SAMPLE - cda.gov.pk · PDF fileintimation to this effect will be made to the bidder through an...
Transcript of SAMPLE - cda.gov.pk · PDF fileintimation to this effect will be made to the bidder through an...
I N D E X
1
2
3
4
5
6
7
8
9
PREAMBLE
ELIGIBILITY
SCOPE
MODE OF AUCTION
MODE OF PAYMENT
OTHER CONDITIONS
LIST OF PLOTS
MAPS / SITE PLAN
REQUIREMENTS / ANNEXURES
S. No. TITLE / DESCRIPTION PAGE No.
01
03
05
07
09
11
13
23
42SAMPLE
PREAMBLE
1. Islamabad today is one of the most inviting spots for real estate developers in
Pakistan and abroad. There are numerous prospects for safe and secure
investments in Commercial plots located in the busy 'Marakiz' of different
sectors of Islamabad.
2. A fast-track one-window facility is available to assist the depositing of dues,
taking over possession, getting building plans approved and addressing any
other queries that the clients may have.
3. Commercial plots located in various sectors of Islamabad are being offered for
allotment on leasehold basis, for a term of 33 years extendable for another
two terms of 33 years each, on standard terms and conditions applicable at the
time of each renewal of lease.
4. The auction will take place at Jinnah Convention Center, Islamabad on
27th, 28th & 29th March 2018. The proceedings shall commence at 10:00
A.M. and shall continue till the end.
۱
SAMPLE
ELIGIBILITY
5. The successful bidders shall be required to obtain an additional
token(s) to participate in the bid of any other plot. The token shall be
submitted on the original Application Form annexed in this Brochure at
Annex-B.
6. If any person intends to participate in the auction on behalf of another
person, company, firm or society, he / she will have to submit, at the
time of purchase of token, a special power of attorney as per specimen
at Annex-C or a sealed (embossed) resolution or authorization from
the company, firm or society authorizing him / her to participate in the
auction on its behalf along with a copy of certificate of incorporation or
registration.
1. The auction is open to all Pakistani nationals, whether residing in
Pakistan or abroad. Companies/firms and societies registered in
Pakistan under the relevant laws can also participate in the auction.
Foreign nationals and companies can participate in the auction with the
prior permission from the Ministry of Interior, Government of Pakistan.
2. Token money for plots will be as under:-
I. Rs. 100 million (Red Token).
ii. Rs. 75 million (Blue Token).
iii. Rs. 50 millions (Black Token).
iv. Rs. 25 million (Purple Token).
v. Rs. 20 million (Yellow Token)
vi. Rs. 10 million (White Token).
vii. Rs. 5 million (Green Token).
(Individual token money is mentioned against each plot in the list of
plots)
3. The person(s) participating in the auction are required to obtain tokens
(Annex-D) by providing Pay Order of 100/ 75/ 50/25/20/ 10 / 5 million
for plots of above mentioned categories from the Accounts Office
(Estate Management-II), CDA Main Office, Khayaban-e-Suhrawardy, G-
7/4, Islamabad upon fulfilling the prescribed requirements as per
Annex-A and submitting the application at Annex-B of this Brochure.
Tokens will also be available at the auction venue and can be purchased
before the start of auction.
4. Token used in successful bids shall be adjusted in the first installment
and therefore cannot be used in subsequent bid. All unsuccessful
tokens can be used for subsequent bidding or will be refunded to the
token holder.
3
SAMPLE
1. Site / location of the plot shall not be changed on any ground
whatsoever at any stage. The bidder shall be bound to satisfy himself
about the location, ground position and surroundings of the plot and
no claim at a subsequent stage shall be entertained in this regard as the
plots are auctioned on “AS IS WHERE IS ” basis. Moreover, the payment
of premium of the plot is neither subject to infrastructure development
nor subject to delivery of possession because the successful bidder
shall have no claim in relation to the plot till the payment of 100%
premium.
2. The premium will be charged according to actual size of the plot as
determined at the time of handing over possession. In case of the
substantial variation in the size of the plot, the successful bidder will,
however, have the option to retain or surrender the plot and claim
refund of the amount without any deduction / markup or
compensation under special circumstances within 30 days. After 30
days, usual deduction @ 10% of total premium of the plot shall be
forfeited.
3. The Auction Committee reserves the right to withdraw any plot from
the auction without assigning any reason thereof.
4. The Auction Committee also reserves the right to reject any bid without
assigning any reason thereof.
5. The Auction Committee/CDA management reserves the right to
disqualify any bidder and to amend / delete any of the provisions
contained therein to any extent or to add new provisions regarding
terms and conditions at the time of auction without assigning any
reason thereto after announcement and proper recording of the
proceedings.
