RMDCN Technical Solution RMDCN Workshop, 18-20 Jan 99 ECMWF/TB-1 RMDCN Technical Solution Tony Bakker WAN Group Leader, Network Section ECMWF

Transcript of RMDCN Technical Solution RMDCN Workshop, 18-20 Jan 99ECMWF/TB-1 RMDCN Technical Solution Tony Bakker...

Page 1: RMDCN Technical Solution RMDCN Workshop, 18-20 Jan 99ECMWF/TB-1 RMDCN Technical Solution Tony Bakker WAN Group Leader, Network Section ECMWF.

RMDCN Technical Solution

RMDCN Workshop, 18-20 Jan 99 ECMWF/TB-1

RMDCNTechnical Solution

Tony Bakker

WAN Group Leader, Network Section

ECMWF

Page 2: RMDCN Technical Solution RMDCN Workshop, 18-20 Jan 99ECMWF/TB-1 RMDCN Technical Solution Tony Bakker WAN Group Leader, Network Section ECMWF.

RMDCN Technical Solution

RMDCN Workshop, 18-20 Jan 99 ECMWF/TB-2

Agenda (1)

• Background & Requirements

• EQUANT Solution– Access

• Frame Relay

• X25 access

– X25-Frame Relay Gateway

Page 3: RMDCN Technical Solution RMDCN Workshop, 18-20 Jan 99ECMWF/TB-1 RMDCN Technical Solution Tony Bakker WAN Group Leader, Network Section ECMWF.

RMDCN Technical Solution

RMDCN Workshop, 18-20 Jan 99 ECMWF/TB-3

Agenda (2)

• Backup options– ISDN/PSTN Dialup– Mission Critical environment

• TCP/IP Issues

• Prioritisation

• Network Monitoring

Page 4: RMDCN Technical Solution RMDCN Workshop, 18-20 Jan 99ECMWF/TB-1 RMDCN Technical Solution Tony Bakker WAN Group Leader, Network Section ECMWF.

RMDCN Technical Solution

RMDCN Workshop, 18-20 Jan 99 ECMWF/TB-4

Background (1)

• Jan 1993: Working group on Planning and Implementation of the WWW in Region VI:– identified the necessity for GTS reorganization

• Sep 1993: Subgroup on regional aspects of GTS– first proposal for modernisation of RMTN

• 1994 - RMDCN Steering Group established

• 1996 - RFI/RFQ for MDN

Page 5: RMDCN Technical Solution RMDCN Workshop, 18-20 Jan 99ECMWF/TB-1 RMDCN Technical Solution Tony Bakker WAN Group Leader, Network Section ECMWF.

RMDCN Technical Solution

RMDCN Workshop, 18-20 Jan 99 ECMWF/TB-5

Background (2)

• 1997: Steering group recommendation:– A MDN provides a cost effective way for

providing the requirements for an RMDCN– Requested ECMWF to lead and co-ordinate the

procurement, implementation and operational phase for all countries

– establish a Contract Advisory Committee

• Jun 1997: ECMWF Council accepts timetable for RMDCN project

Page 6: RMDCN Technical Solution RMDCN Workshop, 18-20 Jan 99ECMWF/TB-1 RMDCN Technical Solution Tony Bakker WAN Group Leader, Network Section ECMWF.

RMDCN Technical Solution

RMDCN Workshop, 18-20 Jan 99 ECMWF/TB-6

Background (3)

• Nov 1997: RMDCN Contract Advisory Committee and ECMWF– start preperation of ITT Documents

• Apr 1998: ITT

• Dec 1998 - ECMWF Council approves RMDCN Contract with EQUANT

Page 7: RMDCN Technical Solution RMDCN Workshop, 18-20 Jan 99ECMWF/TB-1 RMDCN Technical Solution Tony Bakker WAN Group Leader, Network Section ECMWF.

