Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009

Transcript of Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20,...

Page 1: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

Saving YourAsphalt!

36th AnnualRocky Mountain

Asphalt Conference & Equipment ShowFebruary 18-20, 2009

Page 2: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

The Bad News

Page 3: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

The “Good” News

Let’s not get caught off-guard next time!

Page 4: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

The “Bad” News

NaturalDisasters

UnnaturalDisasters

Page 5: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

Five Ways to Save Your Asphalt

• Up the RAP

• Rock the Asphalt

• Thinner Overlays

• The Right Asphalt for the Right Occasion

• Raise the Roof with Shingles

• Perpetuate Asphalt Pavements

Page 6: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

Up the RAP

• Reuse what you have.

• Characterize it like it was any other component of your product.

• Process it properly.

• Advantages– Economics– Environment– Performance

Page 7: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

RAP Guides

Page 8: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

RAP Example

• Virgin mix requires 5.5% AC

• RAP has 4.0% AC

• Use 30% RAP – Reduce virgin AC 1.2%

• RAP Processing - $6.00/ton

• AC price $650/ton – Aggr. price $10/ton

• On 1 ton HMA reduce AC by 0.012 tons

• Reduce aggregate by 0.28 tons

• SAVE $8.80/ton!

Page 9: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

AASHTO Survey of States

• Objectives– Find extent

of RAP usage

– Find the roadblocks to usage

Page 10: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

RAP Use in Base

Allowed

Used

0%10%15%20%25%30%n/a

Page 11: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

RAP Use in Binder

Allowed

Used

0%10%15%20%25%30%n/a

Page 12: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

RAP Use in Surface

Allowed

Used

0%10%15%20%25%30%n/a

Page 13: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

The Survey Says. . .

• We can do more recycling under the existing specs. Need to consider how it’s handled.

• Need to consider availability.• Not much consistency between states on

what’s allowed.• We need to work with agencies to get RAP

percentages increased, especially in surface mixes.

Page 14: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

What is limiting RAP?

• Specification limits Superpave

• Specification limits surface

• Lack of knowledge by specifiers

• Specification limits PMA

• Binder Issues

Page 15: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

Rock the Asphalt!

• Use Large Stone Mixes where possible.

• Larger aggregate mixes need less asphalt to provide the same coating.

• Applications– Heavy duty

pavements– Base mixes

Page 16: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

Surface Area

10”

10”

10”

10”

10”

10” Cube of 1” BallsSurface Area = 3,142 in2

10” Cube of 1/2” BallsSurface Area = 6,280 in2

10”

Page 17: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

Larger Stone Mixes

3.32% 3.07%

3.76%

4.66%

4.21%

2.00%

3.00%

4.00%

5.00%

6.00%

7.00%

9.5 12.5 19 25 37.5

Page 18: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

Large Stone Example

• Compare 1-3/4” mix to 5/8” mix

• LSM uses 1.7% less asphalt

• Save 0.017 tons AC per ton HMA

• Save $11.05 per ton HMA!

Page 19: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

Issues with LSM

• Segregation

• Equipment wear

• Sampling

• Permeability

• Noise

Page 20: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

Thinner Overlays

• If overlay placed to correct functional deficiency (smoothness) rather than structural, consider a thinner overlay.

• Lift thickness related to aggregate size.

• Fine aggregate mixes do not rut more than coarse aggregate mixes. – NCHRP Report 539

Page 21: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

Thin Overlay Example

• Say NMAS/lift is 4• For 12.5 mm mix ~ 50 mm

– AC content 6.0%– 217 lbs/sy = $8.14/sy @ $75/ton

• For 9.5 mm mix ~ 37.5 mm– AC content 6.5%– 163 lbs/sy = $6.93/sy @ $85/ton

• Thinner overlay = 18% less asphalt• Thinner overlay = $1.21/sy less

Page 22: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

When not to use Thin Overlays

• When large NMAS is specified.

• When structural improvement is needed.

