Page 1 of 8 List of works to be taken up through State Plan fund under Drainage Sector during the year 2012-13 ~ Rs. in Lakhs Budget/Proposal for Stata Plan-2012-13 xis ~ Drainag SI. Name ofthe Work Estimated No. Amount 1 2 3 A. ExecutiveEn2ineer, Draina2e Division,Balasore 1 Constnof approachroadto newlyconstructedsluiceoverGochhidaNallahat RD6.30M 50.00 2 ConstructionofD.G. set controlroomfor GochhidaSluiceworksite -- 7.00 3 Construction of Protection wall on Nuniaiodi Nallah near Saraswati Sishumandir of 6.00 4 Improvement and Bank connection to Bagadhipa and Tindharia Sluice of Remuna Block. 8.00 5 Bank Protection & Slope Packing work near Sluice at RD 24970 M of Palpala Nallah of 6.00 Baliapal Block. 6 Construction of Sluice cum VRB at RD 4230 M ofPjagala Nallah under Basta Block. 30.00 7 Construction of Drainage Sluice over Churmara Nallah near Churmara 20.00 8 Construction of Foot Bridge over Pjagala Nallah near village Kundei of Basta Block 10.00 9 Construction of Foot Bridge over Palpala Nallah near village Chakarada 10.00 10 Construction of Foot Bridge over Bishnupur Nallah 5.00 11 Construction of Foot Bridge over Bhograi Embankment Pasikhal (R/S) near 5.00 12 Construction of Concrete Drain near village Manipur of Soro Block 4.00 13 Construction of Slope Protection wall and stone packing on Guasul Nallah 10.00 14 Slope Protection work to Ghagra Nallah near village Sajanagarh and Kusunia of Nilgiri 9.00 15 Constn ofFB over Kochiakoili Nallah near Barik house of Arada village in Bahanaga 10.00 16 Annual Maintenance, Electrification and Paintaining of Gates of Gochhida Sluice 8.00 17 Balance work of VRB of Manu Nallah, Foot Bridge over Prasanna Nallah, Foot Bridge 10.00 over Chalanti Nallah, Foot Bridge near Badamandaruni, F. B. near Chalanti Sitapur Nallah near Adibasi Sahi, F.B. over Mahabilapat Nallah. 18 Repair Maintenance of Division & Circle office building 3.00 19 Renovation of Kochiakoili Nallah System 15.00 20 Renovation, Extension & Improvement of Kankadajodi Nallah System 15.00 21 Renovation, Extension & Improvement of Baharda Drainage System 15.00 22 Survey Investigation and Quality Control Tests of new Projects 4.00 23 Final Bill Payment of pending FDR works executed during 2007-08 and 2008-09 12.00 24 Final Bill Payment of acc for the work Gochhida Sluice cum VRB 28.00 Total: 300.00 B. Executive En2ineer, Draina2e Division, Berhampur 1 Construction of Foot Bridge over Gania Nalla near village Gopalpur 20.70 2 Construction of Foot Bridge over Gania Nalla near village Badhiosta 5.30 3 Construction of Foot Bridge over Lunda Nalla near village Pandiajholi 10.00 4 Renovation of Bahana Nalla & Its Branches 5.00 5 Improvement to Rajghai & Sirigiri Nalla & Its Branches 4.00 6 Improvement to Kukudakhai nalla near village Khandadeuli via Sanakhemundi Block 3.00 7 Improvement to Gumma Nalla VIS of D/W structure under Sanakhemundi Block 5.00 8 Protection to Beirani Nalla near village.Naravanpur 4.00 9 Improvement to Routaray Nalla near village Manidei Pentha under Sanakhemundi Block 2.00 10 Improvement Hariaghai Nalla near village Kharudar under Chikiti Block 4.00 11 Renovation ofNachuni Nalla, Bhanjanagar Block 6.00 12 Renovation of Kotipada Nalla, Bhanjanagar Block 7.00 13 Renovation of Gangapur Nalla Aska Block 5.00 14 Renovation of Kathua Nalla Purushottampur Block Khallikote 8.00

Transcript of Rs. in Lakhs€¦ · 15 Constn ofFB over Kochiakoili Nallah near Barik house of Arada village in...

