banker’s cheque in favour of “Sr Vice President,SBIIMS HYDERABAD”

within 14 days from the date of issue of work order to commence work. The EMD

and Initial Security deposit thus paid shall be held by the State Bank of India as

Security deposit, for due execution and fulfillment of the contract, till the

completion of the work and defect liability period in all respects and shall not bear

any interest.

11.3 Together with the money paid under clause 11.1 & 11.2 above, further retention of

10% of the value of the work done will be deducted from every running bill, till total

retention, including EMD and initial SD paid earlier, comes to 5% of the contract

value, and same shall be held by the Bank as Total Security Deposit. On the

Architect’s certifying the completion of work, 50% of the total security deposit shall

be released to the contractor along with the final certificate of payment, and the

balance amount will be retained in the manner stated elsewhere for a further period

of twelve months after the completion date recorded in completion certificate, issued

Page 9: SBI Infra Management Solutions Pvt Ltd · 2018. 4. 20. · Architects & Engineers 859, Banjara Avenue, (6-3-597/A/12/A/6B), Hyderabad-500004 040-23318020 SR VICE PRESIDENT SBI INFRA

EMPLOYER CONTRACTOR 8

by the Architects and agreed to by the Bank. Also refer condition 23(ii) on Page 7

of Volume 1.

12. Within 15 days of the receipt of intimation from the Architects of the acceptance of

his/their tender, the successful tenderer shall be bound to sign an agreement, on a

stamp paper in accordance with the Draft Agreement and conditions of contract

attached herewith, but the work order or the written acceptance of a tender by the

Employer will constitute a binding agreement between the Employer and the person

tendering whether such formal contract is or not signed by the contractor.

13. All compensation or other sums of money payable by the contractors to the clients,

under the terms of this contract, may be deducted from the Security Deposit or from

any sum that may be or may become due to the contractor on any account

whatsoever, and in the event of the Security deposit being reduced by reasons of any

such deductions, the contractor shall within 15 days of being asked to do so make

good in cash or cheque, any sum which have been deducted from his security

deposit.

14. The contractor shall arrange for the procurement of all the materials at site as

required and directed, and store them in their godown at the site of construction, and

also bear all the expense incurred in connection therewith, including payment of

taxes, octroi, storage, watch and ward etc.

15. The rates quoted by the Contractor shall include all eventualities, such as heavy rain,

sudden floods, accidents, fire, riots etc., which may cause damage to the executed

work or which may totally wash out the work. Until the completion certificate is

issued to the Contractors, neither the Architect nor the clients will be responsible for

such damage or wash out of the construction work.

16. Time is the essence of the contract. The work should be completed within 1 month,

from the date of commencement. The date of commencement shall be

a) Within 7 days from the date of issue of Work Order.

The successful contractor will have to give a CPM/PERT chart of various activities

of work to be done so that the work gets completed within the stipulated time. The

chart shall be submitted within 7 days from the date of acceptance of the tender.

17. If the contractor fails to complete the work by the Scheduled date of completion or

within any sanctioned extended time, he will have to pay liquidated damages at the

rate of ½% of contract amount for each week of delay the work remains incomplete

beyond the completion (Original/extended date), subject to maximum of 5% of the

contract value (without extra items) as per clause 31 of the General conditions of

contract.

18. The quantities contained in the Schedule are only indicative. The work as actually

carried out and done will be measured up from time to time, for which payment will

be made subject to the terms and conditions of contract.

Page 10: SBI Infra Management Solutions Pvt Ltd · 2018. 4. 20. · Architects & Engineers 859, Banjara Avenue, (6-3-597/A/12/A/6B), Hyderabad-500004 040-23318020 SR VICE PRESIDENT SBI INFRA

EMPLOYER CONTRACTOR 9

19. The unit prices shall be deemed to be fixed prices. In case of extra items, a record of

labour charges paid shall be maintained and shall be presented every month for

extra/substituted items regularly to the Architects for checking. The settlement will

be made based on figures arrived at jointly and taking into account unit prices of

items of work mentioned in the contract assigned to the successful tenderers. In

case, of extra items, where similar or comparable items are quoted in the tender,

extra rates shall invariably be based on those tender rates to the extent reasonable.

