HyNet Hydrogen SupplyH₂ from CH₄ with CCS in HyNet

Date 16/07/20

Page 2: HyNetHydrogen Supply - UKCCSRC

1. HyNet general project description2. Hydrogen production from natural gas

Contents

Confidential 2

Page 3: HyNetHydrogen Supply - UKCCSRC

A source of hydrogen and the technology to extract it A method of disposing of any by-products of the process A customer(s) for the hydrogen A commercial framework in which to operate

4 things needed to make a hydrogen project happen

Confidential 3

Page 4: HyNetHydrogen Supply - UKCCSRC

4 things needed to make a hydrogen project happen

Confidential 4

Source of hydrogen By-product disposal Customers Commercial framework

Page 5: HyNetHydrogen Supply - UKCCSRC

4 things needed to make a hydrogen project happen

Confidential 5

Depleted gas field• Gas phase• Low pressure

New section• Gas phase• 35barg• 36” dia.

Existing NG line• Gas phase• 35barg• 24” dia.

Upgrade when>3mtpa

Existing NG line• Gas phase• 35barg• 20” dia.

Upgrade to higher pressure when>3mtpa

Page 6: HyNetHydrogen Supply - UKCCSRC

4 things needed to make a hydrogen project happen

Confidential 6

Depleted gas field• Gas phase• Low pressure

New section• Gas phase• 35barg• 36” dia.

Existing CO₂• Processing• 35barg

Existing NG line• Gas phase• 35barg• 20” dia.

Upgrade to higher pressure when>3mtpa

Existing NG line• Gas phase• 35barg• 24” dia.

Upgrade when>3mtpa

Page 7: HyNetHydrogen Supply - UKCCSRC

4 things needed to make a hydrogen project happen

Confidential 7

Encirc Glass

ESSAR refinery

Page 8: HyNetHydrogen Supply - UKCCSRC

4 things needed to make a hydrogen project happen

Confidential 8

Page 9: HyNetHydrogen Supply - UKCCSRC

Phased approach: constructing and commissioning the CO₂ infrastructure, dislocating the CCS infrastructure from ‘blue’ hydrogen production, and minimising the risk associated with the hydrogen plant Up-scalable technology allowing a build-out to keep pace with projected

hydrogen demand Pipeline infrastructure designed to handle full-scale hydrogen and CO₂

production

HyNet North West

Confidential 9

Page 10: HyNetHydrogen Supply - UKCCSRC

1. HyNet general project description2. Hydrogen production from natural gas

Contents

Confidential 10

Page 11: HyNetHydrogen Supply - UKCCSRC

NaturalGas

Hydrogen

Purfication

Sulphur

Steam

Oxygen

Saturator

Process condensate

CO₂ export to store

Hydrogenexport

Wastegas to fuel

CO₂stripper

Pressureswing

adsorption

Hydrogen production from natural gas

Confidential

Water

AutothermalReactor

Isothermaltemperature

shiftGas HeatedReformer

Low Carbon Hydrogen process

Page 12: HyNetHydrogen Supply - UKCCSRC

Hydrogen production from natural gas

Confidential 12

LCH>99% CO₂

>3 9’s H₂Natural GasElectricity

Water

Sulphur

CO₂NOx

WTPemissions

Flare stack

Amine purge