SAI WARDHA POWER GENERATION LIMITED SIX MONTHLY ENVIRONMENTAL COMPLIANCE STATUS REPORT (PERIOD : OCT, 2017 to MARCH, 2018) Ref: J-13011/23/2007-IA-II (T) Dated: 17/07/2007 (as amended in the Year, 2013 & 2014) and J-13011/46/2007-IA-II (T) Dated: 21/11/2007 1 | Page Six monthly Compliance Status Report (October, 2017to March, 2018) Point wise compliance for the conditions stipulated in Environmental Clearance of (Phase- I & II) S.N. Condition Compliance as on 31 th March, 2018 1 No additional land in excess of 144 ha shall be acquired for any activity related to Phase-I & Phase-II. No additional land is acquired in excess of 144 Hac. for any activity related to Phase-I &II. 2 Coal with ash content not exceeding 34% and Sulphur content not exceeding 0.5% shall be used. Compliance in progress. WCL & SECL mines coal being utilized having ash content <34% and Sulphur content not exceeding 0.5%. 3 A bi-flue stack of 220 m height with exit velocity of not less than 25 m/s shall be provided with continuous online monitoring system. A bi-flue stack of 220 m has provided to each phase. 04 nos. of CEMS are in operation to measure the real time PM SO 2 , NO X and CO content along with physical parameter’s in flue gas. 4 High efficiency Electrostatic Precipitator (ESP’s) having efficiency of 99.9% shall be installed so as to ensure that particulate emissions do not exceed 50 mg/N m 3 . Compact ESP’s (COEBP) with adequate (=99.9%) collection efficiency has been installed in each unit to keep the particulate emissions within stipulated standards. Bags of Unit# 4 replaced during August’2017. Stack emission details are attached as annexure-I 5 Fly ash shall be collected in dry form and utilized as per fly ash utilization notification, 1999. The fly ash stored in dry form in silos with adequate capacities. 100% fly ash is being supplied to Cement plants as per fly ash notification come into force time to time. (Please see annex. II) 6 Water requirement shall not exceed 1892 m 3 /hr. Agreed and compliance in progress. 7 Closed cycle of Concentration (COC) of 5 shall be provided. Agreed and compliance in progress. 8 Waste water generated shall be recycled and reused within the plant premises. There shall be no discharge of waste water outside the plant boundary. Waste Water is being treated in ETP & STP and further utilized in process, green belt development and dust suppression activities. There is no discharge of waste water outside the plant premises.

Transcript of SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. ·...

Page 1: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

SAI WARDHA POWER GENERATION LIMITED

SIX MONTHLY ENVIRONMENTAL COMPLIANCE STATUS REPORT

(PERIOD : OCT, 2017 to MARCH, 2018)

Ref: J-13011/23/2007-IA-II (T) Dated: 17/07/2007 (as amended in the Year, 2013 & 2014) and

J-13011/46/2007-IA-II (T) Dated: 21/11/2007

1 | P a g e Six monthly Compliance Status Report (October, 2017to March, 2018)

Point wise compliance for the conditions stipulated in Environmental Clearance of (Phase- I & II)

S.N. Condition Compliance as on 31th

March, 2018

1 No additional land in excess of 144 ha shall

be acquired for any activity related to

Phase-I & Phase-II.

No additional land is acquired in excess of 144 Hac.

for any activity related to Phase-I &II.

2 Coal with ash content not exceeding 34%

and Sulphur content not exceeding 0.5%

shall be used.

Compliance in progress. WCL & SECL mines coal

being utilized having ash content <34% and Sulphur

content not exceeding 0.5%.

3 A bi-flue stack of 220 m height with exit

velocity of not less than 25 m/s shall be

provided with continuous online

monitoring system.

A bi-flue stack of 220 m has provided to each phase.

04 nos. of CEMS are in operation to measure the

real time PM SO2, NOX and CO content along with

physical parameter’s in flue gas.

4 High efficiency Electrostatic Precipitator

(ESP’s) having efficiency of 99.9% shall be

installed so as to ensure that particulate

emissions do not exceed 50 mg/N m3.

Compact ESP’s (COEBP) with adequate (=99.9%)

collection efficiency has been installed in each unit

to keep the particulate emissions within stipulated

standards. Bags of Unit# 4 replaced during

August’2017. Stack emission details are attached

as annexure-I

5 Fly ash shall be collected in dry form and

utilized as per fly ash utilization

notification, 1999.

The fly ash stored in dry form in silos with adequate

capacities. 100% fly ash is being supplied to Cement

plants as per fly ash notification come into force

time to time. (Please see annex. II)

6 Water requirement shall not exceed 1892

m3/hr.

Agreed and compliance in progress.

7 Closed cycle of Concentration (COC) of 5

shall be provided.

Agreed and compliance in progress.

8 Waste water generated shall be recycled

and reused within the plant premises.

There shall be no discharge of waste water

outside the plant boundary.

Waste Water is being treated in ETP & STP and

further utilized in process, green belt development

and dust suppression activities. There is no

discharge of waste water outside the plant

premises.

Page 2: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

SAI WARDHA POWER GENERATION LIMITED

SIX MONTHLY ENVIRONMENTAL COMPLIANCE STATUS REPORT

(PERIOD : OCT, 2017 to MARCH, 2018)

Ref: J-13011/23/2007-IA-II (T) Dated: 17/07/2007 (as amended in the Year, 2013 & 2014) and

J-13011/46/2007-IA-II (T) Dated: 21/11/2007

2 | P a g e Six monthly Compliance Status Report (October, 2017to March, 2018)

9 Regular monitoring of ground water quality

including heavy metals shall be undertaken

in the project area to ascertain the change,

if any, in the water quality due to leaching

of contaminants from the ash disposal area.

Ground water quality monitoring and analysis is

being carry out in regular intervals in an around the

project and waste disposal areas. Ground water

Monitoring Report is enclosed herewith as

Annexure III

10 Noise levels shall be limited to 75 dBA. For

people working in the high noise area,

protective devices such as earplugs etc.

shall be provided.

Noise levels are being regularly monitored in work

place area as well as around project area. The

monitoring results are within the prescribed limits.

The turbine and generator are acoustically enclosed

to restrict the noise levels at work zone within the

permissible limits. However, protective devices

have been provided to the workers working in the

high noise areas.

11 A greenbelt shall be developed all around

the plant boundary and ash pond area

covering at least 1/3rd

of total project area

of Phase-I & Phase-II.

Green Belt developed in approx. 48 Hac area

covering approx. 34% of total plant area .Plantation

is done all along the periphery of the plant premises

as well as inside plant. Status of Greenbelt

Development is enclosed as Annexure – IV.

12 Regular monitoring of the air quality shall

be carried out in and around the power

plant and records shall be maintained. The

location of monitoring stations and

frequency of monitoring shall be decided in

consultation with State Pollution Control

Board. Six monthly reports shall be

submitted to this Ministry and its Regional

Office at Bhopal.

Regular monitoring of ambient air quality is being

carried out in the plant premises and in surrounding

villages. Monitoring results are within the

prescribed limits and submitted regularly to the

MPC Board.

Ambient Air Quality Monitoring Report is enclosed

as Annexure-V

13 For controlling fugitive dust, regular

sprinkling of water in coal handling areas

and other vulnerable areas of the plant

shall be ensured.

For controlling fugitive dust emission, effective dust

suppression system has been installed at coal

storage yard, conveyor belt, along the sides of the

internal roads and other vulnerable areas of AHP &

CHP.

Page 3: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

SAI WARDHA POWER GENERATION LIMITED

SIX MONTHLY ENVIRONMENTAL COMPLIANCE STATUS REPORT

(PERIOD : OCT, 2017 to MARCH, 2018)

Ref: J-13011/23/2007-IA-II (T) Dated: 17/07/2007 (as amended in the Year, 2013 & 2014) and

J-13011/46/2007-IA-II (T) Dated: 21/11/2007

3 | P a g e Six monthly Compliance Status Report (October, 2017to March, 2018)

In addition, Two water tankers are being deployed

at site for controlling of fugitive dust.

14 The project proponent should advertise in

at least two local newspapers widely

circulated in the region around the project,

one of which should be in the vernacular

language of the locality concerned within

seven days of issue of this letter, informing

that the project has been accorded

environmental clearance and copies of

clearance letters are available with the

State Pollution Control Board/Committee

and may also be seen in the Website of the

Ministry of Environment and Forests in the

http://envfor.nic.in.