20. SBIIMS does not bind themselves to accept the lowest or any tender and reserve to

themselves the right to accept or reject any or all tenders, either in whole or in part,

without assigning any reason whatsoever for doing so.

21. No employee of the bank is allowed to work as a contractor for a period of two years

of his retirement from bank service, without the previous permission of the bank.

This contract is liable to be cancelled, if either the contractor or any of his

employees is found at any time to be such a person who had not obtained the

permission of the bank as aforesaid before submission of the tender or engagement

in the contractor’s service.

22. The tenderer, apart from being a competent contractor must associate himself with

agencies of the appropriate class who are eligible to tender for (1) Electrical (2) Air-

conditioning works, (3) Audio Video, (4) Interiors (fixed furniture), as the case

maybe.

23. Electricity and water charges shall be borne by the Contractor.

23. Release of security deposit:

i) 50% of the total security deposit will be released along with the final

certificate of payments as stipulated under para 9 on page 12 of Volume I,

Appendix to General Conditions of contract,

ii) Balance 50% of Retention money will also be released as noted under(i)

above, subject to submission of a Bank Guarantee, to the satisfaction of SBI

for an equivalent amount. This Bank Guarantee shall be valid upto

completion of defects/removal liability period plus 3 months.

Page 11: SBI Infra Management Solutions Pvt Ltd · 2018. 4. 20. · Architects & Engineers 859, Banjara Avenue, (6-3-597/A/12/A/6B), Hyderabad-500004 040-23318020 SR VICE PRESIDENT SBI INFRA

EMPLOYER CONTRACTOR 10

5. ARTICLES OF AGREEMENT

ARTICLES OF AGREEMENT made the ______________ day of __________ 2018

between ________________________________________________________________

_______________________________________________________________________

of _____________________________________________________________________

_______________________________________________________________________

(hereinafter called the “Employer”) of the one part and ___________________________

of ________________________________________ (hereinafter called “The Contractor”)

of the other part, where as the Employer is desirous of getting the work of

“______________________________________________________________________”

executed and has caused drawings, conditions of contract, specifications and schedule of

quantities etc., describing the works prepared by M/s MURTY & MANYAM, Architects &

Engineers, Hyderabad.

AND WHEREAS the SAID DRAWINGS numbered as per list attached inclusive of and

the conditions of contract, specifications and schedule of quantities etc., have been signed

by or on behalf of the parties hereto.

AND WHEREAS THE CONTRACTOR has agreed to execute upon and subject to the

conditions set forth in the Schedule hereto (hereinafter referred to as “Said Conditions”) the

works shown upon the said drawings and described in the same specifications and included

in the said schedule of quantities for such sum as may be ascertained to be payable in terms

of the Bills of Quantities, and which sum is estimated to be Rs. ____________

(Rupees____________________________________________________ (hereinafter

referred to as “Said Contract Amount”).

NOW IT IS HEREBY AGREED AS FOLLOWS:

1. In consideration of the said sum to be paid at the times and in the manner set forth in

the said conditions, the contractor shall upon and subject to the said conditions,

execute and complete the work shown in the said drawings and described in the said

specifications.

2. The Employer shall pay the contractor the said sum or such sums as shall become

payable hereunder at the times and in the manner specified in the said conditions.

3. The term “Architect” in the said conditions shall mean the said M/s Murty &

Manyam, Architects & Engineers, or in the event of their ceasing to be the Architect

for the purpose of this contract, such other person as shall be nominated for that

purpose by the Employer , not being a person to whom the contractor shall object for

reasons considered to be sufficient by the Arbitrator mentioned in the said

conditions provided always that no persons subsequently appointed to be the

Architect under this contract shall be entitled to disregard or over-rule any previous

decision or approval or direction given or expressed by the Architect for the time

being.

