Transcript of Sarah Tennison (Tees Valley Unlimited) - Teesside Collective: Designing an Industrial CCS Network in...
![Page 1: Sarah Tennison (Tees Valley Unlimited) - Teesside Collective: Designing an Industrial CCS Network in Teesside, Outcomes from the Engineering Design Work - UKCCSRC Cranfield Biannual](https://reader030.fdocuments.us/reader030/viewer/2022032420/55a542a21a28abad478b458d/html5/thumbnails/1.jpg)
Engineering outputs of an industrial CCS
network in Teesside
Sarah Tennison
@Teescollective
www.teessidecollective.co.uk
![Page 2: Sarah Tennison (Tees Valley Unlimited) - Teesside Collective: Designing an Industrial CCS Network in Teesside, Outcomes from the Engineering Design Work - UKCCSRC Cranfield Biannual](https://reader030.fdocuments.us/reader030/viewer/2022032420/55a542a21a28abad478b458d/html5/thumbnails/2.jpg)
![Page 3: Sarah Tennison (Tees Valley Unlimited) - Teesside Collective: Designing an Industrial CCS Network in Teesside, Outcomes from the Engineering Design Work - UKCCSRC Cranfield Biannual](https://reader030.fdocuments.us/reader030/viewer/2022032420/55a542a21a28abad478b458d/html5/thumbnails/3.jpg)
SSI - Europe’s second largest
Blast Furnace
• Total site emits 7.1million tonnes of CO2 per
year
• After optioneering 3 concepts selected for
further study: 1. Post combustion capture on the flue gas from new
power station fueled by blast furnace gas – 1.6million
tonnes captured
2. Pre-combustion capture from entire blast furnace gas
– 2.1million tonnes captured
3. Pre-combustion capture from excess blast furnace
gas and BOS gas – carbon converted to H2 and CO2
in shift reaction – 2.2million tonnes captured
![Page 4: Sarah Tennison (Tees Valley Unlimited) - Teesside Collective: Designing an Industrial CCS Network in Teesside, Outcomes from the Engineering Design Work - UKCCSRC Cranfield Biannual](https://reader030.fdocuments.us/reader030/viewer/2022032420/55a542a21a28abad478b458d/html5/thumbnails/4.jpg)
Comparison of options
![Page 5: Sarah Tennison (Tees Valley Unlimited) - Teesside Collective: Designing an Industrial CCS Network in Teesside, Outcomes from the Engineering Design Work - UKCCSRC Cranfield Biannual](https://reader030.fdocuments.us/reader030/viewer/2022032420/55a542a21a28abad478b458d/html5/thumbnails/5.jpg)
Growhow – 35% of UK’s
fertilisers
• Produces CO2 as part of process, sells to
Greenhouses and Drinks industry
• Average of 375,000 tonnes of CO2 per year
• New 100barg compression plant required
(2 x 50tonne/hr compressors)
• Proven technology from existing suppliers
• No operation or integration issues identified
![Page 6: Sarah Tennison (Tees Valley Unlimited) - Teesside Collective: Designing an Industrial CCS Network in Teesside, Outcomes from the Engineering Design Work - UKCCSRC Cranfield Biannual](https://reader030.fdocuments.us/reader030/viewer/2022032420/55a542a21a28abad478b458d/html5/thumbnails/6.jpg)
Compressor Compound
![Page 7: Sarah Tennison (Tees Valley Unlimited) - Teesside Collective: Designing an Industrial CCS Network in Teesside, Outcomes from the Engineering Design Work - UKCCSRC Cranfield Biannual](https://reader030.fdocuments.us/reader030/viewer/2022032420/55a542a21a28abad478b458d/html5/thumbnails/7.jpg)
BOC Linde - UK’s largest Steam
Methane Reformer
• 305,000 tonnes of CO2 captured
• Conventional Amine Process on flue
gas from SMR
• No significant impact on the
hydrogen plant
• Significant power consumption –
5.9MW
Reformer CCP
Core
Plant
PSA
CCP Utilities