The Public Notice of Environmental Clearance has

been given in two newspapers namely, The Hitvada

and Lokmat on 03.08.07 (Phase-I) and 28.11.2007

(Phase-II) which are widely circulated in the region.

15 A separate environment monitoring cell

with suitable qualified staff should be set

up for implementation of the stipulated

environmental safeguards.

A separate environmental management cell

comprising the qualified personals is in place at site

who is reporting to Unit Head/In-Charge.

Further, Environmental Management department

at head office coordinate with site environment

management cell in all the activities.

16

Half yearly report on the status of

implementation of the conditions and

environmental safeguards shall be

submitted to this Ministry, its Regional

Office, CPCB and SPCB.

Half yearly reports are being sent to MoEF & RO,

MPCB regularly. Half yearly report for the period of

March 2017 to September’2017 has been submitted

vide letter no. MoEF, NGP/SVVN/4160128/1150,

Dt. 06/12/2017.

A copy of the letter is attached for your ready

reference as Annexure-VI

17 Regional Office of the Ministry of

Environment & Forests located at Bhopal

will monitor the implementation of the

stipulated conditions. A complete set of

documents including Environmental Impact

Assessment Report, Environment

Management Plan and other information

A complete set of documents has been submitted

to Regional Office of the Ministry vide ref MOEF,

BHPL/AKM/1160101/910 dated 02.06.2009.

Page 4: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

SAI WARDHA POWER GENERATION LIMITED

SIX MONTHLY ENVIRONMENTAL COMPLIANCE STATUS REPORT

(PERIOD : OCT, 2017 to MARCH, 2018)

Ref: J-13011/23/2007-IA-II (T) Dated: 17/07/2007 (as amended in the Year, 2013 & 2014) and

J-13011/46/2007-IA-II (T) Dated: 21/11/2007

4 | P a g e Six monthly Compliance Status Report (October, 2017to March, 2018)

Submitted to MoEF should be forwarded to

the Regional Office for their use during

monitoring.

18 Separate funds should be allocated for

implementation of environmental

protection measures along with item-wise

break-up. These cost should be included as

part of the project cost. The funds

earmarked for the environment protection

measures should not be diverted for other

purposes and year-wise expenditure should

be reported to the Ministry.

Separate funds have been allocated for

implementation of environmental protection

measures. The funds earmarked for the

environment protection measures shall be utilized

only for environment protection.

19 Full cooperation should be extended to the

Scientists/Officers from the Ministry and its

Regional Office at Bhopal /the CPCB/the

SPCB during monitoring of the project.

Noted, and is being complied.

Page 5: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 1

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Stack Emission Monitoring ReportReport No.: ME-CN0763-171230-SA-SWPGL-WARORA Date: 30.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATIONLIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/010330 Dt.04.09.2017

Sample Description/Type

Stack Emission Monitoring

Sample Collected by Laboratory

Sampling Location Stack Port Hole Sample Quantity/Packing

PM, Hg: 1 X 1 No. ThimbleSO2: 30 mL X 1No. PVC Bottle NOX: 25 mL X 1No. PVC Bottle CO: Bladder 2L X 1 No.

Date of Sampling 25.12.2017Date of Receipt of Sample 26.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

27.12.2017 Date of Completion of Analysis

30.12.2017

Stack Details Stack Identity Unit No.3 -Stack attached to ESP -Material of construction RCC -Stack height above ground level 220 MeterStack diameter 3.5 MeterStack shape at top Round -Type of fuel Coal -Parameter Unit Result *Limit Method ReferenceFlue gas temperature oC 125 - IS:11255 (Part 3):2008

Flue gas velocity m/s 23.3 - IS:11255 (Part 3):2008

Total gas quantity Nm3/h 603944 - IS:11255 (Part 3):2008

Total Particulate Matter (PM) mg/Nm3 34 100 IS:11255 (Part 1):1985, RA 2003

Sulphur Dioxide (SO2) mg/Nm3 425 18.0 T/day IS 11255 (Part 2): 1985, RA 2003

Sulphur Dioxide (SO2) kg/day 6160 - IS 11255 (Part 2): 1985, RA 2003

Oxide of Nitrogen (NOX) mg/Nm3 105 - IS 11255 (Part 7): RA 2005

Carbon Monoxide ppm 1.2 - IS 5182 (Part 10): 1999, RA 2003

Mercury (Hg) μg/Nm3 <0.6 0.03 mg/Nm3 USEPA Method 101a

Remarks: * Limit as per Notification on Dt.:07.12.2015----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 6: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 1

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Stack Emission Monitoring ReportReport No.: ME-CN0764-171230-SA-SWPGL-WARORA Date: 30.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/010330 Dt.04.09.2017

Sample Description/Type

Stack Emission Monitoring

Sample Collected by Laboratory

Sampling Location Stack Port Hole Sample Quantity/Packing

PM, Hg: 1 X 1 No. ThimbleSO2: 30 mL X 1No. PVC Bottle NOX: 25 mL X 1No. PVC Bottle CO: Bladder 2L X 1 No.

Date of Sampling 25.12.2017Date of Receipt of Sample 26.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

27.12.2017 Date of Completion of Analysis

30.12.2017

Stack Details Stack Identity Unit No.4 -Stack attached to ESP -Material of construction RCC -Stack height above ground level 220 MeterStack diameter 3.5 MeterStack shape at top Round -Type of fuel Coal -Parameter Unit Result *Limit Method ReferenceFlue gas temperature oC 127 - IS:11255 (Part 3):2008

Flue gas velocity m/s 24.3 - IS:11255 (Part 3):2008

Total gas quantity Nm3/h 626716 - IS:11255 (Part 3):2008

Total Particulate Matter (PM) mg/Nm3 37 100 IS:11255 (Part 1):1985, RA 2003

Sulphur Dioxide (SO2) mg/Nm3 473 18.0 T/day IS 11255 (Part 2): 1985, RA 2003

Sulphur Dioxide (SO2) kg/day 7114 - IS 11255 (Part 2): 1985, RA 2003

Oxide of Nitrogen (NOX) mg/Nm3 107 - IS 11255 (Part 7): RA 2005

Carbon Monoxide ppm 1.7 - IS 5182 (Part 10): 1999, RA 2003

Mercury (Hg) μg/Nm3 <0.6 0.03 mg/Nm3 USEPA Method 101a

Remarks: * Limit as per Notification on Dt.:07.12.2015----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 7: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 1

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Noise Level Monitoring Report (Inside Plant)

Report No.: ME-CN0765-171230-SA-SWPGL-WARORA Date: 30.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/010330 Dt.04.09.2017

Sample Description/Type

Noise Level Monitoring

Sample Collected by

Laboratory

Date of Sampling 25.12.2017

Sampling Procedure IS 9876:1981 & manufacturer Manual

Location(Industrial Area)

Unit

ResultsLimit

(For Industrial Zone)Time (h) Minimum Maximum

DM Plant dBA 11:00 63.5 66.3

75

Circulating Pump House

dBA 11:10 64.1 65.5

Fuel Oil Pump House dBA 11:05 63.3 66.4

Main Gate dBA 10:35 58.2 64.0

Boiler Area dBA 12:22 68.2 70.6

----------------------------------------------------------------END----------------------------------------------------------------FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 8: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 1

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Noise Level Monitoring Report (Outside Plant)

Report No.: ME-CN0766-171230-SA-SWPGL-WARORA Date: 30.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/010330 Dt.04.09.2017

Sample Description/Type

Noise Level Monitoring

Sample Collected by

Laboratory

Date of Sampling 25.12.2017

Sampling Procedure IS 9876:1981 & manufacturer Manual

Location(Residential Area)

UnitResults

Limit(For Residential Zone)

Time (h) Minimum Maximum

Naideo Village dBA 15:40 48.2 52.4

55Mohabala Village dBA 15:25 48.4 52.1

----------------------------------------------------------------END----------------------------------------------------------------FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 9: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content
Page 10: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content
Page 11: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content
Page 12: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content
Page 13: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Water Sample Analysis ReportReport No.: ME-CN0749-171222-SA-SWPGL-WARORA Date: 22.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATIONLIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/010330 Dt.04.09.2017

Sample Description/Type

Ground Water Sample Collected by Laboratory

Sampling Location

Well Water-Village Mohabala

Sample Quantity/Packing

3 L X 1 No. PVC Can500 mL X 1 No. PVC Can

Date of Sampling 05.12.2017Date of Receipt of Sample 06.12.2017

Sampling Procedure

IS:3025(Part I): 1987 RA2003, APHA 22nd Ed. 2012, 1060-B, 1-39

Date of Start of Analysis

07.12.2017Date of Completion of Analysis

22.12.2017

Sr. No.

