Route 17 Corridor Study Public Workshop II – November 29, 2012

33
Route 17 Corridor Study Public Workshop II – November 29, 2012 Orange / Sullivan County 1

description

Route 17 Corridor Study Public Workshop II – November 29, 2012. Orange / Sullivan County. Welcome & Introductions. Introductions Project Team Members NYSDOT Consultant Team TPC Members. www.dot.ny.gov/rt17corridor. Agenda. Welcome and Introductions - PowerPoint PPT Presentation

Transcript of Route 17 Corridor Study Public Workshop II – November 29, 2012

Page 1: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 1

Route 17 Corridor StudyPublic Workshop II – November 29, 2012

Orange / Sullivan County

Page 2: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 2

Welcome & Introductions

Introductions

Project Team Memberso NYSDOT o Consultant Teamo TPC Members

www.dot.ny.gov/rt17corridor

Page 3: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 3

Agenda Welcome and Introductions Study Schedule & Public Involvement Process Public Workshop Purpose & Study Update Review of Feasible Alternatives Review of Interchange Scenarios Evaluation of Alternatives/Scenarios & Report

Back Next Steps

www.dot.ny.gov/rt17corridor

Page 4: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 4

Study Schedule & Public Involvement Process

www.dot.ny.gov/rt17corridor

Page 5: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 5

Public Involvement Process

Page 6: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 6

Public Workshop Purpose & Study Update

www.dot.ny.gov/rt17corridor

Page 7: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 7

Corridor Study Step 1Corridor Vision Statement

The Route 17 corridor in Orange and Sullivan counties will support a robust, economic future with safe, efficient access for all users while preserving its scenic beauty and natural resources. Freight commerce, recreational travelers, and daily commuters will travel between New York City and the Hudson Valley-Catskill Mountain region along a well managed and maintained, modern facility that simultaneously supports long distance access to the southern tier of New York State and provides enhanced mobility for local trips among adjoining communities.

Corridor Goal Statements

•Improve corridor safety for all users and stakeholders.•Provide a reliable transportation corridor that accommodates public transit,• minimizes delay, and accommodates current and future travel demand for all.•Preserve corridor infrastructure investments in a fiscally, sustainable manner.•Modernize corridor roadway and interchanges while maintaining the quality of • life and preserving the scenic beauty and natural resources.•Provide a transportation corridor that supports and enhances the opportunity for continued economic development.

www.dot.ny.gov/rt17corridor

Page 8: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 8

Corridor Study Step 2

Transportation Concepts:• Maintain Existing - Baseline• General Use Third Lane• High Occupancy Vehicle (HOV) Lane• Bus Rapid Transit (BRT)• Light Rail

www.dot.ny.gov/rt17corridor

Page 9: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 9

Screening Criteria

Operational and design features, including sustainability

Right-of-way requirements Public and TPC input Environmental impacts Goals and Objectives Cost

www.dot.ny.gov/rt17corridor

Page 10: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 10

Review of Feasible Alternatives

www.dot.ny.gov/rt17corridor

Page 11: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 11

Feasible Transportation Alternatives

Additional General Purpose Third Lane (from Exit 120 in Middletown to Exit 131)

HOV Lane (from Exit 120 in Middletown to Exit 131) • Long-term potential for development of

some version of BRT Sullivan County – Focus on access to

corridor

www.dot.ny.gov/rt17corridor

Page 12: Route 17 Corridor Study Public Workshop II – November  29, 2012

Projected Orange County Trip Growth Rate – AM Peak 2010 vs 2045

Source: Orange County Planning Model• 12

www.dot.ny.gov/rt17corridor

Trip Growth Rates

Page 13: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 13

Projected Orange County Trip Growth Rate – PM Peak 2010 vs 2045

Source: Orange County Planning Modelwww.dot.ny.gov/rt17corridor

Trip Growth Rates

Page 14: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 14

Projected Sullivan County Growth 2045

Concord Resort

Center for Discovery

ProposedProjects

Background growth projection of 2% per year

www.dot.ny.gov/rt17corridor

Page 15: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 15

Projected Traffic Comparison – AM Existing vs 2045

www.dot.ny.gov/rt17corridor

11883009

33544446

20683878

35144990

223939932277

3914

ExistingFuture 2045900

1400

Page 16: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 16

Projected Traffic Comparison – PM Existing vs 2045

www.dot.ny.gov/rt17corridor

32174813

9332882

34354920

22994040

290247891932

2891

ExistingFuture 2045

9001500

Page 17: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 17

Projected Traffic Conditions – AM 2045

www.dot.ny.gov/rt17corridor

Page 18: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 18

Projected Traffic Conditions – PM 2045

www.dot.ny.gov/rt17corridor

Page 19: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 19

Transportation Alternative Development

www.dot.ny.gov/rt17corridor

Page 20: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 20

Transportation Alternative Development

www.dot.ny.gov/rt17corridor

Page 21: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 21

Projected Traffic Conditions3rd Lane Alternative – AM 2045

www.dot.ny.gov/rt17corridor

Page 22: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 22

Projected Traffic Conditions3rd Lane Alternative – PM 2045

www.dot.ny.gov/rt17corridor

Page 23: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 23

Transportation Alternative Development

www.dot.ny.gov/rt17corridor

Page 24: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 24

HOV Lane Entrances/Exits

www.dot.ny.gov/rt17corridor

Page 25: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 25

Projected Traffic ConditionsHOV Lane Alternative – AM 2045 With modest mode shift

www.dot.ny.gov/rt17corridor

Page 26: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 26

Projected Traffic ConditionsHOV Lane Alternative – PM 2045 With modest mode shift

www.dot.ny.gov/rt17corridor

Page 27: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 27www.dot.ny.gov/rt17corridor

Review of Interchange Scenarios

Page 28: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 28

Safety Improvements

Page 29: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 29

Existing and Known Development

Page 30: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 30

Future Development & Quality of Life

Page 31: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 31www.dot.ny.gov/rt17corridor

Evaluation of Feasible Alternatives/Scenarios &

Report Back

Page 32: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 32

Corridor Vision & Goal StatementsCorridor Vision Statement

The Route 17 corridor in Orange and Sullivan counties will support a robust, economic future with safe, efficient access for all users while preserving its scenic beauty and natural resources. Freight commerce, recreational travelers, and daily commuters will travel between New York City and the Hudson Valley-Catskill Mountain region along a well managed and maintained, modern facility that simultaneously supports long distance access to the southern tier of New York State and provides enhanced mobility for local trips among adjoining communities.

Corridor Goal Statements

• Improve corridor safety for all users and stakeholders.• Provide a reliable transportation corridor that accommodates public transit,minimizes delay, and accommodates current and future travel demand for all.• Preserve corridor infrastructure investments in a fiscally, sustainable manner.• Modernize corridor roadway and interchanges while maintaining the quality of life and preserving the scenic beauty and natural resources.• Provide a transportation corridor that supports and enhances the opportunity for continued economic development.

www.dot.ny.gov/rt17corridor

Page 33: Route 17 Corridor Study Public Workshop II – November  29, 2012

• 33www.dot.ny.gov/rt17corridor

Next Steps