Page 1: Rs. in Lakhs€¦ · 15 Constn ofFB over Kochiakoili Nallah near Barik house of Arada village in Bahanaga 10.00 16 Annual Maintenance, Electrification and Paintaining of Gates of

Page 1 of 8

List of works to be taken up through State Plan fund underDrainage Sector during the year 2012-13 ~

Rs. in Lakhs

Budget/Proposal for Stata Plan-2012-13 xis

~

Drainage

SI. Name ofthe Work EstimatedNo. Amount

1 2 3A. ExecutiveEn2ineer, Draina2e Division,Balasore1 Constnof approachroadto newlyconstructedsluiceoverGochhidaNallahat RD 6.30M 50.002 ConstructionofD.G. set controlroomforGochhidaSluiceworksite -- 7.003 Construction of Protection wall on Nuniaiodi Nallah near Saraswati Sishumandir of 6.004 Improvement and Bank connection to Bagadhipa and Tindharia Sluice of Remuna Block. 8.005 Bank Protection & Slope Packing work near Sluice at RD 24970 M of Palpala Nallah of 6.00

Baliapal Block.6 Construction of Sluice cum VRB at RD 4230 M ofPjagala Nallah under Basta Block. 30.007 Construction of Drainage Sluice over Churmara Nallah near Churmara 20.008 Construction of Foot Bridge over Pjagala Nallah near village Kundei of Basta Block 10.009 Construction of Foot Bridge over Palpala Nallah near village Chakarada 10.0010 Construction of Foot Bridge over Bishnupur Nallah 5.0011 Construction of Foot Bridge over Bhograi Embankment Pasikhal (R/S) near 5.0012 Construction of Concrete Drain near village Manipur of Soro Block 4.0013 Construction of Slope Protection wall and stone packing on Guasul Nallah 10.0014 Slope Protection work to Ghagra Nallah near village Sajanagarh and Kusunia of Nilgiri 9.0015 Constn ofFB over Kochiakoili Nallah near Barik house of Arada village in Bahanaga 10.0016 Annual Maintenance, Electrification and Paintaining of Gates of Gochhida Sluice 8.0017 Balance work of VRB of Manu Nallah, Foot Bridge over Prasanna Nallah, Foot Bridge 10.00

over Chalanti Nallah, Foot Bridge near Badamandaruni, F. B. near Chalanti SitapurNallah near Adibasi Sahi, F.B. over Mahabilapat Nallah.

18 Repair Maintenance of Division & Circle office building 3.0019 Renovation of Kochiakoili Nallah System 15.0020 Renovation, Extension & Improvement of Kankadajodi Nallah System 15.0021 Renovation, Extension & Improvement of Baharda Drainage System 15.0022 Survey Investigation and Quality Control Tests of new Projects 4.0023 Final Bill Payment of pending FDR works executed during 2007-08 and 2008-09 12.0024 Final Bill Payment of acc for the work Gochhida Sluice cum VRB 28.00

Total: 300.00B. Executive En2ineer, Draina2e Division, Berhampur1 Construction of Foot Bridge over Gania Nalla near village Gopalpur 20.702 Construction of Foot Bridge over Gania Nalla near village Badhiosta 5.303 Construction of Foot Bridge over Lunda Nalla near village Pandiajholi 10.004 Renovation of Bahana Nalla & Its Branches 5.005 Improvement to Rajghai & Sirigiri Nalla & Its Branches 4.006 Improvement to Kukudakhai nalla near village Khandadeuli via Sanakhemundi Block 3.007 Improvement to Gumma Nalla VIS of D/W structure under Sanakhemundi Block 5.008 Protection to Beirani Nalla near village.Naravanpur 4.009 Improvement to Routaray Nalla near village Manidei Pentha under Sanakhemundi Block 2.0010 Improvement Hariaghai Nalla near village Kharudar under Chikiti Block 4.0011 Renovation ofNachuni Nalla, Bhanjanagar Block 6.0012 Renovation of Kotipada Nalla, Bhanjanagar Block 7.0013 Renovation of Gangapur Nalla Aska Block 5.0014 Renovation of Kathua Nalla Purushottampur Block Khallikote 8.00

Page 2: Rs. in Lakhs€¦ · 15 Constn ofFB over Kochiakoili Nallah near Barik house of Arada village in Bahanaga 10.00 16 Annual Maintenance, Electrification and Paintaining of Gates of