6. Auction results shall not be final unless approved by the Board of
Capital Development Authority and a highest bid at auction shall not
per se accrue any right in favour of the bidder. The approval of the bid
would be further subject to payment of applicable taxes, duties or
surcharge by the bidder that may be levied on such auction under the
prevalent law and non-payment of such taxes / duties or surcharges,
etc, within the specified period shall result in automatic cancellation
of the accepted bid.
7. The CDA Board shall decide acceptance or rejection of the bid within
10 working days (excluding holidays) of auction and in case of rejection
CDA shall refund the amount within 15 days (excluding holidays) after
the decision of the Board.
SCOPE
5
SAMPLE
1. The Auction shall be conducted through open bidding. The bid will be
offered in terms of rupees per square yard, which will form basis to
calculate total premium of the plot /site. Each bid will be raised by
bidders by multiples of Rs. 1000/- per sq. yard. The bid start price will
be informed for each plot at the time of auction.
2. The bid will be expressed loudly/ openly with show of token number.
3. Provisional acceptance of the bid shall be issued in the name of
person(s) in whose name token was issued.
4. Pay order deposited in advance by the participant will be released after
the auction dates to unsuccessful bidder(s) from the Accounts Section,
EM-II.
5. The Authority reserves the right to alter / amend the order for auction
of plots.
MODE OF AUCTION
7
SAMPLE
MODE OF PAYMENT
4. After acceptance of the bid, the allottee shall submit an undertaking on judicial stamp paper of Rs. 30/-. (Specimen available at Annex E).
5. On receipt of full amount of premium and all applicable taxes, etc. if any, are payable, within the specified time, the allotment letter will be issued as per Annexure-G containing detailed terms and conditions of allotment. Upon issuance of allotment letter, the allottee will be required to take over possession of the plot within 30 days, failing which the possession shall be deemed to have been taken over by him.
6. In addition to the premium, Annual Ground Rent (AGR) shall be payable without demand, in advance, in the first month of every year, at the prescribed rate. The rate of AGR in respect of all the plots shall be increased by 15% after every three years or as determined by the CDA Board from time to time.
7. All payments shall be made through Bank Drafts / Pay Orders / Deposits-at-Call in favour of “Capital Development Authority, Islamabad”. Bank charges on transactions of out-station bank drafts will be borne by the bidder / allottee.
8. Allottee(s) are liable to pay all taxes like Advance Tax and CVT wherever applicable in prescribed manner and thereafter submit proof to the Authority within the prescribed time alongwith premium, failing which acceptance of the bid letter shall be withdrawn.
9. In case, the bidder fails to pay balance installment (s) for Six months alongwith delay charges, the plot shall be liable to cancellation.
1. Consequent upon CDA Board's decision to be communicated through “Provisional Bid Acceptance Letter” (Annex-F), the successful bidder shall deposit 25% of the total amount of premium after adjusting the token money alongwith proof of payment of applicable taxes (on the total amount of bid) within ten (10) working days. An additional period of 10 working days will be allowed on payment of delayed charges alongwith applicable taxes. Upon expiry of this period, the bid offer shall stand automatically cancelled and the token money shall be forfeited. However, intimation to this effect will be made to the bidder through an official letter.
2. Remaining 75% of the premium shall be payable in three quarterly installments as given below:-
I. 1st Installment (25% of the premium) within four months of issuance of Bid Acceptance Letter;
II. 2nd installment (25% of the premium) within eight months of issuance of Bid Acceptance Letter;rd
III. 3 installment (25% of the premium) within twelve months of issuance of Bid Acceptance Letter;
Note:In case of failure to pay the due installment and /or applicable taxes within given time period, the acceptance of bid shall stand automatically withdrawn and 10% of the total premium shall be forfeited. However, intimation to this effect will be made to the bidder through an official letter.
3. In case the successful bidder pays the remaining amount in lump-sum, following rebate will be allowed:
If total premium is paid within 20 days (holidays excluded) of bid acceptance, a rebate @ 5% of 75% on the premium will be granted.
9
SAMPLE
1. Subject to payment of full premium and other dues, the leasehold rights in
the plots are transferable on payment of “Transfer Fee” as fixed by the
Authority from time to time.
2. Non-conforming use of the site or building shall render the defaulter liable to
pay such penalties as are prescribed in the prevalent laws, rules and
regulations, and may result in cancellation of the allotment as well.
3. CDA shall not be responsible for any loss / damages to the allottees in case
any unauthorized service line is laid by any agency other than CDA.
