New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority...

43

Transcript of New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority...

Page 1: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,
Page 2: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,
Page 3: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,
Page 4: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,
Page 5: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,
Page 6: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,
Page 7: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

THERMAL POWER GENERATION EXPERIENCE

1. GUDDU COMBINED CYCLE THERMAL POWER STATION.

Client Water & Power Development Authority (USAID Fundings)

Capacity 300 MW

Scope of work Design, Construction Supervision, Testing and Commissioning of Oil Fired Gas Turbines.

Duration of Job 4½ years

Associated Firm(s): M/s Gibbs & Hill (U.S.A.)

2. MUZAFFARGARH THERMAL POWER STATION EXTENSION PROJECT UNITS 4, 5 & 6.

Client Water and Power Development Authority

Capacity 720 MW

Scope of work Planning, Designing, Vetting of Manufacturer Designs, Construction Supervision, Testing and Commissioning of 300 and 2 x 210 MW sets.

Starting date of Assignment April 1992

Date of completion 1998 (Unit 4)

Associated Firm(s): • National Engineering Services Pakistan (Pvt) Ltd. (NESPAK)

• Pakistan Engineering Services (Pvt) Ltd. (PES)

• Associated Consulting Engineers (Pvt) Ltd.

• TurkPak International (Pvt) Ltd.

Page 8: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

3. SAHIWAL COMBINED CYCLE POWER STATION PROJECT

Client Water & Power Development Authority.

Capacity 600 MW

Scope of work Planning, Designing, Preparation of Technical Specifications, and Bid Documents

Duration of Job 6 Months

Associated Firm(s): • National Engineering Services Pakistan (Pvt) Ltd. (NESPAK)

• Pakistan Engineering Services (Pvt) Ltd. (PES)

4. DIESEL GENERATING PLANT, ORMARA, BALUCHISTAN, PAKISTAN.

Client Water & Power Development Authority.

Capacity 20 MW

Scope of work Planning, Designing, Layout, Preparation of Technical Specifications and Bid Documents for 4 x 5 MW Station.

Duration of Job 6 months

Associated Firm(s): Nil

5. SHAUKAT KHANUM MEMORIAL, CANCER HOSPITAL, LAHORE.

Client Shaukat Khanum Memorial, Cancer Hospital Lahore.

Capacity 5.4 MW

Scope of work Prefeasibility Report for 2 x 2.7 MW Diesel Power Plant at Shaukat Khanum Memorial, Cancer Hospital, Lahore.

Duration of Job 3 months.

Associated Firm(s): Nil

Page 9: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

6. SMALL INDUSTRIAL ESTATE FEROZWALA.

Client M/s Crescent Development, Corporation (Pvt) Ltd. Lahore.

Capacity 12 MW Scope of work Prefeasibility Report for 2 x 6 MW Diesel

Power Plant at Small Industrial Estate, Ferozwala, Near Shahdara, Lahore.

Duration of Job 3 months. Associated Firm(s): Nil

7. KOHINOOR ENERGY LTD.

Client M/s Saigols (Pvt) Ltd., Lahore. Capacity 120 MW Scope of work Survey and Special Technical report for

120 MW Diesel Power Plant near Lahore.

Duration of Job 2 months. Associated Firm(s): Nil

8. OIL FIRED STEAM POWER PLANT.

Client M/s Sunpower Ltd., Gujranwala. Capacity 50 MW Scope of work Pre-Feasibility study for oil fired steam

plant, 2x25 MW, located near Fatehjang.

Duration of Job 3 months Associated Firm(s): Nil

9. DIESEL POWER PLANT

Client M/s Siddiqsons Industrial Group, Karachi

Capacity 114 MW Scope of work Feasibility studies, planning and design

of 114 MW Diesel Power Station, Karachi.

Duration of Job 18 months.

Page 10: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

Associated Firm(s): Nil

10. STEAM POWER PLANT

Client M/s MAKKAYS Ltd., Islamabad

Capacity 110 MW

Scope of work Pre-Feasibility studies of 110 MW, steam fired power plant, located near Tallagang, (Pindi)

Duration of Job 9 months.

Associated Firm(s): Nil

11. NATURAL GAS TURBINE

Client Kunnar Power Group.

Capacity 16 MW

Scope of work Feasibility study, specifications, & tender documents for private power plant Fired on Natural Gas Turbine/Gas sets of 4x4 MW located near Kunnar (Sind).

Duration of Job 9 months.

Associated Firm(s): Nil

12. ROUSCH PRIVATE POWER LTD.

Client M/s K&M Engineering & Consulting Corporation, USA.

Capacity 412 MW Scope of work Monitoring of project O&M as the

Engineers of ANZ Grindlays Bank. Duration of Job 3 Years.

Associated Firm(s): Nil

Page 11: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,
Page 12: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

HYDROPOWER GENERATION EXPERIENCE

1. CHASHMA HYDROPOWER PROJECT

Client Water and Power Development Authority

Capacity 184 MW

Scope of work Planning, Designing, Vetting of Manufacturer Designs, Construction Supervision, Testing and Commissioning of 8 sets of 23 MW each – Bulb Turbines.

