Determining When To Repair AgingEquipment or Upgrade to New
Technology PRESENTED BY
Darryl Jacobs Schaedler YescoThomas House Rockwell Automation
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
2/81
Copyright 2012 Rockwell Automation, Inc. All rights reserved.
What well cover today
Evaluating Existing Equipment
Understanding Your Migration Options
Justifying and Prioritizing Migration Resources
Products and Services to Make it Easier to Upgrade
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
3/81
Copyright 2012 Rockwell Automation, Inc. All rights reserved.
Market Challenges
3
Companies are increasing looking at migration as a solution
ImprovePRODUCTIVITYwith betterasset utilization and systemperformance
PromoteGLOBALIZATIONwith easyaccess to actionable, plant-wideinformation
CultivateINNOVATIONwithincreased system flexibility andtechnical risk mitigation
SupportSUSTAINABILITYwithextended product lifecycles andbetter asset utilization
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
4/81
Copyright 2012 Rockwell Automation, Inc. All rights reserved.
Typical Concerns
Cost Loss ofFunctionality Too BusyTechnology Acceptance
Reluctantto Change
Companies also quote similar reasons for lack of migration
To get from there to here not so bad
To get from there to here is a muchwider gap and pain
Migration - ChallengesPLC2 phone
http://www.google.com/url?sa=t&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&uact=8&ved=0CAQQjRw&url=http://howtogetreal.com/blog/?p=28&ei=C1wnU9WXPIfg0gH3q4D4DA&usg=AFQjCNHcRM540CnjA9Qs3-5isf6ov0Zvfghttp://www.google.com/url?sa=t&rct=j&q=&esrc=s&frm=1&source=images&cd=&cad=rja&uact=8&ved=0CAQQjRw&url=http://howtogetreal.com/blog/?p=28&ei=C1wnU9WXPIfg0gH3q4D4DA&usg=AFQjCNHcRM540CnjA9Qs3-5isf6ov0Zvfg -
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
5/81
Copyright 2012 Rockwell Automation, Inc. All rights reserved.
Companies View of Migration(the misconceptions and fables)
5Migration can reduce risk & improve productivity !!!
Migration is
Costly
Migration will result
in loss of Production
Migration
is risky
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
6/81
Copyright 2012 Rockwell Automation, Inc. All rights reserved.
Benefits of Migration
Productivity gains through increased capacity,repeatability, throughput and quality
Product / Process Innovation: make it future ready
Reduce maintenance and parts costs
Reduce downtime
Meet global standards
Gain a competitive advantage
Build a data ready system
6
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
7/81
Copyright 2012 Rockwell Automation, Inc. All rights reserved.
*Evaluating Existing Equipment*
How do I determine what our situation really is?- A great first step is knowing what you have in house- SYD/RA offers installed base evaluation services- Compare this to the product life cycle stage
- This is the beginning at looking at an overall strategy for longterm cost controls and superior productivity
While its not as simple as looking at obsolete parts it is an obviousexample toward justification and sense of urgency
1785-L26BRepair OnlyLast$13,400
1785-L86BIn rackreplacement$38,100
1756-L71MigrationOption$5,570
16KB 100KB 2MB
While we offer best in class repair services as a viable option tomaintain the operational life cycle this still locks you in time for support
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
8/81
Copyright 2012 Rockwell Automation, Inc. All rights reserved.
Repair or Replace (Migration)?
8
Practical Answer:Repair part services is a very cost effective strategy where the commitment to maintain
shelf stock is closely monitored and you have a reliable repair center.
On discontinued or soon to be obsolete parts its really kicking the can down the road
that will create real high drama eventually without a plan in place. (see Murphy's law )The Bottom Line
*If you plan to run the machine application for years to come..*Unless you can afford 1 day to 1 week outages*Dont mind repeating unexpected high service call costs*Have copies of known good programs and resources to get in operation*Have a known obsolete part that will require some engineering to replace*Have 1, 2 or more critical little time bombs that can stop production
You should have started your migration upgrade plan yesterday .
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
9/81
Copyright 2012 Rockwell Automation, Inc. All rights reserved.