Parameter Unit ResultAcceptable Limit

for Drinking Water (IS 10500:2012)

Method Reference

1. Colour Hazen <1 5 Max. APHA 22nd Ed. 2012, 2120-B, 2-6

2. Odour - Agreeable Agreeable IS 3025 (Part 5):1983,

Reaffirmed 2006

3. Taste -Agreeable

Agreeable IS 3025 (Part 7):1984, Reaffirmed 2006

4. Turbidity NTU 0.8 1 Max. APHA 22nd Ed. 2012, 2130-B, 2-13

5. pH - 8.0 6.5 to 8.5 APHA 22nd Ed. 2012, 4500-H+-B, 4-92

6.Total Dissolved Solids mg/L 879 500 Max. IS 3025 (Part 16):1984

Reaffirmed 2006

7.Total Suspended Solids mg/L <5 - APHA 22nd Ed. 2012, 2540-

D, 2-66

8.Alkalinity Total (as CaCO3)

mg/L 262 200 Max. IS 3025 (Part 23):1986 Reaffirmed 2009

9.Total Hardness (as CaCO3)

mg/L 338 200 Max.APHA 22nd Ed. 2012, 2340-C, 2-44,45

10.Ca-Hardness (as CaCO3)

mg/L 208 - APHA 22nd Ed. 2012, 3500-Ca-B, 3-67

11. Magnesium (as Mg) mg/L 31.6 30 Max. APHA 22nd Ed. 2012, 3500-Mg- B, 3-84

12. Potassium (as K) mg/L 2.6 - APHA 22nd Ed. 2012, 3500-K- B, 3-87

13. Chloride (as Cl) mg/L 236 250 Max. APHA 22nd Ed. 2012, 4500-Cl-B, 4-72

14. Sulphate (as SO4) mg/L 104 200 Max. APHA 22nd Ed. 2012, 4500-SO4-E, 4-190

Page 14: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Report No. 0749 cont…

Sr. No.

Parameter Unit ResultAcceptable Limit

for Drinking Water (IS 10500:2012)

Method Reference

15. Nitrate (as NO3) mg/L 13.5 45 Max. APHA 22nd Ed. 2012, 4500-NO3-E, 4-125

16.Phosphate Total(as PO4)

mg/L 0.041 - APHA 22nd Ed. 2012, 4500-P B, 4-151, E, 4-155

17. Fluoride (as F) mg/L 0.821 1 Max. APHA 22nd Ed. 2012, 4500-F- B & D, 4-84, 4-87

18. Copper (as Cu) mg/L N.D. 0.05 Max. APHA 22nd Ed. 2012, 3111-B, 3-18

19. Manganese (as Mn) mg/L N.D. 0.1 Max. APHA 22nd Ed. 2012, 3111-B, 3-18

20. Zinc (as Zn) mg/L 0.054 5 Max. APHA 22nd Ed. 2012, 3111-B, 3-18

Remarks: N.D. – Not Detected

-----------------------------------------------------------------END----------------------------------------------------------------FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 15: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Water Sample Analysis ReportReport No.: ME-CN0750-171222-SA-SWPGL-WARORA Date: 22.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/010330 Dt.04.09.2017

Sample Description/Type

Ground Water Sample Collected by Laboratory

Sampling Location

Borewell -Mohabala Village

Sample Quantity/Packing

3 L X 1 No. PVC Can500 mL X 1 No. PVC Can

Date of Sampling 05.12.2017 Date of Receipt ofSample

06.12.2017

Sampling Procedure IS:3025(Part I): 1987 RA2003, APHA 22nd Ed. 2012, 1060-B, 1-39

Date of Start of Analysis

07.12.2017 Date of Completion of Analysis

22.12.2017

Sr. No. Parameter Unit Result

Acceptable Limit for Drinking Water

(IS 10500:2012)Method Reference

1. Colour Hazen <1 5 Max. APHA 22nd Ed.2012,2120-B, 2-6

2. Odour - AgreeAble Agreeable IS 3025 (Part 5):1983,

Reaffirmed 2006

3. Taste - AgreeAble

Agreeable IS 3025 (Part 7):1984, Reaffirmed 2006

4. Turbidity NTU 0.7 1 Max. APHA 22nd Ed. 2012, 2130-B, 2-13

5. pH - 7.1 6.5 to 8.5 APHA 22nd Ed. 2012, 4500-H+-B, 4-92

6.Total Dissolved Solids mg/L 555 500 Max. IS 3025 (Part 16):1984

Reaffirmed 2006

7.Total Suspended Solids mg/L <5 - APHA 22nd Ed. 2012, 2540-

D, 2-66

8.Alkalinity Total (as CaCO3)

mg/L 198 200 Max. IS 3025 (Part 23):1986 Reaffirmed 2009

9.Total Hardness (as CaCO3)

mg/L 324 200 Max. APHA 22nd Ed. 2012, 2340-C, 2-44,45

10.Ca-Hardness (as CaCO3)

mg/L 222 - APHA 22nd Ed. 2012, 3500-Ca-B, 3-67

11. Magnesium (as Mg) mg/L 33.4 30 Max. APHA 22nd Ed. 2012, 3500-Mg- B, 3-84

12. Potassium (as K) mg/L 1.6 - APHA 22nd Ed. 2012, 3500-K- B, 3-87

13. Chloride (as Cl) mg/L 150 250 Max. APHA 22nd Ed. 2012, 4500-Cl-B, 4-72

14. Sulphate (as SO4) mg/L 50.4 200 Max. APHA 22nd Ed. 2012, 4500-SO4-E, 4-190

Page 16: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Report No. 0750 cont…

Sr. No.

Parameter Unit ResultAcceptable Limit

for Drinking Water (IS 10500:2012)

Method Reference

15. Nitrate (as NO3) mg/L 27.0 45 Max. APHA 22nd Ed. 2012, 4500-NO3-E, 4-125

16.Phosphate Total(as PO4)

mg/L <0.03 - APHA 22nd Ed. 2012, 4500-P B, 4-151, E, 4-155

17. Fluoride (as F) mg/L 0.988 1 Max. APHA 22nd Ed. 2012, 4500-F- B & D, 4-84, 4-87

18. Copper (as Cu) mg/L N.D. 0.05 Max. APHA 22nd Ed. 2012, 3111-B, 3-18

19. Manganese (as Mn) mg/L N.D. 0.1 Max. APHA 22nd Ed. 2012, 3111-B, 3-18

20. Zinc (as Zn) mg/L 0.091 5 Max. APHA 22nd Ed. 2012, 3111-B, 3-18

Remarks: N.D. – Not Detected

-----------------------------------------------------------------END----------------------------------------------------------------FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 17: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Water Sample Analysis ReportReport No.: ME-CN0751-171222-SA-SWPGL-WARORA Date: 22.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/010330 Dt.04.09.2017

Sample Description/Type

Ground Water Sample Collected by Laboratory

Sampling Location

Borewell -Village Naideo

Sample Quantity/Packing

3 L X 1 No. PVC Can500 mL X 1 No. PVC Can

Date of Sampling 05.12.2017 Date of Receipt of Sample

06.12.2017

Sampling Procedure

IS:3025(Part I): 1987 RA2003, APHA 22nd Ed. 2012, 1060-B, 1-39

Date of Start of Analysis 07.12.2017

Date of Completion of Analysis 22.12.2017

Sr. No.

