    JOB OBJECTIVE

    A position in a results-oriented company that seeks an ambitious and career conscious person,where acquired skills and education will be utilized toward continued growth andadvancement.

    KNOWLEDGE BASE

    Has 16+ years maintenance experience in the power field involving both gas and steam

    trbines. Degree holder in Bachelor of Engineering (B.E) with major in MECHANICALdiscipline.

    Fully conversant to carry out all types of inspections and maintenance independently viz. GasTurbine maintenance including Combustion Inspection, Hot Gas Path Inspection and Major Inspection of GE Frame 5,Frame 6 and Frame 9 machines.

    Independently can handle Steam Turbine Erection, Re-erection, Rehabilitation, Overhauling,Commissioning, Troubleshooting, Reblading, assistance in Modification of CondensingTurbine into Back Pressure Turbine, Third Party Inspection to maintain the quality andmeasurement at external workshop. Can do better and accurate alignment of rotatingequipments. Has application knowledge in alignment software "TURBINE TOOLS".

    Excellent computer knowledge in the CMMS (Computerised Maintenance ManagementSystem) and inventory control. Attended special workshop on PLANNING, ESTIMATING,SCHEDULING & CMMS.

    Studied softwares MS OFFICE, AUTOCAD 2004,PRIMAVERA PROJECT PLANNER,MSPROJECT,MAXIMO(CMMS) and has their application knowledge in the field.Prepare Training Materials using computer aided illustrations for training the maintenanceteam. Prepare all kinds of forms using softwares MS Office, PDF Form Filler, and Form ToolExpress.

    Manages all kinds of data using BRILLIANT DATABASE and write all reports using"CRYSTAL REPORT WRITER".

    Can develop individual system applications as required for the plant.

    EDUCATION AND TRAINING

    B.E, MECHANICAL APR. 1990

    A K College Of Engineering, MADURAI KAMARAJ UNIVERSITYStudied turbo machines as one of the subjects in Engineering

    Manah Power Plant, Post Box: 733, Postal Code: 611, Nizwa, OMANDirect (OMAN) 00968-99213682 / 99029112Home (INDIA) 0091-9443774751

    [email protected] & [email protected]

  • 7/30/2019 Sample Turbine Cv

    2/6

    Resume of Asokan Page 2 of 6

    TRAINING, INPLANT NEYVELI LIGNITE CORPORATION, INDIA

    Went on In plant Training and learned activities related to power plant and engineering

    practices.

    MS OFFICECANDY E-COMPUTER INSTITUTE, CHENNAI,INDIAI studied the MS Office course to support my engineering job at various levels.

    MAXIMO ON-SITE TRAINING

    During the initial set up of Computerised maintenance management system in the plant Iundergone the special onsite training on the software MAXIMO.

    AUTO CAD, 2004CADD centre, Trichy, INDIA

    Studied Auto Cad 2004 software and learned all the skills like how to ease and execute thework with CAD application.

    PRIMAVERA, Project PlanningCADD centre, Chennai, India

    Studied PRIMAVERA PROJECT PLANNER software and learned the art of planning andexecuting the job within the time frame.

    MS PROJECTSURYA COMPUTERS,INDIA

    Studied MS PROJECT and plan the job track them applying in real field.

    PLANNING, ESTIMATING, SCHEDULING & CMMS .Special workshop - Gained the knowledge of optimising the usage of CMMS and its benefits.

    WORK EXPERIENCEMAINTENANCE MANAGER Sept 2003 to Till nowSOGEX OMAN CO LLC, MUSCAT

    SOGEX is basically a Operation and Maintenance contracting company of power anddesalination plants. Presently they are operating Manah Power Plant at Oman, Sohar Power Company at Oman and one more plant at Algeria. Also they are partners in some of the

    power plants.

    I am posted as a Maintenance Manager at Manah Power Plant which has two Frame 9 and

    three Frame 6 (GE make) gas turbines.

  • 7/30/2019 Sample Turbine Cv

    3/6

    Resume of Asokan Page 3 of 6

    RESPONSIBILITIES:

    Responsible for all the preventive, scheduled and unscheduled and breakdownmaintenance (mechanical, electrical and instrumentation) activities inside the plant.

    Involves advance planning and scheduling of the jobs and arrangement andverification of men and materials required for the execution of the job.

    Follow up of the jobs for its timely and proper execution. Inventory spares management, which includes Purchase request, Technical approval

    and inspection of the materials and availability of the materials in enough quantity.Communication with different vendors, clients and Gas Turbine manufacturer GE for the procurement of materials.

    Work orders tracking and its data entry. Equipment History Generation. Tools and instruments calibration and certification. Pressure vessels testing. Do risk analysis of the jobs to fix the responsibility and accountability. Doing all the modifications and improvements necessary to the plant. Train the subordinates and maintenance team for the latest maintenance techniques

    and standards. Sub-ordinates administration like leave schedule, attendance etc. Writing Technical Reports and Maintenance Procedures. Forms creation to support the maintenance procedures.

