S Lander St Bridge Project Open House #2 Jessica Murphy, Project Manager September 22, 2016 1

Transcript of S Lander St Bridge Project · Open House #2 Jessica Murphy, Project Manager ... Presentation...

Page 1: S Lander St Bridge Project · Open House #2 Jessica Murphy, Project Manager ... Presentation overview •Background •Timeline •Funding •What’s new! •Next steps 2. Background

S Lander St Bridge Project

Open House #2

Jessica Murphy, Project Manager

September 22, 2016 1

Page 2: S Lander St Bridge Project · Open House #2 Jessica Murphy, Project Manager ... Presentation overview •Background •Timeline •Funding •What’s new! •Next steps 2. Background

Presentation overview

• Background

• Timeline

• Funding

• What’s new!

• Next steps

2

Page 3: S Lander St Bridge Project · Open House #2 Jessica Murphy, Project Manager ... Presentation overview •Background •Timeline •Funding •What’s new! •Next steps 2. Background

Background

3

• New bridge over the

railroad tracks on S

Lander St between 1st

Ave S and 4th Ave S

• Project benefits:

– Relieve traffic

– Improve safety

– Increase freight

mobility

• High priority project for

city, region, and state

Page 4: S Lander St Bridge Project · Open House #2 Jessica Murphy, Project Manager ... Presentation overview •Background •Timeline •Funding •What’s new! •Next steps 2. Background

Timeline

4

We are here

Open house – Today!

Online open house – Sept 19-30

Page 5: S Lander St Bridge Project · Open House #2 Jessica Murphy, Project Manager ... Presentation overview •Background •Timeline •Funding •What’s new! •Next steps 2. Background

Funding

5

Page 6: S Lander St Bridge Project · Open House #2 Jessica Murphy, Project Manager ... Presentation overview •Background •Timeline •Funding •What’s new! •Next steps 2. Background

What’s new in design

• Feedback from

Open House #1

• Feedback from

property owners

and local

stakeholders

• Traffic analysis

(August 2016)

• Cost

6

Page 7: S Lander St Bridge Project · Open House #2 Jessica Murphy, Project Manager ... Presentation overview •Background •Timeline •Funding •What’s new! •Next steps 2. Background

Current roadway

Page 8: S Lander St Bridge Project · Open House #2 Jessica Murphy, Project Manager ... Presentation overview •Background •Timeline •Funding •What’s new! •Next steps 2. Background

Bridge cross-sectionsPreliminary options presented

8

Page 9: S Lander St Bridge Project · Open House #2 Jessica Murphy, Project Manager ... Presentation overview •Background •Timeline •Funding •What’s new! •Next steps 2. Background

Bridge cross-sectionsWhat we heard

9

54%

preferred

this option

41%

preferred

this option

Page 10: S Lander St Bridge Project · Open House #2 Jessica Murphy, Project Manager ... Presentation overview •Background •Timeline •Funding •What’s new! •Next steps 2. Background

Roadway design – EAST of tracksPreliminary options presented

10

Page 11: S Lander St Bridge Project · Open House #2 Jessica Murphy, Project Manager ... Presentation overview •Background •Timeline •Funding •What’s new! •Next steps 2. Background

Roadway design – EAST of tracksWhat we heard

11

25%

preferred

this option

57%

preferred

this option

Page 12: S Lander St Bridge Project · Open House #2 Jessica Murphy, Project Manager ... Presentation overview •Background •Timeline •Funding •What’s new! •Next steps 2. Background

Proposed design – EAST of tracks

12

3rd Ave S:

• Two-way access drive on south

side of bridge

• Based on feedback from nearby

properties and stakeholders

Parking:

• New parking spaces under

the bridge

• Concerns remain about

utilization and management

Page 13: S Lander St Bridge Project · Open House #2 Jessica Murphy, Project Manager ... Presentation overview •Background •Timeline •Funding •What’s new! •Next steps 2. Background

Roadway design – WEST of tracksPreliminary options presented

13

Page 14: S Lander St Bridge Project · Open House #2 Jessica Murphy, Project Manager ... Presentation overview •Background •Timeline •Funding •What’s new! •Next steps 2. Background

Roadway design – WEST of tracksWhat we heard

14

53%

preferred

this option

41%

preferred

this option

Page 15: S Lander St Bridge Project · Open House #2 Jessica Murphy, Project Manager ... Presentation overview •Background •Timeline •Funding •What’s new! •Next steps 2. Background

Proposed design – WEST of tracks

15

Occidental Ave S:

• Proposed dead-ends

• Based on community feedback, stakeholder input, and recent traffic analysis

(limited use of north/south through traffic)

Page 16: S Lander St Bridge Project · Open House #2 Jessica Murphy, Project Manager ... Presentation overview •Background •Timeline •Funding •What’s new! •Next steps 2. Background

Proposed corridor rendering

16

Page 17: S Lander St Bridge Project · Open House #2 Jessica Murphy, Project Manager ... Presentation overview •Background •Timeline •Funding •What’s new! •Next steps 2. Background

Urban designWhat we heard

13

Feedback from the June open house indicated preferences for:

• Architectural elements reflecting neighborhood’s character

• Artistic features

• Wall details with texture and patterns

• Landscaping and plantings

Page 18: S Lander St Bridge Project · Open House #2 Jessica Murphy, Project Manager ... Presentation overview •Background •Timeline •Funding •What’s new! •Next steps 2. Background

Urban design optionsIndustry theme

Page 19: S Lander St Bridge Project · Open House #2 Jessica Murphy, Project Manager ... Presentation overview •Background •Timeline •Funding •What’s new! •Next steps 2. Background

Urban design optionsDeco theme

Page 20: S Lander St Bridge Project · Open House #2 Jessica Murphy, Project Manager ... Presentation overview •Background •Timeline •Funding •What’s new! •Next steps 2. Background

Share your feedback!

• Comment today or via the online open house through

September 30

Page 21: S Lander St Bridge Project · Open House #2 Jessica Murphy, Project Manager ... Presentation overview •Background •Timeline •Funding •What’s new! •Next steps 2. Background

Ongoing design

21

Several design

features still under

development:

• Green space,

landscaping

and urban

design

opportunities

• Parking

• Driveways

• Vehicle

turnaround

areas

Proposed visualization: Bird’s-eye view

Looking northwest

Page 22: S Lander St Bridge Project · Open House #2 Jessica Murphy, Project Manager ... Presentation overview •Background •Timeline •Funding •What’s new! •Next steps 2. Background

Next stepsThrough 2016

• Review feedback and continue to

incorporate, especially urban design

• Provide periodic updates as design

progresses

• Begin the environmental permitting

process

Spring 2017

• Begin construction planning

Summer 2017

• Complete final design

• Solicit for construction

22

Page 23: S Lander St Bridge Project · Open House #2 Jessica Murphy, Project Manager ... Presentation overview •Background •Timeline •Funding •What’s new! •Next steps 2. Background

Stay connected

www.seattle.gov/transportation

23

• Visit: www.seattle.gov/lander_bridge.htm

• Call Jessica Murphy: 206-684-0178

• Email: [email protected]

– Watch for emails from us!

• Online open house through September 30:

landerbridge.participate.online