StepForward Program
Rockwell Automation Product Lifecycle Map
9
Active Silver Series Discontinued Obsolete
Active -Current, in-stock product, Full support (consulting, repair, training, transactional, and contract services)
Silver Series -Low inventory, support through forecasted date, Well-defined migration path with incentives
Discontinued -No new product; repair services available
StepForward Program - Promotional incentives, tools & utilities to upgrade/migrate.
Obsolete - Product and repair services unavailable
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
10/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.
Silver Series TM
TheSilver Series Program is part of our communicationprogram to help you navigate through the transition phase.
The Silver Date is the forecasted date Rockwell Automation will notaccept orders for new product shipments. After a products SilverDate, it officially enters the Discontinued phase.
The Silver phase is typically a 0 - 24 month timeframe during whichyou can still order new products before they become discontinued.
In some situations, the Silver Series timeframe is shorter, due tocircumstances beyond Rockwell Automations control (e.g., when a
third-party supplier stops making an essential element for a Rockwell Automation product).
10
Silver Series Website Link:
http://www.rockwellautomation.com/rockwellautomation/legacy/overview.page
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
11/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.
Rockwells Commitment
We offer migration solutions to Rockwell & from competitors products !!11
Exceptional Product Longevity & Lifecycle CommunicationRockwell Automation has a strong track record of keeping products viable, resulting in long product lifecyclerelative to our competition. As our products age, we provide options to help customers extend product life as as possible, and enough advance notification to allow them to transition as seamlessly as possible to the nextgeneration of products.
Phased Migration Strategy and Extensive Migrations ToolkitRockwell Automation provides the broadest portfolio of upgrade and replacement options, along with a phasemigration approach that minimizes risk and protects customers investments as they move to new technology.
Global Partners Network with Domain ExpertiseWe have a large number of global partners who offer migrations options for various industries and disciplines
Global Solutions and ServicesRockwell Automation provides project management, domain expertise, and global execution to help optimizecustomers experience during every phase of the automation lifecycle.
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
12/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.
A Word About Longevity
Rockwell Automation has a great track record of long term life cyclesupport on products.
Example: Standard Panelview had a 23 year run before entering thdiscontinued stage in 2012Letters of product longevity expectations are available on line and the Knowledgebase
12
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
13/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.
*Understanding Your MigrationOptions*
How do I get this accomplished?- Migrations are not all rip and replace. Phased migration
approach affords the most flexibility with a security blanket- Rockwell Automation has a whole toolbox of hardware and
software migration solutions How do I justify a budget for this?
- Developing a plan regardless of scale is key to predicting cost versusend goal benefits.
- Phased migration plans are fit to budget and your paceShow results to justify the next phase
- Get the right advice and assistance.Schaedler -Yesco, Rockwell Automation and our partners have theexperience to assist you in this process.
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
14/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.
Product Migration Options (the Help)
Let us help you develop the right migration plan for your company14
Caution:
Often a the machine builder/OEM will offer upgradepackages. Does this accomplish real modernizationand productivity goals or a band aid?
Get the information on what is being proposed to becertain they are not putting you in another box inreducing parts and maintenance cost goals.
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
15/81
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
16/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.
Migration Plan
16
Assess & document your control systemUnderstand your current & future needsIdentify reliability and longevity issuesDetermine scope of projectUnderstand your cost and availability time
Assess
Work with Rockwell Automation &Work with your partners to review your optionsDevelop migration plan to meet your needsDocument the benefits of the new system
Develop A Plan
Engage the right partner Execute developed planDocument benefits of migration
Implement
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
17/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.
Migration Tools
Lets look some common examples in what is available today in hardwareand software migration tools. This is the how part of the implementationplan.
PLC5 to Controllogix
SLC500 to CompactlogixPanelview Standard to Panelview Plus 61336 series to Powerflex 750 series AC drives
17
Time will run out before we look at all of thisbut it will be on the presentation copy.
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
18/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.Rev 5058-CO900C
PLC-5 Migration
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
19/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.
PLC-5 Silver Series Update
Key PLC-5 products that are obsolete NOW ! !1785-KE, 1771-ACN, 1771-ACNR, 1771-ACR15, 1771-ACNR151785-L40L, L30B, L20C15, L11BServo/Stepper modules 1771-QA, QB, QCEncoder/TTL modules 1771-IG, IJ, IK
Key PLC-5 products that are in the silver series 1771Chassis (A1, A2, A3 & A4) -3/31/20131771-IAN, IBN, OAN, & OWNA (32 pt modules) - 12/31/2013.
