River Road AreaRiver Road AreaSewer ImprovementsSewer Improvements
Neighborhood Advisory Committee
June 24, 2004
![Page 2: River Road Meeting 6-24-04](https://reader036.fdocuments.us/reader036/viewer/2022062513/555e8aa2d8b42a0d738b46ea/html5/thumbnails/2.jpg)
Today’s MeetingToday’s Meeting
• Program Overview – Video
• Role of the Committee
• Sanitary Sewer Overflows
• River Road Projects
• Next Meeting Date
![Page 3: River Road Meeting 6-24-04](https://reader036.fdocuments.us/reader036/viewer/2022062513/555e8aa2d8b42a0d738b46ea/html5/thumbnails/3.jpg)
Role of the CommitteeRole of the Committee
• Provide input and feedback
• Independent and objective review
• Serve for duration of projects
![Page 4: River Road Meeting 6-24-04](https://reader036.fdocuments.us/reader036/viewer/2022062513/555e8aa2d8b42a0d738b46ea/html5/thumbnails/4.jpg)
What You Can DoWhat You Can Do
• Listen to the presentations and issues that are presented to you
• Offer your honest opinions on the issue
• Work with us to help find constructive solutions
• Help educate others on the project
![Page 5: River Road Meeting 6-24-04](https://reader036.fdocuments.us/reader036/viewer/2022062513/555e8aa2d8b42a0d738b46ea/html5/thumbnails/5.jpg)
Sanitary Sewer OverflowsSanitary Sewer Overflows
• Nine Sanitary Sewer Overflows in Toledo• 4 in the River Road Area• 2 in the Parkside Area• 3 in Point Place
• Must be eliminated by November of 2006• Stiff penalties for missed deadlines
![Page 6: River Road Meeting 6-24-04](https://reader036.fdocuments.us/reader036/viewer/2022062513/555e8aa2d8b42a0d738b46ea/html5/thumbnails/6.jpg)
Past & Ongoing River Past & Ongoing River Road Area ProjectsRoad Area Projects• Sanitary sewer study – 2000/2001
• Storm sewer study – 2002/2003
• Sewer lining – 2002/ongoing
• Copland storm sewer – 2002
• Beverly/Medford storm sewer – 2004/ongoing
![Page 7: River Road Meeting 6-24-04](https://reader036.fdocuments.us/reader036/viewer/2022062513/555e8aa2d8b42a0d738b46ea/html5/thumbnails/7.jpg)
Proposed River Road Proposed River Road Area ProjectsArea Projects• Underground Equalization Basin – Brookford
Park
• Underground Pump Station – Brookford Park
• New Force Main Sewer – Brookford
• New Relief Sewer– Beverly and River Road
• Beverly Pump Station – West of Trail
![Page 8: River Road Meeting 6-24-04](https://reader036.fdocuments.us/reader036/viewer/2022062513/555e8aa2d8b42a0d738b46ea/html5/thumbnails/8.jpg)
River Road SSOsRiver Road SSOs
(insert map showing locations)
![Page 9: River Road Meeting 6-24-04](https://reader036.fdocuments.us/reader036/viewer/2022062513/555e8aa2d8b42a0d738b46ea/html5/thumbnails/9.jpg)
Project SchedulesProject Schedules
• Projects will be built concurrently
• Construction bids – October/November 2004
• Break Ground – Early 2005
• Completed by November 2006
![Page 10: River Road Meeting 6-24-04](https://reader036.fdocuments.us/reader036/viewer/2022062513/555e8aa2d8b42a0d738b46ea/html5/thumbnails/10.jpg)
Equalization BasinEqualization Basin
• Designed to eliminate need to discharge raw sewage into the Maumee River during heavy rains.
• Will hold wastewater at “peak” times when flow of waste exceeds sewer system capacity.
• When the rain lets up, wastewater in the basin sent to plant for treatment
![Page 11: River Road Meeting 6-24-04](https://reader036.fdocuments.us/reader036/viewer/2022062513/555e8aa2d8b42a0d738b46ea/html5/thumbnails/11.jpg)
Equalization BasinEqualization Basin
• Underground facility
• To be located at Brookford Park ball diamond site• Tanks from old Toledo Water Plant currently
located there
• 3 million gallon storage capacity
• 120 ft. x 240 ft.
• 17 ft. deep
![Page 12: River Road Meeting 6-24-04](https://reader036.fdocuments.us/reader036/viewer/2022062513/555e8aa2d8b42a0d738b46ea/html5/thumbnails/12.jpg)
Equalization BasinEqualization Basin
![Page 13: River Road Meeting 6-24-04](https://reader036.fdocuments.us/reader036/viewer/2022062513/555e8aa2d8b42a0d738b46ea/html5/thumbnails/13.jpg)
EQ Basin EQ Basin Issues & DiscussionIssues & Discussion• Construction
Access Road• From River Road
to site (between playgrounds)
• Reduces amount of construction equipment entering site from Brookford
• Could disrupt playground areas
![Page 14: River Road Meeting 6-24-04](https://reader036.fdocuments.us/reader036/viewer/2022062513/555e8aa2d8b42a0d738b46ea/html5/thumbnails/14.jpg)
Issues and DiscussionIssues and Discussion
• Baseball field• Will be lost for one season due to construction• Alternative options for replacement of the field
![Page 15: River Road Meeting 6-24-04](https://reader036.fdocuments.us/reader036/viewer/2022062513/555e8aa2d8b42a0d738b46ea/html5/thumbnails/15.jpg)
Brookford Park Brookford Park Pump StationPump Station• Located next to
Equalization Basin
• Bulk of facility underground
• Control panel above ground
• Will pump waste from River Road sewer to equalization basin
![Page 16: River Road Meeting 6-24-04](https://reader036.fdocuments.us/reader036/viewer/2022062513/555e8aa2d8b42a0d738b46ea/html5/thumbnails/16.jpg)
Beverly Pump StationBeverly Pump Station
• Underground – with control panel(s) above ground
• Will pump waste from Beverly sewer to new EQ basin
![Page 17: River Road Meeting 6-24-04](https://reader036.fdocuments.us/reader036/viewer/2022062513/555e8aa2d8b42a0d738b46ea/html5/thumbnails/17.jpg)
Force Main SewerForce Main Sewer
• New sewer from Beverly pump station on west side of Anthony Wayne Trail down Brookford to the Equalization Basin
• To be located on south side of Brookford
• Shouldn’t disturb street – except for crossings at OLPH and Island Avenue
• Traffic maintained• Will work with committee to minimize disruption
![Page 18: River Road Meeting 6-24-04](https://reader036.fdocuments.us/reader036/viewer/2022062513/555e8aa2d8b42a0d738b46ea/html5/thumbnails/18.jpg)
New Relief SewersNew Relief Sewers
• From River Road, Midland or Hemlock down River Road to Brookford
• New water line will be installed at same time• Should help resolve water pressure problems
• Preferred sewer location is in east lane of River Road
• Discussion
![Page 19: River Road Meeting 6-24-04](https://reader036.fdocuments.us/reader036/viewer/2022062513/555e8aa2d8b42a0d738b46ea/html5/thumbnails/19.jpg)
New Relief SewersNew Relief Sewers
• On Beverly from Brookford to Medford
• Both relief sewer lines should help alleviate basement flooding in area