Monthly Update – October 2019
1
Revisions for the month of October are listed and displayed below and will be included in projects submitted for the February letting, except as specified below. E-mail road related questions on these changes to [email protected]. E-mail bridge related questions to [email protected].
Special Details
R-67-G: Guardrail Anchorage Bridge, Details: Added details for bolt locations in the thrie beam terminal connectors when attaching them to the bridge railing concrete block retrofit in anchorages M-1 through M-6. (One bolt location deviates from the standard pattern.) Also, added “concrete block retrofit” to the bolt requirements table on sheet 16 and to the list of bridge barrier types which guardrail may connect to on anchorage details M1 through M6.
B-22-E & B-23-F: Bridge Railing Thrie Beam Retrofit: Updated details with new guardrail approach sections, Detail A3 (Guardrail Type MGS-8), A4 (Guardrail Type T) and A5 (Guardrail Type B). Note: This detail will be effective for projects beginning with the mid-January 2020 letting.
Road Design Manual
6.03.09A1a: Mixture Selection: Eliminated the CPM exception for the use of mainline super pave mix.
6.06.08: Bridge Approach Curb & Gutter: Revised section to include the new approach curb & gutter details and requirements for their use.
7.01.16: Guardrail Attachments to Bridges and Walls: Revised the section to make the “M” and “A” anchorages the standard for new installations, along with providing a description for their current use.
Bridge Design Manual
7.03.09 A.12(LFD) & 7.03.09 A.13(LRFD): Added note for the design of piles regarding load types.
7.03.13 G. (LFD & LRFD): Added note for the design of drilled shafts regarding load types.
Road & Bridge Design Publications
Monthly Update – October 2019
2
Updates to MDOT Cell Library, Bridge Auto Draw Program, etc., may be required in tandem with some of this month's updates. Until such updates to automated tools can be made, it is the designer's/detailer's responsibility to manually incorporate any necessary revisions to notes and plan details to reflect these revisions.
Index to Special Details 10-28-2019
SPECIAL DETAIL
NUMBER
NUMBER OF
SHEETS TITLE CURRENT
DATE
21 2 GUARDRAIL AT INTERSECTIONS 4-9-18
24 8 GUARDRAIL ANCHORED IN BACKSLOPE TYPES 4B, 4T, & 4MGS-8 9-28-18
99 2 CHAIN LINK FENCE WITH WIRE ROPE 9-22-14
R-1-G 9 DRAINAGE STRUCTURES 6-15-16
R-15-G 3 COVER K 7-26-19
R-22-F 4 COVER V 8-6-18
R-23-E 3 COVER W 8-6-18
R-24-F 3 COVER VG 8-6-18
R-27-F 1 BRIDGE APPROACH CURB & GUTTER (USING EXISTING CATCH BASIN) 10-14-19
R-28-J 7 SIDEWALK RAMP AND DETECTABLE WARNING DETAILS 7-26-19
R-32-F 8 APPROACH CURB & GUTTER DOWNSPOUTS 10-14-19
R-33-G 2 CONCRETE VALLEY GUTTER AND URBAN FREEWAY CURB 8-14-19
R-35-E 2 CONCRETE SHOULDER GUTTER AND SPILLWAY 7-30-18
R-45-J 2 PAVEMENT REINFORCEMENT FOR BRIDGE APPROACH 6-25-18
R-53-A 22 TEMPORARY CONCRETE BARRIER LIMITED DEFLECTION 8-14-15
R-56-F 6 GUARDRAIL MEDIAN OBJECT PROTECTION 2-5-19
R-60-J 17 GUARDRAIL TYPES A, B, BD, T, TD, MGS-8, & MGS-8D 2-27-19
R-62-H 4 GUARDRAIL APPROACH TERMINAL TYPE 2M 5-1-18
R-63-C 16 GUARDRAIL APPROACH TERMINAL TYPES 3B & 3T 2-5-19
R-66-E 4 GUARDRAIL DEPARTING TERMINAL TYPES B, T, & MGS 9-28-18
*R-67-G 20 GUARDRAIL ANCHORAGE, BRIDGE, DETAILS 10-24-19
R-72-D 11 W-BEAM BACKED GUARDRAIL & GUARDRAIL LONG SPAN INSTALLATIONS 2-7-19
R-73-F 3 GUARDRAIL OVER BOX OR SLAB CULVERTS 8-1-19
R-84-A 1 BOX CULVERT JOINT TIE ASSEMBLIES 2-19-19
R-86-F 2 PRECAST CONCRETE END SECTION FOR PIPE CULVERT 9-13-18
R-95-G 7 CULVERT SLOPED END SECTIONS 9-19-18
R-126-I 5 PLACEMENT OF TEMPORARY CONCRETE & STEEL BARRIER 8-25-15
R-127-G 8 DELINEATOR INSTALLATIONS 3-4-19
* Denotes New or Revised Special Detail to be included in projects for (beginning with) the February letting.
Note: Former Standard Plans IV-87, IV-89, IV-90, and IV-91 Series, used for building cast-in-place concrete head walls for elliptical and circular pipe culverts, are now being replaced with plans that detail each specific size. The Special Structures Unit will provide these full-sized special details for inclusion in construction plans for MDOT jobs. To assure prompt delivery, requests must be made in advance.
Former Standard Plans IV-93 and IV-94 series have been replaced with precast concrete box & three-sided culverts as per the 2012 Standard Specifications for Construction.
Index to Bridge Detail Sheets 10-28-2019
DETAIL NUMBER
NUMBEROF
SHEETS TITLE CURRENT
DATE
*B-22-E 5 BRIDGE RAILING, THRIE BEAM RETROFIT (R4 TYPE RAILING) 10-23-19
*B-23-F 6 BRIDGE RAILING, THRIE BEAM RETROFIT (OPEN PARAPET RAILING) 10-23-19
B-26-F 8 BRIDGE RAILING, 4 TUBE 5-22-18
B-28-A 7 BRIDGE BARRIER RAILING, TYPE 7 9-27-19
B-29-A 8 BRIDGE BARRIER RAILING, TYPE 6 9-27-19
B-50-A 3 BRIDGE RAILING, CONCRETE BLOCK RETROFIT 10-15-19
B-101-G 2 DRAIN CASTING ASSEMBLEY DETAILS 7-26-18
EJ3AC 1 to 3 EXPANSION JOINT DETAILS 10-8-19
EJ4P 1 to 3 EXPANSION JOINT DETAILS 10-8-19
PC-1M 1 PRESTRESSED CONCRETE I-BEAM DETAILS 8-23-17
PC-2H 1 70" PRESTRESSED CONCRETE I-BEAM DETAILS 8-23-17
PC-4F 1 PRESTRESSED CONCRETE 1800 BEAM DETAILS 8-23-17
* Denotes New or Revised Special Detail to be included in projects for (beginning with) the Mid-January letting.
Note: Details EJ3AC & EJ4P are interactive, i.e. designers and detailers choose details based upon railing type and angle of crossing. Place all details appropriate for the project, structure specific information, and the Expansion Joint Device quantity on the sheet. The sheet shall then be added to the plans as a normal plan sheet.
Detail PC-1M, PC-2H and PC-4F shall have structure specific information and quantities added to the sheet. The sheet shall then be added to the plans as a normal plan sheet.
DEPARTMENT DIRECTOR MICHIGAN DEPARTMENT OF TRANSPORTATION
OF
SHEET
PLAN DATEF.H.W.A. APPROVALCHECKED BY:
DRAWN BY:
Michigan Department of Transportation
BUREAU OF DEVELOPMENT STANDARD PLAN FOR
APPROVED BY:
APPROVED BY:
Paul C. Ajegba
BY
PREPARED
DESIGN DIVISION
DIRECTOR, BUREAU OF FIELD SERVICES
DIRECTOR, BUREAU OF DEVELOPMENT 1
BRIDGE, DETAILS
GUARDRAIL ANCHORAGE,
R-67-G
RAILING
BRIDGE BARRIER
E3 JOINT
PO
ST 6
PO
ST 5
PO
ST 4
PO
ST 3
PO
ST 2
PO
ST 1
PLAN VIEW
15"
(4 SPACES) (3 SPACES)
3'-1•" POST SPACING
25'-0"
10'-7•"
POST SPACING
6'-3"
3'-6" POST SPACING
1'-6ƒ"
ELEVATION VIEW
THRIE BEAM EXPANSION SECTION
BRIDGE BARRIER RAILING
THRIE BEAM TERMINAL CONNECTOR
34"
15"
(4 SPACES) (3 SPACES)
3'-1•" POST SPACING 6'-3" POST SPACING
(2 SPACES)
3'-6" POST SPACING
1'-6ƒ"
10'-7•"
34"
28"33"
THRIE BEAM EXPANSION SECTIONTHRIE BEAM TERMINAL CONNECTOR
BRIDGE BARRIER RAILING
ELEVATION VIEW
(TO BE USED WITH GUARDRAIL, TYPE B)
(WITHOUT EXPANSION AT BACKWALL)
6'-3" TYPICAL POST SPACING
GUARDRAIL, TYPE T
GUARDRAIL, TYPE MGS-8 *
INFORMATION)
FOR TYPE MGS-8 GUARDRAIL HEIGHT
(SEE STANDARD PLAN R-60-SERIES
34" TYPE T
(TO BE USED WITH GUARDRAIL, TYPE T & TYPE MGS-8)
AESTHETIC PARAPET TUBE, OR 3 TUBE WITH PICKETS
BRIDGE BARRIER RAILINGS, TYPE 4, 2-TUBE, 4-TUBE,
DETAILS FOR CONNECTING GUARDRAIL TO
6'-3" TYPICAL POST SPACING
GUARDRAIL, TYPE B
31'-3"
10 GAUGE
TRANSITION
THRIE BEAM
SYMMETRICAL
6'-3"25'-0"
10-24-2019
20
10 GAUGE
THRIE BEAM SECTIONS
10 GAUGE
THRIE BEAM SECTIONS
GUARDRAIL ANCHORAGE, BRIDGE, DETAIL T1 (SEE NOTES, SHEET 20)
ANCHORAGE, BRIDGE DETAILS T1, T4 & T6
FROM GUARDRAIL, TYPE MGS-8 TO GUARDRAIL
SPACING AND GUARDRAIL LAYOUT TO TRANSITION
* SEE STANDARD PLAN R-60-SERIES FOR POST
GUARDRAIL ANCHORAGE, BRIDGE, DETAIL T2 (SEE NOTES, SHEET 20)
B.L.T.
W.K.P.
MICHIGAN DEPARTMENT OF TRANSPORTATION
OF
SHEET
PLAN DATEF.H.W.A. APPROVAL
BUREAU OF DEVELOPMENT STANDARD PLAN FOR
BRIDGE, DETAILS
GUARDRAIL ANCHORAGE,
R-67-G
PO
ST 1
PO
ST 2
PO
ST 3
PO
ST 4
PO
ST 5
PO
ST 6
RAILING, TYPE 5
BRIDGE BARRIER
PLAN VIEW
E3 JOINT
(4 SPACES) (3 SPACES)
3'-1•" POST SPACING3'-6" POST SPACING
1'-6ƒ"
15"
ELEVATION VIEW
SPECIAL END SHOE
BRIDGE BARRIER RAILING, TYPE 5
30"
(WITHOUT EXPANSION AT BACKWALL)
DETAILS FOR CONNECTING GUARDRAIL TO BRIDGE BARRIER RAILINGS, TYPE 5
(TO BE USED WITH GUARDRAIL, TYPE B)
ELEVATION VIEW
33"
34"
BRIDGE BARRIER RAILING, TYPE 5
SPECIAL END SHOE
30"
(4 SPACES) (3 SPACES)
3'-1•" POST SPACING 6'-3" POST SPACING
(2 SPACES)
6'-3" TYPICAL POST SPACING
37'-6"
3'-6" POST SPACING
1'-6ƒ"
15"
28"
6'-3" TYPICAL POST SPACING
GUARDRAIL, TYPE T
GUARDRAIL, TYPE B
GUARDRAIL, TYPE MGS-8 *
INFORMATION)
FOR TYPE MGS-8 GUARDRAIL HEIGHT
(SEE STANDARD PLAN R-60-SERIES
34" TYPE T
(TO BE USED WITH GUARDRAIL, TYPE T & TYPE MGS-8)
10-24-2019
GUARDRAIL ANCHORAGE, BRIDGE, DETAIL T3 (SEE NOTES, SHEET 20)
25'-0"
10 GAUGE
TRANSITION
THRIE BEAM
SYMMETRICAL
6'-3"
10 GAUGE
TRANSITION
THRIE BEAM
SYMMETRICAL
6'-3"
10 GAUGE
TRANSITION
THRIE BEAM
SYMMETRICAL
6'-3" 12'-6"
18'-9"
2 20
10 GAUGE
THRIE BEAM SECTION
10 GAUGE
THRIE BEAM SECTIONS
THRIE BEAM EXPANSION SECTION
THRIE BEAM EXPANSION SECTION
(SEE NOTES, SHEET 20)
GUARDRAIL ANCHORAGE, BRIDGE, DETAIL T4
ANCHORAGE, BRIDGE DETAILS T1, T4 & T6
FROM GUARDRAIL, TYPE MGS-8 TO GUARDRAIL
SPACING AND GUARDRAIL LAYOUT TO TRANSITION
* SEE STANDARD PLAN R-60-SERIES FOR POST
MICHIGAN DEPARTMENT OF TRANSPORTATION
OF
SHEET
PLAN DATEF.H.W.A. APPROVAL
BUREAU OF DEVELOPMENT STANDARD PLAN FOR
BRIDGE, DETAILS
GUARDRAIL ANCHORAGE,
R-67-G10-24-2019
PO
ST 1
PO
ST 2
PO
ST 3
PO
ST 4
PO
ST 5
PO
ST
6
RAILING, TYPE 4
BRIDGE BARRIER
PLAN VIEW
E3 JOINTEXPANSION JOINT
BRIDGE
(WITH EXPANSION AT BACKWALL)
(TO BE USED WITH GUARDRAIL, TYPE B)
ELEVATION VIEW
THRIE BEAM EXPANSION SECTION
34"
THRIE BEAM TERMINAL CONNECTOR
BRIDGE BARRIER RAILING, TYPE 4
34"
32"
16"
(4 SPACES) (4 SPACES)
3'- 1•" POST SPACING
MAX (2 SPACES)
6'-3" POST SPACING
6'-3" TYPICAL POST SPACING
43'-9"
7'-10•" 6'-3" 12'-6"
3'-6"
MIN.
POST SPACING
1'-6ƒ"
ELEVATION VIEW
THRIE BEAM EXPANSION SECTIONTHRIE BEAM TERMINAL CONNECTOR
BRIDGE BARRIER RAILING, TYPE 4
34"
16"
(4 SPACES) (4 SPACES)
3'-1•" POST SPACING
MAX
25'-0"
7'-10•" 6'-3" 12'-6"
POST SPACING
1'-6ƒ"
3'-6"
MIN.