RMDCN Technical Solution

RMDCN Workshop, 18-20 Jan 99 ECMWF/TB-7

Regional Meteorological Telecommunication Network for Region VI (Europe)point-to-point circuits implementation (transmission speed in kilobit/s) - October 1997

Dublin

SkopjeBaku

Yerevan

Tirana

Beirut

Washington

Beijing

Nairobi

Algiers

Cairo

New Delhi

Jeddah

Casablanca

TripoliTunis

Cairo

Beijing

RTH

NMC

Centre in other region

MTN circuit

Regional circuit

Interregional circuit

Norrköping

Rome

Ljubljana

ECMWF

Copenhagen

Madrid

Athens

Brussels

Belgrade

Kishenev

Kiev

Tbilisi

Bucharest

Helsinki

Oslo

Zagreb

WarsawMinsk

Malta

Amman

Bet Dagan

Reykjavik

SondreStormfjord

De Bilt

Lisbon

ViennaBudapest

Bratislava

Vilnius

Riga

Tallin

Bracknell

Prague

Zurich

Offenbach

Damascus

Ankara

Sofia

Larnaca

Khabarovsk

Novosibirsk

Tashkent

Tehran

Hanoi

128

64

64

64

14.4

9.6

28.8

9.6

28.8

9.6

9.6

9.6

9.6

4.8

4.8

7.2

0.1

2.4

0.05

9.664

9.6

0.15

2.42.4

0.05

0.05

N/O

2.4

9.6

9.6

2.4

24.2

9.6

9.6

0.05

0.05

9.6

9.6

9.6

9.6

Nairobi

Toulouse

640.05

9.6Moscow

0.05

7.2

640.05

N/O

9.6

0.050.05

0.1

0.2

19.2

9.6

64

9.6

19.2

19.2

7.2

9.6

0.1

9.6

9.6

0.2

N/O

N/O

N/O N/O

9.6

9.6

19.2

2.4

2.4

9.6

2.4

9.6

9.6

7.2

38.4

9.69.6

9.6

14.4

9.6

N/04.8

9.69.6

7.2

N/O

9.6N/O

9.6

N/O

Dakar

FIGURE 1

0.1

Page 8: RMDCN Technical Solution RMDCN Workshop, 18-20 Jan 99ECMWF/TB-1 RMDCN Technical Solution Tony Bakker WAN Group Leader, Network Section ECMWF.

RMDCN Technical Solution

RMDCN Workshop, 18-20 Jan 99 ECMWF/TB-8

a

FRANCE

FINLAND

TURKEYITALY

SPAIN

IRELAND

GREECE

NORWAY

DENMARK

NETHERLANDS

PORTUGAL

SWEDEN

SWITZERLAND

32 kb/s

56 kb/s

64 kb/s

128 kb/s

256 kb/s

512 kb/s

2 Mb/s

GERMANYAUSTRIA

HUNGARY

ICELAND

U.K.

CROATIA

SLOVENIA

BELGIUM

JULY 1998

ECNETThe ECMWF external telecommunications

network

Page 9: RMDCN Technical Solution RMDCN Workshop, 18-20 Jan 99ECMWF/TB-1 RMDCN Technical Solution Tony Bakker WAN Group Leader, Network Section ECMWF.

RMDCN Technical Solution

RMDCN Workshop, 18-20 Jan 99 ECMWF/TB-9

Requirements

• combine the two networks – RAVI GTS & ECMWF

• cost savings• technological improvements• fully managed network - uniform service

level• high availability• prioritisation of traffic• multi-protocol (IP, X.25, DECnet)

Page 10: RMDCN Technical Solution RMDCN Workshop, 18-20 Jan 99ECMWF/TB-1 RMDCN Technical Solution Tony Bakker WAN Group Leader, Network Section ECMWF.