Parameter Unit ResultAcceptable Limit

for Drinking Water (IS 10500:2012)

Method Reference

1. Colour Hazen <1 5 Max. APHA 22nd Ed.2012,2120-B, 2-6

2. Odour - Agreeable Agreeable IS 3025 (Part 5):1983, Reaffirmed 2006

3. Taste - Agreeable Agreeable IS 3025 (Part 7):1984, Reaffirmed 2006

4. Turbidity NTU 0.8 1 Max. APHA 22nd Ed. 2012, 2130-B, 2-13

5. pH - 7.8 6.5 to 8.5 APHA 22nd Ed. 2012, 4500-H+-B, 4-92

6.Total Dissolved Solids mg/L 496 500 Max. IS 3025 (Part 16):1984

Reaffirmed 2006

7.Total Suspended Solids mg/L <5 - APHA 22nd Ed. 2012,

2540-D, 2-66

8.Alkalinity Total (as CaCO3)

mg/L 282 200 Max. IS 3025 (Part 23):1986 Reaffirmed 2009

9.Total Hardness (as CaCO3)

mg/L 236 200 Max.APHA 22nd Ed. 2012, 2340-C, 2-44,45

10.Ca-Hardness (as CaCO3)

mg/L 182 - APHA 22nd Ed. 2012, 3500-Ca-B, 3-67

11. Magnesium (as Mg) mg/L 24.2 30 Max. APHA 22nd Ed. 2012, 3500-Mg- B, 3-84

12. Potassium (as K) mg/L 0.37 - APHA 22nd Ed. 2012, 3500-K- B, 3-87

13. Chloride (as Cl) mg/L 48.5 250 Max. APHA 22nd Ed. 2012, 4500-Cl-B, 4-72

14. Sulphate (as SO4) mg/L 40.8 200 Max. APHA 22nd Ed. 2012, 4500- SO4-E, 4-190

Page 18: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Report No. 0751 cont…

Sr. No.

Parameter Unit ResultAcceptable Limit

for Drinking Water (IS 10500:2012)

Method Reference

15. Nitrate (as NO3) mg/L 25.1 45 Max. APHA 22nd Ed. 2012, 4500-NO3-E, 4-125

16.Phosphate Total (as PO4)

mg/L 0.031 - APHA 22nd Ed. 2012, 4500-P B, 4-151, E, 4-155

17. Fluoride (as F) mg/L 0.652 1 Max. APHA 22nd Ed. 2012, 4500-F- B & D, 4-84, 4-87

18. Copper (as Cu) mg/L N.D. 0.05 Max. APHA 22nd Ed. 2012, 3111-B, 3-18

19. Manganese (as Mn) mg/L <0.04 0.1 Max. APHA 22nd Ed. 2012, 3111-B, 3-18

20. Zinc (as Zn) mg/L 0.050 5 Max. APHA 22nd Ed. 2012, 3111-B, 3-18

Remarks:

-----------------------------------------------------------------END----------------------------------------------------------------FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 19: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Water Sample Analysis ReportReport No.: ME-CN0752-171222-SA-SWPGL-WARORA Date: 22.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/010330 Dt.04.09.2017

Sample Description/Type

Surface Water Sample Collected by Laboratory

Sampling Location

Naideo NallahSample Quantity/Packing

3 L X 1 No. PVC Can500 mL X 1 No. PVC Can

Date of Sampling 05.12.2017 Date of Receipt of Sample

06.12.2017

Sampling Procedure

IS:3025(Part I): 1987 RA2003, APHA 22nd Ed. 2012, 1060-B, 1-39

Date of Start of Analysis 07.12.2017

Date of Completion of Analysis 22.12.2017

Sr. No.

Parameter Unit Result Method Reference

1. Colour Hazen <1 APHA 22nd Ed.2012,2120-B, 2-6

2. Odour - Agreeable IS 3025 (Part 5):1983, Reaffirmed 2006

3. Taste - N.A. IS 3025 (Part 7):1984, Reaffirmed 2006

4. Turbidity NTU 6.6 APHA 22nd Ed. 2012, 2130-B, 2-13

5. pH - 8.5 APHA 22nd Ed. 2012, 4500-H+-B, 4-92

6. Total Dissolved Solids mg/L 963 IS 3025 (Part 16):1984 Reaffirmed 2006

7. Total Suspended Solids mg/L 30 APHA 22nd Ed. 2012, 2540-D, 2-66

8. Alkalinity Total (as CaCO3) mg/L 154 IS 3025 (Part 23):1986 Reaffirmed 2009

9. Total Hardness (as CaCO3) mg/L 500 APHA 22nd Ed. 2012, 2340-C, 2-44,45

10. Ca-Hardness (as CaCO3) mg/L 264 APHA 22nd Ed. 2012, 3500-Ca-B, 3-67

11. Magnesium (as Mg) mg/L 57.3 APHA 22nd Ed. 2012, 3500-Mg- B, 3-84

12. Potassium (as K) mg/L 4.8 APHA 22nd Ed. 2012, 3500-K- B, 3-87

13. Chloride (as Cl) mg/L 164 APHA 22nd Ed. 2012, 4500-Cl-B, 4-72

14. Sulphate (as SO4) mg/L 166 APHA 22nd Ed. 2012, 4500- SO4-E, 4-190

Page 20: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Report No.0752 cont…Sr. No. Parameter Unit Result Method Reference

15. Nitrate (as NO3) mg/L 2.97 APHA 22nd Ed. 2012, 4500-NO3-E, 4-125

16. Phosphate Total (as PO4) mg/L 0.372 APHA 22nd Ed. 2012, 4500-P B, 4-151, E, 4-155

17. Fluoride (as F) mg/L 1.21 APHA 22nd Ed. 2012, 4500-F- B & D, 4-84, 4-87

18. Copper (as Cu) mg/L N.D APHA 22nd Ed. 2012, 3111-B, 3-18

19. Manganese (as Mn) mg/L 0.06 APHA 22nd Ed. 2012, 3111-B, 3-18

20. Zinc (as Zn) mg/L 0.045 APHA 22nd Ed. 2012, 3111-B, 3-18

Remarks: N.A.-Not Applicable; N.D. Not Detected-----------------------------------------------------------------END----------------------------------------------------------------FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 21: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 1

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Effluent Sample Analysis ReportReport No.: ME-CN0709-171218-SA-SWPGL-WARORA Date: 18.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATIONLIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/010330 Dt.04.09.2017

Sample Description/Type

Domestic Effluent

Sample Collected by Laboratory

Sampling Location

STP Outlet Sample Quantity/Packing

3 L X 1 No. PVC Can100 mL X 1 No. PVC Can

Date of Sampling 08.12.2017Date of Receipt of Sample

09.12.2017

Sampling Procedure IS:3025(Part I): 1987 RA2003, APHA 22nd Ed. 2012, 1060-B, 1-39

Date of Start of Analysis

09.12.2017 Date of Completion of Analysis

15.12.2017

Sr. No. Parameter Unit Result

Limit as per MPCB Consent Method Reference

1 pH - 7.8 5.5-9.0 APHA 22nd Ed. 2012, 4500-H+-B, 4-92

2 Electrical Conductivity S/cm 763 - APHA 22nd Ed. 2012, 2510-B, 2-54

3 Total Dissolved Solids mg/L 456 2100 Max. IS 3025 (Part 16):1984 Reaffirmed 2006

4 Total Suspended Solids mg/L 7 100 Max. APHA 22nd Ed. 2012, 2540-D, 2-66

5Biochemical Oxygen Demand (3 days 27oC) mg/L 5.6 30 Max. IS 3025 (Part 44): 1993,

Reaffirmed 2003, Amds.1

6Chemical Oxygen Demand mg/L 20 250 Max. APHA 22nd Ed. 2012, 5220-

B, 5-17

Remarks:

-----------------------------------------------------------------END----------------------------------------------------------------FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 22: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 1

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Effluent Sample Analysis ReportReport No.: ME-CN0710-171218-SA-SWPGL-WARORA Date: 18.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/010330 Dt.04.09.2017

Sample Description/Type

Industrial Effluent/Grab

Sample Collected by Laboratory

Sampling Location

DM Plant Effluent

Sample Quantity/Packing

3 L X 1 No. PVC Can100 mL X 1 No. PVC Can1 L X 1 No. Glass Bottle

Date of Sampling 08.12.2017 Date of Receipt of Sample

09.12.2017

Sampling Procedure

IS:3025(Part I): 1987 RA2003, APHA 22nd Ed. 2012, 1060-B, 1-39

Date of Start of Analysis 09.12.2017

Date of Completion of Analysis 15.12.2017

Sr. No.

