Page 1: RUNCORN STATION QUARTER MASTERPLAN · create a new gateway into Runcorn, the Liverpool City Region and beyond. The aim of the masterplan and delivery strategy is to enable the regeneration

RUNCORN STATION QUARTER MASTERPLAN

Urban Design & Architecture (Lead)

Transport & MovementProperty, Viability & Delivery

Socio-Economic

Page 2: RUNCORN STATION QUARTER MASTERPLAN · create a new gateway into Runcorn, the Liverpool City Region and beyond. The aim of the masterplan and delivery strategy is to enable the regeneration

RUNCORN STATION QUARTER MASTERPLAN

p 6139 Runcorn Station Quarter © VVe Made ThaT

2.0conTeXT SeTTinG

Runcorn Station Quarter masterplan boundary

Runcorn Station

Trumpet Loopsite

Silver JubileeBridge

Runcorn OldTown Centre

BridgewaterCanal

Runcorn Cemetery

Green

way R

oad

Hollow

ay

Roland Avenue

Shaw Street

Arthur Street

Okell S

treetA

lban

y Terrace

Victoria Road

Shaw Street

Picow Farm Road

A533

A557

Greenway Road

Byron Street

Cavendish St

50m0N

KEY

Runcorn Station Quarter Masterplan boundary

The site area for the masterplan is an area of approximately 6 hectares which sits to the immediate north east of, and includes, Runcorn Station as defined by Opportunity Sites 18 and 19 of the Runcorn Vision.

The site is in mixed ownership and has a number of operational users including: Runcorn Station, Picow Engineering Group, the Campanile Hotel, Early Learners Nursery Ltd and Inflata Nation located off Lowlands Road, Shaw Street and Cavendish Street, along with the ATS garage off Greenway Road. The majority of the site comprises land currently occupied by the existing structures of the SJB approaches and adopted highways which become redundant as part of the forthcoming delinking proposals.

Runcorn Station and its associated car parks forms a significant portion of the masterplan site. This area belongs to Network Rail who will be consulted with closely throughout the development of the masterplan.

Page 3: RUNCORN STATION QUARTER MASTERPLAN · create a new gateway into Runcorn, the Liverpool City Region and beyond. The aim of the masterplan and delivery strategy is to enable the regeneration

RUNCORN STATION QUARTER MASTERPLAN

OPTIONS APPRAISAL CRITICAL DECISION

Appraisal of station car parks including NR access points

1Reprovision of spaces within northern car park with adjacent extension to existing multi storey in Shaw Street car park

2Reprovision of spaces within northern car park at southern end of Shaw Street car park

3Reprovision of northern car park at southern end of Shaw Street car park, plus addition multi storey within Holloway Road car park

Which location for additional car parking is preferable? How much parking should be provided in the future (to allow for growth)?

Is there sufficient evidence to support this process

Car parking strategy 1Compliance with updated HBC local policy

Vehicle movement priorities

1Direct link to Cavendish Street

2Direct link to Shaw Street

Selection of link suited to priority for the wider network

Optimum pedestrian & cycle routes

1Direct links to town centre from station, and Cavendish Street linking Bridgewater Canal and Runcorn Cemetery

Approval of network proposed

Transport interchange proposals (long list) 1

Large footprint extending over Picow Farm Road & Cavendish Street, with large clear area in middle of hub which could accommodate development opportunity

2Large footprint extending over Cavendish Street only, with medium clear area in middle of hub which could accommodate kiosk activity

3Medium footprint avoiding Cavendish Street and Picow Farm Road with small area in middle of hub which could accommodate kiosk activity

4Medium footprint avoiding Cavendish Street and Picow Farm Road, with diagonal alignment of taxi rank, and potential for shared surfaces

5Medium footprint avoiding Cavendish Street and Picow Farm Road and parallel alignment of taxi rank, and potential for shared surfaces

Identification of preferred option / additional development of options

Transport interchange proposals (short list)

2 3 4

Private ownership & leaseholds

All transport interchange options impact upon the following ownerships and uses: Network Rail, Hotel Campanile, Inflata Nation Desired approach to land assembly or negotiations with land owners

Public realm & streetscape proposals

1Illustrative proposals

Development Zone A: Station car park

Plot A1 Relocation of the car park on this site to create opportunity for development.