RMDCN Technical Solution

RMDCN Workshop, 18-20 Jan 99 ECMWF/TB-10

ECMWF- Dissemination of products (to Member States)- Observations (from Member States)- Interactive sessions- data transfers to/from Member States

GTS- Observations- Forecast data- low priority messages- other data

Page 11: RMDCN Technical Solution RMDCN Workshop, 18-20 Jan 99ECMWF/TB-1 RMDCN Technical Solution Tony Bakker WAN Group Leader, Network Section ECMWF.

RMDCN Technical Solution

RMDCN Workshop, 18-20 Jan 99 ECMWF/TB-11

EQUANT Solution (1)

• Frame Relay Access Service

• complemented by X25 Access Service

• create a Virtual Private Network

• LAN Access Service– fully managed CISCO router service

• Management of Access Line– liaise with PTT (line order, fault reports, etc)

Page 12: RMDCN Technical Solution RMDCN Workshop, 18-20 Jan 99ECMWF/TB-1 RMDCN Technical Solution Tony Bakker WAN Group Leader, Network Section ECMWF.

RMDCN Technical Solution

RMDCN Workshop, 18-20 Jan 99 ECMWF/TB-12

EQUANT Solution (2)

• X25 - Frame Relay Gateway

• TCP/IP as transport protocol– irrespective of access method– X25 encapsulated (XOT)

Page 13: RMDCN Technical Solution RMDCN Workshop, 18-20 Jan 99ECMWF/TB-1 RMDCN Technical Solution Tony Bakker WAN Group Leader, Network Section ECMWF.

RMDCN Technical Solution

RMDCN Workshop, 18-20 Jan 99 ECMWF/TB-13

SITA/EQUANT POP

LAN Access router

Leased line

Virtual Circuit

KEY

EQUANTGlobalNetworkGlobalNetwork

EQUANT Solution

Page 14: RMDCN Technical Solution RMDCN Workshop, 18-20 Jan 99ECMWF/TB-1 RMDCN Technical Solution Tony Bakker WAN Group Leader, Network Section ECMWF.

RMDCN Technical Solution

RMDCN Workshop, 18-20 Jan 99 ECMWF/TB-14

EQUANTGlobal Network

Access Line

LAN

X25 switchMSS

CPEPOP

Access

Page 15: RMDCN Technical Solution RMDCN Workshop, 18-20 Jan 99ECMWF/TB-1 RMDCN Technical Solution Tony Bakker WAN Group Leader, Network Section ECMWF.

RMDCN Technical Solution

RMDCN Workshop, 18-20 Jan 99 ECMWF/TB-15

LAN

X25 switchMSS

POP

CPE

LAN

X25 switchMSS

CPEPOP

EQUANTGlobalNetwork

FR

FR

pvcFrame Relay Access Service

Page 16: RMDCN Technical Solution RMDCN Workshop, 18-20 Jan 99ECMWF/TB-1 RMDCN Technical Solution Tony Bakker WAN Group Leader, Network Section ECMWF.

RMDCN Technical Solution

RMDCN Workshop, 18-20 Jan 99 ECMWF/TB-16

POP

Access Line

FR

CPE

XOT

TCP/IP

pvc

pvc

pvc

pvc

X25

TCP/IP

POP

POP

POP

POP

Equant GlobalNetwork

Frame Relay Access Service

Page 17: RMDCN Technical Solution RMDCN Workshop, 18-20 Jan 99ECMWF/TB-1 RMDCN Technical Solution Tony Bakker WAN Group Leader, Network Section ECMWF.

RMDCN Technical Solution

RMDCN Workshop, 18-20 Jan 99 ECMWF/TB-17

GWPOP

LAN

X25 switchMSS

POP

CPE

LAN

X25 switchMSS

CPEPOP

EQUANTGlobalNetwork

Frame Relay

X25

pvc

svc

X25 Access Service

Page 18: RMDCN Technical Solution RMDCN Workshop, 18-20 Jan 99ECMWF/TB-1 RMDCN Technical Solution Tony Bakker WAN Group Leader, Network Section ECMWF.