Starting date of Assignment March 1990

Scheduled date for completion 2002

Associated Firm(s): • Sogreah France • CNR France • ACE (Pvt) Ltd. Pakistan • NESPAK (Pvt) Ltd.

2. GHAZI BAROTHA HYDRO POWER PROJECT

Client Water & Power Development Authority. (OECF, ADB, Other Fundings)

Capacity 1450 MW

Scope of work Construction Supervision of Electrical and Mechanical Works, Testing & Commissioning of 5 sets of 290 MW each.

Starting date of Assignment January 1997

Scheduled date for Completion December 2002.

Associated Firm(s): Pakistan Hydro Consultants (A Joint Venture of NESPAK (Pvt) Ltd., ACE (Pvt) Ltd., EWbank Preece Ltd., Harza Engg. International L.P., Binnie and Partners (Overseas) Ltd.

Page 13: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

3. BS LINK-1 TAIL, HYDEL POWER STATION

Client M/s ABACUS, Abacus House Lahore.

Capacity 6 MW

Scope of work Prefeasibility Report for 6 MW Hydel Power Station on Balloki-Suleimanki Link-1 Canal at Tail.

Duration of Job 2 months.

Associated Firm(s) Nil

4. KOTLI HYDRO PROJECT

Client M/s Naseer Siddiqui and Partners.

Capacity 150 MW

Scope of work Pre-Feasibility studies and preliminary design for private power plant project of 3x50 MW, High Head Project, on river Punch, near Kotli, Azad Jamu and Kashmir.

Duration of Job 6 months.

Associated Firm(s) Nil

5. SAARC - HYDEL PROJECT - BHUTAN & NEPAL, (PRIVATE)

Client American Investors Group.

Capacity 25 MW & 40 MW.

Scope of work Bhutan 25 M.W, Nepal 40 MW, for Private Parties, very high head stations. Pre-Feasibility and Preliminary Design.

Duration of Job 9 months.

Associated Firm(s) Nil

Page 14: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

6. BUNJI HYDRO POWER PROJECT Client Water and Power Development Authority

Capacity 5400 MW

Scope of work Pre-Feasibility study, Survey, Geotech studies, bore holes, hydrological investigation, preliminary design of structures, E&M Equipment, tunnel, dam and outlets, etc.

Starting date of Assignment January 15, 2003

Scheduled date for completion January 16, 2005

Associated Firm(s) • Scott Wilson Piesold Ltd., U.K. • Progressive Consultants (Pvt) Ltd. • Sampak International (Pvt) Ltd.

7. SATAPARA DAM PROJECT Client Water and Power Development Authority

Capacity 128ft high Dam Across Satpara Nallah

Scope of work Review the design, reports/data, surveys and investigation, checking of supplier designs, drawings and specifications, carryout detail design and preparation of construction drawings of the civil works. Supervision of construction works including installation of the E&M equipments. Checks and certify Contractors monthly payments bills, submission of the inception report, progress reports, design reports, manual and completion reports.

Starting date of Assignment November , 2002

Scheduled date for completion November, 2006

Associated Firm(s) • PES (Pvt) Ltd. • M.M. Pakistan (Pvt) Ltd. • Zaheeruddin Consultants (Pvt) Ltd. • In-Consult (Pvt) Ltd. • Technical International

Page 15: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,
Page 16: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

DISTRIBUTION SYSTEM & NETWORK EXPERIENCE

1. Rural Electrification Baluchistan Province Client WAPDA

Scope of work 11KV lines, Transformer L.T. Distributation in whole of Baluchistan Province 1150 Villas

Duration of job 5 years 2. M.A. JAUHAR TOWN, LAHORE. Client Lahore Development Authority.

Scope of work Electrical Utility Services Network Design.

Duration of Job 6 months.

Associated Firm(s) Nil

3. SABZAZAR TOWN, LAHORE. Client Lahore Development Authority. Scope of work Electrical Utility Services Network

Design.

Duration of Job 3 months.

Associated Firm(s) Nil

4. SHER SHAH HOUSING SCHEME, LAHORE. Client Housing & Physical Planning

Department. Govt. of Punjab.

Scope of work Electrical Utility Services Network Design.

Duration of Job 3 months Associated Firm(s) Nil

5. PUNJAB BOARD OF REVENUE EMPLOYEES HOUSING SCHEME, LAHORE.

Client Punjab Board of Revenue.

Page 17: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

Scope of work Electrical Utility Services Network Design.

Duration of Job 3 months

Associated Firm(s) Nil

6. BEGUM SHER ALI AND FAMILY HOUSING SCHEME, LAHORE. Client General Sher Ali.

Scope of work Electrical Utility Services Network Design.

Duration of Job 2 months.

Associated Firm(s) Nil

7. SMALL INDUSTRIAL ESTATE, FEROZEWALA, LAHORE. Client Crescent Development Corp. Lahore.

Scope of work Electrical Utility Services Network Design.

Duration of Job 2 months.

Associated Firm(s) Nil

8. LABOUR COLONY CHAK NO. 71 G.B. SARGODHA. Client Housing & Physical Planning Division,

Sargodha.

Scope of work Electrical Utility Services Network Design of the Labour Colony.