4. Tender documents containing work order Notice to the Contractor, Conditions of

Contract, Appendix thereto, Special Conditions of Contract, Specifications and

Page 12: SBI Infra Management Solutions Pvt Ltd · 2018. 4. 20. · Architects & Engineers 859, Banjara Avenue, (6-3-597/A/12/A/6B), Hyderabad-500004 040-23318020 SR VICE PRESIDENT SBI INFRA

EMPLOYER CONTRACTOR 11

Schedule of Quantities with the rates entered therein, shall be read and studied as

forming part of this agreement and the parties hereto shall respectively abide by and

submit themselves to the conditions and stipulations and perform the agreement on

their part respectively in such conditions contained.

5. The contract is neither a fixed lump sum contract or a piece work contract, but is a

contract to carry out work in respect of the entire works to be paid for according to

actual measured quantities, including variations from BOQ at the rates contained in

the Schedule of rates and Probable bill of quantities or as provided in the said

conditions.

6. The Employer through the Architect, reserves to himself the right of altering the

drawings and natures of the work, of adding/substitution to or omitting any items of

work or having portions of the same carried out through alternate agencies without

prejudice to this contract.

7. Time shall be considered a the essence of this agreement and the contractor hereby

agrees to commence the work soon after the site is handed over to him but within 15

days reckoned from the date of issue of work order to execute the work, as provided

for in the said conditions and complete the entire work in 1 month subject to

nevertheless to the provisions for extension of time.

8. This agreement and contract shall be deemed to have been made in Hyderabad and

any questions or dispute rising out of or in any way connected with this Agreement

and Contract shall be deemed to have arisen in Hyderabad and only the courts in

Hyderabad shall have jurisdiction to determine the same. The limitation period will

be 90 days from the date of dispute having arisen.

AS WITNESS our hand this _____________ day of ____________ 2018

Signed by the said in the presence of:

WITNESS : SIGNATURE

NAME :

ADDRESS : EMPLOYER

WITNESS : SIGNATURE

NAME :

ADDRESS :

Page 13: SBI Infra Management Solutions Pvt Ltd · 2018. 4. 20. · Architects & Engineers 859, Banjara Avenue, (6-3-597/A/12/A/6B), Hyderabad-500004 040-23318020 SR VICE PRESIDENT SBI INFRA

EMPLOYER CONTRACTOR 12

6. APPENDIX TO GENERAL CONDITIONS OF CONTRACT

1. Earnest Money Deposit (EMD) : Rs. 25,000/-

2. Initial Security Deposit (ISD) : 2% of contract value including

EMD.

3. Period of completion : 1 month

4. Defects Liability period : 12 months after completion as

recorded in the completion certificate.

5. Agreed Liquidated Damages : ½% of contract amount per week of

delay subjected to a maximum of 5% of

contract value.

6. Period of final measurement : one month after completion as

recorded in the completion certificate.

7. Minimum value of work to be : Minimum Rs.8.00 Lakhs

Executed for issue of interim

Certificates for making payment

8.a) Retention money from each bill : 10% of gross value of each interim

bill, subject to 8(b) below.

b) Total retention money including : 5% of the contract value.

Earnest money and initial security

Deposit

9. Release of Security deposit after : 50% of the total security to be

Virtual completion. released along with final certificate of

payment, but only after removing all

his materials, equipment, labour,

huts/force, temporary sheds/stores, all

his installations, machinery etc., from

the site. Balance payment to be

released on submission of Bank

Guarantee on any Scheduled Bank,

Other than SBI, in the prescribed

manner and valid till the completion of

defects liability period of 12 months

plus 3 months.

Page 14: SBI Infra Management Solutions Pvt Ltd · 2018. 4. 20. · Architects & Engineers 859, Banjara Avenue, (6-3-597/A/12/A/6B), Hyderabad-500004 040-23318020 SR VICE PRESIDENT SBI INFRA

EMPLOYER CONTRACTOR 13

10. Period for honouring certificate : 15 working days from date of

Architects certificate of payment for

interim bills and 45 working days for

final certificate.