1771-SDN - 12/31/20131785-L60B, L40C & L40C15 - 12/31/20131785-L20B, L20E, L40B, L40E, & L60L -12/31/2014.
PLC-5 were introduced in 1985 - 25+ years ago!!!
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
20/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.
PLC-5 Migration Tools, Utilities &Programs
PLC-5 program conversion tool (Installed with RSLogix 5000)Free utility Translate PLC-5/SLC 2.0 to convert the program.
1771 to 1756 Swing arm conversion systemReplace 1771 with 1756 IO while using the current swing arm.
DH+ Network migration optionsUse 1756-DHRIO ModuleUse Prosoft Ethernet to DH+ Gateway
RIO Network migration optionsUse 1756-DHRIO ModuleUse 1756-RIO ModuleUse Prosoft Ethernet to RIO Gateway
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
21/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.
PLC-5 to Logix Code Conversion
Please review the log file after conversion.Please refer to publication 1756-RM085C-EN-P on how to use this tool.
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
22/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.
Easily layout existing 1771 chassis and have1756 chassis created automatically
IAB automatically prompts for items thatmay not have a direct cross
IAB ensures correct modules and quantitiesare selected.
1771 to 1756 Chassis
1771 Wiring Conversion Systemcomponents can be automaticallyincluded (optional, butrecommended for ease of
installation) Installation video anddocumentation available
Full BOM and Report showing aconverted chassis and anyApplication Considerations that mayapply.
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
23/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.
1771 to 1756 Chassis
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
24/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.24
1771 to 1756 Conversion Wizard in IABDrag and drop modules onto 1771 chassis to populate 1756 chassis with corresponding modules.
Press OK
when finished
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
25/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.
IAB Report FeaturesFull BOM includedGraphic representation of populated chassisCross reference table including 1771 module to 1756 equivalentApplication Considerations for each 1756 module is also included.
Please refer to publication 1492-SG121B-EN-P for more details
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
26/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.
DH+ & DH485 Migration - Logix Gateway
26
Multiple Communication Modules in a Logix Chassis Bridge between Ethernet, DH+ and DH485 Reusable Solution once everything is converted to Ethernet
Ethernet/IP 1756-DHRIO 1756-DH485
DH+ Network RIO Network
DH-485 NetworkEthernet Network
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
27/81Copyright 2012 Rockwell Automation, Inc. All rights reserved.
1756-RIO Module for Phased Migrations
The 1756-RIO provides a Logix solution for communications over RIOKey Features include
Provides one RIO network connection at 57.6K, 115K or 230K baud Acts as a scanner on a remote I/O network Acts as an adapter that exchanges data on a RIO network
Supports native RIO 16-bit words for data, control and status bitsSupports discrete data and block transfers in either modeSupports as many as 10 produced/consumed data with 248input/output words per connectionMaps all discrete and block transfer data into the produced/consumedconnections
This module eliminates the need for any message instructions to implementBlock Transfer Read (BTR) and Block Transfer Write (BTW) on RIO network.
The module is configured with an external configuration software (providedwith the module) and requires activated version of RSLinx.