Duration of Job 3 months

Associated Firm(s) Nil

9. GOVT. OFFICERS/OFFICIALS COOPERATIVE HOUSING SOCIETY LIMITED, BHAKKAR.

Client Ali & Co, Shadman Market, Lahore.

Scope of work Electrical Utility Services Network Design.

Duration of Job 2 weeks.

Associated Firm(s) Nil

Page 18: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

10. ARMY WELFARE TRUST HOUSING SCHEME, LAHORE. Client M/S Army Welfare Trust Housing

Scheme, 150-G, Commercial Area, Lahore Cantt.

Scope of work Electrical Utility Services Network Design.

Duration of Job 3 months

Associated Firm(s) Nil

11. GUJRANWALA COLLEGES EMPLOYEES COOPERATIVE HOUSING SOCIETY LTD., GUJRANWALA.

Client The Gujranwala Colleges Employees Cooperative Housing Society Ltd., Gujranwala.

Scope of work Electrical Utility Services Network Design.

Duration of Job 2 months

Associated Firm(s) Nil

12. SABZAZAR TOWN EXTENSION, LAHORE. Client Lahore Development Authority.

Scope of Work Electrical Utility Services Network Design.

Duration of Job 3 months

Associated Firm(s) Nil

13. ARMY OFFICERS WELFARE HOUSING SCHEME, MORGAH

Client Head Quarter Frontier Work Organization, Rawalpindi.

Scope of Work Electrical Utility Services Network Design.

Duration of Job 6 months

Associated Firm(s) Nil

Page 19: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

14. DISTRIBUTION SYSTEM DESIGN AND CONSTRUCTION SUPERVISION FOR WAPDA TOWN MULTAN

Client WAPDA Employees. Co-op. Housing Society Ltd., Khanewal Road Multan.

Scope of work Electrical Utility Services Network Design and Construction Supervision.

Duration of Job 3 years

Associated Firm(s) Nil

15. DISTRIBUTION SYSTEM DESIGN & CONSTRUCTION SUPERVISION FOR ARMY WELFARE TRUST HOUSING SCHEME, PESHAWAR.

Client Army Welfare Trust, Rawalpindi.

Scope of Work Complete planning, designing and Construction Supervision of electrification system for Army Welfare Trust Housing Scheme Peshawar.

Duration of Job 2 years.

Associated Firm(s) Nil

16. DISTRIBUTION SYSTEM DESIGN FOR RAIL TOWN, LAHORE. Client Lahore Railway Employees Cooperative

Housing Society Ltd., Lahore.

Scope of Work Electrical Utility Services Network Design of Rail Town, Lahore.

Duration of Job 1 year.

Associated Firm(s) Nil

17. STUDY OF EARTHING SYSTEMS FOR ACCIDENT PREVENTION OF ALLAMA IQBAL TOWN & FORT DIVISIONS, LAHORE

Client WAPDA

Scope of work Testing & Improvements of Earthing of L.T / H.T. Poles / Structures and Distribution Transformers.

Duration of Job 5 years.

Associated Firm(s) Nil

Page 20: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

18. DISTRIBUTION SYSTEM DESIGN & CONSTRUCTION SUPERVISION FOR PUBLIC HEALTH ENGG. DEPTT. EMPLOYEES COOPERATIVE HOUSING SOCIETY LTD., LAHORE.

Client Public Health Engineering Deptt. Employees Cooperative Housing Society Ltd. Lahore.

Scope of work Electrical Utility Services Network Design and Construction supervision of PHEDCHS. Lahore.

Duration of Job 3 years Associated Firm(s) Nil

19. DISTRIBUTION SYSTEM DESIGN & CONSTRUCTION SUPERVISION FOR PASCO EMPLOYEES HOUSING SOCIETY, LTD., LAHORE.

Client PASCO Employees Cooperative Housing Society, Ltd., Lahore.

Scope of Work Electrical Utility Services Network Design.

Duration of Job 1 year. Associated Firm(s) Nil

20. DISTRIBUTION SYSTEM DESIGN OF STATE BANK STAFF COLONY AT ICHHRA, LAHORE.

Client State Bank of Pakistan. Scope of Work Electrical Utility Services Network

Design. Duration of job 3 months. Associated Firm(s) Nil

21. REVIEW AND RECOMMENDATIONS FOR WAPDA SYSTEM

Client Pakistan WAPDA Scope of work This study was carried out to review the

existing procedure of Power Utility Services and recommend measures for improvements.

Duration of Job 6 months. Associated Firm(s) Nil

Page 21: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,
Page 22: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

TRANSMISSION LINE & SCADA EXPERIENCE

1. TRANSMISSION LINE PROJECT

Client Saudi Electric Company – West, Saudi Arabia.

Scope of work Design Review and Construction Supervision of Transmission Line of Yanbu & Madina

Duration of Job 2 Years.

Associated Firm(s) Al-jazirah Engineers & Consultants (AJEC) Saudi Arabia

2. TABUK – TAIMA OVERHEAD LINE PROJECT

Client Saudi Electric Company – West, Saudi Arabia.

Scope of work Construction Supervision

Duration of Job 2 Years. Associated Firm(s) Al-jazirah Engineers & Consultants

(AJEC) Saudi Arabia

3. AL-ULA SUB-STATION PROJECT

Client Saudi Electric Company – West, Saudi Arabia.