4. In the event of cancellation or surrender of the plot for whatever reason, the
deposited amount of premium shall be refunded after forfeiture of 10% of
the total premium of the plot.
5. Any decision of Authority regarding auction, acceptance or rejection of bid,
forfeiture of token money, 10% of total premium deduction or any other
matter in relation to auction / allotment of plots shall be final.
6. The correspondence shall be at the address indicated by the bidder /
attorney and it will be his responsibility to communicate any change in
address to the Authority. If the successful bidder does not receive any
intimation from the Authority within 15 days, he himself shall have to
contact to the Authority to inquire about the status of his bid.
7. The bidder will be deemed to have read and accepted the terms and
conditions enumerated in this booklet and the Annexures and would be
bound by these conditions.
OTHER CONDITIONS
11
SAMPLE
LIST OF PLOTS
Sr. Number
Plot No. Sector Dimensions and Size (Sq. Yds.)
Category Token Money
Planning Parameters
1 6 Class-III SC
No. 2, Firdous Market, F-6/2
160(48’x30’)
Commercial
10 million
Lower Ground+Ground+1 Storey, Ground Coverage 100%, F.A.R. I:3, All Floors Commercial
2 11 Class-III SC No. 2, Firdous Market, F-6/2
160(48’x30’)
Commercial 10 million
Lower Ground+Ground+1 Storey, Ground Coverage 100%, F.A.R. I:3, All Floors Commercial
3 5 C-III SC
No. 4F-8/4
160(30’x48’)
Commercial 10 million
Lower Ground+Ground+1 Storey, Ground Coverage 100%, F.A.R. I:3, All Floors Commercial
4 7
C-III SC No. 4
F-10/3
166.66(30’x50’)
Commercial 10 million
Lower Ground+Ground+1 Storey, Ground Coverage 100%, F.A.R. I:3, All Floors Commercial
5 3-H
C-III SC No. 5
F-10/4
133.33(30’x40’)
Commercial 10 million Lower Ground+Ground+1 Storey, Ground Coverage 100%, F.A.R. I:3, All Floors Commercial
6 1-N Class-III SC No. 5,
F-11/1
133.33(30’x40’)
Commercial 10 million Lower Ground+Ground+1 Storey, Ground Coverage 100%, F.A.R. I:3, All Floors Commercial
7 1-O
Class-III SC No. 5, F-11/1
200(30’x60’)
Commercial 10 million Lower Ground+Ground+1 Storey, Ground Coverage 100%, F.A.R. I:3, All Floors Co mmercial
8 8 F-10 Markaz 11,750(470’x225’)
Apartments 75 million
Basements + Ground+ 9 Storey (Maximum) Maximum Ground Coverage = 50%Max. F.A.R.= 1:4
Minimum Setbacks: Front = 60 feet, Rear = 40 feet, Both Sides = 30 feet each
Basement = As per Parking requirements and shall be used for Parking only.
Minimum Distance between two Blocks = 40 Feet.
14
SAMPLE
15
Sr. Number
Plot No. Sector Dimensions and Size (Sq. Yds.)
Category Token Money
Planning Parameters
9 D-1 Blue Area G/9 4,111.66
(150’x250’) Commercial 100 million Maximum Floor Area Ratio (F.A.R.) =1:8
Maximum Permissible Ground CoverageGround+4
Storey = 70%, Subsequent Storey = 50%
Maximum Height = As Cleared by CAAUses
Ground + 4 Storey = Commercial [as defined in Clause 3(2) read with Clause-6 of the ILDR, 2005]
Subsequent Storey = Offices and/or Apartments Minimum Set BacksNorth = 10’, South=10’, East=20’, West=10’ParkingOne Car Space for 1,000 Sq. Ft. covered area. The parking requirements will be accommodated within Plot Line including Basements.Basements
As per Parking requirements and shall be used for Parking only. Parking Area Calculations = 250 Sq. ft. area for one Car
10 D-2 Blue Area G/9 4,111.66
(150’x250’)
Commercial 100 million
Maximum Floor Area Ratio (F.A.R.) =1:8 Maximum Permissible Ground CoverageGround+4 Storey = 70%, Subsequent Storey = 50%
Maximum Height = As Cleared by CAAUses
Ground + 4 Storey = Commercial [as defined in Clause 3(2) read with Clause-6 of the ILDR, 2005]
Subsequent Storey = Offices and/or Apartments Minimum Set BacksNorth = 10’, South=10’, East= 0’, West= ’201SAMPLE
16
Sr. Number
Plot No. Sector Dimensions and Size (Sq. Yds.)