    ACHIEVEMENTS

    Installation of the Computerised Maintenance Management System(CMMS) for work order process and inventory management.

    Automated and Implemented the report writing system among the departments. I have done many modifications and improvements in the plant which cut cost on

    spares and user friendly to the maintenance reducing the job time. Some of them Ihave listed here.

    v Interconnection of all the gas turbine air receiver tanks thereby eliminated theusage of Air compressors and its spares.

    v Exhaust plenum expansion joints were frequently failing in frame 9 machines.Trouble shooted the problem providing the guides.

    v Fabrication of Maintenance tool box trolley which cut the most travelling timeof the workers.

    v Developed Opportunity maintenance awareness among the people within the

    time frame.

    MECHANICAL MAINTENANCE ENGINEER May 2000 to August 2003 Sogex Oman Co LLC,, Muscat, OMAN

    Carried out routine, preventive, breakdown maintenance of Frame 5, Frame 6B(3 Nos.) andFrame 9E (2 Nos.) Gas Turbines and its auxiliaries. Fully involved and experienced inCombustion Inspections, Hot Gas Path Inspections and Major Inspections in accordance withOEM manual recommendations and also under the Guidance of GE Technical Advisors.Carrying out annual maintenance of all the balance of plant equipments such as water bath

    heaters, pumps, filter replacements, gas valve etc.

  • 7/30/2019 Sample Turbine Cv

    4/6

    Resume of Asokan Page 4 of 6

    Prepared maintenance schedules with proper allotment of manpower and material resources.Scheduled works and workflow in MS PROJECT 2000.

    Worked as a core team person in plant computerization (MAXIMO) and its customisation,which includes spares and work management. Co-Ordination with planning department in allthe maintenance activities from planning till execution. Co-Ordination with Operation

    Department in all pre-commissioning and Isolation & De-Isolation activities.

    As a senior authorized person in the Safety permit to work system and took all theappropriate permits for safe and timely execution of the jobs.

    Excellent hands on experience and lead forward the mechanical team in the right track with proven modern techniques.

    Prepared Reports and Presentations in MS OFFICE 2000.Preparation of all the maintenanceforms using AUTOCAD, FORM TOOL, PDF FORM FILLER and MS WORD & EXCEL.

    DEPUTY MANAGER August 1997 to April 2000 Gujarat Enterprises (TURBINE EXPERTS) Makarpura, Baroda., Gujarat, INDIA

    GUJARAT ENTERPRISES was founded by Ex-ABB people in 1984 and they are Turbineexperts dealing overhauling, maintenance, installation, commissioning, spares manufacturing,third party inspection, reblading etc.. of steam turbines.

    My key responsibility included steam turbine installation, maintenance, re-installation,troubleshooting, and modification of condensing type to back pressure type turbine,reconditioning and commissioning.

    As a maintenance contractors of our clients I have worked, involved and experienced in thefollowing steam turbines

    15000 KW "BRITISH THOMPSON & HOUSTON CO. LTD."TG - Convertedcondensing turbine into back pressure turbine.

    3000 KW "METROVICKERS" Condensing TG Set.

    ASSISTANT MANAGER August 1995 to July 199 7Gujarat Enterprises (TURBINE EXPERTS) Makarpura, Baroda, Gujarat, INDIA

    At this position I was handling the following steam turbines erection and commissioningactivities in addition to sub-ordinates training.

    3000 KW "BBC" / 600 KW "DE LEVAL" / 1500 KW "MITSUBISHI" /10000 KW"HITACHI" / 750KW "WESTING HOUSE" / 1400 KW "KAWASAKI HEAVYINDUSTRIES LTD." / 500 KW,1000 KW,1250 KW "GEC" Mill Drive / 5000 KW "GE" /3000 KW "BRUSH" / 500 KW GPM Turbo pump drive / 2500 KW,4500 KW,5000 KW"DLF" / 1200 KW,1600 KW "GHH"

  • 7/30/2019 Sample Turbine Cv

    5/6

  • 7/30/2019 Sample Turbine Cv

    6/6

    Resume of Asokan Page 6 of 6

    Fernel catalogue FAG bearing catalogue

    In addition I own the following softwares in my laptop to facilitate and gear up my job. Brilliant Database PDFill PDF Editor Task Plus Form tool express

    PERSONAL DATA

    Nationality :IndianDate of Birth : 09-03-1969Passport Number: A9098540, Valid up to July 2011.Driving Licence Valid GULF car licence. 62434677,Issued at Oman, Exp.: 25/09/2012Hands on Experience.

    Excellent interpersonal skillsGood communication.For more details please visit my website: www.asokanonline.com

    PROFESSIONAL REFERENCES

    MR.RAJENDRA THAKUR Planning and Performance Engineer Manah Power PlantContact number : 00968 99028772E-mail ID : [email protected] / [email protected]

    MR. MITCHEL MALANAOperations Manager Manah Power PlantContact number: 00968 99213564E-mail ID : [email protected]

    More references are available upon request.