28"
GUARDRAIL, TYPE B
6'-3" TYPICAL POST SPACING
GUARDRAIL, TYPE T
(TO BE USED WITH GUARDRAIL, TYPE T & TYPE MGS-8)
GUARDRAIL, TYPE MGS-8 *
INFORMATION)
FOR TYPE MGS-8 GUARDRAIL HEIGHT
(SEE STANDARD PLAN R-60-SERIES
34" TYPE T
AESTHETIC PARAPET TUBE, OR 3 TUBE WITH PICKETS
BRIDGE BARRIER RAILINGS, TYPE 4, 2-TUBE, 4-TUBE,
DETAILS FOR CONNECTING GUARDRAIL TO
10 GAUGE
TRANSITION
THRIE BEAM
SYMMETRICAL
6'-3"37'-6"
GUARDRAIL ANCHORAGE, BRIDGE, DETAIL T5 (SEE NOTES, SHEET 20)
GUARDRAIL ANCHORAGE, BRIDGE, DETAIL T1 (SEE NOTES, SHEET 20)
3 20
10 GAUGE
THRIE BEAM SECTIONS
10 GAUGE
THRIE BEAM SECTIONS
ANCHORAGE, BRIDGE DETAILS T1, T4 & T6
FROM GUARDRAIL, TYPE MGS-8 TO GUARDRAIL
SPACING AND GUARDRAIL LAYOUT TO TRANSITION
* SEE STANDARD PLAN R-60-SERIES FOR POST
MICHIGAN DEPARTMENT OF TRANSPORTATION
OF
SHEET
PLAN DATEF.H.W.A. APPROVAL
BUREAU OF DEVELOPMENT STANDARD PLAN FOR
BRIDGE, DETAILS
GUARDRAIL ANCHORAGE,
R-67-G10-24-2019
4
SECTIONS AT BRIDGE RAILINGS
POST 3
RAILING, TYPE 5
BRIDGE BARRIER
POST 2 FOR
RAILING, TYPE 4
BRIDGE BARRIER
POST 2 FOR
RAILING, TYPE 5
BRIDGE BARRIER
POST 1 FOR
RAILING, TYPE 4
BRIDGE BARRIER
POST 1 FOR
POST 4 POST 5 POST 6
34"
(ROADWAY)
TOP OF SLAB
(ROADWAY)
TOP OF SLAB
30"
6•"6•" 7‚"
8"8"
8" 8" 8"
6" 7"
1'-10"
3" 3"
1'-6" 3
Ž"
2†" 2†"
5…
"
1'-8"
2‚"
7•" 8"8"
8"
34"
1"1•"1‡"
TYPE 4
TYPE 5
5
4
BRIDGE RAILING BOLT LENGTHTHREAD LENGTH
MINIMUM
REQUIRED
NUMBER
4"
4"11•"
12•"
RAILING TYPE 4
BRIDGE BARRIER
RAILING TYPE 5
BRIDGE BARRIER
20
NUMBER REQUIRED.) WASHER DETAILS ARE SHOWN ON SHEET 5.
AND SQUARE WASHERS ON BACK. (SEE CHART BELOW FOR LENGTHS AND
CONNECT GUARDRAIL TO BRIDGE RAILINGS WITH ROUND WASHERS ON FRONT
HIGH STRENGTH ‡" DIA. HEX HEAD BOLT AND NUTS SHALL BE USED TO
‚" BEYOND THE NUT WHEN TIGHTENED.
SHORTER BOLT LENGTHS MAY BE USED PROVIDED THE BOLT EXTENDS
GUARDRAIL TO BRIDGE RAILINGS
BOLT REQUIREMENTS FOR CONNECTING
GUARDRAIL ANCHORAGE, BRIDGE, DETAIL T1, T2, T3, T4 AND T5
GUARDRAIL POST SECTIONS FOR
MICHIGAN DEPARTMENT OF TRANSPORTATION
OF
SHEET
PLAN DATEF.H.W.A. APPROVAL
BUREAU OF DEVELOPMENT STANDARD PLAN FOR
BRIDGE, DETAILS
GUARDRAIL ANCHORAGE,
R-67-G10-24-2019
5
3…"
1˜"
1'-8"
+
‰"
NEUTRAL AXIS8•"
THRIE BEAM EXPANSION SECTION
4"
SPLICE BOLT SLOT (TYP.)
x 1„" 4‚" 4‚" 2"
6‚"
1'-6ƒ"
AS THRIE BEAM ELEMENT
SAME CROSS SECTION
POST BOLT SLOTS
ƒ" x 2•"
7" 12'-6"
ƒ" x 3ƒ" SLOTTED HOLES SPACED AT 1'-6ƒ"
SLOTTED HOLE (TYP.)
x 5"
‡" DIA. BOLTS
ROUND WASHER FOR
•" DIA. HOLE
2‚" DIA.
’"
‡" DIA. BOLTS
SQUARE WASHER FOR
•" DIA. HOLE
‚"
3"
1•"
3"
1•
"
3"+
2"
8•"
7‚"3"
MIN.
3…"
2'-6"
4"4"
(TYP.)
1" DIA. HOLES1˜"
4"
3…
"
BRIDGE RAILING
AVOID STEEL REINFORCEMENT IN
1" DIA. HOLES WHEN NEEDED TO
DRILL (DO NOT BURN) ADDITIONAL
1ƒ
"
3•
"3•
"
1ƒ
"
NEUTRAL AXIS
1'-0‚
"
+ ‚
"7†
"6
‰"
6‰
"
1'-8"
+
‰"
3…
"
3"+
3"8•"2" 8"
2'-6"
7†
"7†
"
3…"
1˜"
NEUTRAL AXIS
7‚"
SPECIAL END SHOE
\ BEAM ELEMENT
\ x 5" SLOTS
(OPTIONAL)
POST BOLT SLOT
ƒ" x 2•"
20
(TYP.)
1" DIA. HOLES
(OPTIONAL)
POST BOLT SLOT (TYP.)
ƒ" x 2•"
(TYP.)
SPLICE BOLT SLOT
x 1„"
THRIE BEAM TERMINAL CONNECTOR
REFER TO SHEET 19 FOR BOLT LOCATIONS FOR DETAILS M1, M2, M3, M4, M5 AND M6.
BOLT LOCATIONS SHOWN APPLY TO DETAILS T1, T2, T5, M7, M8 AND M9.
MICHIGAN DEPARTMENT OF TRANSPORTATION
OF
SHEET
PLAN DATEF.H.W.A. APPROVAL
BUREAU OF DEVELOPMENT STANDARD PLAN FOR
BRIDGE, DETAILS
GUARDRAIL ANCHORAGE,
R-67-G10-24-2019
6
SECTION A-A
3'-6"
2'-8"
1'-4"8" 8" 2'-0"
3'-6"
3'-6"
2'-4"
1'-8"
SURFACE
SHOULDER
SURFACE
SHOULDER
SURFACE
SHOULDER
SECTION B-B SECTION C-C
DETAILS FOR CONNECTING GUARDRAIL TO CONCRETE BARRIER, SINGLE FACE
BA C
BA
C
4'-0"
(TYP)
•" MAX.
12'-0"
TRANSITION SECTION
CONCRETE BARRIER, SINGLE FACE
SEE STANDARD PLAN R-54-SERIES
CONCRETE BARRIER
FROM SINGLE SLOPE SHAPE TO VERTICAL WALL
UNIFORMLY TRANSITION THE BARRIER FACES
4'-0"4'-0"
TRANSITION SECTION.
CONNECT GUARDRAIL TO CONCRETE BARRIER, SINGLE FACE
ROUND WASHERS FRONT AND BACK SHALL BE USED TO
BOLTS WITH 2" MINIMUM THREAD LENGTH AND NUTS WITH
HIGH STRENGTH ‡" DIAMETER x 26" LONG HEX HEAD
PLAN VIEW
20
FOR GUARDRAIL POST SPACING AND LAYOUT DETAILS.
REFER TO GUARDRAIL ANCHORAGE BRIDGE, DETAIL M1, M2 AND M3
*
HEIGHT.
DETAIL M1, M2, AND M3 FOR GUARDRAIL
* REFER TO GUARDRAIL ANCHORAGE BRIDGE,
MICHIGAN DEPARTMENT OF TRANSPORTATION
OF
SHEET
PLAN DATEF.H.W.A. APPROVAL
BUREAU OF DEVELOPMENT STANDARD PLAN FOR
BRIDGE, DETAILS
GUARDRAIL ANCHORAGE,
R-67-G10-24-2019
7
12
GA
UG
E
TW
O
NE
ST
ED
W-
BE
AM
SE
CTI
ON
S
12'-6"
6'-3"
12
GA
UG
E
TH
RI
E
BE
AM
SE
CTI
ON
6'-3"
10
GA
UG
E
TH
RI
E
BE
AM
TR
AN
SI
TI
ON
AS
YM
ME
TRI
CA
L
12'-6"
1'-
10ƒ
"
TY
PE
MG
S-8
GU
AR
DR
AI
L
3'-1•
"3'-1•
"2
SP
AC
ES
@ 3'-1•
"
6'-3"
4
SP
AC
ES
@ 1'-6
ƒ"
6'-3"
4
SP
AC
ES
@ 3'-1•
"
12'-6"
2'-8
ƒ"
32
15
41
21
11
06
78
9
2'-1•
"
31"
(V
ER
TI
CA
L
FA
CE
ON
LY)
CO
NC
RE
TE
BA
RRI
ER
BRI
DG
E
RAI
LI
NG
OR
6'-3"
PO
ST 1
0
TH
RO
UG
H 1
2 -
W6 x 1
5
PO
ST (7'-0"
LO
NG)
WI
TH 1
2"
OF
FS
ET
BL
OC
K
PO
ST 1
TH
RO
UG
H 9 -
W6 x 9
OR
W6 x 8.5
PO
ST (6'-0"
LO
NG)
WI
TH 1
2"
OF
FS
ET
BL
OC
K
12
GA
UG
E
TW
O
NE
ST
ED
TH
RI
E
BE
AM
EX
PA
NSI
ON
SE
CTI
ON
S
*
BA
RRI
ER
EN
DI
NG
MU
ST
TR
AN
SI
TI
ON
FR
OM
SI
NG
LE-
SL
OP
E
TO
VE
RTI
CA
L
FA
CE I
N
AD
VA
NC
E
OF
EN
D
SH
OE.
AT
TA
CH
ME
NT
TO
VE
RTI
CA
L
FA
CE I
S
RE
QUI
RE
D.
4"
MA
X.
HEI
GH
T
CU
RB
&
GU
TT
ER
20
GU
AR
DR
AI
L
AN
CH
OR
AG
E,
BRI
DG
E,
DE
TAI
L
M1
39'-4
ƒ"
(WIT
HO
UT
EX
PA
NSIO
N
AT
BA
CK
WA
LL)
TY
PE
6*, T
YP
E
7*, O
R
SIN
GL
E
FA
CE
CO
NC
RE
TE
BA
RRIE
R*
3
TU
BE
WIT
H
PIC
KE
TS, C
ON
CR
ET
E
BL
OC
K
RE
TR
OFIT,
2-T
UB
E, 4
-T
UB
E, A
ES
TH
ETIC
PA
RA
PE
T
TU
BE,
DE
TAIL
S
FO
R
CO
NN
EC
TIN
G
GU
AR
DR
AIL
TY
PE
MG
S-8
TO
MICHIGAN DEPARTMENT OF TRANSPORTATION
OF
SHEET
PLAN DATEF.H.W.A. APPROVAL
BUREAU OF DEVELOPMENT STANDARD PLAN FOR
BRIDGE, DETAILS
GUARDRAIL ANCHORAGE,
R-67-G10-24-2019
8
12'-6"
12'-6"
1'-
10ƒ
"
3'-1•
"2
SP
AC
ES
@ 3'-1•
"
6'-3"
4
SP
AC
ES
@ 1'-6
ƒ"
6'-3"
2'-8
ƒ"
43
26
51
31
21
17
89
10
2'-1•
"
12'-6"
TY
PE
T
GU
AR
DR
AI
L
5
SP
AC
ES
@ 3'-1•
"
15'-7•
"
1
12
GA
UG
E
TW
O
NE
ST
ED
TH
RI
E
BE
AM
SE
CTI
ON
S
12
GA
UG
E
TW
O
NE
ST
ED
TH
RI
E
BE
AM
SE
CTI
ON
S34"
(V
ER
TI
CA
L
FA
CE
ON
LY)
CO
NC
RE
TE
BA
RRI
ER
BRI
DG
E
RAI
LI
NG
OR
PO
ST 1
1
TH
RO
UG
H 1
3 -
W6 x 1
5
PO
ST (7'-0"
LO
NG)
WI
TH 1
2"
OF
FS
ET
BL
OC
K
PO
ST 1
TH
RO
UG
H 1
0 -
W6 x 9
OR
W6 x 8.5
PO
ST (7'-0"
LO
NG)
WI
TH 1
2"
OF
FS
ET
BL
OC
K
6'-3"
12
GA
UG
E
TW
O
NE
ST
ED
TH
RI
E
BE
AM
EX
PA
NSI
ON
SE
CTI
ON
S
*
BA
RRI
ER
EN
DI
NG
MU
ST
TR
AN
SI
TI
ON
FR
OM
SI
NG
LE-
SL
OP
E
TO
VE
RTI
CA
L
FA
CE I
N
AD
VA
NC
E
OF
EN
D
SH
OE.
AT
TA
CH
ME
NT
TO
VE
RTI
CA
L
FA
CE I
S
RE
QUI
RE
D.
4"
MA
X.
HEI
GH
T
CU
RB
&
GU
TT
ER
20
GU
AR
DR
AI
L
AN
CH
OR
AG
E,
BRI
DG
E,
DE
TAI
L
M2
39'-4
ƒ"
(WIT
HO
UT
EX
PA
NSIO
N
AT
BA
CK
WA
LL)
TY
PE
6*, T
YP
E
7*, O
R
SIN
GL
E
FA
CE
CO
NC
RE
TE
BA
RRIE
R*
3
TU
BE
WIT
H
PIC
KE
TS,
CO
NC
RE
TE
BL
OC
K
RE
TR
OFIT,
2-T
UB
E, 4
-T
UB
E, A
ES
TH
ETIC
PA
RA
PE
T
TU
BE,
DE
TAIL
S
FO
R
CO
NN
EC
TIN
G
GU
AR
DR
AIL
TY
PE
T
TO
MICHIGAN DEPARTMENT OF TRANSPORTATION
OF
SHEET
PLAN DATEF.H.W.A. APPROVAL
BUREAU OF DEVELOPMENT STANDARD PLAN FOR
BRIDGE, DETAILS
GUARDRAIL ANCHORAGE,
R-67-G10-24-2019
9
12'-6"
12'-6"
1'-
10ƒ
"
3'-1•
"2
SP
AC
ES
@ 3'-1•
"
6'-3"
4
SP
AC
ES
@ 1'-6
ƒ"
6'-3"
2'-8
ƒ"
54
27
61
41
31
28
91
01
1
2'-1•
"
1
12
GA
UG
E
TW
O
NE
ST
ED
TH
RI
E
BE
AM
SE
CTI
ON
S
6'-3"
10
GA
UG
E
TH
RI
E
BE
AM
TR
AN
SI
TI
ON
SY
MM
ET
RI
CA
L
31"
28"
(V
ER
TI
CA
L
FA
CE
ON
LY)
CO
NC
RE
TE
BA
RRI
ER
BRI
DG
E
RAI
LI
NG
OR
5
SP
AC
ES
@ 3'-1•
"
15'-7•
"
12'-6"
12
GA
UG
E
TW
O
NE
ST
ED
TH
RI
E
BE
AM
SE
CTI
ON
S
3
GU
AR
DR
AI
L
TY
PE
B
2
SP
AC
ES
@ 6'-3"
12'-6"
12
GA
UG
E
TW
O
NE
ST
ED
TH
RI
E
BE
AM
EX
PA
NSI
ON
SE
CTI
ON
S
PO
ST 1
2
TH
RO
UG
H 1
4 -
W6 x 1
5
PO
ST (7'-0"
LO
NG)
WI
TH 1
2"
OF
FS
ET
BL
OC
K
PO
ST 1
TH
RO
UG
H 1
1 -
W6 x 9
OR
W6 x 8.5
PO
ST (7'-0"
LO
NG)
WI
TH 1
2"
OF
FS
ET
BL
OC
K
*
BA
RRI
ER
EN
DI
NG
MU
ST
TR
AN
SI
TI
ON
FR
OM
SI
NG
LE-
SL
OP
E
TO
VE
RTI
CA
L
FA
CE I
N
AD
VA
NC
E
OF
EN
D
SH
OE.