Approach to joint venture between NR and HBC.

Scenario 1: Comprehensive redevelopmentNew civic/leisure development with active frontage on various levels to address significant level changes around the station site

Development Zone B: Picow Engineering

Plot B1 Plot B2 Plot B3

Which scenario is preferred for each plot: phased

development initially retaining existing uses; or

comprehensive redevelopment?

Scenario 1: Phased development part 1 Retain Picow Engineering with infill development providing active frontage along Station Road

Scenario 1: Phased development part 1 Retain Early Learners Nursery with infill development providing active frontage along Cavendish Street and new link to town centre

Scenario 1: Comprehensive redevelopment New commercial development with active frontage along new link to town centre

Scenario 2: Phased development part 2 Redevelop Picow Engineering with space reprovided within masterplan area

Scenario 2: Phased development part 2 Redevelop Early Learners Nursery site with space reprovided within masterplan area providing active frontage along Cavendish Street

Scenario 3: Comprehensive redevelopment Redevelopment of site including commercial and employment uses, and reprovided space for Picow Engineering within masterplan area

Scenario 3: Comprehensive redevelopment Redevelopment of site including civic and leisure uses and reprovision of space for Early Learners Nursery within masterplan area

Development Zone C: Inflata Nation & Shaw Street

Plot C1 Plot C2 Plot C3 Plot C4Which scenario is preferred for each plot: phased

development initially retaining existing uses; or

comprehensive redevelopment?

Scenario 1: Comprehensive redevelopment New civic development with active frontage along pedestrian link to station

Scenario 1: Phased development part 1 Retain Inflata Nation with rationalisation of current ownership boundary

Scenario 1: Comprehensive redevelopment New residential development continuing existing street grain from the south

Scenario 1: Phased development part 1 Retain Surrey Street Garages with infill residential development continuing existing street grain from the south

Scenario 2: Phased development part 2 Redevelop Inflata Nation site with new residential development and positive frontage along new link to town centre

Scenario 2: Combined comprehensive redevelopmentRedevelop Inflata Nation and combine with plot C3 to provide new residential development continuing existing street grain from the south

Scenario 1: Phased development part 2 Redevelop Surrey Street Garages with residential development continuing existing street grain from the south, and reprovision

Scenario 3: Combined comprehensive redevelopmentRedevelop Inflata Nation and combine with plot C3 to provide new residential development continuing existing street grain from the south

Development Zone D: ATS & Greenway Road

Plot D1 Plot D2 Plot D3 Should the masterplan seek to include within

preferred option?Scenario 1: Retain ATS Scenario 1: Comprehensive

redevelopmentNew commercial/light industrial development with positive frontage along link to new junction

Scenario 1: Comprehensive redevelopmentNew commercial/light industrial development

Options appraisal

Page 4: RUNCORN STATION QUARTER MASTERPLAN · create a new gateway into Runcorn, the Liverpool City Region and beyond. The aim of the masterplan and delivery strategy is to enable the regeneration

RUNCORN STATION QUARTER MASTERPLAN p 1139 Runcorn Station Quarter © VVE MADE THAT

Existing

Existing

Page 5: RUNCORN STATION QUARTER MASTERPLAN · create a new gateway into Runcorn, the Liverpool City Region and beyond. The aim of the masterplan and delivery strategy is to enable the regeneration

RUNCORN STATION QUARTER MASTERPLAN p 3139 Runcorn Station Quarter © VVe Made ThaT

eXecuTiVe SuMMaRY

STA

TIO

N Q

UA

RT

ER

RU

NCO

RN

STA

TION

ST

AT

ION

QU

AR

TE

R

About the projectHalton Borough Council has appointed a team to produce a masterplan and delivery strategy for the Runcorn Station Quarter, which will prepare for the forthcoming HS2 and West Coast Mainline improvements and create a new gateway into Runcorn, the Liverpool City Region and beyond. The aim of the masterplan and delivery strategy is to enable the regeneration of the Runcorn Station Quarter area to be realised as quickly as possible, proposing a rich mix of land uses – including quality public realm – that are realistic and deliverable yet aspirational and transformational. As part of the delinking of the Silver Jubilee Bridge, resources have been set aside by the council to remove existing road infrastructure that is no longer needed, to aid with the regeneration of the whole area.