Category Token Money
Planning Parameters
Parking One Car Space for 1,000 Sq. Ft. covered area. The parking requirements will be accommodated within Plot Line including Basements. Basements As per Parking requirements and shall be used for Parking only. Parking Area Calculations = 250 Sq. ft. area for one Car
11 63-C
Blue Area, F/7
1,666.66 (150’x100’)
Filling Station
20 million
Maximum Ground Coverage = 20% (Uses: Tuck Shop, Tyre Shop, Service Station)
Maximum Storey =1 Minimum Setbacks
North = 10’, South=10’, East=20’, West=10’ Public Toilets must be Provided
12 13-A
G-8/1
Mauve Area
2,555.55
[200’x (150’+70’)/2]
Petrol Pump
20 million
Maximum Ground Coverage = 20%
(Uses: Tuck Shop, Tyre Shop, Service Station)
Maximum Storey =1Minimum SetbacksNorth = 10’, South=10’, East=20’, West=10’Public Toilets must be Provided
SAMPLE
17
Sr. Number
Plot No. Sector Dimensions and
Size (Sq. Yds.) Category Token
Money Planning Parameters
13 20
D-12 Markaz
711.11
Commercial
20 million
14 20-A
D-12 Markaz
711.11
Commercial
20 million
15 30 I
-
8 Markaz 1,111.11 Commercial 20 million
16 31 I-8 Markaz 1,066.66 Commercial 20 million
17
17-B
Dip. Enclave Markaz
422.22
(76’x50’)
Commercial
20 million
Lower Ground+Ground+3 Storey OR Ground+4 Storey
Ground Coverage1 0 0 %,F.A.R.I:5, All Floors Commercial
18
17-D
Dip. Enclave Markaz
566..66
(102’x50’)
Commercial
20 million
19
17-F
Dip. Enclave Markaz
416.66
(75’x50’)Commercial
20 million
Lower Ground+Ground+3 Storey OR Ground+4 Storey
Ground Coverage1 0 0 %,F.A.R.I:5, All Floors Commercial
Lower Ground+Ground=3 Storey OR Ground+4 Storey
Ground Coverage1 0 0 %,F.A.R.I:5, All Floors Commercial
Lower Ground+Ground+3 Storey OR Ground+4 Storey
Ground Coverage1 0 0 %,F.A.R.I:5, All Floors Commercial
Lower Ground+Ground+3 Storey OR Ground+4 Storey
Ground Coverage1 0 0 %,F.A.R.I:5, All Floors Commercial
Lower Ground+Ground+3 Storey OR Ground+4 Storey
Ground Coverage1 0 0 %,F.A.R.I:5, All Floors Commercial
Lower Ground+Ground+3 Storey OR Ground+4 Storey
Ground Coverage1 0 0 %,F.A.R.I:5, All Floors Commercial
SAMPLE
18
Sr. Number
Plot No. Sector Dimensions and Size (Sq. Yds.)
Category Token Money
Planning Parameters
20
36
G-11 Markaz
3,733.33
(160’x210’)
Hotel
25 million
Max. F.A.R.= 1:4.90
Max. No. of Storey= Ground+6
Max. Ground Coverage = 70%
Minimum Setbacks:
North = 25’, South=10’, East=10’, West=10’Commercial/Offices
Maximum 5% of the Total Permissible Covered Area and can be given on Different Floors.Parking Requirements• One Car Space for every three hotel rooms/suites.
• One car space for every 500 square feet of restaurant / Halls.
• One car space for every 1,000 square feet of commercial/offices.
The parking requirements will be accommodated within Plot Line including Basements.
Basements
As per Parking requirements and shall be used for Parking only. Parking Area Calculations = 250 Sq. Ft. area for one Car space.
21 25-B G-11/1 6,750 (225’x270’)
Apartments 25 million Basements+Ground+6 Storey (Maximum)Max. Ground Coverage = 50%F.A.R. = 1:3
Minimum Setbacks
Front = 30’ , Rear = 30’, Both Sides = 20’ Each
Parking = One Car Space for
1,000 Sq. Feet Covered Area.
Basements as per Parking requirements and shall be used for Parking only.
Minimum Distance between two Blocks 40 Feet.SAMPLE
19
Sr. Number
Plot No. Sector Dimensions and Size (Sq. Yds.)
Category Token Money
Planning Parameters
22 20 G-11/3 3861.11 Apartments 25 million Basements+Ground+6 Storey (Maximum)Max. Ground Coverage = 50%F.A.R. = 1:3
Minimum Setbacks
Front = 30’ , Rear = 30’, Both Sides = 20’ EachParking = One Car Space for 1,000 Sq. Feet Covered Area.