AT
TA
CH
ME
NT
TO
VE
RTI
CA
L
FA
CE I
S
RE
QUI
RE
D.
4"
MA
X.
HEI
GH
T
CU
RB
&
GU
TT
ER
20
GU
AR
DR
AI
L
AN
CH
OR
AG
E,
BRI
DG
E,
DE
TAI
L
M3
45'-7
ƒ"
(WIT
HO
UT
EX
PA
NSIO
N
AT
BA
CK
WA
LL)
TY
PE
6*, T
YP
E
7*, O
R
SIN
GL
E
FA
CE
CO
NC
RE
TE
BA
RRIE
R*
3
TU
BE
WIT
H
PIC
KE
TS,
CO
NC
RE
TE
BL
OC
K
RE
TR
OFIT,
2-T
UB
E, 4
-T
UB
E, A
ES
TH
ETIC
PA
RA
PE
T
TU
BE,
DE
TAIL
S
FO
R
CO
NN
EC
TIN
G
GU
AR
DR
AIL
TY
PE
B
TO
MICHIGAN DEPARTMENT OF TRANSPORTATION
OF
SHEET
PLAN DATEF.H.W.A. APPROVAL
BUREAU OF DEVELOPMENT STANDARD PLAN FOR
BRIDGE, DETAILS
GUARDRAIL ANCHORAGE,
R-67-G10-24-2019
10
12
GA
UG
E
TW
O
NE
ST
ED
W-
BE
AM
SE
CTI
ON
S
12'-6"
6'-3"
12
GA
UG
E
TH
RI
E
BE
AM
SE
CTI
ON
6'-3"
10
GA
UG
E
TH
RI
E
BE
AM
TR
AN
SI
TI
ON
AS
YM
ME
TRI
CA
L
12'-6"
1'-
10ƒ
"
3'-1•
"3
SP
AC
ES
@ 3'-1•
"
9'-4•
"
4
SP
AC
ES
@ 1'-6
ƒ"
6'-3"
6'-3"
1
2'-1•
"MI
N.
2'-8
ƒ"
MA
X.
3'-1•
"
GU
AR
DR
AI
L
TY
PE
MG
S-8
31"
(V
ER
TI
CA
L
FA
CE
ON
LY)
CO
NC
RE
TE
BA
RRI
ER
BRI
DG
E
RAI
LI
NG
OR
13
12
11
10
98
76
54
32
6'-3"
4
SP
AC
ES
@ 3'-1•
"
12'-6"
PO
ST 1
0
TH
RO
UG
H 1
3 -
W6 x 1
5
PO
ST (7'-0"
LO
NG)
WI
TH 1
2"
OF
FS
ET
BL
OC
K
PO
ST 1
TH
RO
UG
H 9 -
W6 x 9
OR
W6 x 8.5
PO
ST (6'-0"
LO
NG)
WI
TH 1
2"
OF
FS
ET
BL
OC
K
*
BA
RRI
ER
EN
DI
NG
MU
ST
TR
AN
SI
TI
ON
FR
OM
SI
NG
LE-
SL
OP
E
TO
VE
RTI
CA
L
FA
CE I
N
AD
VA
NC
E
OF
EN
D
SH
OE.
AT
TA
CH
ME
NT
TO
VE
RTI
CA
L
FA
CE I
S
RE
QUI
RE
D.
4"
MA
X.
HEI
GH
T
CU
RB
&
GU
TT
ER
20
12
GA
UG
E
TW
O
NE
ST
ED
TH
RI
E
BE
AM
EX
PA
NSI
ON
SE
CTI
ON
S
12
GA
UG
E
TH
RI
E
BE
AM
SE
CTI
ON
S
TW
O
NE
ST
ED
GU
AR
DR
AI
L
AN
CH
OR
AG
E,
BRI
DG
E,
DE
TAI
L
M4
45'-7
ƒ"
(WIT
H
EX
PA
NSIO
N
AT
BA
CK
WA
LL)
TY
PE
6*, T
YP
E
7*, O
R
SIN
GL
E
FA
CE
CO
NC
RE
TE
BA
RRIE
R*
3
TU
BE
WIT
H
PIC
KE
TS,
CO
NC
RE
TE
BL
OC
K
RE
TR
OFIT,
2-T
UB
E, 4
-T
UB
E, A
ES
TH
ETIC
PA
RA
PE
T
TU
BE,
DE
TAIL
S
FO
R
CO
NN
EC
TIN
G
GU
AR
DR
AIL
TY
PE
MG
S-8
TO
MICHIGAN DEPARTMENT OF TRANSPORTATION
OF
SHEET
PLAN DATEF.H.W.A. APPROVAL
BUREAU OF DEVELOPMENT STANDARD PLAN FOR
BRIDGE, DETAILS
GUARDRAIL ANCHORAGE,
R-67-G10-24-2019
11
12'-6"
12'-6"
1'-
10ƒ
"
3
SP
AC
ES
@ 3'-1•
"
9'-4•
"
4
SP
AC
ES
@ 1'-6
ƒ"
6'-3"
6'-3"
34"
14
13
12
11
10
98
76
54
32
2'-1•
"MI
N.
2'-8
ƒ"
MA
X.
3'-1•
"
12'-6"
12
GA
UG
E
TW
O
NE
ST
ED
TH
RI
E
BE
AM
SE
CTI
ON
S
12
GA
UG
E
TW
O
NE
ST
ED
TH
RI
E
BE
AM
SE
CTI
ON
S
(V
ER
TI
CA
L
FA
CE
ON
LY)
CO
NC
RE
TE
BA
RRI
ER
BRI
DG
E
RAI
LI
NG
OR
PO
ST 1
1
TH
RO
UG
H 1
4 -
W6 x 1
5
PO
ST (7'-0"
LO
NG)
WI
TH 1
2"
OF
FS
ET
BL
OC
K
PO
ST 1
TH
RO
UG
H 1
0 -
W6 x 9
OR
W6 x 8.5
PO
ST (7'-0"
LO
NG)
WI
TH 1
2"
OF
FS
ET
BL
OC
K
1
6'-3"
5
SP
AC
ES
@ 3'-1•
"
15'-7•
"
*
BA
RRI
ER
EN
DI
NG
MU
ST
TR
AN
SI
TI
ON
FR
OM
SI
NG
LE-
SL
OP
E
TO
VE
RTI
CA
L
FA
CE I
N
AD
VA
NC
E
OF
EN
D
SH
OE.
AT
TA
CH
ME
NT
TO
VE
RTI
CA
L
FA
CE I
S
RE
QUI
RE
D.
GU
AR
DR
AI
L
TY
PE
T
4"
MA
X.
HEI
GH
T
CU
RB
&
GU
TT
ER
20
12
GA
UG
E
TH
RI
E
BE
AM
SE
CTI
ON
S
TW
O
NE
ST
ED
12
GA
UG
E
TW
O
NE
ST
ED
TH
RI
E
BE
AM
EX
PA
NSI
ON
SE
CTI
ON
S
GU
AR
DR
AI
L
AN
CH
OR
AG
E,
BRI
DG
E,
DE
TAI
L
M5
45'-7
ƒ"
(WIT
H
EX
PA
NSIO
N
AT
BA
CK
WA
LL)
TY
PE
6*, T
YP
E
7*, O
R
SIN
GL
E
FA
CE
CO
NC
RE
TE
BA
RRIE
R*
3
TU
BE
WIT
H
PIC
KE
TS,
CO
NC
RE
TE
BL
OC
K
RE
TR
OFIT,
2-T
UB
E, 4
-T
UB
E, A
ES
TH
ETIC
PA
RA
PE
T
TU
BE,
DE
TAIL
S
FO
R
CO
NN
EC
TIN
G
GU
AR
DR
AIL
TY
PE
T
TO
MICHIGAN DEPARTMENT OF TRANSPORTATION
OF
SHEET
PLAN DATEF.H.W.A. APPROVAL
BUREAU OF DEVELOPMENT STANDARD PLAN FOR
BRIDGE, DETAILS
GUARDRAIL ANCHORAGE,
R-67-G10-24-2019
12
12'-6"
1'-
10ƒ
"
3
SP
AC
ES
@ 3'-1•
"
9'-4•
"
4
SP
AC
ES
@ 1'-6
ƒ"
6'-3"
6'-3"
31"
15
14
13
12
11
10
98
76
54
2
2'-1•
"MI
N.
2'-8
ƒ"
MA
X.
3'-1•
"
12'-6"
12
GA
UG
E
TW
O
NE
ST
ED
TH
RI
E
BE
AM
SE
CTI
ON
S
(V
ER
TI
CA
L
FA
CE
ON
LY)
CO
NC
RE
TE
BA
RRI
ER
BRI
DG
E
RAI
LI
NG
OR
PO
ST 1
2
TH
RO
UG
H 1
5 -
W6 x 1
5
PO
ST (7'-0"
LO
NG)
WI
TH 1
2"
OF
FS
ET
BL
OC
K
PO
ST 1
TH
RO
UG
H 1
1 -
W6 x 9
OR
W6 x 8.5
PO
ST (6'-0"
LO
NG)
WI
TH 1
2"
OF
FS
ET
BL
OC
K
32
1
6'-3"
10
GA
UG
E
TH
RI
E
BE
AM
TR
AN
SI
TI
ON
SY
MM
ET
RI
CA
L
28"
2
SP
AC
ES
@ 6'-3"
12'-6"
12'-6"
12
GA
UG
E
TW
O
NE
ST
ED
TH
RI
E
BE
AM
SE
CTI
ON
S
3
TY
PE
B
GU
AR
DR
AI
L
5
SP
AC
ES
@ 3'-1•
"
15'-7•
"
*
BA
RRI
ER
EN
DI
NG
MU
ST
TR
AN
SI
TI
ON
FR
OM
SI
NG
LE-
SL
OP
E
TO
VE
RTI
CA
L
FA
CE I
N
AD
VA
NC
E
OF
EN
D
SH
OE.
AT
TA
CH
ME
NT
TO
VE
RTI
CA
L
FA
CE I
S
RE
QUI
RE
D.
4"
MA
X.
HEI
GH
T
CU
RB
&
GU
TT
ER
20
12
GA
UG
E
TH
RI
E
BE
AM
SE
CTI
ON
S
TW
O
NE
ST
ED
12
GA
UG
E
TW
O
NE
ST
ED
TH
RI
E
BE
AM
EX
PA
NSI
ON
SE
CTI
ON
S
GU
AR
DR
AI
L
AN
CH
OR
AG
E,
BRI
DG
E,
DE
TAI
L
M6
51'-1
0ƒ
"
GU
AR
DR
AI
L
AN
CH
OR
AG
E,
BRI
DG
E,
DE
TAI
L
M6
51'-10ƒ
"
(WIT
H
EX
PA
NSIO
N
AT
BA
CK
WA
LL)
TY
PE
6*, T
YP
E
7*, O
R
SIN
GL
E
FA
CE
CO
NC
RE
TE
BA
RRIE
R*
3
TU
BE
WIT
H
PIC
KE
TS,
CO
NC
RE
TE
BL
OC
K
RE
TR
OFIT,
2-T
UB
E, 4
-T
UB
E, A
ES
TH
ETIC
PA
RA
PE
T
TU
BE,
DE
TAIL
S
FO
R
CO
NN
EC
TIN
G
GU
AR
DR
AIL
TY
PE
B
TO
MICHIGAN DEPARTMENT OF TRANSPORTATION
OF
SHEET
PLAN DATEF.H.W.A. APPROVAL
BUREAU OF DEVELOPMENT STANDARD PLAN FOR
BRIDGE, DETAILS
GUARDRAIL ANCHORAGE,
R-67-G10-24-2019
13
12
GA
UG
E
TW
O
NE
ST
ED
W-
BE
AM
SE
CTI
ON
S
12'-6"
6'-3"
10
GA
UG
E
TH
RI
E
BE
AM
TR
AN
SI
TI
ON
AS
YM
ME
TRI
CA
L
TY
PE
MG
S-8
GU
AR
DR
AI
L
3'-1•
"4
SP
AC
ES
@ 3'-1•
"
12'-6"
32
15
46
6'-3"
12
GA
UG
E
TH
RI
E
BE
AM
SE
CTI
ON
12'-6"
3
SP
AC
ES
@ 3'-1•
"
9'-4•
"
4
SP
AC
ES
@ 1'-6ƒ
"
6'-3"
51
31
11
06
78
9
2'-1•
"
12
GA
UG
E
TW
O
NE
ST
ED
TH
RI
E
BE
AM
SE
CTI
ON
S
31"
12
1'-
10ƒ
"
MI
N.
2'-8
ƒ"
12'-6"
DE
PT
H 2'-1•
"
FR
OM
BRI
DG
E
PI
ER.
WH
EN
FI
RS
T
PO
ST
CA
N
BE I
NS
TA
LL
ED
FU
LL
**
FI
LL
ER
WA
LL
EN
D
BL
OC
K
MA
Y
BE
OM
MI
TE
D
**
PI
ER
BRI
DG
E
31"
PO
ST 1
0
TH
RO
UG
H 1
3 -
W6 x 1
5
PO
ST (7'-0"
LO
NG)
WI
TH 1
2"
OF
FS
ET
BL
OC
K
PO
ST 1
TH
RO
UG
H 9 -
W6 x 9
OR
W6 x 8.5
PO
ST (6'-0"
LO
NG)
WI
TH 1
2"
OF
FS
ET
BL
OC
K
FI
LL
ER
WA
LL (
VE
RTI
CA
L
FA
CE)
6'-3"
12
GA
UG
E
TW
O
NE
ST
ED
TH
RI
E
BE
AM
EX
PA
NSI
ON
SE
CTI
ON
S
DE
TAIL
S
FO
R
CO
NN
EC
TIN
G
GU
AR
DR
AIL
TY
PE
MG
S-8
TO
FIL
LE
R
WA
LL
4"
MA
X.
