SUBSTATIONS & SUBTRANSMISSION PLAN SAMAR ELECTRIC COOPERATIVES

description

Power Supply Planning for Leyte and Samar.

Transcript of Samar Subtransmission Presentation -Final

  • SUBSTATIONS & SUBTRANSMISSION PLANSAMAR ELECTRIC COOPERATIVES

  • EXISTING SYSTEM MAPOF SAMAR ISLAND COOPS

  • BAGOLIBAS S/S5/6.25 MVABAGOLIBAS NGCP S/S10 MVA-138/69 KVWRIGHT NGCP S/S138/69 KVCATBALOGANS/S10/12.5 MVAPARANAS S/S5/6.25 MVABUENAVISTA S/S5/6.25 MVACABONGS/S5/6.25 MVATAFT S/S3.75 MVASAN AGUSTINS/S5/6.25 MVACAPOOCANS/S5/6.25 MVAPALANASS/S5/6.25 MVALAWAAN S/S3.75 MVACATARMAN S/S5/6.25 MVAALLEN S/S5/6.25 MVAEXISTING SYSTEM MAP 2010CALBAYOG NGCP S/S138/69 KV

  • 2011- 2030 DEMAND MW FORECASTOF SAMAR ISLAND COOPS

  • 2011-2030 DEMAND MW FORECAST per COOP

    YEARDEMAND MWESAMELCOSAMELCO ISAMELCO IINORSAMELCOTOTAL201112.69410.69510.72611.33045.446201213.47511.30211.13712.07247.986201314.31112.00811.59912.96550.883201415.20812.82512.11814.03554.186201516.17213.76312.69915.30857.942201617.20714.83513.34616.81262.200201718.31916.05114.06618.57267.008201819.51417.42214.86220.61672.415201920.79818.95915.74122.97078.467202022.17620.67316.70525.66085.214202123.65322.57517.76128.71392.703202225.23524.67718.91332.156100.982202326.92826.99020.16736.014110.099202428.73729.52421.52640.316120.103202530.66732.29022.99741.525127.480202632.72535.30124.58342.771135.379202734.91538.56626.28944.054143.824202837.24342.09728.12145.376152.837202939.71545.90530.08346.737162.440203042.33750.00032.18048.139172.656

  • PROPOSED SUBSTATION LOCATION (2011 2030)

    OF SAMAR ISLAND COOPS

  • PROPOSED SUBSTATION FOR 2011 BOBON S/S15/20 MVACATARMAN S/S5/6.25 MVACAPOOCANS/S5/6.25 MVACABONGS/S5/6.25 MVACAPOOCANS/S15/20 MVACABONGS/S15/20 MVA MAPANAS S/S5/6.25 MVA GUIUAN S/S5/6.25 MVA VILLAREALS/S5/6.25 MVA

  • PROPOSED SUBSTATION FOR 2012 ORAS S/S5/6.25 MVATAFT S/S3.75 MVA TINAMBACAN S/S5/6.25 MVA

  • PROPOSED SUBSTATION FOR 2016 GANDARA S/S10/12.5 MVA

  • PROPOSED SUBSTATION FOR 2017 OQUENDO SS10/12.5 MVAPALAPAGSS5/6.25 MVA

  • PROPOSED SUBSTATION FOR 2018 SAN ISIDRO S/S5/6.25 MVA

  • PROPOSED SUBSTATION FOR 2020 LAWAAN SS5/6.25 MVA CATARMAN S/S10/12.5 MVA

  • PROPOSED SUBSTATION FOR 2021RAWIS SS15/20 MVABASEY SS5/6.25 MVA PAMBUJAN SS5/6.25 MVA

  • PROPOSED SUBSTATION FOR 2024 ROSARIO S/S5/6.25MVA

  • PROPOSED SUBSTATION FOR 2025CALBIGA S/S5/6.25 MVA GUIUAN S/S2-5/6.25 MVA

  • PROPOSED SUBSTATION FOR 2028DARAM S/S5/6.25 MVA

  • PROPOSED SUBSTATION FOR 2029 LOKILOKON S/S3.75 MVA LLORENTE S/S5/6.25 MVA

  • PROPOSED SUBSTATION FOR 2030

  • 2011 -2015 Substation w/ 69 kV Expansion

    Samar Island Coops

  • PROPOSED SUBSTATION FOR 2011 BOBON S/S15/20 MVACAPOOCANS/S5/6.25 MVACABONGS/S5/6.25 MVACAPOOCANS/S15/20 MVACABONGS/S15/20 MVA MAPANAS S/S5/6.25 MVA GUIUAN S/S5/6.25 MVA VILLAREALS/S5/6.25 MVA