About the design teamThe consortium is led by architecture and urbanism practice We Made That, and includes Regeneris (socio-economic advice), Steer (transport and movement) and PRD (property, and viability advice).

Building an evidence baseA baseline appraisal study for Runcorn Station Quarter provided a detailed evidence base which has informed the masterplan proposals. The study provided a borough wide, area wide and site specific analysis, assessing spatial constraints and opportunities, socio-economic factors including local demographics and employment, local housing and commercial property market, and the relationship between Runcorn town centre and Runcorn Station.

A vision for Runcorn Station QuarterA vision statement and set of guiding principles were developed to steer the proposals within the Runcorn Station Quarter Masterplan. The principles and vision have been informed by the evidence within the baseline appraisal, along with feedback received from the stakeholder workshops. The vision aims to build a positive outlook for the future of Runcorn Station Quarter, whilst defining the key strategic moves which will enable its success.

‘Runcorn Revitalised’

Page 6: RUNCORN STATION QUARTER MASTERPLAN · create a new gateway into Runcorn, the Liverpool City Region and beyond. The aim of the masterplan and delivery strategy is to enable the regeneration

RUNCORN STATION QUARTER MASTERPLAN

p 27139 Runcorn Station Quarter © VVe Made ThaT

View from Runcorn Station towards The Brindley

A welcoming gateway into Runcorn provided by an inclusive and accessible public square with furniture and planting which create pleasant areas to sit and rest. Sight lines and direct routes to key assets such as The Brindley and the town centre complemented by clear wayfinding.

Page 7: RUNCORN STATION QUARTER MASTERPLAN · create a new gateway into Runcorn, the Liverpool City Region and beyond. The aim of the masterplan and delivery strategy is to enable the regeneration

RUNCORN STATION QUARTER MASTERPLAN

p 28139 Runcorn Station Quarter © VVe Made ThaT

View from Waterloo Bridgeapproaching Station Quarter

The approach into the Station Quarter is defined by positive gateway buildings accommodating public uses and active frontage on the ground floor, whilst incorporating a clear bus interchange.

Page 8: RUNCORN STATION QUARTER MASTERPLAN · create a new gateway into Runcorn, the Liverpool City Region and beyond. The aim of the masterplan and delivery strategy is to enable the regeneration

RUNCORN STATION QUARTER MASTERPLAN

p 29139 Runcorn Station Quarter © VVe Made ThaT

View towards Runcorn Station from cavendish St

Entrance to the Station Square from Cavendish Street with a clear view of Runcorn Station, accessed via a stepped landscape which incorporates seating and greening.

Page 9: RUNCORN STATION QUARTER MASTERPLAN · create a new gateway into Runcorn, the Liverpool City Region and beyond. The aim of the masterplan and delivery strategy is to enable the regeneration

RUNCORN STATION QUARTER MASTERPLAN

p 24139 Runcorn Station Quarter © VVe Made ThaT

Ground floor plan

50m0N

KEY

Nursery / other community uses (D1, D2 use class)

Commercial workspace (B1 use class)

Commercial workspace (B1a-b, B2,B8 use classes)

Public / third sector workspace & public facilities

Residential (2-3 bed flats)

Residential (3-4 bed family houses)

Hotel (Climbing centre on lower ground)

Retail and cafe (A use classes)

Sui Generis (station and car park)