HEI
GH
T
CU
RB
&
GU
TT
ER
20
GU
AR
DR
AI
L
AN
CH
OR
AG
E,
BRI
DG
E,
DE
TAI
L
M7
51'-1
0ƒ
"
GU
AR
DR
AI
L
AN
CH
OR
AG
E,
BRI
DG
E,
DE
TAI
L
M7
51'-10ƒ
"
MICHIGAN DEPARTMENT OF TRANSPORTATION
OF
SHEET
PLAN DATEF.H.W.A. APPROVAL
BUREAU OF DEVELOPMENT STANDARD PLAN FOR
BRIDGE, DETAILS
GUARDRAIL ANCHORAGE,
R-67-G10-24-2019
14
12'-6"
43
26
57
12'-6"
3
SP
AC
ES
@ 3'-1•
"
9'-4•
"
4
SP
AC
ES
@ 1'-6ƒ
"
6'-3"
61
41
21
17
89
10
2'-1•
"
12
GA
UG
E
TW
O
NE
ST
ED
TH
RI
E
BE
AM
SE
CTI
ON
S
34"
13
1'-
10ƒ
"
MI
N.
2'-8
ƒ"
12'-6"
DE
PT
H 2'-1•
"
FR
OM
BRI
DG
E
PI
ER.
WH
EN
FI
RS
T
PO
ST
CA
N
BE I
NS
TA
LL
ED
FU
LL
**
FI
LL
ER
WA
LL
EN
D
BL
OC
K
MA
Y
BE
OM
MI
TE
D
**
PI
ER
BRI
DG
E
45
12'-6"
12
GA
UG
E
TW
O
NE
ST
ED
TH
RI
E
BE
AM
SE
CTI
ON
S
TY
PE
T
GU
AR
DR
AI
L
34"
DE
TAIL
S
FO
R
CO
NN
EC
TIN
G
GU
AR
DR
AIL
TY
PE
T
TO
FIL
LE
R
WA
LL
FI
LL
ER
WA
LL (
VE
RTI
CA
L
FA
CE)
PO
ST 1
1
TH
RO
UG
H 1
4 -
W6 x 1
5
PO
ST (7'-0"
LO
NG)
WI
TH 1
2"
OF
FS
ET
BL
OC
K
PO
ST 0
TH
RO
UG
H 1
0 -
W6 x 9
OR
W6 x 8.5
PO
ST (7'-0"
LO
NG)
WI
TH 1
2"
OF
FS
ET
BL
OC
K
12
GA
UG
E
TW
O
NE
ST
ED
TH
RI
E
BE
AM
SE
CTI
ON
S
12
GA
UG
E
TW
O
NE
ST
ED
TH
RI
E
BE
AM
EX
PA
NSI
ON
SE
CTI
ON
S
5
SP
AC
ES
@ 3'-1•
"
15'-7•
"
1
6'-3"
4"
MA
X.
HEI
GH
T
CU
RB
&
GU
TT
ER
20
GU
AR
DR
AI
L
AN
CH
OR
AG
E,
BRI
DG
E,
DE
TAI
L
M8
51'-1
0ƒ
"
GU
AR
DR
AI
L
AN
CH
OR
AG
E,
BRI
DG
E,
DE
TAI
L
M8
51'-10ƒ
"
MICHIGAN DEPARTMENT OF TRANSPORTATION
OF
SHEET
PLAN DATEF.H.W.A. APPROVAL
BUREAU OF DEVELOPMENT STANDARD PLAN FOR
BRIDGE, DETAILS
GUARDRAIL ANCHORAGE,
R-67-G10-24-2019
15
12'-6"
6'-3"
10
GA
UG
E
TH
RI
E
BE
AM
TR
AN
SI
TI
ON
SY
MM
ET
RI
CA
L
35
46
12'-6"
12'-6"
3
SP
AC
ES
@ 3'-1•
"
9'-4•
"
4
SP
AC
ES
@ 1'-6ƒ
"
6'-3"
71
51
31
28
910
11
2'-1•
"
12
GA
UG
E
TW
O
NE
ST
ED
TH
RI
E
BE
AM
SE
CTI
ON
S
31"
14
1'-
10ƒ
"
MI
N.
2'-8
ƒ"
12'-6"
DE
PT
H 2'-1•
"
FR
OM
BRI
DG
E
PI
ER.
WH
EN
FI
RS
T
PO
ST
CA
N
BE I
NS
TA
LL
ED
FU
LL
**
FI
LL
ER
WA
LL
EN
D
BL
OC
K
MA
Y
BE
OM
MI
TE
D
**
PI
ER
BRI
DG
E
21
5
SP
AC
ES
@ 3'-1•
"
15'-7•
"
TY
PE
B
GU
AR
DR
AI
L
DE
TAIL
S
FO
R
CO
NN
EC
TIN
G
GU
AR
DR
AIL
TY
PE
B
TO
FIL
LE
R
WA
LL
12
GA
UG
E
TW
O
NE
ST
ED
TH
RI
E
BE
AM
SE
CTI
ON
S
12
GA
UG
E
TH
RI
E
BE
AM
SE
CTI
ON
S
TW
O
NE
ST
ED
28"
FI
LL
ER
WA
LL (
VE
RTI
CA
L
FA
CE)
PO
ST 1
2
TH
RO
UG
H 1
5 -
W6 x 1
5
PO
ST (7'-0"
LO
NG)
WI
TH 1
2"
OF
FS
ET
BL
OC
K
PO
ST 1
TH
RO
UG
H 1
1 -
W6 x 9
OR
W6 x 8.5
PO
ST (6'-0"
LO
NG)
WI
TH 1
2"
OF
FS
ET
BL
OC
K
56
2
SP
AC
ES
@ 6'-3"
12'-6"
78
12
GA
UG
E
TW
O
NE
ST
ED
TH
RI
E
BE
AM
EX
PA
NSI
ON
SE
CTI
ON
S
4"
MA
X.
HEI
GH
T
CU
RB
&
GU
TT
ER
20
GU
AR
DR
AI
L
AN
CH
OR
AG
E,
BRI
DG
E,
DE
TAI
L
M9
58'-1
ƒ"
GU
AR
DR
AI
L
AN
CH
OR
AG
E,
BRI
DG
E,
DE
TAI
L
M9
58'-1
ƒ"
MICHIGAN DEPARTMENT OF TRANSPORTATION
OF
SHEET
PLAN DATEF.H.W.A. APPROVAL
BUREAU OF DEVELOPMENT STANDARD PLAN FOR
BRIDGE, DETAILS
GUARDRAIL ANCHORAGE,
R-67-G10-24-2019
16 20
(TYP)
•" MAX.
4'
2 TUBE
4 TUBE
AESTHETIC PARAPET TUBE
3 TUBE WITH PICKETS
TYPE 6
TYPE 7
GUARDRAIL TO BRIDGE RAILINGS
BOLT REQUIREMENTS FOR CONNECTING
THICKNESS
WALL
THICKNESS
WALL
RAILING
BRIDGE
1'-5•"
1'-7"
1'-0"
1'-0"
1'-0"
1'-4•"
1'-7•"
1'-9"
1'-2"
1'-2"
1'-2"
1'-6•"
LENGTH
BOLT
THREAD LENGTH
MINIMUM
4"
4"
4"
4"
4"
4"
‚" BEYOND THE NUT WHEN TIGHTENED.
SHORTER BOLT LENGTHS MAY BE USED PROVIDED THE BOLT EXTENDS
HEIGHT.
DETAIL M1 THROUGH M9 FOR GUARDRAIL
REFER TO GUARDRAIL ANCHORAGE BRIDGE,
(ROADWAY)
TOP OF SLAB
GU
AR
DR
AI
L
HEI
GH
T
CURB & GUTTER
4" MAX. HEIGHT
POST DETAIL
GUARDRAIL ANCHORAGE, BRIDGE, DETAIL M1 THROUGH M9
GUARDRAIL POST SECTIONS FOR
BRIDGE RAILING & FILLER WALL
ALTERNATE CONSTRUCTION METHOD
FILLER WALL
VARIES 4"WALL THK + 2"
APPLICABLE ONLY TO FILLER WALLS
** FILLER WALL
3. WHEN CONDITIONS PROHIBIT THE USE OF BOLTS
2. IN EXISTING FILLER WALLS THICKER THAN 1'-6"
FILLER WALL EXTENSION
WALL IS A DIFFERENT THICKNESS THAN THE
1. AT OR NEAR THE JOINT LINE WHEN A FILLER
LOCATIONS:
THROUGH THE FILLER WALL, IN THE FOLLOWING
WALLS WILL BE ALLOWED, INSTEAD OF BOLTING
EMBEDDED 8" TO ATTACH GUARDRAIL TO FILLER
** THE USE OF ‡" DIA. ADHESIVE ANCHORED BOLTS
4"1'-3ƒ"CONCRETE BLOCK RETROFIT 1'-5ƒ"
BRIDGE, DETAILS
GUARDRAIL ANCHORAGE,
R-67-G10-24-2019
17
4‚"4‚" 2"4‚"4‚"2"
7'-3•"
1'-6ƒ" 1'-6ƒ"
1'-8"
+
‰"
POST BOLT SLOT (TYP.)
ƒ" x 2•"
SPLICE BOLT SLOT (TYP.)
x 1„"
1'-6ƒ" 1'-6ƒ"
6'-3" THRIE BEAM SECTION
7„
"
1'-2‚
"1'-0"
TOP
FRONT
W BEAM GUARDRAIL
OFFSET BLOCK FOR
FRONT
THRIE BEAM GUARDRAIL
OFFSET BLOCK FOR
TOP
Š" “"
2"
†"
†"
1„
"
1Š"
)•
"+ˆ
"
-
"
SPLICE BOLT
GUARDRAIL BEAM ELEMENTS
FOR USE WITH NESTED
20
…"
6"
4‚"
ƒ" DIA. HOLE
1'-0"
…"
6"
4‚"
7„
"
1'-7"
7†
"4‚
"
FRONT
THRIE BEAM GUARDRAIL
OFFSET BLOCK FOR
ƒ" DIA. HOLE
TOP
1'-0"
6"
7„
"
1'-7"
7†
"4‚
"
FOR USE WITH W6 x 15 POSTSFOR USE WITH W6 x 8.5 OR W6 x 9 POSTS
1„"
< „"
\
1„"
< „"
\
ƒ" DIA. HOLE
1„"
< „"
\
MICHIGAN DEPARTMENT OF TRANSPORTATION
OF
SHEET
PLAN DATEF.H.W.A. APPROVAL
BUREAU OF DEVELOPMENT STANDARD PLAN FOR
BRIDGE, DETAILS
GUARDRAIL ANCHORAGE,
R-67-G10-24-2019
18
3•"
ƒ"
7†
"7
‰"
5‡"
7'-0"
6"
FRONT SIDE FRONT SIDE
W6 x 15 POST
W6 x 8.5 POST
W6 x 9 OR
TOP TOP
6"
ƒ" DIA. HOLE *
GUARDRAIL
WITH THRIE BEAM
* BOTTOM HOLE FOR USE
6'-0"
OR 7'-0"
20
(OPTIONAL)
GALVANIZING HOLE
2"
TO 3"
(OPTIONAL)
GALVANIZING HOLE
2"
TO 3"
7†
"7
‰"
ƒ" DIA. HOLE
1‡"
MICHIGAN DEPARTMENT OF TRANSPORTATION
OF
SHEET
PLAN DATEF.H.W.A. APPROVAL
BUREAU OF DEVELOPMENT STANDARD PLAN FOR
MICHIGAN DEPARTMENT OF TRANSPORTATION
OF
SHEET
PLAN DATEF.H.W.A. APPROVAL
BUREAU OF DEVELOPMENT STANDARD PLAN FOR
7†
"6
‰"
6‰
"
1'-8"
<
‰"
8•"8"2"
7‚"7†
"3
Ž"
3"
2'-6"
3"<
3…
"
(TYP.)
SPLICE BOLT SLOT
ž" x 1„"
(OPTIONAL)
POST BOLT SLOT (TYP.)
ƒ" x 2•"
(TYP.)
1" DIA. HOLE
GUARDRAIL ANCHORAGE TYPE M1, M3, M4, M6
BOLT LOCATION FOR
THRIE BEAM TERMINAL CONNECTOR
7†
"6
‰"
6‰
"
1'-8"
<
‰"
8•"8"2"
7‚"
7†
"3
Ž"
3"
2'-6"
3"<
3…
"
(TYP.)
SPLICE BOLT SLOT
ž" x 1„"
(OPTIONAL)
POST BOLT SLOT (TYP.)
ƒ" x 2•"
(TYP.)
1" DIA. HOLE
GUARDRAIL ANCHORAGE TYPE M2, M5
BOLT LOCATION FOR
THRIE BEAM TERMINAL CONNECTOR
BRIDGE, DETAILS
GUARDRAIL ANCHORAGE,
R-67-G10-24-2019
19 20
BRIDGE SPANS A BRIDGE EXPANSION JOINT.
SEE APPROPRIATE PLANS TO DETERMINE WHETHER GUARDRAIL ANCHORAGE,
FILLER WALL END BLOCK.
SEE THE CURRENT STANDARD PLAN R-55-SERIES FOR FILLER WALLS AND
BE LAPPED IN EITHER DIRECTION.
TRAFFIC, EXCEPT FOR THE THRIE BEAM TERMINAL CONNECTOR WHICH MAY
GUARDRAIL BEAM ELEMENTS SHALL BE LAPPED IN THE DIRECTION OF
USE IN ANCHORAGE SHALL BE FIELD BENT.
SECTIONS OF THE THRIE BEAM ELEMENT REQUIRED TO BE TWISTED FOR
STANDARD.
PLAN R-60-SERIES, WHERE APPLICABLE, EXCEPT AS SPECIFIED ON THIS
THE CURRENT STANDARD SPECIFICATIONS AND TO THE CURRENT STANDARD
HARDWARE, (INCLUDING BOLTS, NUTS, AND WASHERS) SHALL CONFORM TO
ALL POSTS, OFFSET BLOCKS, BEAM ELEMENTS, REFLECTORS, AND
NOTES:
FACE, TYPE __".
SEE STANDARD PLAN R-54-SERIES FOR "CONCRETE BARRIER, SINGLE
TYPE __".
INCLUDED IN THE PAY ITEM "CONCRETE BARRIER, SINGLE FACE,
CONCRETE BARRIER, SINGLE FACE TRANSITION SECTION SHALL BE
MICHIGAN DEPARTMENT OF TRANSPORTATION
OF
SHEET
PLAN DATEF.H.W.A. APPROVAL
BUREAU OF DEVELOPMENT STANDARD PLAN FOR
BRIDGE, DETAILS
GUARDRAIL ANCHORAGE,
R-67-G10-24-2019
20 20
GAUGE MUST MEET CLASS B REQUIREMENTS PER AASHTO M 180.
REQUIREMENTS PER AASHTO M 180. BEAM ELEMENTS IDENTIFIED AS 10
BEAM ELEMENTS IDENTIFIED AS 12 GAUGE MUST MEET CLASS A
GUTTER AND DOWNSPOUT HEADER.
SEE THE CURRENT STANDARD PLAN R-32-SERIES FOR APPROACH CURB AND
COLD CHISEL, SO THAT IT WILL NOT LOOSEN.