Scope of work Construction Supervision Duration of Job 2 Years.

Associated Firm(s) Al-jazirah Engineers & Consultants (AJEC) Saudi Arabia

4. AL-WADJH SUB-STATION PROJECT

Client Saudi Electric Company – West, Saudi Arabia.

Scope of work Construction Supervision

Duration of Job 2 Years.

Page 23: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

Associated Firm(s) Al-jazirah Engineers & Consultants (AJEC) Saudi Arabia

5. SCADA/TELECOM NETWORK PROJECT

Client Saudi Electric Company – West, Saudi Arabia.

Scope of work Study, Designing, Up gradation, construction supervision and commissioning of new systems.

Duration of Job 1 Year. Associated Firm(s) Al-jazirah Engineers & Consultants

(AJEC) Saudi Arabia

Page 24: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,
Page 25: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

RURAL ELECTRIFICATION EXPERIENCE

1. RURAL ELECTRIFICATION PROJECT, QUETTA, BALUCHISTAN.

Client Water and Power Development 7Authority.

Scope of work Power Distribution Network Design, Preparation of Technical Specification and Tenders Documents and Construction Supervision. Economic Evaluation of the Whole Project. The Project Covered 614 villages in Baluchistan.

Starting date of Assignment October 1991.

Date of Completion June 1999

Associated Firm(s) TECHRED (Pvt) Ltd.

Page 26: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

NON-CONVENTIONAL POWER GENERATION EXPERIENCE

1. WIND POWER ENERGY

Client Water & Power Development Authority.

Scope of work MAES has in conjunction with Vestas Co., of Denmark prepared viability and cost estimation studies for wind power project at Ormara site on Sea-coast of Mekran, Baluchistan.

Duration of Job 2 Months

Associated Firm(s) Vestas Co., Denmark.

2. WASTE TO ENERGY PROJECT

Client Lahore Municipal Corporation.

Scope of work MAES in conjunction with Vestas Co., of Denmark has made viability and cost estimation studies for energy generation from municipal garbage at landfills.

Duration of Job 2 Months

Associated Firm(s) Vestas Co., Denmark.

Page 27: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,
Page 28: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

GIS, TOPOGRAPHY & CONTOURING EXPERIENCE

● CLIENT: Pakistan Water & Power Development

Authority (WAPDA)

PROJECT NAME: RURAL ELECTRIFICATION PROJECT BALUCHISTAN

SCOPE OF WORK: Plotting of 128978 villages in the area with a minimum population of 200 or 25 Houses on a base map of scale 1:50,000.

DATABASE, Village Population, Housing Units, Electrified /Un-electrified, Nearest Grid station / 11 Kv feeder, Settlements of 100 persons within 10 K.M distance from existing feeder. SOFTWARE MapInfo

● CLIENT: Pakistan Water & Power Development Authority (WAPDA)

PROJECT: WAPDA/USAID POWER DISTRIBUTION PROGRAM 391-0473

SCOPE OF WORK

Development of a digital database for WAPDA Distribution network. The work consists of the physical and electrical field survey and the generation of mapping database and associated maps for all of the grid stations / feeder in the AEB. Mapping: UTM location of each Structure/Pole of HT/LT line. Location of Permanent references. Major Geographical features. DATABASE: Structure / Pole type, height, assigned identification number. LT include number of Single / three phase service drop. Transformer type, Rating, Associated equipment. All Accessories Assemble on Structure / Pole. Conductor length / size /type. SOFTWAREAutoCAD MS Access

● CLIENT: WASA

PROJECT: WASA MAPPING PACKAGE-C

SCOPE OF WORK To Prepare a complete data map for WASA existing network of sewerage system. MAPPING: Location Survey of Sewer / Drains, Leveling Survey of Sewer / Drains Condition Survey of sewer / Manholes Up dating of base Maps, 3500 K.M of Sewers, 110 K.M of Drains, DATABASE: Size & Type of Manhole / sever

• CLIENT :- PUNJAB MATERNITY & CHILD WELFARE ASSOCIATION. PROJECT :- Mapping of YEAR served by MCH Complex Gulberg Lahore. YEAR :- 1988

Page 29: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

• CLIENT :- PEPAC LAHORE .

PROJECT :- Topography , Contouring of G.V.I at Jaranwala. YEAR :- 1988

• CLIENT :- REPUBLIC ENGINEERING CONSORTIUM LAHORE .

PROJECT :- Plane table Survey of 902 Katchi-Abadies at different cities of Punjab.

YEAR :- 1989

• CLIENT :- N.D.C (PVT.) LTD. LAHORE. PROJECT :- Topography, Contouring and Development of GIS Database of

four flood Irrigation schemes at Lasbela. YEAR :- 1989

• CLIENT :- PROGRESSIVE CONSULTANTS (PVT.) LTD. LAHORE.

PROJECT :- Quaid-e-Azam University Islamabad Topography, Contouring. YEAR :- 1990

• CLIENT :- PROGRESSIVE CONSULTANTS (PVT.) LTD. LAHORE.

PROJECT :- Institute of Medical Sciences Islamabad .Topography, Contouring.

