Satisfying ever increasing MBB demands in Beijing Workers’ Stadium A smart stadium case from Huawei in partnership with CUCC Huawei Small Cell Solutions http://scf.io/case/014 Satisfying MBB demands in Workers’ Stadium On-demand capacity expansion enabled by LampSite The Venue: Beijing Workers’ Stadium Beijing’s premium venue for sports & events Seating for 62,000 spectators + VIP areas Total Area150,000 square metres The challenge: Current 2G/3G DAS system has 8 cells. 10 cells required to serve current LTE demand LTE demand will require 59 cells in 3-5 yrs The Solution: Dedicated LTE LampSite solution for the stadium increases data usage and improves user experience Initial 10 cell config to limit interference & HO Soft upgrade to 59 Cell to satisfy MBB demand LampSite provides remote cell splitting for simple, cost effective capacity expansion

Transcript of Satisfying MBB demands in Workers’ Stadium - Small …€¦ · Satisfying ever increasing MBB...

Satisfying ever increasing MBB demands in Beijing Workers’ Stadium A smart stadium case from Huawei in partnership with CUCC Huawei Small Cell Solutions

http://scf.io/case/014

Satisfying MBB demands in Workers’ Stadium On-demand capacity expansion enabled by LampSite

The Venue: •  Beijing Workers’ Stadium •  Beijing’s premium venue for sports & events •  Seating for 62,000 spectators + VIP areas •  Total Area:150,000 square metres

The challenge: •  Current 2G/3G DAS system has 8 cells. •  10 cells required to serve current LTE demand •  LTE demand will require 59 cells in 3-5 yrs

The Solution: Dedicated LTE LampSite solution for the stadium increases data usage and improves user experience

Initial 10 cell config to limit interference & HO

Soft upgrade to 59 Cell to satisfy MBB demand

LampSite provides remote cell splitting for simple, cost effective capacity expansion