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
28/81
Migr ting from PLC 5 / 1771 IO
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
29/81
29
Migrating from PLC-5 / 1771 IOPhase I: Monitor Mode
DH+
Human Machine Interfacesand Programming Panels (IDT)
Remote I/O Network
HMI / EOI*
*Making the decision to keep or replaceHMI before performing controller codeconversion will save time and money
Phase I
Check your converted logic beforeimplementing: Run Logix in monitormode, reading inputs & outputsdisabled . Learn More
1756-RIO Module used in Monitor Mode allows you checkyour program before going live. The module reads the inputsbut outputs are disabled. Learn More
Migrating from PLC 5 / 1771 IO
http://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.dochttp://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.dochttp://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.dochttp://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.dochttp://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.doc -
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
30/81
30
Migrating from PLC-5 / 1771 IOPhase II: Controller Replacement
DH+
Human Machine Interfacesand Programming Panels (IDT)
Remote I/O Network
HMI / EOI*
*Making the decision to keep or replaceHMI before performing controller codeconversion will save time and money
Phase IIPhase I
The 1771 to 1756 Swing Arm conversionallows replacement using existing wiring andmounting holes. Learn More
1756-DHRIO allows communicationover the existing DH+ network
1756-RIO moduleconfigure d as ascanner whichallows ControlLogixcommunications toRIO Adaptorslocated in remoteracks. Learn More
Migrating from PLC 5 / 1771 IO
http://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.dochttp://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.dochttp://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.dochttp://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.doc -
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
31/81
31
Migrating from PLC-5 / 1771 IOPhase III: HMI Conversion
EtherNet/IP
Remote I/O Network
Phase II Phase IIIPhase I
Replace legacy HMI/EOI w/ Engineering Servicesgraphicutilities to assist conversion Panelview Standard and other third
party products. Learn More
DH+
Migrating from PLC 5 / 1771 IO
http://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.dochttp://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.dochttp://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.doc -
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
32/81
32
Migrating from PLC-5 / 1771 IOPhase IV: Remote I/O Rack Replacement
EtherNet/IP
Remote I/O Network
Phase II Phase III Phase IVPhase I
DH+
1756-RIO modulesconfigured asadaptors in theremote racks.
With the 1771 to 1756 Swing-Arm Interface 1771I/O rackscan quickly be replaced with1756 I/O without disturbingthe I/O field wiringonerack at a time if necessary.Learn More
http://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.dochttp://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.dochttp://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.dochttp://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.doc -
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
33/81
Migrating from PLC-5 / 1771 IO
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
34/81
34
Migrating from PLC-5 / 1771 IOPhase IV: Remote I/O Rack Replacement
EtherNet/IP
Phase II Phase III Phase IVPhase I
EtherNet/IP
Other RIO NodesDrivesScales
ProSoftAN-X-ABRIO
Module
http://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.dochttp://localhost/Local%20Settings/Temp/notes6030C8/Usmayvfile002/Habanero/HOME/MS%20Word/Quest%20Technical%20Solutions/ANXBrochures/AN-X-PBSLV_Brochure.doc -
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
35/81
Copyright 2009 Rockwell Automation, Inc. All rights reserved.
SLC500 Migration
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
36/81
SLC Silver Series Update
Key SLC products that are obsolete NOW !! 1747-L20x, L30x, L40x Fixed SLC controllers. 1746-HSRV IMC110 Servo module
Key SLC products that are in the silver series
SLC were introduced almost 20 years ago!!!
1747-DCM DIRECT COMMUNICATION MODULE 12/1/2013
1747-KE DH-485/RS-232C INTERFACE MODULE 12/1/2013
1746-BAS SLC Basic Module 12/1/2013
1746-BAS T SLC Basic Turbo Module 10/1/2013
1746-IM4 AC INPUT MODULE FOR PROGRAMMABLE CONTROLLER 8/30/2013
1747-M2 SLC EEPROM Memory Module 4/30/2013
1746-OB6EI ELECTRONICALLY PROTECTED ISOLATED SOURCING DC OUTPUTMODULE
4/2/2013
1747-ASB SLC 500 REMOTE I/O ADAPTER MODULE 11/1/2013
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
37/81
Small networked migration using an
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
38/81
Small networked migration using anEthernet adaptor
38
SLC 5/04
PV Std
Serial
SLC 5/04
PV Std
Serial
SLC 5/04
PV Std
Serial
DH+
Serial
PanelView Std
SLC 5/04
SLC 5/05
Ethernet
SLC 5/05 SLC 5/05 SLC 5/05
PV Std
Serial
PV Std
Serial
PV Std
InformationPV +
Serial
Ethernet
Information
PV +
CompactLogix
PV + PV + PV +
1747-AENTR
1747-AENTR
1747-AENTR1747-AENTR
S i C L i
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
39/81
Steps to migrate to CompactLogix
39
Publication - MIGRAT-PP004-EN-E September 2011
Migration Tools: SLC 500 Ethernet/IP Adaptor
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
40/81
Migration Tools: SLC 500 Ethernet/IP Adaptor(1747-AENTR)
40
The SLC Ethernet Adaptor (1747-AENTR) allows SLC I/O racks to be controlled by anLogix Programmable Automation Controller (PAC): Must be located in the first slot (slot 0) of an SLC rack
Replaces SLC controller in local rack Replaces the existing RIO adaptor (1747-ASB) in remote racks Replaces ControlNet adaptor (1747-ACN15, 1747-ACNR15) in remote racks
Supports SLC 500 extended rack Performance depends on module configuration
Requires RSLogix 5000 v20 or greater Utilizes electronic data sheet add on profile capability in v20
Supports various Ethernet network topologies Device Level Ring (DLR) Star Linear
StepForward incentives available for migrating to AENTR
While providing a way to reuse existing rack I/Oit also sets up the possibility of consolidating
processors.
