RISE-MOTIIVE HAC-PB 6 June 2007, Brussels
Data Harmonisation and Integration for Coastal & Marine Stakeholders
Cost-Benefit Methodology DevelopmentsWorkpackage 7
Roger LonghornDirector, GI Projects Office, IDG (UK) Ltd
MOTIIVE Project Steering Committee Leadere-mail: [email protected]
RISE-MOTIIVE HAC-PB 6 June 2007, Brussels
Data Harmonisation and Integration for Coastal & Marine Stakeholders
Investigate the cost-benefit of developing fully integrated land-marine datasets, based on UK ICZMap findings.
Look at the data standards and interoperability specifications that would help reduce costs in future initiatives such as this.
Help develop or steer development of those standards and specifications, working within the ISO and OGC frameworks.
Gather input from the coastal/marine community as to what they need in regard to such harmonised datasets.
Do this by building on the earlier work of the MarineXML project.
MOTIIVE Concept (Dec. 2003)
RISE-MOTIIVE HAC-PB 6 June 2007, Brussels
Data Harmonisation and Integration for Coastal & Marine Stakeholders
•The MOTIIVE Cost-Benefit Analysis Methodology (M-CBA)
•A hybrid Multi-Criteria Analysis (MCA) methodology
•Costs (monetary) & Benefits (value based)
•Built on SDIGER Project cost analysis & NASA ROI GeoVMM (Value Measuring Methodology) MCA approach
•Spreadsheet(s) that can be used for project-based CBA – but (probably) not for SDI-level work.
WP7 – Cost Benefit Analysis
RISE-MOTIIVE HAC-PB 6 June 2007, Brussels
Data Harmonisation and Integration for Coastal & Marine Stakeholders
Traditional CBA methodologies and metrics are best suited to project justifications - not “infrastructures”.
The more complex is the target (an infrastructure versus a project), the greater are the number of assumptions made in performing the analysis.
Therefore, the less ‘believable’ is the result – especially by funding agencies.
Traditional CBA best for project work, where monetary figures can be assigned to costs & benefits.
CEA often used if CBA not suitable due to inability to monetarize all costs and/or benefits.
MCA much more flexible, more subjective, invites wider stakeholder participation.
WP7 – Cost Benefit Analysis
RISE-MOTIIVE HAC-PB 6 June 2007, Brussels
Data Harmonisation and Integration for Coastal & Marine Stakeholders
GeoVMM – Geospatial Value Measuring Method – used by NASA specifically for investigating Interoperability ROI.
Methodology is approved by US Government (recognized as “best practice” by OMB).
Captures expert input, as well a stakeholder input.
Allows for 'weighting' of value factors and benefits.
Takes account of risk factors.
NASA (Booz Allen Hamilton) study focused specifically on added costs and benefits of introducing interoperability technology to existing/new projects. Results were ‘normalized’.
Current WP7 CBA (MCA) Approach
RISE-MOTIIVE HAC-PB 6 June 2007, Brussels
Data Harmonisation and Integration for Coastal & Marine Stakeholders
Direct User value
Data availabilityEase of useBroad data sharing capabilities
Social Value
Better decision making abilityExtra-Governmental coordinationMinimal barriersInstitutional effectivenessEfficient use of taxpayer resources
Government Foundation/Operational
Ease of integrationIntragovernmental collaborationPublic participation and accountabilityInteragency collaborationRe-use, adaptation and consolidationMainstreaming GISIT performance
GeoVMM CBA Methodology (1)
RISE-MOTIIVE HAC-PB 6 June 2007, Brussels
Data Harmonisation and Integration for Coastal & Marine Stakeholders
Government Financial Value
Total cost savingsTotal cost avoidance
Strategic/Political Value
Close working relationshipsSupport improved decision making
GeoVMM CBA Methodology (2)
RISE-MOTIIVE HAC-PB 6 June 2007, Brussels
Data Harmonisation and Integration for Coastal & Marine Stakeholders
Drawbacks exist, as with any CBA methodology:
An expensive methodology to follow – use of experts plus lots of stakeholder time required if the weighting factors, etc. are to be acceptable to stakeholders and funders.