Budget/P'opooal to, State Plan-2012-13.xlo

~D",inage

32,SI. Name of the Work EstitedNo. Amount15 Renovation of Ganjia Nalla Bhanjanagar Block, Bhanjanagar 2.0016 Renovation of Kadallia Nalla Jagannathprasad Block 2.0017 Renovation of Chatura Nalla, Purushottampur Block Khallikote 3.0018 Renovation of Bramhakuda Nalla, Beguniapada Block K.S. Nagar 5.0019 Renovation of Agulapada Nalla, Jagannathprasad Block, B. Nagar , 3.0020 Renovation of Landei Nalla, Belaguntha Block 4.0021 Construction of foot bridge over Alekha Nalla near Patrapur under Patrapur Block 5.0022 Protection work to Boggi Nalla near village near vilage Badabaranga under Chikiti Block 3.0023 Improvement to Manipadia Nalla near village Manipadia under Digapahandi Block 5.0024 Protection work to Sankhua Nalla near village Odosingi 5.0025 Improvement to Tampara Khama Nalla in Golanda Boripadar 8.0026 Improvement and Protection work of Sapua Nalla and its branches 5.0027 Construction of Foot Bridge over Batia Nalla near village Badarampalli 4.0028 Improvement and Protection work ofNandini Nalla and its branches 4.0029 Improvement to Khari Nalla and its branches 4.0030 Renovation and construciton of Causeway in Gania Nalla & its branches 5.0031 Renovation ofVerenda Nalla under Kabisurya Nagar 6.0032 Renovation of Sandeswar Nalla under Gangapur Block 4.0033 Restoration of Sara Nalla under Belaguntha Block 17.0034 Renovaiton of Bali Nalla under Purusottampur Block 4.0035 Renovation of Chadiapalli Sara Nalla under Buguda Block 6.0036 Protection work to Agula Nalla near village Janibilli under Dharakote Block 6.0037 Protection work to Nandini Nalla near village Sheragada under Sheragada Block 5.0038 Protection to Kaincha Nalla near village Gangapur under Sorada Block 6.0039 Renovation of Borosingi Nalla near village Borasingi under Sorada Block 2.0040 Improvement 0 Balia Nalla near village Bandhaguda under Sheragada Block 5.0041 Renovation of Gahanja Nalla & Jhadakhandi Nalla & its branches 4.0042 Improvement to Khama Nalla 2.0043 Improvement to Kharia Branch Nalla 4.0044 Renovation of Link Nalla of Kharkhari Nalla 4.0045 Improvement to Lunda Nalla Nalla, Tamkei Nalla & Its Branches 4.0046 Renovation of Agula Nalla near village Rugumu 4.0047 Constn of Foot Bridge over Kaithada Nalla near vill. Gunthapada under Digapahandi 15.0048 Construction of Foot Bridge over Badangi Nalla near village Pattapali under Sorada Block 11.0049 Renovation of Kochia Nalla under IN Prasad Block 3.0050 Renovation of Kia Nalla 3.0051 Renovation of Jiroijholi Nalla under Bhanjanagar Block 2.0052 Renovation of Dandaghai Nalla under Polosara Block 3.0053 Renovation ofPandarasara Nalla under Aska Block 2.0054 Improvement to Ghadaka Nalla and Godara Nalla System 4.0055 Improvement to Gudi Nalla near village Nababantha & its branches 3.0056 Improvement to branch & link naila of Bahada Nalla 2.0057 Renovation & Improvement to Bodaghai & Kiajhara Nalla and its branches 3.0058 Improvement to Kubei Nalla 3.0059 Renovation of Kendua Nalla under Beguniapada Block 3.0060 Renovation of Gogei Nalla under Sorada Block 2.0061 Construction of Foot Bridge Sankhna Nalla near village Guhalapur -LA.Y Colony 2.00

Total: 300.00

Page 3: Rs. in Lakhs€¦ · 15 Constn ofFB over Kochiakoili Nallah near Barik house of Arada village in Bahanaga 10.00 16 Annual Maintenance, Electrification and Paintaining of Gates of

Budget/P,opO$ol 1o, State PI00-2012-13.xl$ ~ D,o;noge

81. Name of the Work Estim.J -No. AmountC. Executive Engineer, Drainage Division, Bhadrak1 Renovation of D.C from B.C. road to Terjodia Nallah and its link drains near village 4.00

Palashpur.2 Renovation of D.C. from Terjodia to Samal Sahi and its link drains near vilage Palashpur 4.00

