Savannah River SMR Deployment with Dwayne Wilson
5
-
Upload
engenuitysc -
Category
Education
-
view
268 -
download
2
description
Transcript of Savannah River SMR Deployment with Dwayne Wilson
![Page 1: Savannah River SMR Deployment with Dwayne Wilson](https://reader036.fdocuments.us/reader036/viewer/2022081821/54be54f04a7959a4548b47af/html5/thumbnails/1.jpg)
![Page 2: Savannah River SMR Deployment with Dwayne Wilson](https://reader036.fdocuments.us/reader036/viewer/2022081821/54be54f04a7959a4548b47af/html5/thumbnails/2.jpg)
SMR Video
2
![Page 3: Savannah River SMR Deployment with Dwayne Wilson](https://reader036.fdocuments.us/reader036/viewer/2022081821/54be54f04a7959a4548b47af/html5/thumbnails/3.jpg)
Savannah River Site SMR Deployment
• Ms. Helen Belencan DOE SMR Pursuit Manager
• Mr. Dwayne Wilson President and CEO, Savannah River
Nuclear Solutions, LLC
• Dr. Terry Michalske Executive Vice President, SRNS, and
Director of Savannah River National
Laboratory
![Page 4: Savannah River SMR Deployment with Dwayne Wilson](https://reader036.fdocuments.us/reader036/viewer/2022081821/54be54f04a7959a4548b47af/html5/thumbnails/4.jpg)
SRS Assets
• Seismically Stable
• Good Soil Conditions
• Groundwater > 100 feet
4
![Page 5: Savannah River SMR Deployment with Dwayne Wilson](https://reader036.fdocuments.us/reader036/viewer/2022081821/54be54f04a7959a4548b47af/html5/thumbnails/5.jpg)
5
Enterprise•SRS