FIRST THREAD ON THE OUTSIDE OF THE NUT WITH A CENTER PUNCH OR
BEYOND THE NUT. THIS SHALL BE FOLLOWED UP BY UPSETTING THE
ENGAGE THE SPLICE BOLT WITH A MINIMUM OF ONE THREAD EXTENDING
SPLICE BOLT NUT SHALL BE INSTALLED FINGER-TIGHT AND SHALL FULLY
SPLICING THE SPECIAL END SHOE TO THE TRANSITION SECTION. THE
TERMINAL CONNECTOR TO THE THRIE BEAM EXPANSION SECTION AND WHEN
SPLICE BOLTS SHALL BE USED WHEN SPLICING THE THRIE BEAM
NOT BE LIGHTER THAN 10 GAUGE (0.138").
BE THE SAME MATERIAL AS ADJACENT RUN OF GUARDRAIL, AND SHALL
THE THRIE BEAM TERMINAL CONNECTOR AND SPECIAL END SHOE SHALL
W6 x 9) OR WOOD POSTS (6" x 8").
T1 THROUGH T6, SHALL BE 7'-0" LONG STEEL POSTS (W6 x 8.5 OR
ALL POSTS USED TO CONSTRUCT GUARDRAIL ANCHORAGE, BRIDGE, DETAIL
SECTION.
ž" x 5" LONG SLOTTED HOLES IN THE THRIE BEAM EXPANSION
THAT THE THRIE BEAM TERMINAL CONNECTOR BE ATTACHED TO THE
GUARDRAIL ANCHORAGE, BRIDGE, DETAILS T1, T2, AND T5 REQUIRE
DEP
AR
TM
EN
T
DIR
EC
TO
RMIC
HIG
AN
DEP
AR
TM
EN
T
OF TR
AN
SP
OR
TATIO
N
OF
SH
EE
T
PLAN DATE
F.H.
W.A. APPROVAL
CHECKED BY:
DRA
WN BY:
Mic
hig
an
Department of Transportatio
n
BU
RE
AU
OF
DE
VELO
PM
EN
T ST
AN
DA
RD
PLA
N
FO
R
APPROVED BY:
APPROVED BY:
Paul C. Ajegba
BY
PREP
ARE
D
DESI
GN
DI
VISI
ON
DIRECTOR, BUREAU OF FIELD SERVICES
DIRECTOR, BUREAU OF DEVELOP
MENT
APPROVED BY:
DIRECTOR, BUREAU OF BRIDGES AND STRUCTURES
DETAILS FOR CONNECTING GUARDRAIL TYPE MGS-8 TO BRIDGE RAILING, THRIE BEAM RETROFIT
5"
12'-6" 12'-6" 6'-3"
12 GAUGE
SECTION
THRIE BEAM
6'-3"
10 GAUGE
TRANSITION
THRIE BEAM
SYMMETRICAL
12'-6"
GUARDRAIL ANCHORAGE, BRIDGE, DETAIL A3
50'-0"
TYPE MGS-8
GUARDRAIL
THRIE BEAM RETROFIT
* BRIDGE RAILING
OFFSET BLOCK
WITH 12"
(7'-0" LONG)
W6 x 15 POST
MAX.
ON BRIDGE VARIES
LOCATION OF SPLICE
WITH 12" OFFSET BLOCK
(7'-0" LONG)
W6 x 9 OR W6 x 8.5 POST
WITH 12" OFFSET BLOCK
(6'-0" LONG)
W6 x 9 OR W6 x 8.5 POST
3'-1•"6'-3"4 SPACES @ 3'-1•"
12'-6"
CURB & GUTTER
4" MAX. HEIGHT
34"
REFERENCE LINE
PLAN
ELEVATION
31"
8 7 6 5 4 3 2 1
1B-2
2-E
5
B.L.T.
V.Z.
(R4
TY
PE
BRID
GE
RAILIN
G)
TH
RIE
BE
AM
RE
TR
OFIT
BRID
GE
RAILIN
G,
10-23-2019
3'-1•"
**
10 GAUGE ***
THRIE BEAM EXPANSION SECTION
***
12 GAUGE
THRIE BEAM SECTIONS
TWO NESTED
12 GAUGE
W-BEAM SECTIONS
TWO NESTED
@ 3'-1•"
(MINIMUM)
2 SPACES
@ 1'-6ƒ"
(MINIMUM)
4 SPACES
END POSTS
TYP. AT
BRIDGE REFERENCE LINES.
GUARDRAIL SPLICE IS NOT LOCATED WITHIN THE
12 GAUGE, WHEN THE CENTERLINE OF THE NOTED
*** USE TWO NESTED THRIE BEAM EXPANSION SECTIONS,
SPACING ADJUSTMENT.
** SEE PLAN OF ADDITIONAL POST DETAIL FOR POST
TWO EXISTING GUARDRAIL RUNS. SEE SHEET 4.
REFERENCE LINES EXCEPT WHEN CONNECTING BETWEEN
* TO BE A MULTIPLE OF 12'-6" AND CENTERED BETWEEN
MIC
HIG
AN
DEP
AR
TM
EN
T
OF TR
AN
SP
OR
TATIO
N
OF
SH
EE
T
PLAN DATE
F.H.
W.A. APPROVAL
BU
RE
AU
OF
DE
VELO
PM
EN
T ST
AN
DA
RD
PLA
N
FO
R
DETAILS FOR CONNECTING GUARDRAIL TYPE T TO BRIDGE RAILING, THRIE BEAM RETROFIT
REFERENCE LINE
PLAN
12'-6" 12'-6" 12'-6"
GUARDRAIL ANCHORAGE, BRIDGE, DETAIL A4
50'-0"
THRIE BEAM RETROFIT
* BRIDGE RAILING
ON BRIDGE VARIES
LOCATION OF SPLICE
8 7 6 5 4
12'-6"
9 3 2 1
TYPE T
GUARDRAIL
34"
CURB & GUTTER
4" MAX. HEIGHT
34"
OFFSET BLOCK
WITH 12"
(7'-0" LONG)
W6 x 15 POST
MAX.
WITH 12" OFFSET BLOCK
(7'-0" LONG)
W6 x 9 OR W6 x 8.5 POST
6'-3"5 SPACES @ 3'-1•"
15'-7•"
ELEVATION
2B-2
2-E
5
TH
RIE
BE
AM
RE
TR
OFIT
(R4
TY
PE
BRID
GE
RAILIN
G)
BRID
GE
RAILIN
G,
10-23-2019
3'-1•"
**
5"
***
END POSTS
TYP. AT
@ 3'-1•"
(MINIMUM)
2 SPACES
@ 1'-6ƒ"
(MINIMUM)
4 SPACES
12 GAUGE
THRIE BEAM SECTIONS
TWO NESTED
12 GAUGE
THRIE BEAM SECTIONS
TWO NESTED
12 GAUGE
THRIE BEAM SECTIONS
TWO NESTED
10 GAUGE ***
THRIE BEAM EXPANSION SECTION
BRIDGE REFERENCE LINES.
GUARDRAIL SPLICE IS NOT LOCATED WITHIN THE
12 GAUGE, WHEN THE CENTERLINE OF THE NOTED
*** USE TWO NESTED THRIE BEAM EXPANSION SECTIONS,
SPACING ADJUSTMENT.
** SEE PLAN OF ADDITIONAL POST DETAIL FOR POST
TWO EXISTING GUARDRAIL RUNS. SEE SHEET 4.
REFERENCE LINES EXCEPT WHEN CONNECTING BETWEEN
* TO BE A MULTIPLE OF 12'-6" AND CENTERED BETWEEN
MIC
HIG
AN
DEP
AR
TM
EN
T
OF TR
AN
SP
OR
TATIO
N
OF
SH
EE
T
PLAN DATE
F.H.
W.A. APPROVAL
BU
RE
AU
OF
DE
VELO
PM
EN
T ST
AN
DA
RD
PLA
N
FO
R
DETAILS FOR CONNECTING GUARDRAIL TYPE B TO BRIDGE RAILING, THRIE BEAM RETROFIT
REFERENCE LINE
PLAN
12'-6" 12'-6" 12'-6"
GUARDRAIL ANCHORAGE, BRIDGE, DETAIL A5
56'-3"
THRIE BEAM RETROFIT
* BRIDGE RAILING
ON BRIDGE VARIES
LOCATION OF SPLICE
FROM 34" TO 31"
TRANSITION GUARDRAIL HEIGHT
12'-6"
CURB & GUTTER
4" MAX. HEIGHT
34"
31"
6'-3"
10 GAUGE
TRANSITION
THRIE BEAM
SYMMETRICAL
TYPE B
GUARDRAIL
OFFSET BLOCK
WITH 12"
(7'-0" LONG)
W6 x 15 POST
MAX.
WITH 12" OFFSET BLOCK
(7'-0" LONG)
W6 x 9 OR W6 x 8.5 POST
5 SPACES @ 3'-1•"
15'-7•"
2 SPACES @ 6'-3"
12'-6"
28"
ELEVATION
3B-2
2-E
5
(R4
TY
PE
BRID
GE
RAILIN
G)
TH
RIE
BE
AM
RE
TR
OFIT
BRID
GE
RAILIN
G,
10-23-2019
9 810 7 6 5 4 3 2 1
3'-1•"
**
12 GAUGE
THRIE BEAM SECTIONS
TWO NESTED
12 GAUGE
THRIE BEAM SECTIONS
TWO NESTED
12 GAUGE
THRIE BEAM SECTIONS
TWO NESTED
10 GAUGE ***
THRIE BEAM EXPANSION SECTION
5"
***
END POSTS
TYP. AT
@ 3'-1•"
(MINIMUM)
2 SPACES
@ 1'-6ƒ"
(MINIMUM)
4 SPACES
BRIDGE REFERENCE LINES.
GUARDRAIL SPLICE IS NOT LOCATED WITHIN THE
12 GAUGE, WHEN THE CENTERLINE OF THE NOTED
*** USE TWO NESTED THRIE BEAM EXPANSION SECTIONS,
SPACING ADJUSTMENT.
** SEE PLAN OF ADDITIONAL POST DETAIL FOR POST
TWO EXISTING GUARDRAIL RUNS. SEE SHEET 4.
REFERENCE LINES EXCEPT WHEN CONNECTING BETWEEN
* TO BE A MULTIPLE OF 12'-6" AND CENTERED BETWEEN
MICHIGAN DEPARTMENT OF TRANSPORTATION
OF
SHEET
PLAN DATEF.H.W.A. APPROVAL
BUREAU OF DEVELOPMENT STANDARD PLAN FOR
4B-22-E
5
(R4 TY PE BRIDGE RAILIN G)
TH RIE BEA M RETROFIT
BRIDGE RAILIN G,
10-23-2019
EXPANSION SECTION
THRIE BEAM REFERENCE LINE
BRIDGE
BLOCKS AND END POST
1" DIA. HOLES IN BEAM,
\ WOOD BLOCKS AND \
(TYP. AT PIERS OR ABUTMENTS)
AND THE BRIDGE EXPANSION JOINT.
THAT LIE BETWEEN THE SLOTTED SPLICE
THRIE BEAM EXPANSION SECTION AT POSTS
PLACE 1" x 5" SLOTS FOR POST STUDS IN
BRIDGE EXPANSION JOINT
5"
ž " x 5" SLOTS (TYP.)
EXPANSION SPLICE WITH
BRIDGE EXPANSION JOINT
SPLICE
EXPANSION
ELEV ATION SH OW IN G TH RIE BEA M RETROFIT OVER BRIDGE EXPA N SION JOIN TS
AT A BU TM EN TAT PIER
LENGTH
BRIDGE RETROFIT
SPLICE
\ PROPOSED
SK ETCH FOR RETROFITTIN G BETW EEN TW O EXISTIN G RU N S OF G U A RDRAIL
X Y
Z
Z Z
Z
REMOVE ALL EXISTING GUARDRAIL BETWEEN EXISTING SPLICES
BRIDGE RAILING LENGTH
BETWEEN TWO EXISTING RUNS OF GUARDRAIL
INSTRUCTIONS FOR LAYING OUT RETROFIT
SPLICE BACK TOWARD THE BRIDGE.
1. MEASURE THE APPROPRIATE "Z" DISTANCE FROM ONE END OF THE BRIDGE RAILING AND LOCATE THE FIRST EXISTING
3. REPEAT STEPS 1 AND 2, FROM OPPOSITE END OF THE BRIDGE TO OBTAIN "Y" DIMENSION.
THIS DIMENSION WILL VARY FROM 0 TO 12'-6".
2. FROM THIS SPLICE, MEASURE THE SAME "Z" DISTANCE BACK TOWARD THE BRIDGE TO OBTAIN THE "X" DIMENSION.
4. SUBTRACT THE SUM OF "X" + "Y" FROM BRIDGE RAILING LENGTH. THIS WILL BE THE BRIDGE RETROFIT LENGTH.
THE REMAINDER WILL BE THE LENGTH OF A SHORTENED ELEMENT.
5. DIVIDE THE BRIDGE RETROFIT LENGTH BY 12'-6" TO OBTAIN THE NUMBER OF BEAM ELEMENTS PLUS A REMAINDER.
IN STEP 5.
RETROFIT WILL CONTAIN TWO SHORTENED BEAM ELEMENTS WITH ONE LESS 12'-6" BEAM ELEMENT THAN CALCULATED
6. WHEN THE REMAINDER IS LESS THAN 2'-6", ADD 12'-6" TO THE REMAINDER AND DIVIDE BY TWO. THE BRIDGE
W ASH ERS U SED W ITH 7/8" DIA. STU DS
SQU A RE W ASH ERROU N D W ASH ER
• " DIA. HOLE • " DIA. HOLE1ƒ" DIA.
1•"
3"
1•"
3"
„"‚"
PRIOR TO BEING GALVANIZED
WELDED FLUSH TO END OF THREADED STUD
NUT SHALL FULLY ENGAGE THREADS AND BE
7/8" DIA. TH REA DED STU D
3" MIN.
LENGTH AS NEEDED
Z = 56'-3" WHEN CONNECTING TO BEAM GUARDRAIL, TYPE B. USE GUARDRAIL ANCHORAGE, BRIDGE, DETAIL A5
Z = 50'-0" WHEN CONNECTING TO BEAM GUARDRAIL, TYPE T. USE GUARDRAIL ANCHORAGE, BRIDGE, DETAIL A4
Z = 50'-0" WHEN CONNECTING TO BEAM GUARDRAIL, TYPE MGS-8. USE GUARDRAIL ANCHORAGE, BRIDGE, DETAIL A3
EXISTING BRIDGE SIDEWALK
12 GAUGE
THRIE BEAM SECTIONS
TWO NESTED
(REFER TO SHEETS 1 THROUGH 3)
THRIE BEAM EXPANSION SECTION(S)
GUARDRAIL
* EXISTING
SPLICE *
\ EXISTING
GUARDRAIL
* EXISTING
AND A 6'-3" POST SPACING.