3 Renovation of D.C. of Gaudanasi Nallah (Sapkatia to Salandi) 8.00

4 Renovation of D.C. ofPaitapur Nallah 5.00

5 Renovation of D.C. from Kelasahi to Orada Main Drain 12.00

6 Renovation of D.C. from Orada to Sankida Main Drain 12.00

7 Renovation of D.C. of Gaya Jore 2.00

8 Renovation of D.C. from Khadijanal to Patta Pola 4.00

9 Renovation of D.C. from Haladiganda to Mantei River near village Kudakanti 6.00

10 Renovation of D.C. from Jashipur to Goudanipokhari near village Jashipur 6.00

11 Renovation of D.C. from Haladiganda to Khandia Nallah near village Paramanandapur 8.00

12 Renovation of D.C. from Terjuria to Totapada via-Ghanteswar Nallah 4.00

13 Renovation of D.C. from Gobara Chakka Nallah to Genguti (Badapada) 4.00

14 Renovation ofD. C. from Hinjila to Chhelia via Balighai 5.00

15 Renovation of D. C. from Terachha Canal to Nuanallah to Genguti 4.00

16 Renovation ofD. C. from Kapali to Rebo Bhanja Mahara 4.00

17 Renovation ofD. C. from Bhadrak to Orali (Chid Chida Nallah) 5.00

18 Renovation ofD. C. from Chabishpada to Orali 5.00

19 Renovation ofD. C. From Chhelia to Khatuapatna 4.00

20 Construction of inlets to Rebo D.C. near village Ganeshnagar 2.50

21 Renovation ofD. C. from Gobinpur to Rebo 5.00

22 Renovation ofD. C. From Namakana OAE Embankment to Baitarani River 5.00

23 Renovation ofD. C. From Khapanipada to Baitarani River 2.00

24 Construction ofF. B. over Rebo DC near village Polasahi 18.00

25 Renovation ofD. C. from Balabhadrapur to Kapali 5.00

26 Construciton of Guard wall over Rebo DC near village Kalinga Ichhapur 2.50

27 Renovation ofD. C. ofKantia 4.00

28 Construciton of Slope Protection of Rebo D.C. near village Sabanga 5.00

29 Renovation ofD. C. Berhampur to Mirapatna 2.00

30 Renovation ofD. C. from Akhuapal to Railway line 3.00

31 Renovation ofD. C. from Berhampur to Chandanpur 3.00

32 Construction of Slope Protection & Stone Packing of Rebo D.C. near Pando Jena Sahi 4.00

33 Renovation ofD. C. from Osanga to Choudhuri Pokhari via-Mohitpur Kandada 4.00

34 Construction ofH.P. culvert over D.c. from Osanga to Choudhuri Pokhari 3.00

35 Renovation ofD. C. from O.C.C. to Panpur Gohiri 2.00

36 Renovation ofD. C. Balimeda Creek to Paikasahi 2.00

Page 4: Rs. in Lakhs€¦ · 15 Constn ofFB over Kochiakoili Nallah near Barik house of Arada village in Bahanaga 10.00 16 Annual Maintenance, Electrification and Paintaining of Gates of

I QU

SI. Name of the Work i Est~atea-No. - - - AmoulI~-37 Renovation ofD. C. from Ekdal to Dayanidhipur 4.00

38 Renovation ofD. C. from O.C.c. to Purusottampur 2.00

39 Renovation ofD. C. ofBhedanaikani 4.00

40 Renovation ofD. C. from Ekdal Jore to Mishrapaur 2.00

41 Renovation ofD. C. from Ricket to Ayodhaya 4.00

42 Renovation ofD. C. from P.P. Cut to Sunamunhi 2.00

43 Construction of culvert over D.C. from O.c.C to Dayanidhipur 2.0044 Construction of culvert over D.C. from Balimed to Paikasahi 2.00

45 Construction of F. B. over SafeiNallah 2.00

46 Construction of culvert over Apartipur D.C. 3.00

47 Construction of 3 Nos culvert over Bhedanaikani D.C. near village Paikasahi, Chhatrapur 5.00& Panpur

48 Construction of culvert over D.C. from P.P. cut to Khempur near village Sribatsapur 2.0049 Construction of F. B. over D.C. from Ricket to Ramachandrapur near village 2.00