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
41/81
Mi ti T l L i G t
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
42/81
Migration Tools Logix Gateway
42
Multiple Communication Modules in a Logix Chassis Bridge between Ethernet, DH+ and DH485 Reusable Solution once everything is converted to Ethernet
Ethernet/IP 1756-DHRIO 1756-DH485
DH+ Network RIO Network
DH-485 NetworkEthernet Network
P S ft DH485 G t
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
43/81
ProSoft DH485 Gateway
43
EtherNet/IP to DH-485 Gateway - 5201-DFNT-DH485 Helps to connect DH485 network to an EtherNet/IP network. Supports DH485 Master & Salve modes. In Slave mode, the module accepts commands from one or more
Masters to read/write data stored in the module's internal datamemory. In this mode, the ProLinx unit is answering DH-485
commands and has the appearance of an SLC processor to thenetwork In Master mode, the ProLinx DH-485 driver will actively gather data
from other devices on the network, controlling the read/write datatransfer between the gateway and other DH-485 devices, such asSLC processors. Data transfer can be initiated and executed with
other devices without any ladder logic being required in the Rockwell Automation slave hardware
Migration Tools:
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
44/81
Migration Tools:Integrated Architecture Builder (IAB)
44
IAB includes a Migration Wizard specifically created for SLC to Logix (CompactLogControlLogix) migrations Minimize cost and risk to convert SLC systems to Logix systems Enter current SLC BOM into IAB and select a conversion option to quickly conve
the BOM to an equivalent Logix system
IAB will automatically select system components, size power supplies, etc. Convert system in 30 minutes or less with minimal training Helps you determine any critical application considerations
Convert
Migration Tools: Logic Code Translation Tool
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
45/81
Migration Tools: Logic Code Translation Toolin RSLogix 5000
45
Updated and updateablecontroller list
Wizard-style step-by-step dialogs guide theuser through the translation process
Migration & Conversion Services
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
46/81
Migration & Conversion Services
46
Complete turnkey services delivered through Rockwell Automation
CSM that focuses on one-for-one replacement :
Upgrade your operator interface withcurrent technologyReplace an AC or DC drive with currenttechnologyReplace a PLC with current technologyUpdate automation software andcommunication/HMI technology
Convert an analog drive to its digitalcounterpartImplement or convert a network for yourautomation assets
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
47/81
Experience the Difference!
Electrical Lighting Automation DataComm
ENJOY th e EXPO!
Please complete your survey!
Schaedler Yesco Expo 2014The Premier Electrical Tradeshow in Central PA!
A Two-day, Jam-Packed Schedule!Over 100 Booths from Leading Manufacturers !
http://www.sydist.com/Portals/0/Expo2014/exhibitorlist.htmlhttp://www.sydist.com/Portals/0/Expo2014/exhibitorlist.html -
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
48/81
Copyright 2009 Rockwell Automation, Inc. All rights reserved.
Electronic Operator Interface Migration
PanelView Standard obsolete
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
49/81
PanelView Standard - obsolete
PanelView 300 & MicroPanelView 550PanelView 600
PanelView 1000 Announced Silver Series in January 2011 End of life December 31, 2012 Repairs will be made 5-7 years after 2012
or as long as parts are available
PanelView Standard was introduced in 1993 - 21 years ago!
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
50/81
Additional EOIs Status
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
51/81
Additional EOI s Status
DTAM limited availability from Spectrum Controls
Dataliners - obsolete InView taken over by Spectrum Controls
51
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
52/81
Copyright 2009 Rockwell Automation, Inc. All rights reserved.