Basements as per Parking requirements and shall be used for Parking only.
Minimum Distance between two Blocks 40 Feet.
23 3-G Class-III SC No. 5, G-10/3
133.33
(30’x40’)
Commercial 10 million
Lower Ground+Ground+1 Storey, Ground Coverage 100%, F.A.R. I:3, All Floors Commercial
24 1-J Class-III SC No. 3
G-11/1
177.77
(40’x40’)
Commercial 10 million
Lower Ground+Ground+1 Storey, Ground Coverage 100%, F.A.R. I:3, All Floors Commercial
25 5-I Class-III SC No.10
G-11/3
133.33
(30’x40’)Commercial 10 million
Lower Ground+Ground+1 Storey, Ground Coverage 100%, F.A.R. I:3, All Floors Commercial
26 6-A Class-III SC
No.13, G-11/4133.33
(30’x40’)Commercial 10 million Lower Ground+Ground+1 Storey, Ground Coverage
100%, F.A.R. I:3, All Floors CommercialSAMPLE
20
Sr. Number
Plot No. Sector Dimensions and Size (Sq. Yds.)
Category Token Money
Planning Parameters
27
1028
I-8/4, IJP Road
1,155
Commercial
20 million
Lower Ground+Ground+1 Storey, Ground Coverage 100%, F.A.R. I:3, All Floors Commercial
28
37
G-11 Markaz
3,733.33
(240’x140’)
Hospital
25 million
Lower Ground + Ground + 3 Storey
Max. Ground Coverage = 60%
F.A.R. 1:3
Minimum Setbacks
Front = 35’, Rear = 15’, Both Sides = 15’ EachParking:
One Car Space for 1,000 Sq. Feet Covered Area.Basements as per Parking requirements and shall be used for Parking only.
29
6-A
Class-III SC
No. 1, D-12/1
133.33
(30’x40’)
Commercial
10 million
Lower Ground+Ground+1 Storey, Ground Coverage100%, F.A.R. I:3, All Floors Commercial
30
5-J
Class-III SC
No. 2, D-12/2
133.33
(30’x40’)
Commercial
10 million
Lower Ground+Ground+1 Storey, Ground Coverage 100%, F.A.R. I:3, All Floors Commercial
31
4-G
Class-III SC
No. 3, D-12/3
133.33
(30’x40’)
Commercial
10 million
Lower Ground+Ground+1 Storey, Ground Coverage 100%, F.A.R. I:3, All Floors Commercial
32
25
Class-III SC
No. 4, D-12/4
133.33
(30’x40’)
Commercial
10 million
Lower Ground+Ground+1 Storey, Ground Coverage 100%, F.A.R. I:3, Al l Floors Commercial
33 4-N Community Core, H-8/2
266.66(40’x60’)
Commercial 10 million Lower Ground+Ground+1 Storey, Ground Coverage 100%, F.A.R. I:3, All Floors Commercial
34 7-G Community Core, 266.66 Commercial 10 million Lower Ground+Ground+1 Storey, Ground Coverage
100%, F.A.R. I:3, All Floors CommercialH-11/4 (40’x60’)SAMPLE
21
Sr. Number
Plot No. Sector Dimensions and Size (Sq. Yds.)
Category Token Money
Planning Parameters
35 1-F C-III SC No.4-A, I-8/2
200 (60’x30’)
Commercial 10 million Lower Ground+Ground+1 Storey, Ground Coverage 100%, F.A.R. I:3, All Floors Commercial
36 3-B C-III SC I-11/4
444.44 (50’x80’)
Commercial 05 million Lower Ground+Ground+1 Storey, Ground Coverage 100%, F.A.R. I:3, All Floors Commercial
37 3-C C-III SC I-11/4
444.44 (50’x80’)
Commercial 05 million Lower Ground+Ground+1 Storey, Ground Coverage 100%, F.A.R. I:3, All Floors Commercial
38 5-D Class-III SC No. 9, I-14/3
133.33 (30’x40’)
Commercial 05 million Lower Ground+Ground+1 Storey, Ground Coverage 100%, F.A.R. I:3, All Floors Commercial
39 3-E Class-III SC
No. 10, I-14/4
133.33
(30’x40’)
Commercial 05
million Lower Ground+Ground+1 Storey, Ground Coverage 100%, F.A.R. I:3, All Floors Commercial
40 2-E Class-III SC
No.12, I-14/4 133.33
(30’x40’)
Commercial 05 million Lower Ground+Ground+1 Storey, Ground Coverage 100%, F.A.R. I:3, All Floor s Commercial
41 1-D Bazar No. 4, Margalla Town
Phase-II
133.33 (30’x40’)
Commercial 05 million Lower Ground+Ground+1 Storey, Ground Coverage 100%, F.A.R. I:3, All Floors Commercial
42 1-E Bazar No. 4, Margalla Town
Phase-II
133.33 (30’x40’)
Commercial 05 million Lower Ground+Ground+1 Storey, Ground Coverage 100%, F.A.R. I:3, All Floors Commercial
43 21 Shahzad Town
150 (30’x45’)
Commercial 05 million Lower Ground+Ground+1 Storey, Ground Coverage 100%, F.A.R. I:3, All Floors CommercialClass-III SC SAMPLE
22
Sr. Number
Plot No. Sector Dimensions and Size (Sq. Yds.)