Ramachandrapur50 Construction of F. B. along with renovation over Damodarpur D.c. near vi1age 2.50

Damodarpur51 Construction of 1No VRB & FB over DC from Brajanandapur to Dosandi 5.00

52 Construction of Culvert over D.C. from Munipada to Mantei near village Daruni 1.50

53 Construction ofF.B. over Jali Nallah near Tini Chhak Banadanda Village 2.00

54 Stone Ptoection work of River Kapali at Kanhu Charan Rana House at Korua 5.00

55 Renovation of Gohira Matha Sahi Minor to Arjhatia Nallah under Bonth Block near 2.00Odhan~ G.P.

56 Construction of Foot Bridge at Ghantagadia near Randia Fishery office 6.00

57 Construction of of Foot Bridge at Khaparbanka Muladiha over Kundi Nallah 6.0058 Construction of Construction of Outlet on Dhali Nallah (Left Side ofNallah) at Asura 1.0059 Construction of Stone Protection work to river Kapali at Baburigaon 8.0060 Construction of Sluice at Pallaharganda over Kundi Nallah at Palia Bindha 22.0061 Construction of VRB over Kapali Drainage Channel on Kalhandia to Kapali Railway 25.00

Station.Total: 300.00

BodO.UP,oposal for State Plao-2012-13.xl, ~Dramaoe

Page 5: Rs. in Lakhs€¦ · 15 Constn ofFB over Kochiakoili Nallah near Barik house of Arada village in Bahanaga 10.00 16 Annual Maintenance, Electrification and Paintaining of Gates of

(]

BudgellProposal for State Plar>-2012-13.xIs

if 'EngtDrainage, t

C'randarpu.r, Cuttaclt.:J.Drainage

--. -.,- ,.---

- ---- - ------D. Executive Engineer, Drainage Division, Bhubaneswar1 Stonn Water Drainage System in the Pennises of Sun Temple of Konark 300.0CJ

Chilib LaJto,oD2 Sectioning of River Luna Length 9.00 Km from Confulence Point to Chilika Lagoon 59.003 Sectioning of River Daya Part-B length 5.60 Km from Confulence Point 1.004 Sectioning of River Ratnachira from RD 8.50 Km to 23.70 Km 16.50

5 Excavation of Jagdal Nalla from RD 3.50 Km to 5.20 Km 135.00

6 Sectioning of River Makara from boundary of chilika Lagoon to VIS to Drainage 50.00

Congestion from Daya, Bhargavi, Luna and Makara outfalling to Chilika Lagoon

7 Dredging of Hatia Nalla 51.50

, A Sub Total 313.00#f/M .AA V Total: (Konark + Chilika) 613.00-. - -

Page 6: Rs. in Lakhs€¦ · 15 Constn ofFB over Kochiakoili Nallah near Barik house of Arada village in Bahanaga 10.00 16 Annual Maintenance, Electrification and Paintaining of Gates of