PanelView Standard Migration toPanelView Plus
Value in Moving to an Integrated Architecture
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
53/81
g gSolution
Reduce development time Shared tag database with Logix Faceplates Global Objects Macros
Connectivity Single database in managing tag changes Direct tag browsing
Multi-Application Support (PVP 6) PDF, MPEG, Word, Excel, PPT and Image Viewer
Support
ActiveX Support (pre-installed) Internet Explorer Remote Connectivity - VNC, RDP, ViewPoint, FTP
53
Manage inventory and upgrades withmodular units: Logic module Display module Communication modules
Additional Enhancements Utilization of digital photographs and
animation with bitmap support Runtime RAM Usage FactoryTalk Security Recipe Plus Historical Trending Data Logging
As easy as one two
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
54/81
As easy as one, two
1. Open your PanelView Standard application in FactoryTalk View Stud2. Save it as a PanelView Plus compatible application.
80% of the time, no further modificationis required
Conversion log in FTView Studio identifiesany features not supported by PanelView Plus 6
Typically may want to take advantageof the enhanced features and graphicsavailable in PanelView Plus 6.
54
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
55/81
55
PanelBuilder32 Migration Guide
Migrating PanelBuilder32Applications(Publication: 2711P-AP001A-EN-P)
PanelBuilder32 Migrationto FactoryTalk View ME
This document provides guidelines and procedures for migrating aPanelView Standard terminal and applications to the PanelView Plusterminal platform.
PanelViewStandard
PV Std to PVP Hardware Migration
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
56/81
PV Std to PVP Hardware Migration
56
PV Plus 600 KeypadPV Plus 600 Keypad/Touch
PV 550 KeypadPV 550 Keypad/Touch
PV 1000 KeypadPV 1000 Touch
PV Plus 400PV 550 TouchPV 600 Touch
Cutout Compatible
PV Plus 600 Touch
PV Plus 6 700 KeypadPV Plus 6 700 Keypad/Touch
PV 600 KeypadPV 600 Keypad/Touch
PV Plus 6 1250 Keypad or Keypad/TouchPV Plus 6 1250 Touch
PanelView Conversion Services
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
57/81
.
PanelView Conversion Services
Application Migration toFactoryTalk View ME
PanelView Standard toPanelView Plus Migration
A bundled service offering for migrating
Includes all necessary: Project supervision Hardware Conversion Engineering Services
Leverage past experiences to: Reduce overall price points Improve turn around times
Start-up & Acceptance Services Delivered Onsite by local RA engineers
Standardized service bundle Delivered for a fixed price predictable budget For further information on services go to:
www.rockwellautomation.com/services/onsite
Need to upgrade your RIO PanelView?
http://www.rockwellautomation.com/services/onsitehttp://www.rockwellautomation.com/services/onsite -
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
58/81
Need to upgrade your RIO PanelView?
58
PanelView
StandardPanelView Plus 6
PLC 5
ProSoft Part Number: AN-X2-AB-DHRIORemote I/O Adapter to Ethernet/IP HMIUpgrade your HMIs without replacing your Control System
RIO
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
59/81
Communication Module Compatibility
Terminal
Communications Compatibility
ENET CNET DH+ DH485 DNET RIO
PanelView Plus 6 700, 1000, 1250, 1500(CE6.0-based)
2
PanelView Plus & CE 700, 1000, 1250, 1500
(CE4.1-based) 1 1
PanelView Plus 400, 6003(CE4.1-based)
4 4
PanelView Plus Compact 400, 600, 1000(CE4.1-based)3
59
1 Will be supported with new sales while parts last (5 years)2 ProSoft provides an Ethernet to RIO gateway device (AN-X-ABRIO)3 PVP 400/600 and PVP Compact in redesign for release in CY2013.4 Future Support will be based on 3rd party gateway
Migration Guides
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
60/81
Migration Guides
Migrating PanelView Standard Applications http://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap001_-en-p.pdf
Migrating PanelView Enhanced Applications http://literature.rockwellautomation.com/idc/groups/literature/documents/qs/2711p-qs001_-en-p.pdf
Legacy PanelViews to PanelView Plus Catalog Conversion http://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap002_-en-p.pdf
PanelView Plus to PanelView Plus 6 Catalog Conversions http://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap003_-en-p.pdf
60
l i l l i l 6
http://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap001_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap001_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap001_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/qs/2711p-qs001_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/qs/2711p-qs001_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/qs/2711p-qs001_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap002_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap002_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap002_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap003_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap003_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap003_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap002_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/qs/2711p-qs001_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap001_-en-p.pdf -
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
61/81
PanelView Plus to PanelView Plus 6
61
PanelView Plus 6 700-1500
PanelView Plus 700-1500
Obsolete 12-31-2012
MigrationPVP 700 1500 t PVP6 700 1500
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
62/81
PVP 700-1500 to PVP6 700-1500
62
Migration to PanelView Plus 6 700 to 1500 isMechanically compatible Application compatibleMore performance for less!