Page 23: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

Don’t Be Gauche – Use the Right Asphalt

• Polymer modified asphalt has many uses:– Reduce rutting– Reduce thermal cracking– Reduce fatigue cracking– Improve overall durability

• Can also be misused:– Low volume roads– Overlays of cracked pavements– Base layers

Page 24: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

PMA Economics

• Can be $60 to $80/ton higher than unmodified asphalt

• Can raise HMA price by $4.80/ton

Page 25: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

Raise the Roof with Shingles

• Roofing shingles comprised of:– Polymer modified asphalt– Fiberglass or felt fibers– Grit – angular fine

aggregate– Mineral filler

Page 26: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

Example

• Roofing shingles contain ~ 20% asphalt

• Use 5% shingles in HMA, reduce 1% asphalt

• Reduce 0.01 ton AC/ton HMA

• Reduce cost by $6.50/ton HMA

Page 27: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

Issues with Shingles

• Tear-off shingles require more processing than manufacturing waste.

• Be careful using tear-offs and RAP in same mix. Make sure there is enough virgin asphalt.

• Sizing of shingle particles is important – should be minus ½ inch.

Page 28: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

Not What We’re Looking For!

Page 29: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

Perpetual Pavements

• The sixth of five ways to save asphalt!

• Save asphalt and aggregate over the long term. It’s sustainable.

• Lower Life Cycle Cost

• Lower User Cost

Page 30: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

Concept

Max Tensile Strain

Pavement Foundation

High ModulusRut Resistant Material(Varies As Needed)

Flexible Fatigue ResistantMaterial 75 - 100 mm

40-75 mm SMA, OGFC or Superpave

}100 mmto150 mm

ZoneOf High

Compression

Page 31: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

Perpetual Pavementversus

Conventional Design

0

5

10

15

20

25

0.1 1 10 100 1000

Traffic, ESAL

HM

A T

hic

kne

ss, i

n.

AASHTO High

PerRoad

Page 32: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

Comparison of Structures

Year Activity

0 6” HMA/10” Base

15 Mill 2”/Overlay 3”

25 10% Patching + Mill 2”/Overlay 3”

35 Reconstruct with 8” HMA

50 Mill 2”/Overlay 3”

Year Activity

0 11” HMA/6” Base

18 Mill 2”/Overlay 2”

33 Mill 2”/Overlay 2”

48 Mill 2”/Overlay 2”

50 ------

Conventional Perpetual

Page 33: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

Conventional (tons/lane-mile)

Perpetual Pavement (tons/lane-mile)

Year HMA* Gravel Base* HMA* Gravel Base*

0 2,376 3,168 4,356 1,901

15 1,188

18 792

25 1,426

33 792

35 3,168

48 792

50 1,188

Total 9,346 3,168 6,732 1,901

RAP 2,337 1,683

Aggregate 6,659 3,168 4,797 1,901

Asphalt Binder**

350 252

Page 34: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

Material Usage

0

5000

10000

HM

A, t

ons

Conv. Perp. Pvmt.0

1000

2000

3000

RA

P, t

ons

Conv. Perp. Pvmt.

0

5000

10000

Agg

rega

te,

tons

Conv. Perp. Pvmt. 0

100

200

300

400

Bin

der,

ton

s

Conv. Perp. Pvmt.

Save 32% Save 28%

Save 31% Save 28%

Page 35: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

Costs

Save 44%

Page 36: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

Summary

• Possible to save both asphalt and aggregate.

• Need to apply proper solutions.

• Need to apply engineering principles.

• DON’T SACRIFICE QUALITY!

Page 37: Saving Your Asphalt! 36 th Annual Rocky Mountain Asphalt Conference & Equipment Show February 18-20, 2009.

Other Ideas

• Get Pavement considered as part of solution to road noise – Lower Noise Barriers by 3 ft!

• Use Rubblization with Overlay rather than Remove and Replace PCC – Save 60 to 70% of Total Cost!