YEAR :- 1990 • CLIENT :- PROGRESSIVE CONSULTANTS (PVT.) LTD. LAHORE.

PROJECT :- Exxon Chemicals Pakistan Dharki . Topography , Contouring , H&V Control Points.

YEAR :- 1990 • CLIENT :- PAKISTAN TELEVISION CORPORATION LIMITED

ISLAMABAD. PROJECT :- RBS CHISTIAN , topography , Contouring YEAR :- 1993

• CLIENT :- ACE LAHORE .

PROJECT :- Mapping of SKARDU Town. Topography, Contouring, H&V Control.

YEAR :- 1993

• CLIENT :-M.C HASSANABDAL. PROJECT :-Survey & Mapping of HASSANABDAL Town, Topography,

Contouring YEAR :- 1997

• CLIENT :-N.T.D.C DERAMURAID JAMMALI.

PROJECT :-Survey & Mapping of Naseerabad Township. Topography, Contouring

YEAR :- 1998

• CLIENT :-MIRPUR DEVELOPMENT AUTHORITY AJ&K.

Page 30: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

PROJECT :-Survey & Mapping of Housing Colony. Topography, Contouring YEAR :- 1999

• CLIENT :-D.D&C (GHQ) RAWALPINDI.

PROJECT :-Survey & Mapping of Sawan River. Topography, Contouring, X- Sections and Development of GIS Database. YEAR :- 2000

• CLIENT :-CWO RAWALPINDI.

PROJECT :-Survey & Mapping of Different YEARs. Topography, Contouring, DTM and Development of GIS Database YEAR :- 2001

• CLIENT :- PROGRESSIVE CONSULTANTS (PVT) LTD. LAHORE

PROJECT :-Christian Memorial hospital Sialkot . Topography , spot leveling, production of Maps and as built Drawings . YEAR :- 1989

• CLIENT :- PROGRESSIVE CONSULTANTS (PVT.) LTD. LAHORE .

PROJECT :- Muslim Insurance Company Building at Lahore. Production of Maps and As built Drawings

YEAR :-1989 • CLIEN :- PROGRESSIVE CONSULTANTS (PVT.) LTD. LAHORE .

PROJECT :- State Bank of Pakistan old Building Lahore As Built drawings . YEAR :- 1990

• CLIENT :- PACKAGES LIMITED LAHORE .

PROJECT :- Survey Of Packages Factory at Lahore . YEAR :- 1991

• CLIENT :- PROGRESSIVE CONSULTANTS (PVT.) LTD. LAHORE.

PROJECT :- Survey Of TDCP Sites Multan, D.G.Khan, Faisalabad. YEAR :- 1998

• CLIENT :- NESTLE MILKPAK LIMITED LAHORE.

PROJECT :- Survey Of Lahore office. YEAR :- 2000

● CLIENT :-PROGRESSIVE CONSULTANTS (PVT.) LIMITED LAHORE. PROJECT :-R.C.C Drain at ATTOCK REFINERY at Rawalpindi. Topography, Leveling & GIS YEAR :- 1994

Page 31: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

● CLIENT :-NESPAK-MMI PROJECT :-Topography Survey and GIS of Drains in Lasbela Canal

Command Drainage Project.

YEAR :- 1994 ● CLIENT :-PROGRESSIVE CONSULTANTS (PVT.) LIMITED LAHORE. PROJECT :-Storm Water Drains ATTOCK REFINERY at Rawalpindi. Topography, Leveling and GIS YEAR :- 1996 ● CLIENT :-PROGRESSIVE CONSULTANTS (PVT.) LIMITED LAHORE. PROJECT :-Storm Water Drains ICI Chemicals at Khewara. Topography, Leveling & GIS YEAR :- 1997 ● CLIENT :-IN-CONSULT (PVT.) LIMITED LAHORE. PROJECT :-CETPT, Kasur Taneries Project. Topography, Contouring, As Built Survey. YEAR :- 1999

● CLIENT :- ICC TEXTILES (Pvt.) LTD. LAHORE . PROJECT :- ICC Textile mill at Sunder Topography , Contouring . YEAR :- 1990

● CLIENT :- BECO EDIBLE OILS LTD. AT SHEIKHUPURA . PROJECT :- Factory Site , Topography , Contouring . YEAR :- 1991

● CLIENT :- IMRAN RAD ASSOCIATES LAHORE . PROJECT :- Jam Textile Pattoki , Topography , Contouring YEAR :- 1991 ● CLIENT : DRILLING ENHINEERS (PVT) LIMITED LAHORE. PROJECT :- PARCO REFINERY Mehmood Kot Muzaffargarh. Topography, Contouring, Meterology & Geological Study YEAR :- 1995 ● CLIENT :-ARL RAWALPINDI. PROJECT :-Survey & Mapping of ATTOCK REFINERY at Rawalpindi. Topography, Leveling

YEAR :- 1996 ● CLIENT :-PROGRESSIVE CONSULTANTS (Pvt) LAHORE. PROJECT :-Survey & Mapping of RAVI CHEMICALS at Sheikhpura. Topography, Leveling YEAR :- 1996