Category Token Money
Planning Parameters
FAR 1:1.2Ground Coverage 60%
OROption-II Ground + 2 StoreyFAR 1:1.2
Ground Coverage 40%
45 5-J I-10/3 3,166.66 (95’x300’)
Industrial 20 million Option-I Ground + 1 Storey
FAR 1:1.2 Ground Coverage 60%
OROption-II
Ground + 2 StoreyFAR 1:1.2
Ground Coverage 40%
44 5-H I-10/3 3,166.66 (95’x300’)
Industrial 20 million Option-IGround + 1 Storey
Minimum Set BacksFront Rear Sides 30’ 10’ 15’,15’
Set BacksFront Rear Sides 40’ 10’ 15’,15’
10’ 10’,20’
10’,20’
Minimum Set BacksFront Rear Sides 30’ 10’ 15’,15’
Set BacksFront Rear Sides 40’ 10’ 15’,15’
10’ 10’,20’
SAMPLE
REQUIREMENT OF DOCUMENTS FOR ISSUANCE OF TOKEN
Category “A” (individual)
I. Application for Token (Annex-B)
II. Bank Draft/Pay Order of Rs. 100/ 75/50/25/20/10 /5million for commercial plots
III. Attested Photostat of Computerized National Identity Card (C.N.I.C.).
Category “B” (Individual through attorney)
I. Application for token (Annex-B)
II. Bank Draft/Pay Order (of Rupees as above in category “A” in serial II.)
III. Power-of-Attorney (Annex-C).
IV. Attested photocopies of C.N.I.C. of the applicant and the attorney.
Category “C” (Firm/Company)
I. Application for token (Annex-B)
II. Bank Draft/Pay Order (of Rupees as above in category “A” in serial II.)
III. Attested photocopy of certificate of incorporation/registration of partnership
deed, along with attested photocopy of C.N.I.C. Of the Director/Partner or
attorney participating in the auction along with sealed (embossed) authorization
in his favour.
IV. In case of foreign nationals or companies, letter of permission from the Ministry
of Interior, Government of Pakistan will be required.
REQUIREMENTS Annexure"A”
42
SAMPLE
Subject:- PROVISIONAL ACCEPTANCE OF BID IN RESPECT OF PLOT ___________SECTOR________________, ISLAMABAD FOR ___________________ USE.
Dear Sir, I am pleased to inform that your bid of Rs. _____________ Per Sq. yd in respect of Plot No._______Sector _______Islamabad. measuring ______ Sq. Yards total premium thereof being ____________has been accepted by CDA Board.
2. Adjusting the sum of Rs. __________________deposited by you as token money, you are now requested to deposit an amount of Rs._________________ within ten (10) working days . An additional period of 10 working days will be allowed on payment of delayed charges as determined by the Authority. On expiry of this period, the bid offer will stand cancelled and token money will stand forfeited. 3. The amount of _____________on account of balance 75% premium is to be paid by you in installments given hereunder and government taxes according to prescribed rates in Government Treasury or Authorized Bank and submit the receipt thereof to this Directorate. The payment schedule is as under:-
st I. 1 installment (25% of the premium) within 4 months of the issuance of bid acceptance letter.nd ii. 2 installment (25% of the premium) within 8 months of the issuance of bid acceptance letter.
rdiii 3 installment (25% of the premium) within 12 months of the issuance of bid acceptance letter.
4. In case you like to pay the remaining amount of premium in lump-sum rebate on payment shall be admissible as under:- If total premium is paid within 20 days (holidays excluded) of bid acceptance, a rebate @ 5% of 75% premium will be
granted.
5. The bidder shall be liable to pay applicable taxes (of total premium of Bid) within 10 days of issuance of bid acceptance letter in the manner and time-frame prescribed by FBR and other departments. In case of failure to pay the due installment and /or applicable taxes, the acceptance of bid shall stand withdrawn automatically and 10% of the total premium or earnest money, whichever is higher shall be forfeited.