Silver Series since January 2011End-of-Life before December 1, 20125 year support (warranty/repair) after December 1, 2012
PanelView Plus 700 to 1500 with RIO and DNETNew catalog numbers to support installed baseExpected EOL by end of 2015
PVP RIO & DNET - Configured Units
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
63/81
PVP RIO & DNET Configured Units
New Remote IO Catalog Numbers2711P-T7C1D2 PVP 7 Touch, DC, 128 MB, & RIO Card
2711P-T7C1D6 PVP CE 7 Touch, DC, 128 MB, & RIO Card
2711P-B7C1D2 PVP 7 Combo, DC, 128 MB, & RIO Card
2711P-B7C1D6 PVP CE 7 Combo, DC, 128 MB, & RIO Card
2711P-T10C1D2 PVP 10 Touch, DC, 128 MB, & RIO Card2711P-T10C1D6 PVP CE 10 Touch, DC, 128 MB, & RIO Card
2711P-B10C1D2 PVP 10 Combo, DC, 128 MB, & RIO Card
2711P-B10C1D6 PVP CE 10 Combo, DC, 128 MB, & RIO Card
2711P-T12C1D2 PVP 12 Touch, DC, 128 MB, & RIO Card
2711P-T12C1D6 PVP CE 12 Touch, DC, 128 MB, & RIO Card
2711P-B12C1D2 PVP 12 Combo, DC, 128 MB, & RIO Card
2711P-B12C1D6 PVP CE 12 Combo, DC, 128 MB, & RIO Card
2711P-T15C1D2 PVP 15 Touch, DC, 128 MB, & RIO Card
2711P-T15C1D6 PVP CE 15 Touch, DC, 128 MB, & RIO Card
2711P-B15C1D2 PVP 15 Combo, DC, 128 MB, & RIO Card
2711P-B15C1D6 PVP CE 15 Combo, DC, 128 MB, & RIO Card
16 new configured RIO catalogsunits DC Only 128 MB Only (PVP and PVP CE) Pre-assembled
16 new configured DNET units
DC Only 128 MB Only (PVP and PVP CE) Pre-assembled Similar catalog - replaceC1 with C10 2711P-T7C1D2 changes to 2711P-T7C10D2
E l PVP PVP 6 Cl T f
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
64/81
Example: PVP to PVP 6 Clean Transfer
64
Legacy PVP
2711P T7C15D1
CNET
Current PVP62711P T7C4D1 ENET and RS232
2711P T7C4D8 2711P RN15S
PVP6 Platform Comm Card
2711P T7C4D8
PVP6 Platform
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
65/81
Allen-Bradley PanelView Plus 6D l NIC A C d 2711P RN20
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
66/81
Dual NIC Accessory Card - 2711P-RN20
The PanelView Plus 6 logic module contains 1 Ethernet adapter. Addinga 2nd Ethernet adapter allows connection to an additional subnet.