Car parking

Cycle track provision

Active frontage Positive frontage

Development plots

Retained uses

Runcorn Station Quarter Masterplan boundary

Conc h=1.0m

Runcorn Cemetery

RuncornStation

BridgewaterCanal

Hollow

ay Road

Shaw Street

Cavendish St

Cavendish S

t

Waterloo B

ridge

Green

way R

oad

Picow Farm Road

Greenway Road

PROPOSEDJUNCTIONThe strategy for the land use across the station

quarter is as follows:

— Focus civic and leisure uses around the transport hub, including gateway public buildings with active frontage;

— Intensify commercial and employment uses around the northern part of the masterplan area,nearest to the town centre;

— Introduce a mix of housing typologies in the southern part of the masterplan, ensuring successful integration with existing residential streets;

— Ensure there is sufficient car parking according to type of development incorporating space for on-street parking and private car parks.

Additional multi storey

car park

ZONE A

ZONE B

ZONE C

ZONE D

ZONE E

Page 10: RUNCORN STATION QUARTER MASTERPLAN · create a new gateway into Runcorn, the Liverpool City Region and beyond. The aim of the masterplan and delivery strategy is to enable the regeneration

RUNCORN STATION QUARTER MASTERPLAN

p 18139 Runcorn Station Quarter © VVe Made ThaT

Proposed transport plan

One of the key ambitions of the Runcorn Station Quarter Masterplan was to provide a welcoming gateway into Runcorn by introducing new civic square at the heart of the Station Quarter, along with transport interchange elements within clear sight and easy walking distance of the station.

The public realm and landscaping interventions across the station hub resolve complex level changes whilst also providing seating, shelter and greenery. Space for taxi and drop off areas and a new cycle hub has also been provided. A combination of clear wayfinding, realtime bus timetable facilities, and direct pedestrian and cycling routes to the town centre will assist the public with onward journeys from the station, enabling them to easily reach their desired destinations within Runcorn and the wider area.

Conc h=1.0m

Runcorn Cemetery

RuncornStation

BridgewaterCanal

Hollow

ay Road

Shaw Street

Cavendish St

Cavendish S

t

Waterloo B

ridge

Green

way R

oad

Picow Farm Road

Greenway Road

PROPOSEDJUNCTION

KEY

Key cycle route

Two-way cycle link

Shared footway/cycleway

Cycle store

Vehicular routes

Private pick up/drop off

Taxi rank

Bus shelter

Bus waiting area

Pedestrian crossing

Footbridge

Car park

Runcorn Station Quarter Masterplan boundary

50m0N

ZONE A

ZONE B

ZONE C

ZONE D

ZONE E

Page 11: RUNCORN STATION QUARTER MASTERPLAN · create a new gateway into Runcorn, the Liverpool City Region and beyond. The aim of the masterplan and delivery strategy is to enable the regeneration

RUNCORN STATION QUARTER MASTERPLAN

p 21139 Runcorn Station Quarter © VVe Made ThaT

KEY

Retained buildings

1. Runcorn Station2. Multi-storey car park3. ATS

Retained buildings (optional)

4. Inflata Nation5. Picow Engineering6. Early Learners Nursery

Retained surface car parks

7. Shaw Street

Runcorn Station Quarter Masterplan boundary

Retained development & uses

50m0N

1

2

35

6

4

7

Inflata Nation: Phased redevelopmentUse and building retained in the short term whilst residential development commences on adjacent sites. Ownership boundary is rationalised to enable efficient development plots whilst maintaining parking and access for Inflata Nation. In the long term Inflata Nation is redeveloped as residential (once leasehold has ended).

Picow Engineering: Phased redevelopmentUse retained whilst building is refurbished and extended with additional commercial development on adjacent sites. Decanting process may have to be considered.

Early Learners Nursery: Phased redevelopmentNursery relocated on a site further away from transport interchange and adjacent to residential development (Development Zone C). Site redeveloped with commercial uses.

Hotel Campanile: Comprehensive redevelopmentHotel use to be relocated within Development Zone A to allow Hotel Campanile site to be comprehensively redeveloped to accommodate new link road and additional commercial uses.

Runcorn Cemetery

Shaw Street

Cavendish St

Cavendish S

t

Waterloo B

ridge

Green

way R

oad

Picow Farm Road