Parameter Unit ResultLimit as per MPCB

Consent Method Reference

1 pH - 7.4 5.5-9.0 APHA 22nd Ed. 2012, 4500-H+-B, 4-92

2 Total Dissolved Solids mg/L 1086 2100 Max. IS 3025 (Part 16):1984 Reaffirmed 2006

3Total Suspended Solids mg/L 8 100 Max. APHA 22nd Ed. 2012,

2540-D, 2-66

4Biochemical Oxygen Demand (3 days 27oC) mg/L 3.6 30 Max. IS 3025 (Part 44): 1993,

Reaffirmed 2003, Amds.1

5Chemical Oxygen Demand mg/L 12 250 Max. APHA 22nd Ed. 2012,

5220-B, 5-17

6 Oil and Grease mg/L N.D. 10 Max. IS 3025 (Part 39): 1991, Reaffirmed 2003, Ed. 2.1

Remarks: N.D.–Not Detected

-----------------------------------------------------------------END----------------------------------------------------------------FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 23: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 1

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Effluent Sample Analysis ReportReport No.: ME-CN0711-171218-SA-SWPGL-WARORA Date: 18.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/010330 Dt.04.09.2017

Sample Description/Type

Industrial Effluent/Grab

Sample Collected by

Laboratory

Sampling Location

Boiler Blow Down

Sample Quantity/Packing

3 L X 1 No. PVC Can500 mL X 1 No. PVC Can1 L X 1 No. Glass Bottle

Date of Sampling 08.12.2017Date of Receipt of Sample

09.12.2017

Sampling Procedure

IS:3025(Part I): 1987 RA2003, APHA 22nd Ed. 2012, 1060-B, 1-39

Date of Start of Analysis 09.12.2017

Date of Completion of Analysis 14.12.2017

Sr. No.

Parameter Unit Result Limit as per MPCB Consent

Method Reference

1Total Suspended Solids mg/L <5 100 Max. APHA 22nd Ed. 2012,

2540-D, 2-66

2 Oil and Grease mg/L N.D. 20 Max. IS 3025 (Part 39): 1991, Reaffirmed 2003, Ed. 2.1

3 Copper (as Cu) mg/L <0.04 1.0 Max. APHA 22nd Ed. 2012, 3111-B, 3-18

4 Iron (as Fe) mg/L 0.486 1.0 Max. APHA 22nd Ed. 2012, 3111-B, 3-18

Remarks: N.D.–Not Detected

-----------------------------------------------------------------END----------------------------------------------------------------FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 24: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 1

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Effluent Sample Analysis ReportReport No.: ME-CN0712-171218-SA-SWPGL-WARORA Date: 18.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/010330 Dt.04.09.2017

Sample Description/Type

Industrial Effluent/Grab

Sample Collected by Laboratory

Sampling Location

Cooling Tower Blow Down

Sample Quantity/Packing

3 L X 1 No. PVC Can

Date of Sampling 08.12.2017Date of Receipt of Sample 09.12.2017

Sampling Procedure IS:3025(Part I): 1987 RA2003, APHA 22nd Ed. 2012, 1060-B, 1-39

Date of Start of Analysis

09.12.2017Date of Completion of Analysis

16.12.2017

Sr. No. Parameter Unit Result

Limit as per MPCB Consent Method Reference

1Total Free Chlorine (Residual) mg/L <0.05 0.5 Max. APHA 22nd Ed. 2012,

4500-Cl G, 4-69

2Phosphate Total(as PO4)

mg/L 0.152 5.0 Max. APHA 22nd Ed. 2012, 4500-P B, 4-151, E, 4-155

3 Chromium Total (as Cr) mg/L <0.1 0.2 Max. APHA 22nd Ed. 2012, 3111-B, 3-18

4 Zinc (as Zn) mg/L 0.048 1.0 Max. APHA 22nd Ed. 2012, 3111-B, 3-18

Remarks:

-----------------------------------------------------------------END----------------------------------------------------------------FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 25: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 1

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Effluent Sample Analysis ReportReport No.: ME-CN0713-171218-SA-SWPGL-WARORA Date: 18.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/010330 Dt.04.09.2017

Sample Description/Type

Industrial Effluent/Grab

Sample Collected by

Laboratory

Sampling Location

Condensate Cooling Tower Water

Sample Quantity/Packing

3 L X 1 No. PVC Can

Date of Sampling 08.12.2017Date of Receipt of Sample

09.12.2017

Sampling Procedure IS:3025(Part I): 1987 RA2003, APHA 22nd Ed. 2012, 1060-B, 1-39

Date of Start of Analysis

09.12.2017 Date of Completion of Analysis

12.12.2017

Sr. No.

Parameter Unit ResultLimit as per MPCB

Consent Method Reference

1 Temperature oC 28Not to exceed 50C higher than the

intake water

APHA 22nd Ed. 2012,2550-B, 2-69

2 pH - 8.1 6.5 to 8.5 APHA 22nd Ed. 2012, 4500-H+-B, 4-92

3Total Free Chlorine (Residual) mg/L <0.05 0.5 Max. APHA 22nd Ed. 2012,

4500-Cl G, 4-69

Remarks: N.D.–Not Detected

-----------------------------------------------------------------END----------------------------------------------------------------FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 26: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 1

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Effluent Sample Analysis ReportReport No.: ME-CN0714-171218-SA-SWPGL-WARORA Date: 18.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/010330 Dt.04.09.2017

Sample Description/Type

Industrial Effluent/Grab

Sample Collected by Laboratory

Sampling Location ETP Outlet

SampleQuantity/Packing

2 L X 1 No. PVC Can1 L X 1 No. Glass Bottle100mL X 2 No. PVC Can

Date of Sampling 08.12.2017Date of Receipt of Sample

09.12.2017

Sampling Procedure IS:3025(Part I): 1987 RA2003, APHA 22nd Ed. 2012, 1060-B, 1-39

Date of Start of Analysis

09.12.2017Date of Completion of Analysis

16.12.2017

Sr. No.

Parameter Unit Result

Limit as per E(P)A for

Inland Surface Water Disposal

Method Reference

1 pH - 8.1 5.5 to 9.0 APHA 22nd Ed. 2012,4500-H+-B,4-92

2 Total Dissolved Solids mg/L 742 - IS 3025 (Part 16):1984 RA 2006

3 Total Suspended Solids mg/L 10 100 Max. APHA 22nd Ed. 2012,2540-D 2-66

4 Chloride (as Cl) mg/L 186 - APHA 22nd Ed. 2012,4500-Cl-B, 4-72

5 Sulphate (as SO4) mg/L 35.2 - APHA 22nd Ed.2012,4500-SO4-E,4-190

6Phosphate Total (as PO4)

mg/L 0.194 5.0 Max. APHA 22nd Ed.2012,4500-P B,4-151,E, 4-155

7Biochemical Oxygen Demand (3 days 27oC) mg/L 5.4 30 Max. IS3025(Part 44):1993,RA2003,Amds.1

8Chemical Oxygen Demand mg/L 20 250 Max. APHA 22nd Ed.2012, 5220-B,5-17

9 Oil and Grease mg/L N.D. 10 Max. IS 3025(Part39):1991,RA2003 Ed. 2.1

10 Iron (as Fe) mg/L 0.462 3.0 Max. APHA 22nd Ed. 2012,3111-B, 3-18

11 Chromium Total (as Cr) mg/L N.D. 2.0 Max. APHA 22nd Ed. 2012,3111-B, 3-18

12 Copper (as Cu) mg/L N.D. 3.0 Max. APHA 22nd Ed. 2012 3111-B, 3-18

13 Zinc (as Zn) mg/L 0.062 5.0 Max. APHA 22nd Ed. 2012,3111-B, 3-18

Remarks: N.D.–Not Detected-----------------------------------------------------------------END----------------------------------------------------------------FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 27: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content
Page 28: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring Report (Inside Plant)Report No. : ME-CN0688-171211-SA-SWPGL-WARORA Date: 11.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATIONLIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description/Type

Ambient Air Sample Collected by

Laboratory

Sampling Location

Ash HandlingArea

Sample Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling 05.12.2017

Date of Receipt of Sample 06.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

07.12.2017Date of Completion of Analysis

11.12.2017

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity%

Temperature oC

3.35 km/h EMax. Min. Max. Min.

81 41 29.1 17.4

Location : Ash Handling Area Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 11.9 80 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 12.1 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 45 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 19 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 29: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Plot No. F-7, Road No. 21, MIDC, Thane West - 400604, Maharashtra(600 m from bal.com

Report No.0688 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.62 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 1.1 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP)- particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 3.2 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, NitrogenDioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 30: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring Report (Inside Plant)Report No. : ME-CN0689-171211-SA-SWPGL-WARORA Date: 11.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description/Type

Ambient Air Sample Collected by

Laboratory

Sampling Location

Near SwitchYard

Sample Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling 05.12.2017

Date of Receipt of Sample 06.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

07.12.2017Date of Completion of Analysis

11.12.2017

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity%

Temperature oC

3.35 km/h EMax. Min. Max. Min.