f/I

I,~/

//

""""0

BudgeUProposal for State Plan-2012-13.xls

Chief Engineer,I c- Drainage, ,

r'.rtftnl111Jur, CuttacJ;:.3.- Drainage

rSI.1Name of the Work Estimat

No; Amount -8 Improvement to Bhailipur Drainage Channel 40.35 .4

9 Improvement of Sunder Nalla 22.00

10 Construction of VRB over link drain from Singarpur to Kanapur at Kanapur 8.50

11 Construction ofVRB at village Huruhura over drain Posal- Machhapada 10.00

12 Construction ofCR-cum -VRB of Kaudia Nalla 1.50

13 Construction of CR Haldimukhi Nalla 0.75

14 SectionIngof DC 34 from RD 19980 m to 22500 m 1.50

15 Improvement to DC no 23 to kadua 5.00

16 Improvement toDC no-15 to Kadua nalla 5.00

17 Improvement to Patharbuha Nalla Tail Portion 8.00

18 Improvement to Patharbuha Nalla from RD 9500 to 11500 m 5.00

19 Improvement to Drainage Congestion in U/S & D/S of Otanga Bridge Site 5.00

20 Improvement to Drainage Congestion in U/S & D/S of Tikarapara Bridge Site 6.50

21 Construction ofCR-cum -VRB across drain Bhaliadanda at RD 5850 m 10.00

22 Construction of CR-cum -VRB across drain Bhaliadanda at RD 3315 m 10.00

7 Construction ofWHS across Astaranga Nalla at Ukulai 10.00.J

24 Improvement to Dandabandha Nalla. 4.90

25 Improvement to drain from Madhipur to Gangua Nalla 4.00

26 Improvement to Bhagabati Nalla. 5.50

27 Improvement to Kelahatajora drain from Shardhapur to Rajua. 4.95

28 Improvement to link drain from sluice along Hadapadar road to jokajhari Nalla 4.95

29 Renovation to Akhua Nalla from Badheibandha to Athabatia. 5.00

30 Improvement to drain from Mangaljit M.I.P. towards Tirimi, Chilika. 4.90

31 Improvement to Rana Nadi from Patnibara to Kathapoili 4.50

32 Improvement to Drain from Kesharpur to Manijapur. 4.60

33 Improvement to Drain from Atharabatia to Aswasthapari 8.00

34 Improvement to Ichhapur Nalla to Jokajhari 3.50

35 Improvement to Drain from Bandhapalla-Kukudajhari to Mangaljit M.I.P. 4.95

36 Improvement to Kushumi Link drain from Matha-Khajuria to Paikasahi 4.50

37 Improvement to Jharinalla drain from Balishinsha to Sunamunhi. 4.00

38 Improvement to drain from Sardhapur to Chorakhola. 3.50

39 lTI1provemI1 to'Rap,aNacEfrom Patapur to Dolanapur 4.50

40 [fflBrovementto rJt no-17, It}and Fifi drain to 'UC-18 near Dihuda, Gabasinga, Bisarpur .OO

41 "Improvementto DC-34 from Ranaf)oldlarito Palapachi 15.00

42 Costruction of VRB at Gopinathpur 4.50

43 Costruction of VRB at Kasipur 4.50

44 Improvement to DC-9 12.00

45 Improvement to DC-6 8.00

46 Renovation to drainage channel from Dokhandpur to DC - 38, from Arada Gahir to DC-38 8.00

and from Solahala Gahira to DC-38.47 Renovation to drainage channel from Bhandaridanda to DC-38, from Badabhimadaspur 7.00

to DC-38 and Sanabhimadaspur to DC-38.

48 Renovation to drainage channel from Bagulipari to Sriramchandrapur, from 6.50

Sriramchandrapur to Ghasibhabanipur and from Alasalanga to Parahat49 Renovation to drainage channel from Chandapara to Sirei ( DC-4l) and from Nuapada to 6.00

Sireisara drain. I

AL j

Page 7: Rs. in Lakhs€¦ · 15 Constn ofFB over Kochiakoili Nallah near Barik house of Arada village in Bahanaga 10.00 16 Annual Maintenance, Electrification and Paintaining of Gates of

----

.fi-----

/~ ..~

- M~ ~ ------

~~..I -lJrairi'.&;; .

I'"'-I>ftnnrvur.dUttack-3~' O",,"age

r o. Name of the Work Estimatedl.

No. Amount50 -Renovation to drainage channel from Indira Sankha to DC-38 and from Oterkera to 5.00

SarnantarapUI to DC-38.51 Renovation to drainage channel from PrachandapUI to DC-38 5.5052 Improvement to link drain to Kadua nalla 2.50-,., Construction ofWHS cum VRB at RD 1.07 krn ofDihabari Link drain 1.50).)54 Improvement to link drain from Ohala Khaliasahi to DC-21 4.0055 Improvement to link drain from Pathanarnara & Hansi to DC-21 3.0056 Improvement to drain from Chandanpokhari to Bhargavil/s sluice at Balanga 4.0057 Improvement to DC-34 at VChhUPUIVIS & D/S 4.0058 Improvement to link drain from Nuasantha to Dipideuli to DC-34 3.0059 Improvement to River Daya at Makara offtaking point near Botalarna village

'