Page 32: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

● CLIENT :-SARAH TEXTILE MILLS AT LAHORE. PROJECT :-Survey & Mapping of SARA Textile Mills at Lahore Topography, Leveling ● CLIENT :-SARAH ENTERPRISERS AT LAHORE. PROJECT :-Survey & Mapping of SARA Enterprisers Textile Mills at Lahore Topography, Leveling ● CLIENT :-MATSUI ENGINEERING & SHIPBUILDING CO., LTD., JAPAN. PROJECT :-ARL UpGradation Project. Survey & Mapping, H&V Control of

ATTOCK REFINERY at Rawalpindi

YEAR : 1997 ● CLIENT :-AMMAR TEXTILE MILLS AT LAHORE. PROJECT :-Survey & Mapping of Ammar Textile Mills at Lahore Topography, Leveling ● CLIENT :-ALVERA TEXTILE MILLS AT SHEIKHPURA. PROJECT :-Survey & Mapping of Alvera Textile Mills at Sheikhpura- Faisalabd road. Topography, Contouring. YEAR :- 2000 ● CLIENT :-MILLAC FOODS (PVT) LIMITED. PROJECT :-Survey & Mapping of Millac Foods at Raiwand Road Lahore. ● CLIENT :-D.D & C GHQ RAWALPINDI. PROJECT :-RDA Commercial Complex at Rawalpindi. YEAR : 2000

● CLIENT :- DESIGN CENTER LAHORE. PROJECT :- Route , Topography, X & L -Sections and GIS of road in District

Sialkot. YEAR :- 1988

● CLIENT :- PUNJAB HIGHWAY DEPARTMENT (MIANWALI DIVISION) . PROJECT :- Route , P.T , X-Section and GIS of roads, Kot Chandana to tola Mangali .Mithakhattak to Sultankhel . Awan wala to Sarkia .

YEAR :- 1989

● CLIENT :- PROGRESSIVE CONSULTANTS (PVT.) LTD. LAHORE. PROJECT :- WECHS Gujranwala Profile , X-Section and GIS of roads . YEAR :- 1990

● CLIENT :- PUNJAB HIGHWAY DEPARTMENT (SIALKOT DIVISION).

PROJECT :- Over Head Bridge near Jinnah Stadium Sialkot . Topography , Profile and X-Sections and GIS YEAR :- 1990

Page 33: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

● CLIENT :- PUNJAB HIGHWAY DEPARTMENT (SIALKOT DIVISION).

PROJECT :- Road from Bund road to Rangpura Bridge . Topography , profile , X-Sections and GIS. YEAR :- 1990

● CLIENT :- EPSILON ENGINEERING INTERNATIONAL (PVT.) LTD. LAHORE.

PROJECT :- 4 Canal Crossings in Lahore . Topography , Profile , X-Sections . YEAR :- 1991

● CLIENT :-PROGRESSIVE CONSULTANTS (PVT.) LIMITED LAHORE. PROJECT :-Road at ICC Soda ash Plant Khewra. Topography, Layout, Leveling.

YEAR :- 1994

● CLIENT :-D.D & C (GHQ) RAWALPINDI. PROJECT :-M-II Link Road Rawat-Chakri. Route, Topography, DTM. YEAR :- 1998 ● CLIENT :- PUNJAB HIGHWAY DEPARTMENT (SIALKOT DIVISION).

PROJECT :- 4 Roads in Sialkot Sub-Division. : Topography , profile , X-Sections .

YEAR :- 1999

● CLIENT :- NESPAK LAHORE . PROJECT :- Lahore-Kasur Express way. Topography , Profile , X-Sections and GIS. YEAR :- 1999

● CLIENT :-J & M PAKISTAN (Pvt) LIMITED LAHORE. PROJECT :-Road in Jhelum Highway Division. Topography, Layout, Leveling and GIS YEAR :- 1999

● CLIENT :-D.D & C (GHQ) RAWALPINDI. PROJECT :-Zhob-D.I.Khan road . Route, Topography, DTM and GIS YEAR :- 2000 ● CLIENT :- PROGRESSIVE CONSULTANTS (PVT.) LTD. LAHORE.

PROJECT :- SNGPL Officers Co-Operative housing society Lahore . Topography , Contouring. Layout YEAR :- 1990

Page 34: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

● CLIENT :- PROGRESSIVE CONSULTANTS (PVT.) LTD. LAHORE. PROJECT :- HBFC Officers CO-Operative Housing Society Lahore . Topography , Contouring , Layout . YEAR :- 1991

● CLIENT :- AHBAB CO-OPERATIVE HOUSING SOCIETY LAHORE. PROJECT :- Topography, Contouring, Town Planing, Layout. YEAR :- 1991

● CLIENT :-IEP TOWN LAHORE. PROJECT :- IEP Town Lahore. Layout, Leveling. YEAR :- 1993 ● CLIENT :-PROGRESSIVE CONSULTANTS (PVT.) LIMITED LAHORE. PROJECT :-AECHS Housing Project Faisalabad. Topography, Contouring, Layout.

YEAR :- 1994 ● CLIENT :-PROGRESSIVE CONSULTANTS (PVT.) LIMITED LAHORE. PROJECT :-Housing Project at Rahimyarkhan. Topography, Contouring.

YEAR :- 1997

● CLIENT :-PROGRESSIVE CONSULTANTS (PVT.) LIMITED LAHORE. PROJECT :-Lums housing Project at Lahore. Topography, Contouring.