81 41 29.1 17.4

Location : Near Switch Yard Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 10.9 80 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 11.5 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 42 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 19 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 31: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Plot No. F-7, Road No. 21, MIDC, Thane West - 400604, Maharashtra(600 m from bal.com

Report No.0689 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.60 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 1.2 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP)- particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 3.1 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 32: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring Report (Inside Plant)Report No. : ME-CN0690-171211-SA-SWPGL-WARORA Date: 11.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description/Type

Ambient Air Sample Collected by

Laboratory

Sampling Location

Ash HandlingArea

Sample Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling 06.12.2017

Date of Receipt of Sample 07.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

07.12.2017Date of Completion of Analysis

11.12.2017

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity%

Temperature oC

2.56 km/h EMax. Min. Max. Min.

93 41 30.6 18.1

Location : Ash Handling Area Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 10.9 80 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 11.5 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 40 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 20 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 33: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Plot No. F-7, Road No. 21, MIDC, Thane West - 400604, Maharashtra(600 m from bal.com

Report No.0690 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.64 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 1.3 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP)- particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 3.3 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 34: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring Report (Inside Plant)Report No. : ME-CN0691-171211-SA-SWPGL-WARORA Date: 11.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description/Type

Ambient Air Sample Collected by

Laboratory

Sampling Location

Near SwitchYard

Sample Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling 06.12.2017

Date of Receipt of Sample 07.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

07.12.2017Date of Completion of Analysis

11.12.2017

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity%

Temperature oC

2.56 km/h EMax. Min. Max. Min.

93 41 30.6 18.1

Location : Near Switch Yard Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 9.880 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 10.9 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 42 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 21 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 35: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Plot No. F-7, Road No. 21, MIDC, Thane West - 400604, Maharashtra(600 m from bal.com

Report No.0691 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.55 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 1.2 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP)- particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 3.0 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 36: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring Report (Inside Plant)Report No. : ME-CN0701-171218-SA-SWPGL-WARORA Date: 18.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATIONLIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description/Type

Ambient Air Sample Collected by

Laboratory

Sampling Location

CT Pump House Sample

Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling 12.12.2017

Date of Receipt of Sample 13.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

14.12.2017Date of Completion of Analysis

18.12.2017

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity%

Temperature oC

2.38 km/h SEMax. Min. Max. Min.

82 22 32.4 16.6

Location : CT Pump House Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 10.9 80 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 11.5 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 60 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 28 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 37: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Plot No. F-7, Road No. 21, MIDC, Thane West - 400604, Maharashtra(600 m from bal.com

Report No.0701 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.60 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 1.2 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP)- particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 3.3 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 38: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring Report (Inside Plant)Report No. : ME-CN0702-171218-SA-SWPGL-WARORA Date: 18.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description/Type

Ambient Air Sample Collected by

Laboratory

Sampling Location

Near SwitchYard

Sample Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling 12.12.2017

Date of Receipt of Sample 13.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

14.12.2017Date of Completion of Analysis

18.12.2017

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity%

Temperature oC

2.38 km/h SEMax. Min. Max. Min.

82 22 32.4 16.6

Location : Near Switch Yard Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 9.8 80 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 10.9 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 55 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 24 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 39: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Plot No. F-7, Road No. 21, MIDC, Thane West - 400604, Maharashtra(600 m from bal.com

Report No.0702 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.62 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 1.1 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP)- particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 3.2 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 40: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring Report (Inside Plant)Report No. : ME-CN0703-171218-SA-SWPGL-WARORA Date: 18.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description/Type

Ambient Air Sample Collected by

Laboratory

Sampling Location

CT Pump House

Sample Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling 13.12.2017

Date of Receipt of Sample 14.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

14.12.2017Date of Completion of Analysis

18.12.2017

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity%

Temperature oC

3.24 km/h SEMax. Min. Max. Min.

83 28 32.0 16.8

Location : CT Pump House Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 8.7 80 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 10.3 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 48 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 22 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 41: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Plot No. F-7, Road No. 21, MIDC, Thane West - 400604, Maharashtra(600 m from bal.com

Report No.0703 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.58 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 1.1 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP)- particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Airpollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 3.1 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 42: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring Report (Inside Plant)Report No. : ME-CN0704-171218-SA-SWPGL-WARORA Date: 18.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description/Type

Ambient Air Sample Collected by

Laboratory

Sampling Location

Near SwitchYard

Sample Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling 13.12.2017

Date of Receipt of Sample 14.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

14.12.2017Date of Completion of Analysis

18.12.2017

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity%

Temperature oC

3.24 km/h SEMax. Min. Max. Min.

83 28 32.0 16.8

Location : Near Switch Yard Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 11.980 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 12.1 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 52 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 25 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 43: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Plot No. F-7, Road No. 21, MIDC, Thane West - 400604, Maharashtra(600 m from bal.com

Report No.0704 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.58 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 1.1 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP)- particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 3.2 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 44: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring Report (Inside Plant)Report No. : ME-CN0753-171225-SA-SWPGL-WARORA Date: 25.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATIONLIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description/Type

Ambient Air Sample Collected by

Laboratory

Sampling Location

CT Pump House Sample

Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling 19.12.2017

Date of Receipt of Sample 20.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

21.12.2017Date of Completion of Analysis

25.12.2017

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity%

Temperature oC

1.55 km/h EMax. Min. Max. Min.

78 10 32.0 12.1

Location : CT Pump House Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 11.9 80 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 12.7 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 56 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 24 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 45: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Plot No. F-7, Road No. 21, MIDC, Thane West - 400604, Maharashtra(600 m from bal.com

Report No.0753 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.64 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 1.1 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP)- particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 3.2 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 46: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring Report (Inside Plant)Report No. : ME-CN0754-171225-SA-SWPGL-WARORA Date: 25.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description/Type

Ambient Air Sample Collected by

Laboratory

Sampling Location

Near SwitchYard

Sample Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling 19.12.2017

Date of Receipt of Sample 20.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

21.12.2017Date of Completion of Analysis

25.12.2017

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity%

Temperature oC

1.55 km/h EMax. Min. Max. Min.

78 10 32.0 12.1

Location : Near Switch Yard Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 13.0 80 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 14.5 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 62 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 30 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 47: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Plot No. F-7, Road No. 21, MIDC, Thane West - 400604, Maharashtra(600 m from bal.com

Report No.0754 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.63 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 1.2 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP)- particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 3.3 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 48: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring Report (Inside Plant)Report No. : ME-CN0755-171225-SA-SWPGL-WARORA Date: 25.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description/Type

Ambient Air Sample Collected by

Laboratory

Sampling Location

CT Pump House

Sample Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling 20.12.2017

Date of Receipt of Sample 21.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

21.12.2017Date of Completion of Analysis

25.12.2017

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity%

Temperature oC

1.30 km/h EMax. Min. Max. Min.

84 19 31.9 13.3

Location : CT Pump House Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 9.8 80 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 11.5 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 54 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 25 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 49: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Plot No. F-7, Road No. 21, MIDC, Thane West - 400604, Maharashtra(600 m from bal.com

Report No.0755 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.60 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 1.2 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP)- particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 3.2 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 50: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring Report (Inside Plant)Report No. : ME-CN0756-171225-SA-SWPGL-WARORA Date: 25.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description/Type

Ambient Air Sample Collected by

Laboratory

Sampling Location

Near SwitchYard

Sample Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling 20.12.2017

Date of Receipt of Sample 21.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

21.12.2017Date of Completion of Analysis

25.12.2017

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity%

Temperature oC

1.30 km/h EMax. Min. Max. Min.

84 19 31.9 13.3

Location : Near Switch Yard Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 10.980 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 12.7 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 60 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 27 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 51: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Plot No. F-7, Road No. 21, MIDC, Thane West - 400604, Maharashtra(600 m from bal.com

Report No.0756 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.57 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 1.1 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP)- particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 3.3 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 52: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring Report (Inside Plant)Report No. : ME-CN00767-180101-SA-SWPGL-WARORA Date: 01.01.2018

Name and Address of Customer

SAI WARDHA POWER GENERATIONLIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description/Type

Ambient Air Sample Collected by

Laboratory

Sampling Location

CT Pump House Sample

Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling 26.12.2017

Date of Receipt of Sample 27.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

28.12.2017Date of Completion of Analysis

01.01.2018

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity%

Temperature oC

1.58 km/h NWMax. Min. Max. Min.