3.0060 Renovation to drainage channel from Gada Beguniapada to Tara DC -24 4.0061 Renovation to drainage channel from Paikapada to TeisPUI DC - 37 3.5062 Renovation to drainage channel (Link Drain) from Merdha Sill to Karadi 1.4063 Renovation to drainage channel (Link Drain) from NikhiragobindapUI to BhailPUI 1.4064 Renovation to drainage channel from LohapUITarakai 3.0065 Renovation to drainage channel from Kalisalyapur to PatsahanipUI 2.5066 Renovation to drainage channel from Teisipur to Bastari Nallah (Sripatipur) Link to 3.0067 Renovation to drainage channel from Dethipada to Janghar Link to Luna 4.5068 Improvement to Rana Nadi from Sarna to Patnibara 4.5069 Renovation to drainage channel from Gadianisara to KalyanpUI(DC 27) outfall to Luna 2.0070 Renovation to drainage channel from Kharkhara Sluice to Patia River 2.0071 Renovation to drainage channel from IndiPUIto Nadakhanda 4.2072 Improvement to Llink Drain to DC-35 near Nuasantha , 3.0073 Improvement to Talasua Link Drain outfailing to Kadua Drain 5.0074 Improvement to DC-14 6.00

Sub-Total: 390.35Total: 1003.35

Page 8: Rs. in Lakhs€¦ · 15 Constn ofFB over Kochiakoili Nallah near Barik house of Arada village in Bahanaga 10.00 16 Annual Maintenance, Electrification and Paintaining of Gates of

BudgellP,oposa' fo, State P'a.,2012,13.xls ~ O,a'.age

E. Executive Engineer, Drainage Division, Chandikhol'

1 Construction of Division office building at Chandikhol Agrt. No. 105F2/2011-12 37.21

2 Bank Protection work over DC-6 near village Bidyadharpur under Mahanga Consituency 15.46Agrt. No. 56F2/201 ]-]2

3 Construction ofVRB at RD 3800 M of Bandal Link Drain Agrt. No. 125 F2/20] ]-]2 28.52

4 Construction ofFB near Chakarpur over DC-6 Agrt. No. 57 F2/201]-12 5.00

5 Renovation of Solapat Bhabilopat drain out falling to river Kimiria Agrt. No. 147 F2/2011 17.55

6 Renovation of Link Drain from Gajikhal to Bandal 6.00

7 Renovation of Odamaspur Link Drain 5.00

8 Renovation ofItamunduli Link Drain from 0 to 1260 M 3.80

9 Construction of VRB over Belpal Drainage Cum Creek near village Bandhapada 3.30

10 Renovation of Balisahipatna Drainage cum Creek from RD 00 to 4000 M outfalling to 3.00River Brahmani

11 Renovation of Dhanadia Drainage Cum Creek from RD 00 to 3000 M outfalling to River 3.60Brahmani

12 Renovation of Podagayaspur to Gobari Drainage cum Creek from RD 00 to 1850 M with 4.402 Nos link drain.

13 Renovation of Thauri Drainage cum Creek from RD 00 to 2100 M 0.60

14 Construction of VRB over Chandi Baunsamula Drainage cum Creek near village Badhi 5.10

15 Construciton of Pile FB at RD 740 M over Link Drain of Hatia Drainage Cut near village 8.50Thauri

16 Construction of Pile FB at RD 1680 M over Link Drain of Hatia Drainage cut near vilage 8.50Thauri

17 Construction of Pile FB at RD 2530 M over Link Drain of Hatia Drainage cut near village 10.00Thauri

Page 9: Rs. in Lakhs€¦ · 15 Constn ofFB over Kochiakoili Nallah near Barik house of Arada village in Bahanaga 10.00 16 Annual Maintenance, Electrification and Paintaining of Gates of

BudgellP,opo.al fo' State Plan-2012-13,xI.