YEAR :- 1999 ● CLIENT :-PUNJAB COOPERATIVE BOARD FOR LIQUIDATION LAHORE. PROJECT :-PALACE City housing Project at Lahore. Topography, Contouring.

YEAR :- 1999

● CLIENT :-MDA MIRPUR AJK. PROJECT :-MDA housing Project at Mirpur city. Topography, Contouring.

YEAR :- 2000

● CLIENT :-HOUSING DIRECTORATE GHQ RAWALPINDI. PROJECT :-ASKARI Housing Scheme at Rawalpindi. Topography, Contouring.

YEAR :- 2000

● CLIENT :-PROGRESSIVE CONSULTANTS (PVT.) LIMITED LAHORE. PROJECT :-D.H.A LAHORE. Topography, Contouring.

YEAR :- 2001

● CLIENT :- SIEMENS PAKISTAN ENGINEERING COMPANY LTD .

Page 35: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

PROJECT :- 300 MW Combined Cycle Guddu . Traverse , Topography , Contouring , Layout and GIS YEAR :- 1990

● CLIENT :- TRANSANERGY INTERNATIONAL (PVT.) LTD. PROJECT :- 132/220/500 KV JAMSORO /DAWOOD KHEL GRID STATIONS (EXTENSION) Topography, Contouring, Layout and GIS YEAR :- 1993

● CLIENT :- PROGRESSIVE CONSULTANTS (PVT.) LTD. LAHORE . PROJECT :- Comprehensive study and Development of Database on

Transportation System of Lahore. Screen line 36 Stations , Corden line 9 stations , Parking Study 12 hours x 3 days .

YEAR :-1990

● CLIENT :- HAISTE INTERNATIONAL LIMITED . PROJECT :- Lahore WASA System Mapping Package - C. Data Collection of

Location & Leveling of Sewers / Drains, Location & Leveling of Sewer and Development of GIS Database.

YEAR :- 1991-95

● CLIENT :- ICC (PVT.) LTD . PROJECT :- WAPDA/USAID Power Distribution Program 391-0473 . WAPDA Feeder Survey, Data Collection, Mapping and Development of GIS Database, AEB Islamabad . YEAR :- 1991-93

● CLIENT :- ICC (PVT.) LIMITED LAHORE

PROJECT :- WAPDA FEEDER Survey, Data Collection, Mapping and GIS Database Development AEB Peshawar.

YEAR :- 1995

● CLIENT :- LUCKY GOLD STAR CABLE COMPANY (KOREA) . PROJECT :- 132 KV U/G CABLE Route, Topography, Profile, As Built

Drawings and GIS Database. Rewaz Garden s/s to fort s/s. Mecleod road s/s to Badamibagh s/s.

YEAR :- 1989

● CLIENT :- GREAVES COTTON PAKISTAN (PVT.) LTD. LAHORE . PROJECT :- Burhan-Islamabad 132 Kv D/C OHTL . Route , Profile , Design , Staking of towers . YEAR :- 1990

● CLIENT :- ARL RAWALPINDI. PROJECT :- Sub-Soil Investigation for Open Land. YEAR :- 1998

Page 36: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

● CLIENT :- ARL RAWALPINDI. PROJECT :- Sub-Soil Investigation for New Power House. YEAR :- 1999

● CLIENT :- ARL RAWALPINDI. PROJECT :-Sub-Surface Resistivity Survey for New Power House. YEAR :- 1999

● CLIENT :- ZISHAN ENGINEERS (PVT) LIMITED KARACHI. PROJECT :-Sub-SOIL investigation for Tank 5. YEAR :- 2000

● CLIENT :- GANDAHARA CONSULTANTS (PVT) LTD KARACHI. PROJECT :-Sub-SOIL investigation for 85 PSO sites YEAR :- 2000

● CLIENT :- ZISHAN ENGINEERS (PVT) LIMITED KARACHI.

PROJECT :-Sub-SOIL investigation for 3 Nos. new Tanks YEAR :- 2001

● CLIENT :- PROGRESSIVE CONSULTANTS (PVT.) LTD. LAHORE . PROJECT :- Bulk Water supply Project Mirpur AJ&K YEAR :- 2001

● CLIENT :- GUJRANWALA CANTTONMENT BOARD. PROJECT :- Sewerage & disposal Design of Gujranwala Cantt.

Topography, Profile & Design. YEAR :- 1998

● CLIENT : DRILLING ENGINEERS (PVT) LIMITED LAHORE. PROJECT :- PARCO REFINERY Mehmood Kot Muzaffargarh. Meterology & Geological Study YEAR :- 1995

Page 37: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,
Page 38: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

TELECOMMUNICATIONS EXPERIENCE

1. Optical Fiber Cable Project between Mansehra to Gilgit

Client Special Communications Organization, Government of Pakistan. (SCO)

Scope of Work: Identification of Project Route on 1:50,000 Maps provided by the SCO. Preparation of Conceptual Plan of the Project Presentation and Discussions on Conceptual Plan, Finalization and Approval by SCO. Preparation of Detailed Design of the Project.

