Continuous Flow Hybrid Intersection Indian River Road and ...€¦ · Continuous Flow Hybrid...

16
Continuous Flow Hybrid Intersection Indian River Road and Kempsville Road Improvements City of Virginia Beach Taha Ataya, P.E. Senior Project Manager Transportation Division July 12, 2012 UCI Annual Meeting

Transcript of Continuous Flow Hybrid Intersection Indian River Road and ...€¦ · Continuous Flow Hybrid...

Page 1: Continuous Flow Hybrid Intersection Indian River Road and ...€¦ · Continuous Flow Hybrid Intersection . Indian River Road and Kempsville . Road Improvements . City of Virginia

Continuous Flow Hybrid Intersection Indian River Road and Kempsville

Road Improvements City of Virginia Beach

Taha Ataya, P.E.

Senior Project Manager Transportation Division

July 12, 2012

UCI Annual Meeting

Page 2: Continuous Flow Hybrid Intersection Indian River Road and ...€¦ · Continuous Flow Hybrid Intersection . Indian River Road and Kempsville . Road Improvements . City of Virginia

Current Conditions

Most congested intersection in the City.

Access and maintenance issues.

105,000 Vehicles Per Day

Page 3: Continuous Flow Hybrid Intersection Indian River Road and ...€¦ · Continuous Flow Hybrid Intersection . Indian River Road and Kempsville . Road Improvements . City of Virginia

Signalized Intersections - V/C Rank

-120%

-70%

-20%

30%

80%

1 7 13

19

25

31

37

43

49

55

61

67

73

79

85

91

97

103

109

115

121

127

133

139

145

151

157

163

169

175

181

187

193

199

205

211

217

223

229

235

241

247

253

259

265

271

277

283

289

295

301

307

313

319

325

331

337

343

Nee

ded

Cap

acity

E

xces

s C

apac

ity

Capacity of Signalized Intersections

Excess Capacity

Needed Capacity

Volume / Capacity = 1.0

Indian River at Lake James

Indian River at Centerville

Indian River at Kempsville

Volume / Capacity = 1.0

Indian River at Kempsville

Page 4: Continuous Flow Hybrid Intersection Indian River Road and ...€¦ · Continuous Flow Hybrid Intersection . Indian River Road and Kempsville . Road Improvements . City of Virginia

Indian River Road-Kempsville Road

Page 5: Continuous Flow Hybrid Intersection Indian River Road and ...€¦ · Continuous Flow Hybrid Intersection . Indian River Road and Kempsville . Road Improvements . City of Virginia

Balancing Needs

Three traditional options to address the problem: 1. Lane additions at grade. 2. Grade separated interchanges. 3. No build.

Or

Consider an innovative approach: 4. Non-traditional improvement.

Page 6: Continuous Flow Hybrid Intersection Indian River Road and ...€¦ · Continuous Flow Hybrid Intersection . Indian River Road and Kempsville . Road Improvements . City of Virginia

Traditional Improvements – At Grade – Lane Additions

Large footprint.

Needs extensive Right of Way.

Expensive, and disruptive.

Estimated at $37 Million.

Page 7: Continuous Flow Hybrid Intersection Indian River Road and ...€¦ · Continuous Flow Hybrid Intersection . Indian River Road and Kempsville . Road Improvements . City of Virginia

Traditional Improvements – Grade Separated – Interchanges

Large footprint.

Needs extensive Right of Way.

Eliminates access

Estimated at over $60 Million.

Page 8: Continuous Flow Hybrid Intersection Indian River Road and ...€¦ · Continuous Flow Hybrid Intersection . Indian River Road and Kempsville . Road Improvements . City of Virginia

Traditional Improvements – No-Build Option

Does not address problems.

Does not meet future needs.

Stifles commerce.

Impacts quality of life.

Unacceptable congestion.

Page 9: Continuous Flow Hybrid Intersection Indian River Road and ...€¦ · Continuous Flow Hybrid Intersection . Indian River Road and Kempsville . Road Improvements . City of Virginia

Hybrid design of two non-traditional solutions.

Minimize right of way and cost.

Maximize traffic flow.

Estimated $10.4 Million

Proposed Alternative – A Non-Traditional Improvement

Page 10: Continuous Flow Hybrid Intersection Indian River Road and ...€¦ · Continuous Flow Hybrid Intersection . Indian River Road and Kempsville . Road Improvements . City of Virginia

Intersection Design – Typical Signal

Four typical phases: two through and two turns.

Each phase requires green time and a short clearance time.

Best to eliminate phases when possible.

X X

Page 11: Continuous Flow Hybrid Intersection Indian River Road and ...€¦ · Continuous Flow Hybrid Intersection . Indian River Road and Kempsville . Road Improvements . City of Virginia

Median U-Turn on Indian River Road

To Make A Left From Indian River to Kempsville

Time Shared - Greater Green Time Available To Both Movements Simultaneously

Page 12: Continuous Flow Hybrid Intersection Indian River Road and ...€¦ · Continuous Flow Hybrid Intersection . Indian River Road and Kempsville . Road Improvements . City of Virginia

Displaced Left Turn on Kempsville Road

To Make A Left From Kempsville to Indian River

Greater Green Time Available To Both

Movements Simultaneously

Page 13: Continuous Flow Hybrid Intersection Indian River Road and ...€¦ · Continuous Flow Hybrid Intersection . Indian River Road and Kempsville . Road Improvements . City of Virginia

Moving Forward

Total estimated cost for the project is $10.4 million.

Project is funded with City and Federal Congestion Mitigation and Air Quality funds.

No other option provides the level of improvements for the cost.

Page 14: Continuous Flow Hybrid Intersection Indian River Road and ...€¦ · Continuous Flow Hybrid Intersection . Indian River Road and Kempsville . Road Improvements . City of Virginia

Project Development Milestones

Phase Cost Begin End

Design $ 984,000 Ongoing Spring 2013

Right of way $ 3,500,000 Winter 2012 Spring 2014

Utility relocation $ 525,000 Spring 2014 Fall 2015

Construction $ 4,500,000 Fall 2015 Fall 2016

Street lighting $ 150,000 Spring 2016 Fall 2016

Contingencies $ 750,000 Spring 2013 Fall 2016

Total $ 10,409,000

Page 15: Continuous Flow Hybrid Intersection Indian River Road and ...€¦ · Continuous Flow Hybrid Intersection . Indian River Road and Kempsville . Road Improvements . City of Virginia

Project Status

1. Approaching 60% Design.

2. Project is fully funded with CMAQ and City funds.

3. NEPA process is ongoing: Phase I ESA complete.

4. Citizen Information Meeting complete.

5. Design & Location meeting November 2012.

September

Page 16: Continuous Flow Hybrid Intersection Indian River Road and ...€¦ · Continuous Flow Hybrid Intersection . Indian River Road and Kempsville . Road Improvements . City of Virginia

UCI Annual Meeting

July 12, 2012