Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.

17
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2

Transcript of Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.

Dillon and Christina Project Area

Lander Streets and Utilities 2015Public Meeting No. 2

Presentation Outline• Introduction to Project• Cost and Funding• Project Specific Scope – Dillon and Christina• Status• Construction• Schedule• Public Involvement

Dill

on &

Chr

isti

na

Lander Streets and Utilities 2015

Dill

on &

Chr

isti

na

Dillon & Christina Project

Dill

on &

Chr

isti

na

Dillon & Christina Scope• Full Street Reconstruction• Pavement

• Concrete pavement from Rt 789 to east of Grand View• Narrowed pavement width from Valley View to Leedy

• Curb, Gutter, and Sidewalks• Type A Curb• 5-ft wide sidewalks along Dillon• 4-ft wide sidewalks along Christina

• Driveway Approaches• ADA Ramps D

illon

& C

hris

tina

Dillon & Christina Scope• Utility Replacement• Water Mains and Services w/ Curb Stop

• Christina from Grand View to Leedy• Dillon from Rt 789 to Valley View

• Sanitary Sewer Mains and Services w/ Cleanout• Drainage• Extended Storm Drain

• Rt 789 to Drainage East of Car Wash• Inlets at Grand View

• Constructed Crown Dill

on &

Chr

isti

na

Project Status• 90% Design Presented to City & 1% Committee – March 23rd

• Permitting – Wyoming Department of Environmental Quality and Wyoming Department of Transportation – Pending

• Final Design Ready for Bidding – April 13, 2015

Dill

on &

Chr

isti

na

Construction• Full Time Inspection & Oversight• Construction Activities• One street at a time per project area• 7am – 6pm, M-F• No work on holidays or weekends

• Road Closures• Utility Work - Water and Sewer Crews

• 800 feet at one time• Trenches will be backfilled or barricaded

• Roadway Work – Milling, Final Grading, Paving• Entire length

Dill

on &

Chr

isti

na

Construction• Access During Construction• Vehicular Access

• Access prohibited for a maximum of 10 hours at a time• Limited to pedestrian access during these times

• Open to local traffic – evenings, weekends, and holidays• Contacted by contractor a minimum of 48 hours prior to blocking access

• Pedestrian Access Maintained• Parking

• On street nearby

Dill

on &

Chr

isti

na

Construction• Disruption to Water & Sanitary Sewer Service• Shutdown Times – Approved by City• Maximum Allowable Interruption of Service – 10 hours

• Service must be returned at end of work day• Temporary water service may be required

• Contacted by Contractor a Minimum of 48 Hours Prior to Interruption of Service

Dill

on &

Chr

isti

na

Construction• Deliveries• Mail Delivery – Neighborhood Box Units – Temporarily Relocated

• Contractor to notify residents of temporary location and dates• Regular Parcel Delivery – Park and Walk• Freight Delivery – Coordinate for Access with Contractor• Medical or Other Deliveries - Coordinate with Contractor

• Emergency Access• LPD, EMS, and Fire – Routine Updates from DOWL & Contactor• Contractor is Required to Provide Immediate Access

Dill

on &

Chr

isti

na

Construction• Solid Waste Collection• Contractor to Collect

• Bus Routes• Some impact to activity buses - DOWL to Coordinate• Those with special needs & others who use a transportation service

will need to coordinate with the Contractor• Parked Vehicles• Contractor to provide a 72 hour notice to requesting vehicle be moved• May request assistance of LPD after 72 hours

Dill

on &

Chr

isti

na

Construction• Mailboxes, Signs, Fences, & Landscaping• To be removed within construction area and reinstalled• Small shrubs and bushes in ROW will be removed• Trees >2” diameter will remain

• Drainage• Contractor to maintain drainage in and around construction area

• Housekeeping• Contractor is responsible for cleaning up rubbish, dust control,

cleaning up tracked soil or mud onto existing roads, maintaining roads during shutdowns D

illon

& C

hris

tina

Schedule• Advertise for Bid - April 19th & April 26th

• Mandatory Pre-Bid Conference – April 30th

• Bid Opening – May 7th • Award Bid – May 12th

• Construction – June – October 2015

Dill

on &

Chr

isti

na

Continued Public Involvement• Next Meeting – Meet the Contractor• Weekly Progress Meetings – On Site – Visit with DOWL• Routine Updates Provided on City Website

www.landerwyoming.org• Contact Engineer

Diane L. Oress, PEProject [email protected]

Dill

on &

Chr

isti

na

Questions?

Dill

on &

Chr

isti

na