~/Dnlinage

-------

go jrSI. Name of the Work Estima.4-

No. Amount18 Construction ofVRB over drainage cut Thauri to Nimbera 7.00

19 Construction f VRB at Biribati Adibhasi Sahi over Padalo Maradapur Drainage Cut 10.00

20 Renovation of Kaupada Drainage cut from RD 00 to 8 Km of Gobari Drainage Cut 6.00

21 Construction of VRB over Drainage Cut Bramhani Sahi to Lunia Chhak near vilalge 11.00Badanaukana

22 Construction ofVRB over Drainage Cut of Adhajore to Sanakurpa near village Bilikana 15.00

23 Construction ofVRB over Gobindapur Drainage Cut 8.00

24 Renovation of Duhuria Drainage Cut 1.00

25 Construciton of Pile FB over Kendua Nalla near Village Muraripur 5.00

26 Construction of Retaining wall with slope Protection of Chikana Sluice over Jokei Nalla 4.50

27 Construction of Pile FB over Kusabhadra Drainage Channel at RD 5760 M near Temple 11.92Baruneswar

28 Renovation ofSoradhia Barikula Link Drain from RD 0.00 to 5.50 Km 6.00

29 Killaghat Nalla from Irrigation I.B to Baitarani from RD 0.00 to 4.3 Km 6.00

30 Construciton of Pile F. B. over Kendua Nalla near village Narigaon 15.00

31 Construction of Pile FB over Kotamahara Nalla near village Bhelanga 10.00

32 Renovation of Link Drain of Baitarani from Patarakana to Jalabandhi 8.00

33 Construction of Pile FB over Kusabhadra Link Drain-I near village Pairakha 10.00

Total: 299.96

F. Executive Engineer, Drainage Division, CuttackI Clearance of unpaid amount of works taken up under State Plan d'uring2011-12 30.00

2 Clearance of unpaid amount of works taken up under Maintainance during 2011-12 30.00

3 Clearance of unpaid amount of works taken up under Check Dam during 20I I- I2 20.00

4 Clearance of unpaid amount of works taken up under Critical Lumps during 2011-12 10.00

5 Protection to Scoured Bank of Malia Drain at Chanduli from RD 12.200 to 12.300 Km 10.00

6 Excavation of Water Course from Mahanadi Flow Channel to Rananadi 15.00

7 Clearance of Flow Channel from Ramachandrapur to Tulasipur 10.00

8 Closing of out flanked portion of cross regulator of Khuntabilla DIC 3.00

9 Improvement of Satamana Balijore Link Drain 5.00

10 Improvement of Chatara Balisree Link Drain 2.00

II Construciton of Hume Pipe Calvert on Charigharia DIC at Charigharia 4.00

12 Protection to Siaria DIC at RD 2.500 Km to 2.575 Km 3.00

13 Protection of Siaria DIC at RD 2.80 Km to 2.90 Km 5.00

14 Improvement to Karilo Kutilo DIC 5.00

IS Improvement to Satabatia DIC 5.00

16 Improvement to Gohira DIC 5.00

17 Improvement to Kiakoili DIC 4.00

18 Improvement to Palaghosara to Badabandha DIC 5.00

19 Improvement to Paikrapur DIC 5.00

Page 10: Rs. in Lakhs€¦ · 15 Constn ofFB over Kochiakoili Nallah near Barik house of Arada village in Bahanaga 10.00 16 Annual Maintenance, Electrification and Paintaining of Gates of

, /~SI. Name of the Work Estim~ted-..,.--No. Amount20 Improvement to Kadei D/C 5.00

21 Improvement to Torania D/C 5.00

22 Improvement to Oranda D/C 5.00

23 Improvement to Imam Nagar D/C 5.00

24 Improvement to Baramana D/C 2.00

25 Improvement to Uchhapada D/C 5.00

26 Improvement to Sunadiha D/C 6.00

27 Improvement to Thakumali D/C 18.00

28 Improvement to Teligunia D/C 6.00

29 Improvement to Chadhekuda I Badatola D/C 7.00

30 Improvement to Singhpur I Potak D/C 8.00

31 Improvement to Nachipada I Guruguria D/C 8.00

32 Improvement to Baleipur D/C 7.00

33 Improvement to Ordailo to Badabelari D/C 8.00

34 Improvement to Balia D/C 4.00

35 Improvement to Jaisola D/C 4.50

36 Improvement to Nagpur D/C 5.00

37 Improvement to Madhapur D/C 5.00

38 Improvement to Sidhala Rankei D/C 5.00

39 Improvement to Balibhounri D/C 2.00

40 Improvement to Denga D/C 2.00

41 Improvement to Puakhai D/C 3.00

42 Improvement to Madhyasasan to Mahatol.aD/C 5.00

43 Improvement to Dhanua D/C 8.20

44 Improvement to Hayatpur D/C 4.50

45 Improvement to Link Drain of Dhanua D/C 5.00

46 Improvement to Arilo D/C 4.60

47 Improvement to Singarpur Haripa D/C 4.90

48 Improvement to Kanijore D/C 3.00

49 Improvement to Banikuda D/C 3.30Total: 340.00

Total- (Major Works) 2543.31

1 Work-Charged INMR Salary 196.68

2 M & E 48.00

3 r T & P 12.00

4 Storm Water 0.01

Total: 256.69

Grand Total- (I}rainage) 2800.00