11. Price Variation Adjustment : NO PVA Clause

WITNESS :

DATE : SIGNATURE OF THE CONTRACTOR WITH DATE

Page 15: SBI Infra Management Solutions Pvt Ltd · 2018. 4. 20. · Architects & Engineers 859, Banjara Avenue, (6-3-597/A/12/A/6B), Hyderabad-500004 040-23318020 SR VICE PRESIDENT SBI INFRA

EMPLOYER CONTRACTOR 14

8. LIST OF MATERIALS OF APPROVED BRAND AND THEIR

MANUFACTURERS

1. Vitrified Tiles : Kajaria / Somany / H.R. Johnson / Nitco

2. Ceramic Wall Tiles : Kajaria / Somany / H.R. Johnson / Nitco

3. Ceramic Floor Tiles (antiskid): Kajaria / Somany / H.R. Johnson / Nitco

4. False Flooring : Unifloor / Flexi Access Floor / Armstrong

5. Wooden Laminated Flooring : Pergo / Tiles / Xylos, / Armstrong / Vista

6. Aluminum Fittings : Jindal / Hindalco / MAAN

7. Aluminum Extrusion Sections: Jindal / Hindalco / MAAN

8. Plywood BWR : Century / Green / Archid / Kit ply / Anchor /

Sonear

9. Laminates (1.00mm thik) : Royal touch / Century / Green Lam / Sonear

10. Veneer : Century / Durian / Timex / Sonear / Archid

Merino

11. Drawer Sliding Fittings : Earl Bihari (EBCO) / Godrej / Hettich

12. Floor Spring / Door Closure : Godrej / Hardwyn / Hyper

13. Triple Computer Monitor : Vivo / Dell / HP

Mount / stand arm

14. Flush Door : Century / Anchor / Archid / Kit ply / Sonear

15. Texturized Interior Paint : Sandtex Matt / Dulux / Berger

16. Readymade Computer Drawer: Ebco / Hettich / Burn

17. Paints : Asian / Nerolac / Berger / Dulex

a) Cement Paint : Snowcem / Surfacem / Durocem

b) Synthetic Enamel Paint : Asian / Nerolac / Berger / Dulex

c) Acrylic Emulsion Paint : Asian / Nerolac / Berger / Dulex

(Interior and Exterior)

18. Glazing : Modi float Glass, Triveni Glass Ltd, Indo

Asahi Glass Co Ltd

19. Cement : Grade 43 / 53 of L & T, A.C.C, Rajashree,

Ambuja

Page 16: SBI Infra Management Solutions Pvt Ltd · 2018. 4. 20. · Architects & Engineers 859, Banjara Avenue, (6-3-597/A/12/A/6B), Hyderabad-500004 040-23318020 SR VICE PRESIDENT SBI INFRA

EMPLOYER CONTRACTOR 15

20. Fibre Mineral False Ceiling : Armstrong / Indian Gypsum Board / Gypro

21. ACP Panels : Aluco bond / ALU Décor / Alstrong / Alstone

22. Acrylic Sheets : Sanmati Acrylics / Acrylic Sheet India / Acry

Plus

23. Vertical / Roller Blinds : Vista / MAC / DACK

24. Leatherite : BHOR Europa/Royal touch ever last as

mentioned in specification

25. Melamine polish : ICI or Asian Paints

Page 17: SBI Infra Management Solutions Pvt Ltd · 2018. 4. 20. · Architects & Engineers 859, Banjara Avenue, (6-3-597/A/12/A/6B), Hyderabad-500004 040-23318020 SR VICE PRESIDENT SBI INFRA

EMPLOYER CONTRACTOR 16

Proposed Interior works for SBI CAG office at NSL-ICON Building, 8-2-684/21A (FF&SF), Road no 12, Banjara Hills, Hyderabad

B O Q FOR INTERIORS - ADDITIONAL WORKS

Sn Description Unit Qty Rate (INR)

Amount (INR)

1 Providing and fixing Gypboard false ceiling system coving and for column capitals in different levels firmly fixed on GI frame work section of M/s India Gypsum Ltd as Detailed given. Parameter channel (MF6A) 20x27mm all along the wall fixed with the help of nylon sleeves and screws @ 600mm c/c, Intermediate channel (MF7) 15x45x0.9mm at 1200mm c/c, ceiling angle 25x10x0.55mm thick fixed to soffit with GI cleat and steel expansion anchor fasteners, ceiling channel MF5 80x26x0.5mm @ 450c/c finishing with jointing compound in 3 layers covering upto 150mm on both sides of joint and two coats of primer suitable for board, all as per manufacturer's specification. Note: Rate shall include making cut out/opening for fixing light fittings with necessary frame work, wastages, finishing all etc. Complete no deduction in measurement will be made for openings not exceeding 0.4Sqm and no extra measurement will be made for forming such opening. Paint quantity will be paid in respected tender item.