Sincerely,
Director Estate Management-IICopy to: -1. P.S to Chairman CDA.2. P.S to F.A, Member CDA. 3. PS to Member (Estate), CDA.
CAPITAL DEVELOPMENT AUTHORITY(Estate Management Directorate-II)
Annexure “F”
No. CDA/DEM-II/ Islamabad 2018
51
SAMPLE
From: Director, Estate Management–II,
Capital Development Authority
Islamabad.
To: ______________________________
______________________________
______________________________
Subject:- ALLOTMENT OF PLOT NO. ________SECTOR________, ISLAMABAD.
Dear Sir,
I am pleased to inform you that since you have paid the total premium amounting Rs.______________, @ Rs. ____ psy. the CDA has been pleased to
allot you Plot No. _______, Sector ________________, Islamabad, measuring _____________sq: yards, more or less, subject to actual measurement at the time of
handing over its possession on the following terms and conditions:-
1. The land, will be leased out for a period of 33 years and may be extended for two subsequent terms of 33 years each on such terms and conditions as
may be determined by the Authority at the time of each renewal of the lease.
2. The plot is meant for construction of _________ building for _____________________.
3. Possession of the plot will be taken by you within 30 days of receipt of this letter, failing which the possession will be deemed to have been taken over
by you.
4. The actual amount payable by you on account of premium of the plot shall be determined on demarcation and actual measurement of the plot by the
Authority's Surveyor at the time of handing over possession.
5. If at the time of handing over possession, the plot is found to measure more or less than the area advertised; adjustment would be made accordingly,
the rate of premium remaining unchanged.
6. In addition to the premium, Annual Ground Rent (@ Rs. 13/- per sq. yard for Class-III Shopping Center, I&T Centers, F&V Markets and Whole Sale
Markets – Rs. 26/- for Class-V Shopping Centers / Markaz – Rs. 35/- per sq.yd for Blue Area and Rs. 14,551/- per acre for all Agro-Farms), Hotel-Rs. 16/-,
Motels-Rs. 12/-, Flat sites (I)Luxury Flats-Rs. 25/- (ii) Economy Flats-Rs. 10/- (iii) Government-Rs. 10/- will be charged from the date of possession or
assumed possession, payable in the first week of every year in advance (Whether formally demanded or not). The rate of AGR shall be increased
by 15% after every three years or as determined by the CDA Board from time to time.
CAPITAL DEVELOPMENT AUTHORITY(Estate Management Directorate-II)
Annexure “G”
No. CDA/DEM-II/ Islamabad 2018
53
SAMPLE
7. Water Charges for construction purpose (up to the date of completion or assumed date of completion) will be charged at the rate of Rs.3/- per
square feet of the covered area of the entire building (or as may be revised from time to time). The area has been calculated on the basis of total
permissible covered area of the building.
8. Within one month from the date of possession or assumed date of possession, the CDA will, if so desired by you, execute an agreement to lease
out the plot in question in your favour and get the same registered at your cost and expense.
9. No additional charges, mark up or compensation shall be payable by CDA on any amount that would have remained with it.
10. All payments shall be made through Bank Drafts / Pay Orders in favour of Capital Development Authority, Islamabad.
11. If for any reason you decide to surrender the plot, the Authority shall accept such surrender by forfeiting 10% of the total premium of the plot.
12. Within six months from the date of possession or assumed date of possession you shall start construction in accordance with the plans / drawings
of the proposed building, duly approved by the Authority, and complete it in all respect within a period of 2 years for Class-III Shopping Center, I&T
Center, F&V Markets and Whole Sale Markets and 3 years for Marakaz and Blue Area from the date of this letter fit for occupation and use in
substantial workman-like manner with good and sound material of the respective kinds strictly in accordance with the relevant provisions of
Islamabad Building and Zoning Regulations, standards and instructions as may be in force during the course of construction. Failure to complete the
building within the stipulated time may render allotment liable to be cancelled, in which event 10% of the total premium of the plot shall be forfeited
in favour of the Authority. No compensation etc shall be paid for the structure thereon. Provided the CDA Board may for good and sufficient cause (to
be shown in writing) allow you extension in the construction period by imposing extension surcharge at the rate as may be fixed by the Authority from
time to time. No application for extension of construction period shall be entertained unless the same is submitted at least nine months before the
expiry of the period.
13. If for any reason CDA fails to hand over possession of the plot to you within three months after full payment of the price, you will have the option to
apply for surrendering the plot and claim refund of the paid amount without any deduction. The decision of the Authority shall be final in this regard.