  • PROPOSED SUBSTATION FOR 2012 ORAS SS5/6.25 MVATAFT SS3.75 MVA TINAMBACAN S/S5/6.25 MVA

  • PROPOSED 69 KV LINE LOOP FOR 2013-2015 PROJECT 1 LOOPINGTINAMBACAN ALLEN 69 KV LINEPROJECT 3 LOOPINGMAPANAS ORAS 69 KV LINEPROJECT 2 LOOPINGSTA RITA BUENAVISTA 69 KV LINE

  • SUMMARY OF CAPEX PROJECTS

    SAMAR ISLAND COOPS2011 - 2015

  • A. ACQUISITION OF 69 kV LINE:

    Note: Price Acquisition based on TRANSCO Offer in CY 2007.

    COOPTOTAL 69 KV LENGTH (KM)TOTAL AMOUNT (Php)SAMELCO 183.00100,632,000.00SAMELCO 220.5922,999,385.00ESAMELCO190.50309,476,295.74NORSAMELCO169.00272,618,812.38TOTAL463.09705,726,493.12

  • B. REFURBISHMENT/REHABILITATION OF EXISTING 69 kV LINE:

    Note: Estimated Cost of Refurbishment of 69 kV

    COOPTOTAL 69 KV LENGTH (KM)TOTAL AMOUNT (Php)SAMELCO 183.00 44,252,000.00 SAMELCO 220.59 8,064,864.48 ESAMELCO190.50 185,685,777.44 NORSAMELCO169.00 190,833,168.67 TOTAL463.09 424,836,610.59

  • C. RELIABILITY PROJECTSLOOPING OF 69 KV LINE:NOTE: Cost of New 69 kV line estimated at Php 2.6M/km including ROW.

    LOCATIONTOTAL 69 KV LENGTH (KM)TOTAL AMOUNT (Php)YEAR of IMPLEMENTATIONTINAMBACAN - ALLEN70.00187,600,000.002013 - 2015STA RITA - BUENAVISTA110.00286,000,000.002013 - 2015MAPANAS - ORAS64.00172,000,000.002013 - 2015SAMELCO I (LOOP)2.35,980,000.002013 - 2015TOTAL244651,580,000.00

  • D. SUBSTATION & SUBTRANSMISSION EXPANSION

    Note: Includes the Construction of Substation & Subtransmission

    COOPTOTAL 69 KV LENGTH (KM)TOTAL AMOUNT (Php)SAMELCO 117 76,081,249.50SAMELCO 2101.5 112,940,000.00ESAMELCO156 263,496,058.62NORSAMELCO54.4 184,170,000.00TOTAL329 636,687,308.12

  • SUMMARY OF PROJECTS

    PROJECTTOTAL AMOUNT (Php)ACQUISITION OF 69 KV LINE705,726,493.12REFURBISHMENT/REPLACEMENT OF 69 kV LINE424,836,610.59RELIABILITY PROJECTS651,580,000.00 EXPANSION PROJECTS636,687,308.12TOTAL2,418,830,411.83

  • SUMMARY OF 2010 RESIDUAL & CONNECTION CHARGES per COOPAverage rate for Res & Connection Charges (existing) = 0.7946 Php/kwhr.

    EC2010 kWh PurchasedResidual Charges (Annual)Connection Charges (Annual)TOTAL (Residual + Connection)Rate per kWhrESAMELCO54,454,706.00 703,423.08 80,810,811.36 81,514,234.44 1.496918SAMELCO I50,079,092.00 9,291,712.20 2,621,753.16 11,913,465.36 0.237893SAMELCO II52,577,312.00 1,586,335.56 2,886,505.56 4,472,841.12 0.085072NORSAMELCO60,863,161.00 11,406,593.04 63,910,073.04 75,316,666.08 1.237475TOTAL217,974,271.00 22,988,063.88 150,229,143.12 173,217,207.00 0.794668

  • RATE IMPACT ANALYSIS FOR CAPEX PROJECTSAverage rate for Res & Connection Charges (existing) = 0.7946 Php/kwhr.Average rate for Res & Connection Charges (new) = 1.809 Php/kwhr.

    20112012201320142015TOTALFORECAST ENERGY PURCHASED KWHR226,526,960.28244,611,142.07264,899,205.51287,588,105.89312,874,777.161,336,500,190.92PROJECTED REVENUE409,973,978.57442,703,168.73479,420,997.25520,483,918.62566,248,348.672,418,830,411.83TOTAL CAPEX WITH DEBT SERVICING1,455,456,586.27311,793,825.56217,193,333.33217,193,333.33217,193,333.332,418,830,411.83NET REVENUE FOR CAPEX-1,045,482,607.70130,909,343.17262,227,663.92303,290,585.29349,055,015.330.00