SQM 500.00

2 Providing and fixing wall paneling with 9 mm thick BWR IS-303 ply and 4mm thick natural wood veneer (price Rs.150/Sft) finish as in required pattern and design intend including melamine polishing. The GI framework shall be made out of 50mm metal studs (0.5mm thick having equal flanges of 34mm made out of G.I. steel) the vertically mounted metal studs shall have slots for electrical wiring placed at 610mm C/C in 50mm floor and Stud (0.5mm thick having equal flanges 32mm made out of G.I. steel) complete in all respect as approved by Engineer In Charge/Architect. ( GM room )

Sqm 50.00

3 Providing and fixing Wall Paneling on 9 mm thick BWR ply IS-303 with 1mm Laminate as per given design intend. The GI. framework shall be made out of 50mm metal studs (0.5mm thick having equal flanges of 34mm made out of GI.steel) the vertically mounted metal studs shall have slots for electrical wiring placed at 610mm C/C in 50mm floor and stud (0.5mm thick having equal flanges 32mm made out of GI. steel) complete in all respect as approved by Engineer In Charge/Architect. (DGM Room )

SQM 100.00

4 Providing and fixing Acoustic Paneling with 25mm thick ARMSTRONG SOUNDSCAPE PANEL 600x600mm size on existing partition in given pattern complete as per given directions.( conference room )

SQM 7.00

Page 18: SBI Infra Management Solutions Pvt Ltd · 2018. 4. 20. · Architects & Engineers 859, Banjara Avenue, (6-3-597/A/12/A/6B), Hyderabad-500004 040-23318020 SR VICE PRESIDENT SBI INFRA

EMPLOYER CONTRACTOR 17

5 Providing and fixing 8/9mm thick Glowood (Decorative MDF board) paneling on existing plywood at all heights, finished with PU Paint including base as per design/details complete as per Engineer In Charge/Architect.

SQM 20.00

6 Providing and fixing Leatherette Paneling on conference room existing partition in given pattern complete in all respect as per details and as directed by the Engineer In Charge/Architect. (GM table) Basic rate Rs 180/-sft

SQM 15.00

7 Providing and fixing for 4.0mm thick Veneer on existing full height partitions of conference room ( Inside ) and dining pantry of GM room from inside complete as per direction Engineer In Charge/Architect.

SQM 160.00

8 Providing and fixing wooden ceiling of made out of 18mm thick BWR ply IS-303, wooden margin, second class teak wood framing /neccessary angular frame for fixing hanged from the soffit of the RCC slab and finished with 4.0mm thick veneer as approved and as per design intend including melamine polishing complete in all respect as approved by Engineer In Charge/Architect.

SQM 50.00

9 Providing and fixing 50mm thick Glass Wool (Twiga make) in conference room and GM partition in polythene wraps panels to create acoustics complete in all respect as approved by Engineer In Charge/Architect.

SQM 120.00

10 Providing and fixing 4mm thick toughened Lacquered Glass in approved colour on existing partition, complete in all respect as approved by Engineer In Charge/Architect.