Perform non-production critical, value-added networking communication: ViewPoint: Remote user access to a ViewPoint service running on the
PVP terminal VNC: Live video feed of the terminal to multiple remote users Web Browser: Terminal user access to web material stored in a remote
location on the enterprise network SMTP (E-mail): Connect the terminal unit to the enterprise network to permit
the terminal to send notifications to recipients via e-mail (e.g., when an alarmoccurs)
FTP: Interface terminal through an FTP connection to read/write filesremotely
Data Logging: The terminal can be configured to store productiondata to a remote network location (file server)
Requires PVP6 700-1500 running Firmware Version >= v6.10 or higher
PVP6
NIC1:192.168.1.20
NIC2:10.10.10.20
Cell/Area Zones
Manufacturing Zone
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
67/81
Design Time Productivity
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
68/81
Faceplates can save 50% to 90% of complex screen development time
Tie predefined images to Add-On-Instruction sets
PowerFlex 700 Faceplate
g y
Setup multiple languages without font linking MS Arial Unicode font means one runtime file can configure up to 20 languages
Including Chinese, Russian, Japanese and Korean in one runtime file
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
69/81
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
70/81
FactoryTalk ViewPoint Benefits
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
71/81
y
Web HMI for PanelView Plus 6
Single license included with each PV+6 Extends visualization & real-time decision
capabilities to browser-based remote users Plant managers & supervisors
Mobile personnel Provides on-demand access from anywhere
In the office At Home
On the road Lowers Total Cost of Ownership No client software to install & maintain
Supports multiple browsers / client devices Internet Explorer, Firefox
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
72/81
Runtime MER Compatibility
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
73/81
Runtime MER Compatibility
Terminal
MER Compatibility
V6.x V5.1 V5.0 V4.0 V3.2
PanelView Plus 6 700, 1000, 1250, 1500(CE6.0-based)
PanelView Plus & CE 700, 1000, 1250, 1500
(CE4.1-based)
PanelView Plus 400, 600(CE4.1-based)
PanelView Plus Compact 400, 600, 1000(CE4.1-based)
73
Please be aware that there are new Kepware drivers for PV+ 6
N d t d RIO P lVi ?
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
74/81
Need to upgrade your RIO PanelView?
74
PanelView
StandardPanelView Plus 6
PLC 5
ProSoft Part Number: AN-X-AB-DHRIORemote I/O Adapter to Ethernet/IP HMIUpgrade your HMIs without replacing your Control System
RIO
Communication Module Compatibility
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
75/81
Communication Module Compatibility
Terminal
Communications Compatibility
ENET CNET DH+ DH485 DNET RIO
PanelView Plus 6 700, 1000, 1250, 1500(CE6.0-based)
2
PanelView Plus & CE 700, 1000, 1250, 1500
(CE4.1-based) 1 1
PanelView Plus 400, 6003(CE4.1-based)
4 4
PanelView Plus Compact 400, 600, 1000(CE4.1-based)3
75
1 Will be supported with new sales while parts last (5 years)2 ProSoft provides an Ethernet to RIO gateway device (AN-X-ABRIO)3 PVP 400/600 and PVP Compact in redesign for release in CY2013.4 Future Support will be based on 3rd party gateway
Migration Guides
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
76/81
Migrating PanelView Standard Applications http://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap001_-en-p.pdf
Migrating PanelView Enhanced Applications http://literature.rockwellautomation.com/idc/groups/literature/documents/qs/2711p-qs001_-en-p.pdf
Legacy PanelViews to PanelView Plus Catalog Conversion http://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap002_-en-p.pdf
PanelView Plus to PanelView Plus 6 Catalog Conversions http://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap003_-en-p.pdf
76
http://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap001_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap001_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap001_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/qs/2711p-qs001_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/qs/2711p-qs001_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/qs/2711p-qs001_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap002_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap002_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap002_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap003_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap003_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap003_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap002_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/qs/2711p-qs001_-en-p.pdfhttp://literature.rockwellautomation.com/idc/groups/literature/documents/ap/2711p-ap001_-en-p.pdf -
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
77/81
Copyright 2009 Rockwell Automation, Inc. All rights reserved.
Legacy AC drive Migration Tools
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
78/81
LSC FasTrac Packaged Drives and MotorsLegacy Product Upgrades
-
8/11/2019 Rockwell DeterminingWhenToRepairAgingEquipmentOrUpgradeToNewTechnology
79/81
79
Legacy Product Upgrades
Legacy 1336 Drive Upgrades
Same panel, and mountingdimensionsReplicate termination locationsFlange and panel-mount designsRoll-in installations
Rockwell Automation Drive Center offering
-