77 19 30.5 11.2

Location : CT Pump House Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 10.9 80 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 12.1 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 64 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 30 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 53: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Plot No. F-7, Road No. 21, MIDC, Thane West - 400604, Maharashtra(600 m from bal.com

Report No.0767 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.62 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 1.2 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP)- particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 3.1 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 54: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring Report (Inside Plant)Report No. : ME-CN0768-180101-SA-SWPGL-WARORA Date: 01.01.2018

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description/Type

Ambient Air Sample Collected by

Laboratory

Sampling Location

Near SwitchYard

Sample Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling 26.12.2017

Date of Receipt of Sample 27.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

28.12.2017Date of Completion of Analysis

01.01.2018

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity%

Temperature oC

1.58 km/h NWMax. Min. Max. Min.

77 19 30.5 11.2

Location : Near Switch Yard Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 11.9 80 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 13.3 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 58 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 27 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 55: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Plot No. F-7, Road No. 21, MIDC, Thane West - 400604, Maharashtra(600 m from bal.com

Report No.0768 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.58 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 1.1 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP)- particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 3.1 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 56: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring Report (Inside Plant)Report No. : ME-CN0769-180101-SA-SWPGL-WARORA Date: 01.01.2018

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description/Type

Ambient Air Sample Collected by

Laboratory

Sampling Location

CT Pump House

Sample Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling 27.12.2017

Date of Receipt of Sample 28.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

28.12.2017Date of Completion of Analysis

01.01.2018

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity%

Temperature oC

2.16 km/h NWMax. Min. Max. Min.

82 10 31.1 11.3

Location : CT Pump House Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 9.8 80 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 10.3 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 66 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 32 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 57: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Plot No. F-7, Road No. 21, MIDC, Thane West - 400604, Maharashtra(600 m from bal.com

Report No.0769 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.64 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 1.1 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP)- particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Airpollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 3.3 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 58: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring Report (Inside Plant)Report No. : ME-CN0770-180101-SA-SWPGL-WARORA Date: 01.01.2018

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description/Type

Ambient Air Sample Collected by

Laboratory

Sampling Location

Near SwitchYard

Sample Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling 27.12.2017

Date of Receipt of Sample 28.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

28.12.2017Date of Completion of Analysis

01.01.2018

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity%

Temperature oC

2.16 km/h NWMax. Min. Max. Min.

82 10 31.1 11.3

Location : Near Switch Yard Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 10.980 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 12.7 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 62 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 28 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 59: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Plot No. F-7, Road No. 21, MIDC, Thane West - 400604, Maharashtra(600 m from bal.com

Report No.0770 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.58 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 1.1 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP)- particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 3.2 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 60: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring ReportReport No. : ME-CN0692-171211-SA-SWPGL-WARORA Date: 11.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description /Type

Ambient AirSample Collected by

Laboratory

Sampling Location

AanandwanWarora

Sample Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling

05.12.2017 Date of Receipt of Sample

06.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

07.12.2017 Date of Completion of Analysis

11.12.2017

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity % Temperature oC

3.35 km/h EMax. Min. Max. Min.

81 41 29.1 17.4

Location : Aanandwan Warora Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 9.8 80 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 10.9 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 32 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 17 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 61: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Report No.0692 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.52 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 <1 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP) - particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 <3 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 62: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring ReportReport No. : ME-CN0693-171211-SA-SWPGL-WARORA Date: 11.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description /Type

Ambient AirSample Collected by

Laboratory

Sampling Location Old Wani Naka

Sample Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling

05.12.2017 Date of Receipt of Sample

06.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

07.12.2017 Date of Completion of Analysis

11.12.2017

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity % Temperature oC

3.35 km/h EMax. Min. Max. Min.

81 41 29.1 17.4

Location : Old Wani Naka Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 8.7 80 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 10.3 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 36 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 17 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 63: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Report No.0693 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.51 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 <1 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP)- particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 <3 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 64: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring ReportReport No. : ME-CN0694-171211-SA-SWPGL-WARORA Date: 11.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description /Type

Ambient AirSample Collected by

Laboratory

Sampling Location

AanandwanWarora

Sample Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling

06.12.2017 Date of Receipt of Sample

07.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

07.12.2017 Date of Completion of Analysis

11.12.2017

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity % Temperature oC

2.56 km/h EMax. Min. Max. Min.

93 41 30.6 18.1

Location : Aanandwan Warora Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 10.9 80 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 11.5 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 38 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 18 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 65: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Report No.0694 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.53 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 1.0 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP) - particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 <3 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 66: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring ReportReport No. : ME-CN0695-171211-SA-SWPGL-WARORA Date: 11.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description /Type

Ambient AirSample Collected by

Laboratory

Sampling Location Old Wani Naka

Sample Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling

06.12.2017 Date of Receipt of Sample

07.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

07.12.2017 Date of Completion of Analysis

11.12.2017

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity % Temperature oC

2.56 km/h EMax. Min. Max. Min.

93 41 30.6 18.1

Location : Old Wani Naka Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 9.8 80 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 12.1 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 37 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 21 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 67: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2 of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Report No.0695 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.52 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 <1 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP)- particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 <3 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 68: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring ReportReport No. : ME-CN0705-171218-SA-SWPGL-WARORA Date: 18.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description /Type

Ambient AirSample Collected by

Laboratory

Sampling Location

AanandwanWarora

Sample Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling

12.12.2017 Date of Receipt of Sample

13.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

14.12.2017 Date of Completion of Analysis

18.12.2017

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity % Temperature oC

2.38 km/h SEMax. Min. Max. Min.

82 22 32.4 16.6

Location : Aanandwan Warora Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 6.5 80 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 7.9 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 36 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 16 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 69: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Report No.0705 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.54 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 <1 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP) - particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 <3 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 70: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring ReportReport No. : ME-CN0706-171218-SA-SWPGL-WARORA Date: 18.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description /Type

Ambient AirSample Collected by

Laboratory

Sampling Location Old Wani Naka

Sample Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling

12.12.2017 Date of Receipt of Sample

13.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

14.12.2017 Date of Completion of Analysis

18.12.2017

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity % Temperature oC

2.38 km/h SEMax. Min. Max. Min.

82 22 32.4 16.6

Location : Old Wani Naka Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 7.6 80 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 8.5 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 42 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 20 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 71: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Report No.0706 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.52 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 <1 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP)- particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 <3 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 72: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring ReportReport No. : ME-CN0707-171218-SA-SWPGL-WARORA Date: 18.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description /Type

Ambient AirSample Collected by

Laboratory

Sampling Location

AanandwanWarora

Sample Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling

13.12.2017 Date of Receipt of Sample

14.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

14.12.2017 Date of Completion of Analysis

18.12.2017

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity % Temperature oC

3.24 km/h SEMax. Min. Max. Min.

83 28 32.0 16.8

Location : Aanandwan Warora Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 8.7 80 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 9.7 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 46 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 24 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 73: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Report No.0707 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.54 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 1.0 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP) - particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 <3 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 74: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring ReportReport No. : ME-CN0708-171218-SA-SWPGL-WARORA Date: 18.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description /Type

Ambient AirSample Collected by

Laboratory

Sampling Location Old Wani Naka

Sample Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling

13.12.2017 Date of Receipt of Sample

14.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

14.12.2017 Date of Completion of Analysis

18.12.2017

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity % Temperature oC

3.24 km/h SEMax. Min. Max. Min.

83 28 32.0 16.8

Location : Old Wani Naka Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 10.9 80 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 11.5 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 48 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 22 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 75: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2 of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Report No.0708 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.56 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 <1 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP)- particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 <3 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 76: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring ReportReport No. : ME-CN0757-171225-SA-SWPGL-WARORA Date: 25.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description /Type

Ambient AirSample Collected by

Laboratory

Sampling Location

AanandwanWarora

Sample Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling

19.12.2017 Date of Receipt of Sample

20.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

21.12.2017 Date of Completion of Analysis

25.12.2017

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity % Temperature oC

1.55 km/h EMax. Min. Max. Min.

78 10 32.0 12.1

Location : Aanandwan Warora Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 7.6 80 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 9.1 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 40 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 19 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 77: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Report No.0757 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.56 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 <1 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP) - particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 <3 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 78: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring ReportReport No. : ME-CN0758-171225-SA-SWPGL-WARORA Date: 25.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description /Type

Ambient AirSample Collected by

Laboratory

Sampling Location Old Wani Naka

Sample Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling

19.12.2017 Date of Receipt of Sample

20.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

21.12.2017 Date of Completion of Analysis

25.12.2017

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity % Temperature oC

1.55 km/h EMax. Min. Max. Min.