SQM 20.00

11 Providing and fixing Conference tables of overall size 24000x750x750mm, ( 79 '-0" in length )made out of 18mm thick BWR ply for verticals equally spaced and 38 mm thick table top with 75 mm teak moulding with 4 mm thick steam beach veener with pu polish IS-303, wooden margin and finished with and MDF frame with 12mm Thick Acrylic Surface inside including melamine polishing on vertical surface and 1.0mm thick high gloss PU on table top and pop up boxes as per given design, complete in all respect including the provision for wire manager as approved by Engineer In Charge/Architect as shown in the drawing

Nos 1.00

Page 19: SBI Infra Management Solutions Pvt Ltd · 2018. 4. 20. · Architects & Engineers 859, Banjara Avenue, (6-3-597/A/12/A/6B), Hyderabad-500004 040-23318020 SR VICE PRESIDENT SBI INFRA

EMPLOYER CONTRACTOR 18

12 Providing and fixing GM 's Table comprising of free standing table size 2700x2100x450mm with side unit size 1200x450mm with 38 mm thick bwr ply with 4 mm thick veenering, 3drawer pedestal size 695 (H)x380(W)x500(D) mm, Rear unit size 2700x450mm made out of 18mm thick BWR ply IS-303 and finished with wooden margin placed on storage with openable shutters , 4.0mm thick Italian veneer including metal keyboard tray and CPU Trolley, PU polishing top coat 1mm thick and vertical surface with melamine polishing as per given design and powder coated ss fittings including all neccesary hardware , complete in all respect as approved by Engineer In Charge/ Architect.

Nos 1.00

13 Labour charges for fixing electrical fixtures ( philips line light series 150x1200 in techzone and baffle ceiling ) in the existing false ceiling including making neccesary connections etc complete

Nos 323.00

14 Providing and applying two coats of Royal plastic emulsion paint of approved brand colour and quality including a coat of primer and two coats of birla wall care putty preparation of surface scaffolding necessary tools and tackles complete for internal walls at all heights as per the directions of bank/architect

SQM 100.00

15 Supplying and fixing of 30 mm thick flush door commercial alround teak wood lipping of 30x25 mm and with all neccesary SS fittings locks ,hinges, knob and hydraulic door closure of approved make tools and tackles labour complete finished item of work as per the directions of Bank /Architect ( for GM 's pantry room 0

SQM 3.00

16 Labour charges for fixing Techzone false ceiling of size 600x1200 and making good etc complete in conference room ( Tiles will be supplied )

SQM 170.00

17 Providing etching design of any thickness on glass partitions as per the design and as directed by Engineer incharge. Basic rate Rs 30/-sft

SQM 50.00

18 closing of window in GMS cabin: Providing and cloisng the existing glazing window with 9 mm thiply with necessary gyp sections etc complete

SQM 5.00

CONFERENCE TABLE ACCESSORIES

Page 20: SBI Infra Management Solutions Pvt Ltd · 2018. 4. 20. · Architects & Engineers 859, Banjara Avenue, (6-3-597/A/12/A/6B), Hyderabad-500004 040-23318020 SR VICE PRESIDENT SBI INFRA

EMPLOYER CONTRACTOR 19

1 Supply and fixing of Pressing type Pop up stainless steel Modular 6A, 3Pin Socket outlet with switch of 6A rating , Modular Box including fixing screws and necessary interconnections etc complete..(Independant) For Conference table

Nos 15.00

2 Supply and fixing of Pressing type Pop up stainless steel Modular 6/16A, 5Pin Socket outlet with switch of 16A rating , Modular Box including fixing screws and necessary interconnections etc complete..(Independant) For Conference table

Nos 6.00

3 Supply and fixing of Pressing type Pop up stainless steel Modular 3 Nos 6A, 3Pin Socket outlet with one No switch of 16A rating , Modular Box including fixing screws and necessary interconnections etc complete..(Independant) For Conference table (UPS SOCKET)

Nos 6.00

4 Supply and fixing of Pressing type Pop up stainless steel Modular Telephone socket outlet (RJ 11 ) , Modular Box including fixing screws and necessary interconnections etc complete..(Independant) For Conference table (TELEPHONE SOCKET)

Nos 6.00

5 Supply and fixing of Pressing type Pop up stainless steel Modular Data socket outlet (RJ 45 ) , Modular Box including fixing screws and necessary interconnections etc complete..(Independant) For Conference table (DATA SOCKET)

Nos 6.00

6 Supply and fixing of stainless steel 2 mm thick sheet for fixing to conference table for covering of Electrical power sockets includding cuttin,grinding for smooth finish including fixing hinges etc complete.

Sq mtr 2.00

TOTAL

In words

Signature

Name& address of contractor