Doesn't overcome problem with assigning monetary values to intangible benefits – this is still required and leads to assumptions.
As presented by NASA (BAH), looks mainly at the IT issues relating to interoperability – this seems not to interest many (most?) of the stakeholders in the marine/coastal research and management community.
They are concerned with cost:benefit of project activities, not interoperability issues, i.e. cost of beach nourishment versus benefit to tourism industry, not how the data was collected or harmonised.
GeoVMM CBA Methodology
RISE-MOTIIVE HAC-PB 6 June 2007, Brussels
Data Harmonisation and Integration for Coastal & Marine Stakeholders
SDIGER Project Cost Analysis(Actual Cost Categories Used)
Initial System StudyData architectureNetwork architectureSecurity considerationsAccessibility considerations
Pre-implementation WorkApplication scenario developmentData and Metadata modellingMetadata profilingMetadata editing tool(s) developmentThesaurus / controlled vocabulary developmentGazetteer development (content)Web applications abstract model development
RISE-MOTIIVE HAC-PB 6 June 2007, Brussels
Data Harmonisation and Integration for Coastal & Marine Stakeholders
SDIGER Project Cost Analysis(Actual Cost Categories Used)
Hardware & Software Acquisition & MaintenanceHardware, assessmentHardware, acquisition and upgradesHardware, maintenance & insuranceSoftware, system toolsSoftware, development toolsSoftware upgrades & annual licenses
Development SupportTraining, technical support staffTraining, usersExternal experts / consultancyCreate infrastructure (install DBMS, GIS, etc.)
RISE-MOTIIVE HAC-PB 6 June 2007, Brussels
Data Harmonisation and Integration for Coastal & Marine Stakeholders
SDIGER Project Cost Analysis(Actual Cost Categories Used)
DevelopmentDevelop search client, genericDevelop search client, thematic (1, 2, 3, …)Develop gazetteer clientDevelop map viewer
Develop Web ApplicationsWeb application for scenario 1Web application for scenario 2Web application for scenario n
Handling Legacy DataRe-engineer & load data set 1Re-engineer & load data set 2Re-engineer & load data set n
RISE-MOTIIVE HAC-PB 6 June 2007, Brussels
Data Harmonisation and Integration for Coastal & Marine Stakeholders
SDIGER Project Cost Analysis(Actual Cost Categories Used)
Setting up (new) System
Re-engineer web application dataRe-engineer gazetteer dataRe-engineer thesaurus dataCollect/enter metadata for/from legacy datasetsConfiguring catalog servicesConfiguring gazetteer servicesConfiguring portrayal servicesConfiguring thesaurus services
RISE-MOTIIVE HAC-PB 6 June 2007, Brussels
Data Harmonisation and Integration for Coastal & Marine Stakeholders
SDIGER Project Cost Analysis(Actual Cost Categories Used)
On-going Data Related Costs
Data acquisitionData conversionCreating/entering standard metadataData entry/update/loading all datasetsOn-going General System CostsProgramme/Project managementOperationsSecurityHelpdeskTrainingOther operations
RISE-MOTIIVE HAC-PB 6 June 2007, Brussels
Data Harmonisation and Integration for Coastal & Marine Stakeholders
SDIGER Project Cost Analysis(Actual Cost Categories Used)
Other Specific Project Costs (non-IT / non-Info)
Cost Type 1Cost Type 2Cost Type 3Cost Type 4Cost Type n
Total non-IT / non-Info Project Costs =
Total Project Costs Analysis = Information + Other
RISE-MOTIIVE HAC-PB 6 June 2007, Brussels
Data Harmonisation and Integration for Coastal & Marine Stakeholders
D12 – CBA “Projection” for a GSE project (or 2) to be
replaced with use of GeoVMM methodology if we can
find a suitable candidate project – the hunt is on.
Preparing a practical “how to” manual for the
MOTIIVE (M-CBA) approach for use by other
coastal/marine projects.
Workshop where the method is applied at CoastGIS’07
Conference in Santander, Spain (October 2007)
Promulgation of the M-CBA methodology via EUCC –
The Coastal Union – newsletters, e-mail list and web
site.
WP7 – Cost-Benefit Methodologies – next steps