RIG & LIFTBOAT MOVE PLANNING & EXECUTION
NameTitleCompany Name
Presented by: Capt Bjarke PedersenDeputy Director, Fleet Operations
![Page 2: RIG & LIFTBOAT MOVE PLANNINGmemi.gov.bn/Shared Documents/HSSE/Information Sharing/Presentation... · Rig Move Procedure. Approach Plan. Final Position. Side Profile. Teras Offshore](https://reader030.fdocuments.us/reader030/viewer/2022040109/5e7164a023d8c57c102ebf76/html5/thumbnails/2.jpg)
Lessons Learned from Incidents
Lessons Learned from other Jackup Incidents
![Page 3: RIG & LIFTBOAT MOVE PLANNINGmemi.gov.bn/Shared Documents/HSSE/Information Sharing/Presentation... · Rig Move Procedure. Approach Plan. Final Position. Side Profile. Teras Offshore](https://reader030.fdocuments.us/reader030/viewer/2022040109/5e7164a023d8c57c102ebf76/html5/thumbnails/3.jpg)
Key Assessment Criteria & Information
Teras Internal procedures in place for the Unit Specific Operations Manual
Key details including dimensions, number of legs, weigh,. Jacking system, pre-load details, wind areas etc.
Location Assessment / Site Specific AssessmentWater depth, Metocean conditions, airgap
seabed (topographic, debris, etc) and sub-seabed data (strength of soil)
Operations Time of year & duration of proposed operations, nature of operations.
Crane serviceable range, accommodation requirements
Verified by Marine Warranty Surveyor (MWS) with Certificate of Approval.
![Page 4: RIG & LIFTBOAT MOVE PLANNINGmemi.gov.bn/Shared Documents/HSSE/Information Sharing/Presentation... · Rig Move Procedure. Approach Plan. Final Position. Side Profile. Teras Offshore](https://reader030.fdocuments.us/reader030/viewer/2022040109/5e7164a023d8c57c102ebf76/html5/thumbnails/4.jpg)
Control Measures in place
Conduct of Geophysical & Geotechnical Survey
Suitability Checks Methods
Rig Strong Enough
- Based on site specific metocean & soils data- Within limited operating envelopes- Structural integrity checks
Legs Long Enough - Subject to the following- Rig stated operating water depth- Sufficient height for harsh metocean- Leg penetration
Location Hazards/ Position
- Avoid overlapping old footprint where possible- