Transcript of Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Presentation Outline• Introduction to Project• Cost and Funding• Project Specific Scope – Dillon and Christina• Status• Construction• Schedule• Public Involvement
Dill
on &
Chr
isti
na
Costs & Funding• Total Estimated Project Costs $5.49M• Funding• 1% Optional Sales Tax• Countywide Consensus• Water Fund• Sewer Fund
Dill
on &
Chr
isti
na
Dillon & Christina Scope• Full Street Reconstruction• Pavement
• Concrete pavement from Rt 789 to east of Grand View• Narrowed pavement width from Valley View to Leedy
• Curb, Gutter, and Sidewalks• Type A Curb• 5-ft wide sidewalks along Dillon• 4-ft wide sidewalks along Christina
• Driveway Approaches• ADA Ramps D
illon
& C
hris
tina
Dillon & Christina Scope• Utility Replacement• Water Mains and Services w/ Curb Stop
• Christina from Grand View to Leedy• Dillon from Rt 789 to Valley View
• Sanitary Sewer Mains and Services w/ Cleanout• Drainage• Extended Storm Drain
• Rt 789 to Drainage East of Car Wash• Inlets at Grand View
• Constructed Crown Dill
on &
Chr
isti
na
Project Status• 90% Design Presented to City & 1% Committee – March 23rd
• Permitting – Wyoming Department of Environmental Quality and Wyoming Department of Transportation – Pending
• Final Design Ready for Bidding – April 13, 2015
Dill
on &
Chr
isti
na
Construction• Full Time Inspection & Oversight• Construction Activities• One street at a time per project area• 7am – 6pm, M-F• No work on holidays or weekends
• Road Closures• Utility Work - Water and Sewer Crews
• 800 feet at one time• Trenches will be backfilled or barricaded
• Roadway Work – Milling, Final Grading, Paving• Entire length
Dill
on &
Chr
isti
na
Construction• Access During Construction• Vehicular Access
• Access prohibited for a maximum of 10 hours at a time• Limited to pedestrian access during these times
• Open to local traffic – evenings, weekends, and holidays• Contacted by contractor a minimum of 48 hours prior to blocking access
• Pedestrian Access Maintained• Parking
• On street nearby
Dill
on &
Chr
isti
na
Construction• Disruption to Water & Sanitary Sewer Service• Shutdown Times – Approved by City• Maximum Allowable Interruption of Service – 10 hours
• Service must be returned at end of work day• Temporary water service may be required
• Contacted by Contractor a Minimum of 48 Hours Prior to Interruption of Service
Dill
on &
Chr
isti
na
Construction• Deliveries• Mail Delivery – Neighborhood Box Units – Temporarily Relocated
• Contractor to notify residents of temporary location and dates• Regular Parcel Delivery – Park and Walk• Freight Delivery – Coordinate for Access with Contractor• Medical or Other Deliveries - Coordinate with Contractor
• Emergency Access• LPD, EMS, and Fire – Routine Updates from DOWL & Contactor• Contractor is Required to Provide Immediate Access
Dill
on &
Chr
isti
na
Construction• Solid Waste Collection• Contractor to Collect
• Bus Routes• Some impact to activity buses - DOWL to Coordinate• Those with special needs & others who use a transportation service
will need to coordinate with the Contractor• Parked Vehicles• Contractor to provide a 72 hour notice to requesting vehicle be moved• May request assistance of LPD after 72 hours
Dill
on &
Chr
isti
na
Construction• Mailboxes, Signs, Fences, & Landscaping• To be removed within construction area and reinstalled• Small shrubs and bushes in ROW will be removed• Trees >2” diameter will remain
• Drainage• Contractor to maintain drainage in and around construction area
• Housekeeping• Contractor is responsible for cleaning up rubbish, dust control,
cleaning up tracked soil or mud onto existing roads, maintaining roads during shutdowns D
illon
& C
hris
tina
Schedule• Advertise for Bid - April 19th & April 26th
• Mandatory Pre-Bid Conference – April 30th
• Bid Opening – May 7th • Award Bid – May 12th
• Construction – June – October 2015
Dill
on &
Chr
isti
na
Continued Public Involvement• Next Meeting – Meet the Contractor• Weekly Progress Meetings – On Site – Visit with DOWL• Routine Updates Provided on City Website
www.landerwyoming.org• Contact Engineer
Diane L. Oress, PEProject [email protected]
Dill
on &
Chr
isti
na