78 10 32.0 12.1

Location : Old Wani Naka Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 8.7 80 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 10.3 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 46 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 22 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 79: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Report No.0758 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.54 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 <1 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP)- particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 <3 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 80: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring ReportReport No. : ME-CN0759-171225-SA-SWPGL-WARORA Date: 25.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description /Type

Ambient AirSample Collected by

Laboratory

Sampling Location

AanandwanWarora

Sample Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling

20.12.2017 Date of Receipt of Sample

21.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

21.12.2017 Date of Completion of Analysis

25.12.2017

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity % Temperature oC

1.30 km/h EMax. Min. Max. Min.

84 19 31.9 13.3

Location : Aanandwan Warora Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 6.5 80 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 8.5 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 42 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 20 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 81: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Report No.0759 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.52 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 <1 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP) - particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 <3 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 82: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring ReportReport No. : ME-CN0760-171225-SA-SWPGL-WARORA Date: 25.12.2017

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description /Type

Ambient AirSample Collected by

Laboratory

Sampling Location Old Wani Naka

Sample Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling

20.12.2017 Date of Receipt of Sample

21.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

21.12.2017 Date of Completion of Analysis

25.12.2017

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity % Temperature oC

1.30 km/h EMax. Min. Max. Min.

84 19 31.9 13.3

Location : Old Wani Naka Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 5.4 80 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 6.7 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 44 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 21 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 83: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2 of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Report No.0760 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.55 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 <1 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP)- particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 <3 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 84: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring ReportReport No. : ME-CN0771-180101-SA-SWPGL-WARORA Date: 01.01.2018

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description /Type

Ambient AirSample Collected by

Laboratory

Sampling Location

AanandwanWarora

Sample Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling

26.12.2017 Date of Receipt of Sample

27.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

28.12.2017 Date of Completion of Analysis

01.01.2018

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity % Temperature oC

1.58 km/h NWMax. Min. Max. Min.

77 19 30.5 11.2

Location : Aanandwan Warora Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 6.5 80 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 9.1 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 42 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 21 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 85: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Report No.0771 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.52 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 <1 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP) - particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 <3 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 86: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring ReportReport No. : ME-CN0772-180101-SA-SWPGL-WARORA Date: 01.01.2018

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description /Type

Ambient AirSample Collected by

Laboratory

Sampling Location Old Wani Naka

Sample Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling

26.12.2017 Date of Receipt of Sample

27.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

28.12.2017 Date of Completion of Analysis

01.01.2018

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity % Temperature oC

1.58 km/h NWMax. Min. Max. Min.

77 19 30.5 11.2

Location : Old Wani Naka Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 7.6 80 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 9.7 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 44 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 19 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 87: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Report No.0772 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.52 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 <1 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP)- particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 <3 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 88: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring ReportReport No. : ME-CN0773-180101-SA-SWPGL-WARORA Date: 01.01.2018

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description /Type

Ambient AirSample Collected by

Laboratory

Sampling Location

AanandwanWarora

Sample Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling

27.12.2017 Date of Receipt of Sample

28.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

28.12.2017 Date of Completion of Analysis

01.01.2018

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity % Temperature oC

2.16 km/h NWMax. Min. Max. Min.

82 10 31.1 11.3

Location : Aanandwan Warora Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 8.7 80 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 10.3 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 40 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 18 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 89: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Report No.0773 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.58 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 <1 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP) - particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 <3 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.

Page 90: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.Engineers, Consultants, Environmental Monitoring Laboratory & Contractors

Plot Nos. 13,14,17,18, Grampanchayat Bokhara, 8 km from Nagpur City,Opp. Patel Petrol Pump, Chhindwara Road, Koradi, Dist.Nagpur-441111

Phone: 91-712-2612162 T/Fax: 91-712-2612212 Email: [email protected]

Page 1of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Ambient Air Quality Monitoring ReportReport No. : ME-CN0774-180101-SA-SWPGL-WARORA Date: 01.01.2018

Name and Address of Customer

SAI WARDHA POWER GENERATION LIMITEDMIDC Growth Centre, Warora, Dist: Chandrapur (M.S.)

Order Reference

POMS 41601/HYD/GEN/OM/REV/ 010330 Dt.04.09.2017

Sample Description /Type

Ambient AirSample Collected by

Laboratory

Sampling Location Old Wani Naka

Sample Quantity/Packing

PM10 ,B(a)P, As, Ni, Pb: Filter Paper 3 X 1 No.PM2.5: Filter Paper 1 X 1 No.SO2 :50 mL X 1 No. Plastic BottleNO2 :30 mL X 1 No. Plastic Bottle NH3 :30 mL X 6 No. Plastic Bottle CO: Plastic Bulb 3 X 1 No. O3:10 mL X 6 No. Plastic BottleBenzene:Charcoal Tube:12 X 1 No.

Date of Sampling

27.12.2017 Date of Receipt of Sample

28.12.2017

Sampling Procedure

As per Method Reference

Date of Start of Analysis

28.12.2017 Date of Completion of Analysis

01.01.2018

Meteorological Data

Average Wind velocity

Prominent Wind Direction

Relative Humidity % Temperature oC

2.16 km/h NWMax. Min. Max. Min.

82 10 31.1 11.3

Location : Old Wani Naka Duration of Survey : 24 hours

Parameter Unit Result#NAAQM Standard

Method Reference

Sulphur Dioxide (SO2) µg/m3 9.8 80 IS 5182 ( Part 2): 2001, RA 2006

Nitrogen Dioxide (NO2) µg/m3 10.9 80 IS 5182 (Part 6): 2006

Particulate Matter (size less than 10µm) or PM10

µg/m3 48 100 IS 5182 ( Part 23): 2006

Particulate Matter (size less than 2.5µm) or PM2.5

µg/m3 24 60 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 15 - 30

Ozone (O3) µg/m3 <19.6 180CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.31-34

Lead (Pb) µg/m3 <0.02 01CPCB Guidelines for the Measurement of Ambient Air Pollutants, Volume I, 2012-13, Page No.48-55

Page 91: SAI WARDHA POWER GENERATION LIMITEDksk.co.in/env/HYC-SWPGL-Oct-17-Mar-18.pdf · 2018. 7. 10. · WCL & SECL mines coal being utilized having ash content

Mahabal Enviro Engineers Pvt. Ltd.

Continuation Sheet

Page 2 of 2

Plot No. F-7, Road No. 21, MIDC Wagle Estate, Thane West - 400604, Maharashtra(600 m from Hotel Rukhmini Palace Turn Opp Toyota Show Room. Next to Ashida Electrical - near J B Sawant Bus Stop)Phone: 2582 0658/ 3139/ 1663/ 3154 Fax: 91-22-25823543 [email protected]

Report No.0774 cont…

Parameter Unit Result#NAAQM Standard Method Reference

Carbon Monoxide (CO) mg/m3 0.56 04 IS 5182 ( Part 10): 1999 RA 2003

Ammonia (NH3) µg/m3 <20 400 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 37 - 39

Benzene (C6H6) µg/m3 <1 05 IS 5182 (Part 11): 2006

Benzo (a) Pyrene (BaP)- particulate phase only, ng/m3 <0.5 01 CPCB Guidelines for measurement of Air

pollutants Volume 1, Page 40 - 47

Arsenic (As) ng/m3 <0.3 06 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Nickel (Ni) ng/m3 <3 20 CPCB Guidelines for measurement of Air pollutants Volume 1, Page 48 - 55

Remarks: TWA - Time Weighted Average. #- NAAQS specified as: 24 h. TWA in case of Sulphur Dioxide, Nitrogen Dioxide, PM10, PM2.5, Lead and Ammonia; 1 h. TWA in case of Carbon Monoxide & Ozone; Annual TWA in case of Benzene, Benzo (a) Pyrene, Arsenic and Nickel.----------------------------------------------------------------END----------------------------------------------------------------

FOR MAHABAL ENVIRO ENGINEERS PVT. LTD.

Kishor YeoleB R A N C H M A N A G E R-------------------------------------------------------------------------------------------------------------------------------------Note:1. The result listed refers only to the tested sample(s) and applicable parameter(s).2. This report is not to be reproduced except in full, without written approval of the laboratory.