RMDCN Technical Solution

RMDCN Workshop, 18-20 Jan 99 ECMWF/TB-18

POP

Access Line

X25

CPE

XOT

TCP/IP

svc

svc

X25

TCP/IP

POP

POP

EQUANT GlobalNetwork

X25 Access ServiceGW

POP

CPE

CPE FR

X25

Page 19: RMDCN Technical Solution RMDCN Workshop, 18-20 Jan 99ECMWF/TB-1 RMDCN Technical Solution Tony Bakker WAN Group Leader, Network Section ECMWF.

RMDCN Technical Solution

RMDCN Workshop, 18-20 Jan 99 ECMWF/TB-19

X25-Frame Relay Gateway

• communication between Frame Relay and X25 connected Sites

• configuration– Special purpose CISCO routers– two different locations within the EQUANT

RMDCN VPN– fully managed by EQUANT

Page 20: RMDCN Technical Solution RMDCN Workshop, 18-20 Jan 99ECMWF/TB-1 RMDCN Technical Solution Tony Bakker WAN Group Leader, Network Section ECMWF.

RMDCN Technical Solution

RMDCN Workshop, 18-20 Jan 99 ECMWF/TB-20

Backup options

• ISDN/PSTN backup– box before CPE serial interface

• Mission Critical– Dual Access Line– Dual CPE– CISCO HSRP– shadow PVC

Page 21: RMDCN Technical Solution RMDCN Workshop, 18-20 Jan 99ECMWF/TB-1 RMDCN Technical Solution Tony Bakker WAN Group Leader, Network Section ECMWF.

RMDCN Technical Solution

RMDCN Workshop, 18-20 Jan 99 ECMWF/TB-21

ISDN Dial Backup

EQUANTGlobal NetworkAccess Line

CPEPOPXM M

Page 22: RMDCN Technical Solution RMDCN Workshop, 18-20 Jan 99ECMWF/TB-1 RMDCN Technical Solution Tony Bakker WAN Group Leader, Network Section ECMWF.

RMDCN Technical Solution

RMDCN Workshop, 18-20 Jan 99 ECMWF/TB-22

Mission Critical

EQUANTGlobal Network

CPEPOPXM M

CPEPOP

M M

HSRPHost POP

CPE

Page 23: RMDCN Technical Solution RMDCN Workshop, 18-20 Jan 99ECMWF/TB-1 RMDCN Technical Solution Tony Bakker WAN Group Leader, Network Section ECMWF.

RMDCN Technical Solution

RMDCN Workshop, 18-20 Jan 99 ECMWF/TB-23

TCP/IP Issues

• Public IP Network Addresses– LAN interface– X25 interface

• EQUANT can provide IP Network Address Range if necessary

• IP routing options– Static routes– OSPF with filtering

Page 24: RMDCN Technical Solution RMDCN Workshop, 18-20 Jan 99ECMWF/TB-1 RMDCN Technical Solution Tony Bakker WAN Group Leader, Network Section ECMWF.

RMDCN Technical Solution

RMDCN Workshop, 18-20 Jan 99 ECMWF/TB-24

Prioritisation

• Standard CISCO options– custom queuing– priority queues– weighted fair queueing

• works on output buffer of PVC

• preference for custom queuing– allocate amount of buffer to traffic pattern

based on src-dest-port (IP level)

Page 25: RMDCN Technical Solution RMDCN Workshop, 18-20 Jan 99ECMWF/TB-1 RMDCN Technical Solution Tony Bakker WAN Group Leader, Network Section ECMWF.

RMDCN Technical Solution

RMDCN Workshop, 18-20 Jan 99 ECMWF/TB-25

Network Monitoring

• EQUANT tools:– SITAVISION: VPN view

• HP Openview add-on

• Allows to monitor all RMDCN CPE interfaces

– TTVISION: Trouble Ticket

• ECMWF will monitor the network and report regularly to RA VI via the RMDCN CAC and the RMDCN Operations Committee (ROC)