POSTS WITH GUARDRAIL TYPE MGS-8
BE LOCATED AT MIDSPAN BETWEEN
DIAGRAM. SPLICE LOCATION WILL
6'-3" POST SPACING DEPICTED IN
* GUARDRAIL TYPE B OR TYPE T WITH
MICHIGAN DEPARTMENT OF TRANSPORTATION
OF
SHEET
PLAN DATEF.H.W.A. APPROVAL
BUREAU OF DEVELOPMENT STANDARD PLAN FOR
B-22-E
(SEE NOTES)
WASHERS
REFLECTORIZED
MAX.
6ƒ"
MIN.
O
AS REQUIRED
BLOCK OUT
MAX.
6ƒ"
MIN.
O
(6" WIDE)
WOOD OFFSET BLOCK
(6" WIDE)
WOOD BLOCKOUT
WASHER UNDER OUTSIDE NUT.
UNDER WELDED NUT AND SQUARE
STUD WITH ROUND WASHER
POST. \ ‡" DIA. THREADED
WOOD BLOCKS AND CONCRETE
\ 1" DIA. HOLE IN BEAM,
7†
"
BLOCK OUT
AS REQUIRED
TOP OF EXISTING WEARING SURFACETOP OF EXISTING WEARING SURFACE
1'-6" 2'-6"
2'-
10"
2'-
3ƒ
"
THRIE BEAM ELEMENT
SAME CROSS SECTION AS
SECTIONS 807 & 908 OF THE STANDARD SPECIFICATIONS.
ALL WORK AND MATERIAL SHALL BE IN ACCORDANCE WITH
NOTES:
SPLICE BOLTS.
ATTACHED AT UPPER POST BOLT SLOTS WITH STANDARD
INTERVALS AT BEAM ELEMENT SPLICES. THEY SHALL BE
REFLECTORIZED WASHERS SHALL BE SPACED AT 25'-0"
SHOWN ON THIS PLAN.
PLAN R-60-SERIES, WHERE APPLICABLE, EXCEPT AS
ANCHORAGES SHALL CONFORM TO THE CURRENT STANDARD
BRIDGE RAILING, THRIE BEAM RETROFIT AND GUARDRAIL
8•" 2"
4‚"
1'-
8"
3…"
7" 12'-6" 6‚"
4"
SLOTTED HOLES
ž " x 5"
SLOTTED HOLES
ž " x 1„"
POST BOLT SLOTS
ƒ" x 2•"
WASHER UNDER OUTSIDE NUT.
UNDER WELDED NUT AND SQUARE
STUD WITH ROUND WASHER
POST. \ ‡" DIA. THREADED
WOOD BLOCKS AND CONCRETE
\ 1" DIA. HOLE IN BEAM,
(6" WIDE)
WOOD BLOCKOUT
7†
"
2'-
10"
2'-
3ƒ
"
(SEE NOTES)
WASHERS
REFLECTORIZED
SECTION S TH RU R4 RAILIN G
1'-6ƒ" <SPACED AT 1'-6ƒ" <
ƒ" x 3ƒ" SLOTTED HOLES
TH RIE BEA M EXPA N SION SECTION
POSTS AND REMOVABLE METAL PANELS WITH GRIDS OF THIS PATTERN.
R4 TYPE BRIDGE RAILINGS CAN BE IDENTIFIED AS HAVING CONCRETE
NOTE:
GUARDRAIL.
EXISTING R4 TYPE BRIDGE RAILINGS AND APPROACH
THIS STANDARD IS INTENDED FOR USE IN UPGRADING OF
5 5
(R4 TY PE BRIDGE RAILIN G)
TH RIE BEA M RETROFIT
BRIDGE RAILIN G,
10-23-2019
BRIDGE CURB
FRONT FACE OF
MAX.
BEAM ELEMENT
ADDED GUARDRAIL POST
REFERENCE LINE
WOOD OFFSET BLOCK
BRIDGE RAILING END POST 5"
1'-6ƒ"
PLA N OF A DDITION AL POST DETAIL
FRONT FACE OF APPROACH CURB
WOOD BLOCKOUT
IMMEDIATELY ADJACENT TO STRUCTURE
BLOCK AND OFFSET BLOCK (AS SHOWN)
ELEMENT AND PLACE AN ADDITIONAL POST,
ADDITIONAL HOLES FOR POST BOLTS IN BEAM
WHEN THIS DISTANCE EXCEEDS 3'-1•", DRILL
STRUCTURE REFERENCE LINE
FOR 3'-1•" POST SPACING BEYOND
FIRST SET OF POST BOLT SLOTS
MAINTAINING REQUIRED POST SPACING.
OFFSET BLOCK WIDTH TO LOCATE POST WHILE
IT MAY BE NECESSARY TO INCREASE THE 12"
FOR BRIDGES SKEWED IN DIRECTION SHOWN,
2 SPACES (MINIMUM) @ 3'-1•" 4 SPACES (MINIMUM) @ 1'-6ƒ"
DEP
AR
TM
EN
T
DIR
EC
TO
RMIC
HIG
AN
DEP
AR
TM
EN
T
OF TR
AN
SP
OR
TATIO
N
OF
SH
EE
T
PLAN DATE
F.H.
W.A. APPROVAL
CHECKED BY:
DRA
WN BY:
Mic
hig
an
Department of Transportatio
n
BU
RE
AU
OF
DE
VELO
PM
EN
T ST
AN
DA
RD
PLA
N
FO
R
APPROVED BY:
APPROVED BY:
Paul C. Ajegba
BY
PREP
ARE
D
DESI
GN
DI
VISI
ON
DIRECTOR, BUREAU OF FIELD SERVICES
DIRECTOR, BUREAU OF DEVELOP
MENT
APPROVED BY:
DIRECTOR, BUREAU OF BRIDGES AND STRUCTURES
DETAILS FOR CONNECTING GUARDRAIL TYPE MGS-8 TO BRIDGE RAILING, THRIE BEAM RETROFIT
12'-6" 12'-6" 6'-3"
12 GAUGE
SECTION
THRIE BEAM
6'-3"
10 GAUGE
TRANSITION
THRIE BEAM
SYMMETRICAL
12'-6"
GUARDRAIL ANCHORAGE, BRIDGE, DETAIL A3
50'-0"
TYPE MGS-8
GUARDRAIL
THRIE BEAM RETROFIT
* BRIDGE RAILING
OFFSET BLOCK
WITH 12"
(7'-0" LONG)
W6 x 15 POST
MAX.
ON BRIDGE VARIES
LOCATION OF SPLICE
WITH 12" OFFSET BLOCK
(7'-0" LONG)
W6 x 9 OR W6 x 8.5 POST
WITH 12" OFFSET BLOCK
(6'-0" LONG)
W6 x 9 OR W6 x 8.5 POST
3'-1•"6'-3"4 SPACES @ 3'-1•"
12'-6"
CURB & GUTTER
4" MAX. HEIGHT
34"
REFERENCE LINE
PLAN
ELEVATION
31"
8 7 6 5 4 3 2 1
3'-1•"
16
B.L.T.
V.Z.
TH
RIE
BE
AM
RE
TR
OFIT
BRID
GE
RAILIN
G,
10-23-2019
OVER BRIDGE EXPANSION JOINTS.)
(SEE ELEVATION SHOWING THRIE BEAM RETROFIT
SIDES OF EXPANSION SPLICE AND AT END POST
PLACE WOOD BLOCKOUTS ON CONCRETE POSTS BOTH
(CONCRETE HEADWALL - SEE NOTES)
ALTERNATE CONCRETE POSTS
SPACE WOOD BLOCKOUTS AT
B-2
3-F
(OP
EN
PA
RA
PE
T
TY
PE
BRID
GE
RAILIN
G)
5"
***
END POSTS
TYP. AT
10 GAUGE ***
THRIE BEAM EXPANSION SECTION
12 GAUGE
THRIE BEAM SECTIONS
TWO NESTED
12 GAUGE
W-BEAM SECTIONS
TWO NESTED
@ 3'-1•"
(MINIMUM)
2 SPACES
@ 1'-6ƒ"
(MINIMUM)
4 SPACES
BRIDGE REFERENCE LINES.
GUARDRAIL SPLICE IS NOT LOCATED WITHIN THE
12 GAUGE, WHEN THE CENTERLINE OF THE NOTED
*** USE TWO NESTED THRIE BEAM EXPANSION SECTIONS,
SPACING ADJUSTMENT.
** SEE PLAN OF ADDITIONAL POST DETAIL FOR POST
TWO EXISTING GUARDRAIL RUNS. SEE SHEET 4.
REFERENCE LINES EXCEPT WHEN CONNECTING BETWEEN
* TO BE A MULTIPLE OF 12'-6" AND CENTERED BETWEEN
MIC
HIG
AN
DEP
AR
TM
EN
T
OF TR
AN
SP
OR
TATIO
N
OF
SH
EE
T
PLAN DATE
F.H.
W.A. APPROVAL
BU
RE
AU
OF
DE
VELO
PM
EN
T ST
AN
DA
RD
PLA
N
FO
R
DETAILS FOR CONNECTING GUARDRAIL TYPE T TO BRIDGE RAILING, THRIE BEAM RETROFIT
REFERENCE LINE
PLAN
12'-6" 12'-6" 12'-6"
GUARDRAIL ANCHORAGE, BRIDGE, DETAIL A4
50'-0"
THRIE BEAM RETROFIT
* BRIDGE RAILING
ON BRIDGE VARIES
LOCATION OF SPLICE
8 7 6 5 4
12'-6"
9 3 2 1
TYPE T
GUARDRAIL
34"
CURB & GUTTER
4" MAX. HEIGHT
34"
OFFSET BLOCK
WITH 12"
(7'-0" LONG)
W6 x 15 POST
MAX.
WITH 12" OFFSET BLOCK
(7'-0" LONG)
W6 x 9 OR W6 x 8.5 POST
6'-3"5 SPACES @ 3'-1•"
15'-7•"
ELEVATION
3'-1•"
26
TH
RIE
BE
AM
RE
TR
OFIT
BRID
GE
RAILIN
G,
10-23-2019
OVER BRIDGE EXPANSION JOINTS.)
(SEE ELEVATION SHOWING THRIE BEAM RETROFIT
SIDES OF EXPANSION SPLICE AND AT END POST
PLACE WOOD BLOCKOUTS ON CONCRETE POSTS BOTH
(CONCRETE HEADWALL - SEE NOTES)
ALTERNATE CONCRETE POSTS
SPACE WOOD BLOCKOUTS AT
B-2
3-F
(OP
EN
PA
RA
PE
T
TY
PE
BRID
GE
RAILIN
G)
5"
END POSTS
TYP. AT
***
@ 3'-1•"
(MINIMUM)
2 SPACES
@ 1'-6ƒ"
(MINIMUM)
4 SPACES
10 GAUGE ***
THRIE BEAM EXPANSION SECTION
12 GAUGE
THRIE BEAM SECTIONS
TWO NESTED
12 GAUGE
THRIE BEAM SECTIONS
TWO NESTED
12 GAUGE
THRIE BEAM SECTIONS
TWO NESTED
BRIDGE REFERENCE LINES.
GUARDRAIL SPLICE IS NOT LOCATED WITHIN THE
12 GAUGE, WHEN THE CENTERLINE OF THE NOTED
*** USE TWO NESTED THRIE BEAM EXPANSION SECTIONS,
SPACING ADJUSTMENT.
** SEE PLAN OF ADDITIONAL POST DETAIL FOR POST
TWO EXISTING GUARDRAIL RUNS. SEE SHEET 4.
REFERENCE LINES EXCEPT WHEN CONNECTING BETWEEN
* TO BE A MULTIPLE OF 12'-6" AND CENTERED BETWEEN
MIC
HIG
AN
DEP
AR
TM
EN
T
OF TR
AN
SP
OR
TATIO
N
OF
SH
EE
T
PLAN DATE
F.H.
W.A. APPROVAL
BU
RE
AU
OF
DE
VELO
PM
EN
T ST
AN
DA
RD
PLA
N
FO
R
DETAILS FOR CONNECTING GUARDRAIL TYPE B TO BRIDGE RAILING, THRIE BEAM RETROFIT
REFERENCE LINE
PLAN
12'-6" 12'-6" 12'-6"
GUARDRAIL ANCHORAGE, BRIDGE, DETAIL A5
56'-3"
THRIE BEAM RETROFIT
* BRIDGE RAILING
ON BRIDGE VARIES
LOCATION OF SPLICE
FROM 34" TO 31"
TRANSITION GUARDRAIL HEIGHT
12'-6"
CURB & GUTTER
4" MAX. HEIGHT
34"
31"
6'-3"
10 GAUGE
TRANSITION
THRIE BEAM
SYMMETRICAL
TYPE B
GUARDRAIL
OFFSET BLOCK
WITH 12"
(7'-0" LONG)
W6 x 15 POST
MAX.
WITH 12" OFFSET BLOCK
(7'-0" LONG)
W6 x 9 OR W6 x 8.5 POST
5 SPACES @ 3'-1•"
15'-7•"
2 SPACES @ 6'-3"
12'-6"
28"
ELEVATION
36
TH
RIE
BE
AM
RE
TR
OFIT
BRID
GE
RAILIN
G,
10-23-2019
9 810 7 6 5 4 3 2 1
OVER BRIDGE EXPANSION JOINTS.)
(SEE ELEVATION SHOWING THRIE BEAM RETROFIT
SIDES OF EXPANSION SPLICE AND AT END POST
PLACE WOOD BLOCKOUTS ON CONCRETE POSTS BOTH
(CONCRETE HEADWALL - SEE NOTES)
ALTERNATE CONCRETE POSTS
SPACE WOOD BLOCKOUTS AT
3'-1•"
**
B-2
3-F
(OP
EN
PA
RA
PE
T
TY
PE
BRID
GE
RAILIN
G)
5"
END POSTS
TYP. AT
***
@ 3'-1•"
(MINIMUM)
2 SPACES
@ 1'-6ƒ"
(MINIMUM)
4 SPACES
10 GAUGE ***
THRIE BEAM EXPANSION SECTION
12 GAUGE
THRIE BEAM SECTIONS
TWO NESTED
12 GAUGE
THRIE BEAM SECTIONS
TWO NESTED
12 GAUGE
THRIE BEAM SECTIONS
TWO NESTED
BRIDGE REFERENCE LINES.
GUARDRAIL SPLICE IS NOT LOCATED WITHIN THE
12 GAUGE, WHEN THE CENTERLINE OF THE NOTED
*** USE TWO NESTED THRIE BEAM EXPANSION SECTIONS,
SPACING ADJUSTMENT.
** SEE PLAN OF ADDITIONAL POST DETAIL FOR POST
TWO EXISTING GUARDRAIL RUNS. SEE SHEET 4.
REFERENCE LINES EXCEPT WHEN CONNECTING BETWEEN
* TO BE A MULTIPLE OF 12'-6" AND CENTERED BETWEEN
MICHIGAN DEPARTMENT OF TRANSPORTATION
OF
SHEET
PLAN DATEF.H.W.A. APPROVAL
BUREAU OF DEVELOPMENT STANDARD PLAN FOR
4 6
TH RIE BEA M RETROFIT
BRIDGE RAILIN G,
10-23-2019 B-23-F
EXPANSION SECTION
THRIE BEAM
ROU N D W ASH ER SQU A RE W ASH ER
PRIOR TO BEING GALVANIZED
WELDED FLUSH TO END OF THREADED STUD
NUT SHALL FULLY ENGAGE THREADS AND BE
BACKWALL
EXISTING
RETU RN W IN G W ALLS
AT PIER OR A BU TM EN T W ITH
SLOPEW ALLS
AT A BU TM EN T W ITH
ELEV ATION SH OW IN G TH RIE BEA M RETROFIT OVER BRIDGE EXPA N SION JOIN TS
W ASH ERS U SED W ITH 7/8" DIA. STU DS 7/8" DIA. TH REA DED STU D
LIE BETWEEN THE SLOTTED SPLICE AND THE BRIDGE EXPANSION JOINT.