14. You shall permit and afford reasonable facility at all times, to any officer of the Authority authorized in this behalf to inspect the plot and any
building thereon at all stages.
15. You shall submit form “D” to the CDA for checking at the plinth level (damp proof course) and shall submit form A-1, A-II approval of building plans
and shall submit form B-1 and B-2, in duplicate, along with Seven completion drawing / plans to the CDA, for the issuance of completion certificate
within three months from the date of completion of the building, failing which penalty, as prescribed by the Authority, shall be imposed and
recovered for every week of delay in submission of these forms.
16. Upon the completion of the said building and fulfilling the terms and conditions herein contained to the satisfaction of the Authority, whose
54
SAMPLE
decision in this behalf shall be final, the Authority will, at your cost and expense, execute a lease deed in your favour in respect of the plot reserving
to itself or the Government the rights in all mines, minerals, etc and the right to remove / enjoy the same in accordance with law. In no case the
building shall be occupied without the issuance of Permission to occupy the building by the Authority.
17. If it is found at any time that the lease has been secured by you by giving false information the plot will be withdrawn and the premium paid and
structure raised thereon will be forfeited by the Authority and you will be liable to make good any loss that may be sustained by the Authority on
resale of the plot.
18. You shall, before using or renting out the building for any business / trade or purpose other than one for which the plot / site has been allotted to
you, be required to obtain approval of the Authority. Normally no restriction will be imposed about any trade but in case the Authority considers some
trade to be harmful to the interests of the surrounding area, it may refuse the use for that purpose. The decision of the Authority in this regard will be
final and building upon you. The change may be subject to payment of fee of trade change as may be fixed by the Authority from time to time. The
basement will not be used for any other purpose under any circumstances, other then purpose provided under para 2 above.
19. In case of default due to non-conforming use, the allotment of lease will be withdrawn and structure if any on the plot, will be confiscated and no
compensation will be paid.
20. In case of cancellation of lease allotment, you may appeal to the Authority within a period of one year. In case of restoration of cancelled plot for
non-payment of Authority's dues, or for any other reason you will have to pay not only the outstanding dues, if any, but also the delayed payment
charges thereon and the restoration fee within 30 days under the prevailing restoration policy.
21. Transfer of plot will be subject to the policy of the CDA prevailing at the time of making request for transfer.
22. You shall not without the prior permission in writing of the Authority divide the plot or building or change it's dimensions in any manner
whatsoever, nor shall you part with the possession of or let out the plot or any part thereof.
23. You shall intimate to the Authority any change in your address failing which any communication meant for you will be sent at the last address
available with the Authority. Under normal circumstances, a letter posted shall be deemed to have been delivered at the address outside Islamabad
in one-week time and in Islamabad within four days of the date of posting.
24. If in the opinion of the Authority whose decision in this behalf shall be final topography of the plot so requires the Authority shall, at the time
thereafter, have the right of passage and running of water and soil from the adjoining and neighboring land and building now or thereafter created
thereon through sewerage / drainage pipes and channels or any of them for the purpose of exercising the said right of running of water and soil but
without any allowance or paying any compensation to you for the exercise of such rights.
25. You shall comply with and abide by the rules, regulations, bye-laws, orders and directions that may be issued or given by the Authority from time
to time.
26. You shall not tap or use under ground water except to to the extent and in the manner as any, in writing, be permitted by the Authority.
55
SAMPLE
27. From the date you take over or are deemed to have taken over possession of the plot, you shall pay all taxes, rates, and royalties, if any, land
revenue, assessment, duties, charges (including betterment and maintenance charges) and impositions whatsoever, which are now chargeable or
may hereafter be charged or imposed upon or be payable in respect of the plot or site, any structure thereon or anything fastened thereto under any
law, or order for the time being in force.
28. The municipal services, such as water connection, will be disconnected by the CDA in case you fail to pay property tax and other dues of the CDA
within the prescribed period.
29. In case of breach of any one or more of the above-cited conditions and non-observance of the above-mentioned obligations, the allotment will be
liable to be withdrawn / cancelled after deduction 10% of the total premium of the plot.
30. Time will be the essence of contract in these terms and conditions.
31. These conditions are in addition to the provisions of law, rules and regulations, etc, of the Authority that may be applicable to the allotment of the
subject plot and its use.
Sincerely
(Director EM-II)
Copy to:-
1. Director (Urban Planning) CDA.
2. Director (Building Control), CDA.
3. Director Revenue, CDA.
4. Director IT, CDA
5. Accounts Officer, E M-II, CDA.
6. Master File.
Director EM-II
56
SAMPLE