![Page 8: Sarah Tennison (Tees Valley Unlimited) - Teesside Collective: Designing an Industrial CCS Network in Teesside, Outcomes from the Engineering Design Work - UKCCSRC Cranfield Biannual](https://reader030.fdocuments.us/reader030/viewer/2022032420/55a542a21a28abad478b458d/html5/thumbnails/8.jpg)
BOC Layout
Natural GasFeed
SMR Shift PSAHydrogen
Export
Tail Gas
FlueGas
Steam Export
HMU Utilities
Existing HydrogenPlant
CO2
Capture
Compression &
Dehydration
CO2
Export
Vent Gas
CCP Utilities
New CO2
Capture Plant
![Page 9: Sarah Tennison (Tees Valley Unlimited) - Teesside Collective: Designing an Industrial CCS Network in Teesside, Outcomes from the Engineering Design Work - UKCCSRC Cranfield Biannual](https://reader030.fdocuments.us/reader030/viewer/2022032420/55a542a21a28abad478b458d/html5/thumbnails/9.jpg)
Lotte - Produces enough PET for
15billion drinks bottles every year
• 50,000 tonnes of CO2 captured
• Amine capture solution selected
• Pre-designed amine units
available – American – no
European pricing available
• 90% CO2 captured
New
Plant
![Page 10: Sarah Tennison (Tees Valley Unlimited) - Teesside Collective: Designing an Industrial CCS Network in Teesside, Outcomes from the Engineering Design Work - UKCCSRC Cranfield Biannual](https://reader030.fdocuments.us/reader030/viewer/2022032420/55a542a21a28abad478b458d/html5/thumbnails/10.jpg)
Lotte Chemicals Layout
![Page 11: Sarah Tennison (Tees Valley Unlimited) - Teesside Collective: Designing an Industrial CCS Network in Teesside, Outcomes from the Engineering Design Work - UKCCSRC Cranfield Biannual](https://reader030.fdocuments.us/reader030/viewer/2022032420/55a542a21a28abad478b458d/html5/thumbnails/11.jpg)
Onshore network
• 5 and 15million tonnes per year capacity pipe studied
• 100 barg from capture units with specified CO2, transport at dense phase
• Constraints identified to generate route: – Environmental
– NG NTS Feeder
– Populations
– Access to suitable shore landing
– Rail and road crossings
![Page 12: Sarah Tennison (Tees Valley Unlimited) - Teesside Collective: Designing an Industrial CCS Network in Teesside, Outcomes from the Engineering Design Work - UKCCSRC Cranfield Biannual](https://reader030.fdocuments.us/reader030/viewer/2022032420/55a542a21a28abad478b458d/html5/thumbnails/12.jpg)
Initial spine and extensions
![Page 13: Sarah Tennison (Tees Valley Unlimited) - Teesside Collective: Designing an Industrial CCS Network in Teesside, Outcomes from the Engineering Design Work - UKCCSRC Cranfield Biannual](https://reader030.fdocuments.us/reader030/viewer/2022032420/55a542a21a28abad478b458d/html5/thumbnails/13.jpg)
Booster Station to Offshore Routes
Booster
Station
Booster
Station
Cleveland
Golf
Club
Cleveland
Golf
Club
SSI
CCS
SSI
CCS
Hot
Metal
Line
Hot
Metal
Line
![Page 14: Sarah Tennison (Tees Valley Unlimited) - Teesside Collective: Designing an Industrial CCS Network in Teesside, Outcomes from the Engineering Design Work - UKCCSRC Cranfield Biannual](https://reader030.fdocuments.us/reader030/viewer/2022032420/55a542a21a28abad478b458d/html5/thumbnails/14.jpg)
Offshore network
• Two destinations:
• National Grid’s 5/42 / Bunter – 154km
– 3 pipeline crossings, 3
communication crossings, 3
electrical transmission cable
crossings, submarine exercise area.
– 5mt/yr = 18in. 15mt/yr = 24in
• Captain – 433km
– 4 pipeline crossings
– 5mt/yr = 20in. 15mt/yr = 30in
![Page 15: Sarah Tennison (Tees Valley Unlimited) - Teesside Collective: Designing an Industrial CCS Network in Teesside, Outcomes from the Engineering Design Work - UKCCSRC Cranfield Biannual](https://reader030.fdocuments.us/reader030/viewer/2022032420/55a542a21a28abad478b458d/html5/thumbnails/15.jpg)
Thank you
Sarah Tennison
@Teescollective
www.teessidecollective.co.uk