LAG SCREWS IN THRIE BEAM EXPANSION SECTION AT POST BLOCKOUTS THAT
PLACE 1" x 5" SLOTS FOR POST STUDS AND ƒ" x 5" SLOTS FOR
IN BEAM, BLOCKOUT AND RAILING POST
\ WOOD BLOCKOUT AND \ 1" DIA. HOLES
ž " x 5" SLOTS (TYP.)
EXPANSION SPLICE WITH BRIDGE EXPANSION JOINT EXPANSION SPLICE
BRIDGE EXPANSION JOINT
5"
1'-6"
PROPOSED CONCRETE RAILING POST
1ƒ" DIA. • " DIA. HOLE
„"
• " DIA. HOLE
1•"
3"
1•"
3"
‚"
LENGTH AS NEEDED
3" MIN.
(OPEN PA RAPET TY PE BRIDGE RAILIN G)
LENGTH
BRIDGE RETROFIT
SPLICE
\ PROPOSED
SK ETCH FOR RETROFITTIN G BETW EEN TW O EXISTIN G RU N S OF G U A RDRAIL
X Y
Z
Z Z
Z
REMOVE ALL EXISTING GUARDRAIL BETWEEN EXISTING SPLICES
BRIDGE RAILING LENGTH
BETWEEN TWO EXISTING RUNS OF GUARDRAIL
INSTRUCTIONS FOR LAYING OUT RETROFIT
SPLICE BACK TOWARD THE BRIDGE.
1. MEASURE THE APPROPRIATE "Z" DISTANCE FROM ONE END OF THE BRIDGE RAILING AND LOCATE THE FIRST EXISTING
3. REPEAT STEPS 1 AND 2, FROM OPPOSITE END OF THE BRIDGE TO OBTAIN "Y" DIMENSION.
THIS DIMENSION WILL VARY FROM 0 TO 12'-6".
2. FROM THIS SPLICE, MEASURE THE SAME "Z" DISTANCE BACK TOWARD THE BRIDGE TO OBTAIN THE "X" DIMENSION.
4. SUBTRACT THE SUM OF "X" + "Y" FROM BRIDGE RAILING LENGTH. THIS WILL BE THE BRIDGE RETROFIT LENGTH.
THE REMAINDER WILL BE THE LENGTH OF A SHORTENED ELEMENT.
5. DIVIDE THE BRIDGE RETROFIT LENGTH BY 12'-6" TO OBTAIN THE NUMBER OF BEAM ELEMENTS PLUS A REMAINDER.
IN STEP 5.
RETROFIT WILL CONTAIN TWO SHORTENED BEAM ELEMENTS WITH ONE LESS 12'-6" BEAM ELEMENT THAN CALCULATED
6. WHEN THE REMAINDER IS LESS THAN 2'-6", ADD 12'-6" TO THE REMAINDER AND DIVIDE BY TWO. THE BRIDGE
Z = 56'-3" WHEN CONNECTING TO BEAM GUARDRAIL, TYPE B. USE GUARDRAIL ANCHORAGE, BRIDGE, DETAIL A5
Z = 50'-0" WHEN CONNECTING TO BEAM GUARDRAIL, TYPE T. USE GUARDRAIL ANCHORAGE, BRIDGE, DETAIL A4
Z = 50'-0" WHEN CONNECTING TO BEAM GUARDRAIL, TYPE MGS-8. USE GUARDRAIL ANCHORAGE, BRIDGE, DETAIL A3
GUARDRAIL
* EXISTING
SPLICE *
\ EXISTING
GUARDRAIL
* EXISTING
AND A 6'-3" POST SPACING.
POSTS WITH GUARDRAIL TYPE MGS-8
BE LOCATED AT MIDSPAN BETWEEN
DIAGRAM. SPLICE LOCATION WILL
6'-3" POST SPACING DEPICTED IN
* GUARDRAIL TYPE B OR TYPE T WITH
12 GAUGE
SECTIONS
THRIE BEAM
TWO NESTED
REF. LINE
BRIDGE
(REFER TO SHEETS 1 THROUGH 3)
THRIE BEAM EXPANSION SECTION(S)
MICHIGAN DEPARTMENT OF TRANSPORTATION
OF
SHEET
PLAN DATEF.H.W.A. APPROVAL
BUREAU OF DEVELOPMENT STANDARD PLAN FOR
5 6
TH RIE BEA M RETROFIT
BRIDGE RAILIN G,
10-23-2019 B-23-F
(OPEN PA RAPET TY PE BRIDGE RAILIN G)
BRIDGE CURB
FRONT FACE OF
MAX.
BEAM ELEMENT
ADDED GUARDRAIL POST
REFERENCE LINE
1'-6ƒ"
PLA N OF A DDITION AL POST DETAIL
FRONT FACE OF APPROACH CURB
IMMEDIATELY ADJACENT TO STRUCTURE
BLOCK AND OFFSET BLOCK (AS SHOWN)
ELEMENT AND PLACE AN ADDITIONAL POST,
ADDITIONAL HOLES FOR POST BOLTS IN BEAM
WHEN THIS DISTANCE EXCEEDS 3'-1•", DRILL
STRUCTURE REFERENCE LINE
FOR 3'-1•" POST SPACING BEYOND
FIRST SET OF POST BOLT SLOTS
MAINTAINING REQUIRED POST SPACING.
OFFSET BLOCK WIDTH TO LOCATE POST WHILE
IT MAY BE NECESSARY TO INCREASE THE 12"
FOR BRIDGES SKEWED IN DIRECTION SHOWN,
2 SPACES (MINIMUM) @ 3'-1•" 4 SPACES (MINIMUM) @ 1'-6ƒ"
WOOD BLOCKOUTS
RAILING END POST
OPEN-PARAPET BRIDGE5"<
AS NEEDED
DEPTH
ON BLOCK
CENTER HOLES
FRON T SIDE
W OOD BLOCK OU T DETAIL
DIA. HOLES
* DRILL 1"
FOR LAG SCREW
* DRILL •" DIA. HOLE
SEPARATE
OF BLOCK MAY BE
PROJECTING PORTION
SECTION THRU 1'-10" HIGH PARAPET RAILING
PARAPET RAILING. WHERE REQUIRED, SEE
* NOTE: HOLE LOCATIONS SHOWN ARE FOR 2'-3" HIGH
COMBINATION OF SEPARATE BLOCKS
WOOD BLOCKOUTS MAY BE MADE FROM A
7‚"
MIN
.
7†
"
MIN.
HE
IGH
T A
S N
EE
DE
D
6" 1•"
9"
4"
3" DIA. x 1" DEEP COUNTERSINK
BACKWALL
EXISTING
FASCIA
SIDEWALK
EXISTING
ELEV ATION
A A
REFERENCE LINE
BRIDGE
RE
Q'D
AS
REFERENCE LINE
BRIDGE
SECTION A - A
CON CRETE RAILIN G POST DETAIL
OR FORMED)
POST (MAY BE DRILLED
\ 1" DIA. HOLES IN
#6 BARS (TYP.)
EPOXY ANCHORING
\ 9" DEEP HOLE FOR
(2'-8" LONG)
5 - #6 BARS
5"
#6 BARS
7†
"
3"
1'-6"
3"
2-EQUAL SPACES
6"
#4
TIE
BA
RS
1'-
6"
2'-
3"
3"
1'-6"
3"
2-EQUAL SPACES
3"
3"
1'-
0"
6"
2•"
3"
#4 TIE BAR
THRIE BEAM ELEMENT
SAME CROSS SECTION AS
8•" 2"
4‚"
1'-
8"
3…"
7" 12'-6" 6‚"
4"
SLOTTED HOLES
ž " x 5"
SLOTTED HOLES
ž " x 1„"
POST BOLT SLOTS
ƒ" x 2•"
1'-6ƒ" <SPACED AT 1'-6ƒ" <
ƒ" x 3ƒ" SLOTTED HOLES
TH RIE BEA M EXPA N SION SECTION
6 6
MICHIGAN DEPARTMENT OF TRANSPORTATION
OF
SHEET
PLAN DATEF.H.W.A. APPROVAL
BUREAU OF DEVELOPMENT STANDARD PLAN FOR
TH RIE BEA M RETROFIT
BRIDGE RAILIN G,
10-23-2019 B-23-F
(OPEN PA RAPET TY PE BRIDGE RAILIN G)
(SEE WOOD BLOCKOUT DETAIL)
DEPTH AS NEEDED
CURB
FLUSH WITH
SECTION S TH RU PA RAPET RAILIN G
MIN.
0(SEE NOTES)
WASHERS
REFLECTORIZEDNEEDED
DEPTH AS
REINFORCEMENT
TO AVOID
MAY BE ANGLED1" TO 3"
BEH IN D 6" OR 9" W IDE BRU SH BLOCK
1'-10" H IG H PA RAPET RAILIN G
BEH IN D 6" OR 9" W IDE BRU SH BLOCK
2'-3" H IG H PA RAPET RAILIN G
BEH IN D 1'-6" TO 2'-6" W IDE BRU SH BLOCK
2'-3" H IG H PA RAPET RAILIN G
WIDE BRUSHBLOCKS.
SHOWN FOR 6" OR 9"
STUDS AND LAG SCREWS AS
HEIGHT IS 1'-10", PLACE
WHERE PARAPET RAILING
2'-
10
"
6" & 9"
2'-
3ƒ
"
SQUARE WASHERS UNDER OUTSIDE NUTS.
WITH ROUND WASHERS UNDER WELDED NUTS AND
BRIDGE RAILING. \ ‡" DIA. THREADED STUDS
\ 1" DIA. HOLE IN BEAM, WOOD BLOCKOUT AND
WITH ROUND WASHER
GALVANIZED LAG SCREW
AND \ †" DIA. x 5•"
\ ƒ" DIA. HOLE IN BEAM
WITH ROUND WASHER
GALVANIZED LAG SCREW
AND \ †" DIA. x 2•"
\ ƒ" DIA. HOLE IN BEAM
4"
(SEE NOTES)
WASHERS
REFLECTORIZED
HEIGHT
CURB
EXISTING
HEIGHT
CURB
EXISTING
(SEE NOTES)
WASHERS
REFLECTORIZED
HEIGHT
CURB
EXISTING
WITH ROUND WASHER
GALVANIZED LAG SCREW
AND \ †" DIA. x 6"
\ ƒ" DIA. HOLE IN BEAM
WOOD BLOCKOUT
1" TO 3"
6"
6" & 9"
2'-
10"
2'-
1"
4"
1'-6" TO 2'-6"
6ƒ"
MAX.
(SEE WOOD
BLOCKOUT
DETAIL)
4"
2'-
3ƒ
"
2'-
10"
1" TO 3"
STANDARD SPLICE BOLTS.
SHALL BE ATTACHED AT UPPER POST BOLT SLOTS WITH
25'-0" INTERVALS AT BEAM ELEMENT SPLICES. THEY
REFLECTORIZED WASHERS SHALL BE SPACED AT
SECTIONS 807 & 908 OF THE STANDARD SPECIFICATIONS.
ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WTH
SHOWN ON THIS PLAN.
PLAN R-60 SERIES, WHERE APPLICABLE, EXCEPT AS
ANCHORAGES SHALL CONFORM TO THE CURRENT STANDARD
BRIDGE RAILING, THRIE BEAM RETROFIT AND GUARDRAIL
APPROACH GUARDRAIL.
EXISTING OPEN-PARAPET TYPE BRIDGE RAILINGS AND
THIS STANDARD IS INTENDED FOR USE IN UPGRADING OF
NOTES:
STANDARD.
AND LAST BLOCK ON HEADWALL AS DETAILED ON THIS
OF 10'-7ƒ" OR LESS CENTER TO CENTER. PLACE FIRST
BLOCKOUTS FOR THRIE BEAM GUARDRAIL AT A DISTANCE
FOR PRECAST THREE SIDED OR ARCH CULVERTS SPACE
MICHIGAN DESIGN MANUAL ROAD DESIGN
6.03.09 (revised 10-28-2019)
Hot Mix Asphalt (HMA) Mixture Selection Guidelines
This guide is to aid in the selection of Hot Mix Asphalt (HMA) mixtures, asphalt binders and Aggregate Wear Index values. It is the ultimate responsibility of the Region Soils/Materials Engineer to provide appropriate hot mix asphalt and thickness recommendations. Any questions regarding these guidelines should be addressed to either the HMA Unit or the Pavement Design Engineer in the Construction Field Services Division.
A. Rehabilitation, Reconstruction (R&R) and New Construction Projects
1. Mainline Paving
a) Mixture Selection
All mainline paving shall be composed of Superpave mixtures.
Computed Design BESAL’s (HMA Equivalent Single Axle Load) will be used to identify the appropriate Superpave mixture type.
6.03.09A1a (continued)
Superpave Mix Type
Design BESAL (millions)
E03/LVSP Less than 0.3
E1 Between 0.3 and 1.0
E3 Between 1.0 and 3.0
E10 Between 3.0 and 10.0
E30 Between 10.0 and 30.0
E50 Between 30.0 and 100.0
GGSP Between 10.0 and 100.0
GGSP is to only be used as a top course mixture.
Design BESAL’s are calculated using the following information:
Commercial Traffic Traffic Growth Rate Lane Distribution of Commercial Traffic BESAL Axle Load Equivalency for Flexible
Pavement Total accumulated BESAL’s for 20 year
design
The method for calculating ESAL’s for flexible pavements (BESAL’s) is explained in the AASHTO Guide for Design of Pavement Structures, 1993. Design BESAL’s should be requested from the Project Planning Section of the Project Planning Division. The Pavement Design Engineer of the Pavement Management Section of the Construction Field Services Division can provide an approximate BESAL value (for estimating purposes only). Show the 20 year design BESAL’s on the design plans.
b) Superpave Mixture Number Designation and Thickness Guidelines
After mixture selection has been determined, based on design BESAL’s, the mixture number for use in the various pavement courses can be determined. The mixture number will be 2, 3, 4 or 5 depending on the nominal maximum size aggregate. Following are the mixture numbers, minimum/maximum application rates and course type application:
MICHIGAN DESIGN MANUAL ROAD DESIGN
6.06.06C (continued)
Criteria for Use
Detail F - Detail F curb and gutter may be used where a high profile mountable curb is desired and the design speed is 50 mph (45 mph posted) or less. Typical usage would be in areas where Detail C curb and gutter is being replaced or where Detail B or Detail D curb and gutter would not yield sufficient roadside control.
Detail G - Detail G curb and gutter is to be used on urban freeways. See Section 6.06.10.
D. Unlighted Areas
Generally speaking, it is undesirable to introduce or to use a curb, immediately adjacent to the roadway, in unlighted areas.