Preparation of following Specifications:

Cable Trench and Cable Laying. O/F Cable and its Accessories. Test and Measurement Equipment. Terminal Equipment. All Allied Systems. Presentation and Discussion with SCO.

Cable Trench and Cable Laying. Preparation of Addendum to Bid Documents if required. Participation in Bidders Conference.

Preparation of Evaluation Criteria and Forms. Evaluation of Bids. Financial Bid Opening and Evaluation. Preparation of Final Evaluation Report. Presentation and Discussion with SCO. Assistance to SCO in negotiations with Successful Bidder and Finalization of Contract(s). Preparation of Contract Award and Documents and Vetting of Contract(s).

Page 39: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

2. RURAL TELECOMMUNICATION NETWORK EXPANSION PROJECT FOR NORTHERN AREAS OF PAKISTAN

Client Special Communications Organization, Government of Pakistan. (SCO)

Scope of Work Project Planning & Designing for Himalaya and

Korakuram Mountain regions, Preparation of Tender Documents, Preparation of

Technical Specifications and BOQs of Switching. WLL, M/Wave, VSAT, Towers

and Electric Protection System, Bids Evaluation and Contract Negotiations,

Preparation of Contract Agreement.

Duration 1 Year

Associated Firm(s) Nil

3. ANALYSIS OF Y2K PREPAREDNESS OF PTCL

Client ScowCroft Group, USA.

Scope of Work A detailed study of the state of preparedness of Pakistan

Telecommunication Corporation Limited to handle any problems which may arise

due to Y2K issue. The scope covered whole of PTCL network (internal and

international). The Phase-II of this study covered duration from Dec. 31, 1999 to

March 2000 to evaluate the after effects of Y2K

Duration Oct. – Dec. 1999 – March 2000.

Associated Firm(s) Nil

4. DESIGNING, IMPLEMENATION AND OPERATIONS OF

ACCOUNTING, BILLING AND BILLS PRINTING SYSTEM.

Client ScowCroft Group, USA.

Page 40: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

Scope of Work Designing of system parameters, Defining of specifications

for software development. Analyze and suggest modifications to existing telecom

network with respect to new billing system

Duration 1 Year.

Associated Firm(s) Nil

5. STUDY AND ANALYSIS OF STRUCTURAL REFORMS IN TELECOM SECTOR OF PAKISTAN

Client Public Interest Monitoring Group.

Scope of Work Detailed study on effects due to restructuring of telecommunication sector of Pakistan Analysed the achieved versus planned objectives, reasons for reforms project was funded by the World Bank.

Duration August to October 1999

Associated Firm(s) Nil

6. SURVEY AND ANALYSIS OF MICROWAVE NETWORKS IN PAKISTAN

Client ScowCroft Group, USA.

Scope of Work Prepared a comprehensive survey report on Microwave Networks in Private and Public Sector of Pakistan. Their present condition and possibilities of their future improvements. The survey was aimed at finding possible future openings for US microwave equipment suppliers in the market.

Duration March to July 1999

Associated Firm(s) Nil

7. TECHNICAL AUDIT OF PTCL

Client Inter Active Communications (Pvt) Ltd. (IAC), Islamabad.

Scope of Work Critical Assessment of Digital and Analogue Network, Quality of Service, Network Maintenance and Security, Strategy Planning for Rural Telecommunications Development.

Page 41: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

Duration July 1998 to May 1999

Associated Firm(s) Nil

8. AJ&K RURAL TELECOMMUNICATION UPLIFT PROJECT

Client Special Communications Organization, Government of Pakistan. (SCO)

MAES has done this project through sister concern SA&S (Pvt) Ltd.

Scope of Work Preparation of Project Feasibility, Project approval from Government of Pakistan. Designing and Planning of 96,000 lines Rural Network including Switching Plan, Routing Plan, Signaling Plan, Numbering Plan, Charging Plan, Billing and Fraud Control Systems, Availability and Security Plan, TDMA and WILL Induction Plan, Networking Management System, Preparation of Tender and Technical Specifications, Bids Evaluation, etc.

Duration 1994-1995

Associated Firm(s) Special Assignments & Systems (Pvt) Ltd., Sister Concern of MAES.

9. ESTABLISHMENT OF EMC LABS

Client Secretary, National Communication Security Board, Government of Pakistan.

Scope of Work Preparation of Technical and Financial Feasibility, Project

Designing and Recommendations for Equipment, recommendations on legal aspects

of the Project Technical and Legal Comments on Draft Ordinance for the

Establishment of Pakistan Telecommunication Authority.

Page 42: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,

Duration 1995

Associated Firm(s) Nil

10. CONVENTION CENTRE ISLAMABAD

Client Govt. of Pakistan.

Scope of Work MAES has the pride of being the consultants and designers of all electronics systems installed at the Islamabad Convention Centre and for the OIC Summit Conference During the Conference, MAES had been awarded the responsibility of overall management, control and operations Supervision of all electronics, electrical, mechanical, public health, etc. systems and services operating inside and around the venue of the conference.

Duration 1 Year.

Associated Firm(s) Nil

Page 43: New Company Profile - MAES Company Profile_2006.pdf · Client Water and Power Development Authority Capacity 128ft high Dam Across Satpara Nallah Scope of work Review the design,