sajjad ali shaikh_CV
-
Upload
sajjad-ali -
Category
Documents
-
view
51 -
download
7
Transcript of sajjad ali shaikh_CV
SAJJAD ALI SHAIKH +923312744022/+923313868037
[email protected] Valid UAE Driving License
PROFILE:
Senior Mechanical Engineer (HVAC) having more than 17 years experience to analyze complex engineering problems, strong ability and experience to evaluate and recommend alternatives and communicate recommendations effectively.
AREAS OF SPECIALIZATION: Senior Mechanical Engineer, with more than 17 years experience in Project
Management & Execution of HVAC Projects. Experience of Testing, Commissioning, Designing and Site Supervision. Project and Resources Management Skills.
QUALIFICATION:
B.E. Mechanical Engineering 4– Years Engineering Degree earned in 1995Mehran University of Engineering & Technology, Jamshoro, Sindh, Pakistan
COMPUTER SKILLS:
MS Word, MS Excel, MS Project AutoCAD, Primavera
WORK EXPERIENCE:PETROFAC EMIRATES LLC. Abu Dhabi (GASCO Project) July 2011 – to – May 2013
Field HVAC Engineer (Lead) / Commissioning DepartmentManage resources and conduct support and operations of HVAC installation,Testing & Commissioning at NGL-train-4 Project Al-Ruwais Abu Dhabi
ARABIAN SASNA Est., Abha, KSAMarch 2011 – to – June 2011
Manager of Maintenance & OperationsManage resources and conduct support and operations of Air Conditioning Systems and HVAC installation at various projects in the Abha Region.
1
Project Engineer (HVAC) – THERMO LLC, Dubai, UAEDecember 2007 to October 2008
Responsibilities:
To coordinate the work of HVAC Engineers with the balance of a multi-disciplined team throughout the entire project, design development and contract document work sessions at project site in conjunction with Project Manager, Project Architect and other disciplines.
Responsible to coordinate workload through the entire project requirements Projects completed:
1. Renaissance Hotel at Motor City Project, Dubai5-Star Hotel (2B+G+M+28FL)
2. Area -2 (Phase-1)Furnished Apartments (Zone-1 to Zone-5)
Senior Commissioning Engineer – SUTTON INTERNATIONAL LLC, Dubai, UAEFebruary 2000 to December 2007
Responsibilities:
Reporting to the Projects Manager and the Commissioning Manager. Supervision of the team of Engineers and Technicians. Responsibility of the supervision and execution of commissioning works of
wide range projects throughout the Middle East. Air side balancing and commissioning of central HAVC systems. Water side balancing and commissioning of central HAVC systems. Fault finding and rectification during the commissioning process. Carrying out of “commissioning ability” reviews of mechanical services
design drawings including the issue of detailed reports to the contractor or client indicating recommendations of design changes prior to the commencement of installation works.
Preparation of defects and rectification reports of issues to contractors and consultants.
Attendance of commissioning meetings with clients and consultant. Training of Engineers and Technicians. Preparation of commissioning records. Preparation of operations and maintenance manuals.
Projects completed:
1. Dubai World Trade Centre – New Hotels 2. Grand Hyatt Hotel, Dubai. 3. Sahara Centre, Sharjah (Management)4. Etisalat Building Al Nahda, Sharjah. 5. City Centre, Sharjah 6. Sharjah Mega Mall 7. City Bank HQ, Oud Metha, Dubai 8. Grand Cineplex, Oud Metha, Dubai 9. Bank Meli Iran, Dubai 10. Ritz Carlton Hotel, Doha, Qatar. 11. Commercial Bank of Dubai
2
12. Al Gurg Tower, Dubai13. Sky Walk Towers, Dubai 14. Sheikh Marwan Palace, Dubai 15. Bur Dubai Traffic Police New HQ 16. Shaikh’s Private Villa ( Abu Dhabi) 17. 21st Centaury Tower Dubai ( Management )18. Madina Jamera ( Dubai) 19. Al Raha Beach Resorts (Hotel & Shopping Mall) Abu Dhabi20. New Burjuman Expansion Dubai21. The gate building ( DIFC) Dubai22. Al Ramool Stores ( Dubai Municipality) 23. Jumeirah Beach Residence Sector-01 (JBR-1) (Management)24. Emirates Engineering Centre Dubai Airport
Maintenance Engineer – GOLDEN FALCON HOTEL Dubai (3-Stars Hotel)February1998 to January 2000
Responsibilities:
Carrying out of routine and breakdown maintenance of Air Conditioning systems, lighting, lifts, kitchens, audio equipment etc.
Plant Engineer – JAMSHORO THERMAL POWER STATION, Pakistan August 1995 to January 1998
Responsibilities:
Began employment as Technical Supervisor and later promoted to Plant Engineer for maintenance of compressors and boilers.
Checking and Measurement of compressor gauges. Checking and monitoring of boiler temperatures Maintenance and monitoring of compressor lines Maintenance and monitoring of all boiler equipment including water feeder
temperatures, cooling systems etc.
3