6.06.07
Deleted
6.06.08 (revised 10-28-2019)
Bridge Approach Curb and Gutter
The type, length, and method of drainage at bridge approaches is the responsibility of the bridge designer. The quantities, however, are included in the road plans when road plans are involved.
The designer will need to meet the design spread requirements in the Drainage Manual, including 100% capture (no bypass flows) during the design event at locations where the curbing ends at the approaches to reduce the risk of erosion of the road embankment. The actual spacing and type of drainage capture device (downspout, catch basin, spillway) will be site specific.
Following is a guide to the use of the bridge approach curb and gutter details shown on Standard Plan R-32-Series with a 4” maximum curb height. It should be emphasized that this criteria is only a guide and that the designer should use engineering judgement in determining the type of structure to use.
Detail 5 - Used on the high ends of bridges where the bridge runoff drains toward the bridge or on the departing ends of bridges when guardrail is not needed.
Detail 6 (and 6A) - Used on the low ends of bridges where moderate amounts of drainage area are involved and fills are less than 10’ high.
Detail 7 (and 7A) - Used on the low ends of bridges where greater amounts of drainage may be expected and in fills greater than 10’ high. One downspout header should be provided for each 3500 sft (approximately) of paved runoff areas or fraction thereof. If it is not readily apparent whether to use Detail 6 or Detail 7, use Detail 7.
If the bridge railing is other than the standard shape, the approach curb and gutter should be modified or transitioned to fit the bridge curb.
MICHIGAN DESIGN MANUAL ROAD DESIGN
6.06.08 (continued)
Bridge Approach Curb and Gutter
The detail and length of Bridge Approach Curb and Gutter should be shown on the plans, and will be paid for as "Curb and Gutter, Bridge Approach" per foot. The length of the Bridge Approach Gutter, used when the bridge barrier railing extends beyond the pavement seat on bridge, is included in the “Curb and Gutter, Bridge Approach” pay item. The concrete spillway is paid for as a continuation of Bridge Approach Curb and Gutter Detail 6 or 6A. The downspout header in Details 7 or 7A is paid for separately, although the pay length for Detail 7 or 7A includes the length occupied by the downspout header.
6.06.09
Concrete Valley Gutter
Michigan's use of valley gutter goes back to 1968, when it was created in response to an FHWA insistence on flush shoulders on freeways. Initially, it was located where curb and gutter had been used previously, between the travel lanes and the paved shoulder. More recent practice, and that used currently, places the valley gutter on the outside of the shoulder, adjacent to concrete median barrier, if there is one. On the outside, it would be placed adjacent to single face barrier. When there is no concrete barrier on the outside, concrete curb and gutter, or one of the urban freeway curbs, should be used in place of the valley gutter.
6.06.10
Urban Freeway Curb
Standard Plan R-33-Series illustrates an urban freeway curb and gutter, and a concrete valley gutter. Application of these curb details is as follows:
Detail G1 - Detail G1 curb and gutter is designed to be used on urban freeways and is to be placed only in cut sections and in front of retaining walls. This curb is to be placed on the outside edge of shoulder to reduce the potential of earth to slough onto the shoulder and also to control drainage. Use Cover W, Standard Plan R-23-Series or any drainage structure cover designed to fit a 24” gutter pan.
Detail G2 - Detail G2 is similar to Detail G1, except the wider gutter pan allows the use of Cover V, as on Standard Plan R-22-Series.
These urban curb details may be used in other situations when approved.
6.06.11
Integral Curb
See Standard Plan R-31-Series.
Unless otherwise specified in the plans or proposal, the contractor may cast curb or curb and gutter integrally with concrete pavement, at his option. Integral curb has the advantage of eliminating a longitudinal joint and the attendant possibility of water leakage into the subgrade. If widening of the pavement is in the foreseeable future, the integral option should be prohibited. Generally, it would not be used with concrete base course. Designers are cautioned not to inadvertently prohibit the construction of integral curb by failing to list Standard Plan R-31-Series on the note sheet.
ROAD DESIGN MANUAL ROAD DESIGN
7.01.16 (revised 10-28-2019)
Guardrail Attachment to Bridges and Walls
The following guardrail anchorage details are in current use for new construction and where specified for upgrading and are detailed on Standard Plans R-67-Series, B-22-Series, B-23-Series:
A. Guardrail Anchorage, Bridge, Details M1 & M4 (See Standard Plan R-67-Series)
Current Use:When connecting Guardrail, Type MGS-8 to Bridge Railing, 2-Tube, 4-Tube, Aesthetic Parapet Tube, 3 Tube with Pickets, Concrete Block Retrofit, Type 6, Type 7, or Single Face Concrete Barrier without expansion at backwall (M1) or with expansion at backwall (M4).
B. Guardrail Anchorage, Bridge, Details M2 & M5 (See Standard Plan R-67-Series)
Current Use: When connecting Guardrail, Type T to Bridge Railing, 2-Tube, 4-Tube, Aesthetic Parapet Tube, 3 Tube with Pickets, Concrete Block Retrofit, Type 6, Type 7, or Single Face Concrete Barrier without expansion at backwall (M2) or with expansion at backwall (M5).
C. Guardrail Anchorage, Bridge, Details M3 & M6 (See Standard Plan R-67-Series)
Current Use: When connecting Guardrail, Type B to Bridge Railing, 2-Tube, 4-Tube, Aesthetic Parapet Tube, 3 Tube with Pickets, Concrete Block Retrofit, Type 6, Type 7, or Single Face Concrete Barrier without expansion at backwall (M3) or with expansion at backwall (M6).
7.01.16 (continued)
D. Guardrail Anchorage, Bridge, Details M7, M8 & M9 (See Standard Plan R-67-Series)
Current Use: When connecting Guardrail, Type MGS-8 (M7), Type T (M8) or Type B (M9) to Filler Wall.
E. Guardrail Anchorage, Bridge, Detail A3 (See Standard Plans B-22-Series and B-23-Series)
Current Use:When connecting Guardrail, Type MGS-8 to Bridge Railing, Thrie Beam Retrofit.
F. Guardrail Anchorage, Bridge, Detail A4 (See Standard Plans B-22-Series and B-23-Series)
Current Use: When connecting Guardrail, Type T to Bridge Railing, Thrie Beam Retrofit.
G. Guardrail Anchorage, Bridge, Detail A5 (See Standard Plans B-22-Series and B-23-Series)
Current Use: When connecting Guardrail, Type B to Bridge Railing, Thrie Beam Retrofit.
H. Need for Additional Expansion
The Guardrail Anchorage, Bridge details on Standard Plan R-67-Series will accommodate thermal deck movement up to about 4". If the expected thermal deck movement will exceed 4", the Road designer should consult with the Bridge designer to decide the method for providing the additional expansion required in the guardrail.
MICHIGAN DESIGN MANUAL BRIDGE DESIGN
7.03.09 (continued)
Piles
A. General
8. Pile Batter
Generally, piles are to be battered no flatter than 3V:1H. Where soil conditions are not good enough to provide sufficient lateral pile resistance, we may increase the angle of batter to 2.5V:1H or even 2V:1H. This measure, however, should be a last resort since it is difficult to maintain driving accuracy when the batter is flatter than 3V:1H.
If a 2.5V:1H or 2V:1H batter is shown on the plans, note 8.06.05 G must be added to the plans.
9. Cast-in-Place Concrete Pile Shells
The minimum pile shell thickness shall be 0.312”. (8-20-2012)
10. Pile Numbering
A pile numbering scheme shall be shown on the plans for those units having piles. Each pile shall be assigned a number in a particular row or on an individual basis.
11. Pile Driving Vibration Evaluation (11-28-2011)
Driven piles located within a distance of 100 ft of historic or vibration sensitive structures shall be evaluated for damage potential from vibration and/or vibration induced settlement.
Driven piles shall not be located within a 25 ft radius of existing spread footings, critical utilities, or in-service pavements without mitigation and/or vibration and settlement monitoring specifications.
12. Loads Applied to Piles
Piles are to be designed for compression, shear, and/or moment loads only. Piles are not to be designed for tension loads unless approved by the MDOT Geotechnical Services Section.
(10-28-2019)
7.03.09 (continued)
B. Pile Capacity
In general, the specified capacity shown on the plans and used in the substructure design should be 60 tons. In some cases, the soil profile will indicate that a higher or lower specified capacity would be more economical. The recommendation from the Geotechnical Services Section will indicate what pile capacity to use. (2-26-2018)
1. Steel H Piles
The maximum design load on steel H piles shall not exceed the following:
HP 8x36 45 tons
HP 10x42 55 tons
HP 12x53 70 tons
HP 14x73 95 tons
2. Cast-in-Place Concrete Piles
The maximum design load on cast-in-place concrete piles shall not exceed the following:
10¾" O.D. 45 tons
12" O.D. 65 tons
12¾” O.D. 75 tons
14" O.D. 90 tons
MICHIGAN DESIGN MANUAL BRIDGE DESIGN - CHAPTER 7: LRFD
7.03.09 (continued)
Piles
A. General
4. Test Piles
Test piles are to be provided for all projects using piles unless the Geotechnical Services Section determine that they are not necessary. (2-26-2018)
At least two test piles shall be provided for at each substructure unit placed on piles.
Timber test piles shall be located in a manner that will best serve as a basis for ordering the balance of the piles.
5. Pile Embedment
Piles are to be extended into the footing a distance of 6". When a tremie seal is used, the piles are to be extended into the footing a distance of 1'-0".
6. Concrete Displaced by Piles
No deductions in concrete quantities will be made for steel pile embedments or for pipe pile embedments of 1'-0" or less.
7. Edge Distance
The usual minimum edge distance for piles is 1'-6". This may be reduced to 1'3" where special conditions require.
8. Abutment Piling
When piling is required for abutments, a careful study should be made to ensure that the piling will clear previously placed or proposed culvert pipe.
7.03.09 (continued)
9. Pile Batter
Generally, piles are to be battered no flatter than 3V:1H. Where soil conditions are not good enough to provide sufficient lateral pile resistance, we may increase the angle of batter to 2.5V:1H or even 2V:1H. This measure, however, should be a last resort since it is difficult to maintain driving accuracy when the batter is flatter than 3V:1H.
10. Pile Numbering
A pile numbering scheme shall be shown on the plans for those units having piles. Each pile shall be assigned a number in a particular row or on an individual basis.
11. Lateral Pile Resistance (8-20-2009)
Lateral pile resistance as determined by a Geotechnical Engineer may be used to resist horizontal forces on substructure. See AASHTO LRFD Bridge Design Specification 10.7.
Scour potential for the structure shall be accounted for when the Geotechnical Engineer determines nominal horizontal pile resistance.
12. Pile Driving Vibration Evaluation (11-28-2011)
Driven piles located within a distance of 100 ft of historic or vibration sensitive structures shall be evaluated for damage potential from vibration and/or vibration induced settlement.
Driven piles shall not be located within a 25 ft radius of existing spread footings, critical utilities, or in-service pavements without mitigation and/or vibration and settlement monitoring specifications.
13. Loads Applied to Piles
Piles are to be designed for compression, shear, and/or moment loads only. Piles are not to be designed for tension loads unless approved by the MDOT Geotechnical Services Section.
(10-28-2019)
MICHIGAN DESIGN MANUAL BRIDGE DESIGN
7.03.13
Drilled Shafts (3-26-2018)
Due to relative ease of construction and economy, driven piles are generally preferred for most deep bridge foundations. For unique structures with high vertical or lateral loads, limited footprint, or at sites with deep scour, shallow rock or hardpan, or where foundations are to be built adjacent to vibration sensitive structures, drilled shaft foundations may be appropriate. Drilled shafts are most ideal for sites where short, permanently cased shafts can be socketed into rock or hard pan.
Feasibility of drilled shafts for bridge foundations is subject to the approval of the MDOT Foundation Analysis Engineer. Guidelines used for feasibility evaluation follow:
A. Avoid use of drilled shafts if soil boring logs indicate the presence of gas pockets, artesian/confined aquifers, or nested cobbles/boulders.
B. Shafts up to 50 feet in length, bearing in hard pan or rock, are acceptable. Longer shafts are difficult to case and should be avoided with one possible exception; that being sites where deep lacustrine clay overlies hardpan or rock.
C. Due to increased construction risk, avoid uncased shafts in the drift. Permanent casing, sealed into the competent strata below the drift, is the preferred construction scenario. Temporary cased or uncased designs will be evaluated based on the merits of the site and typical contractor tooling.
7.03.13 (continued)
D. In the absence of a site specific load test program, shafts must be sized such that the full factored geotechnical resistance, is derived from either shaft resistance or end resistance.
1. Friction shafts must develop the full factored vertical side resistance in hardpan and/or rock.
2. End-bearing shafts must be sized such that the full factored vertical resistance is derived from end- bearing on rock or hard pan.
E. Belled drilled shafts are prohibited.
F. Drilled shafts in gas bearing formations are prohibited.
G. Drilled shafts are to be designed for compression, shear, torsion, and/or moment loads only. Drilled shafts are not to be designed for tension loads unless approved by the MDOT Geotechnical Services Section. (10-28-2019)
Contact MDOT’s Geotechnical Services Section with questions.
MICHIGAN DESIGN MANUAL BRIDGE DESIGN - CHAPTER 7: LRFD
7.03.13
Drilled Shafts (3-26-2018)
Due to relative ease of construction and economy, driven piles are generally preferred for most deep bridge foundations. For unique structures with high vertical or lateral loads, limited footprint, or at sites with deep scour, shallow rock or hardpan, or where foundations are to be built adjacent to vibration sensitive structures, drilled shaft foundations may be appropriate. Drilled shafts are most ideal for sites where short, permanently cased shafts can be socketed into rock or hard pan.
Feasibility of drilled shafts for bridge foundations is subject to the approval of the MDOT Foundation Analysis Engineer. Guidelines used for feasibility evaluation follow:
A. Avoid use of drilled shafts if soil boring logs indicate the presence of gas pockets, artesian/confined aquifers, or nested cobbles/boulders.
B. Shafts up to 50 feet in length, bearing in hard pan or rock, are acceptable. Longer shafts are difficult to case and should be avoided with one possible exception; that being sites where deep lacustrine clay overlies hardpan or rock.
C. Due to increased construction risk, avoid uncased shafts in the drift. Permanent casing, sealed into the competent strata below the drift, is the preferred construction scenario. Temporary cased or uncased designs will be evaluated based on the merits of the site and typical contractor tooling.
7.03.13 (continued)
D. In the absence of a site specific load test program, shafts must be sized such that the full factored geotechnical resistance, is derived from either shaft resistance or end resistance.
1. Friction shafts must develop the full factored vertical side resistance in hardpan and/or rock.
2. End-bearing shafts must be sized such that the full factored vertical resistance is derived from end- bearing on rock or hard pan.
E. Belled drilled shafts are prohibited.
F. Drilled shafts in gas bearing formations are prohibited.
G. Drilled shafts are to be designed for compression, shear, torsion, and/or moment loads only. Drilled shafts are not to be designed for tension loads unless approved by the MDOT Geotechnical Services Section. (10-28-2019)
Contact MDOT’s Geotechnical Services Section with questions.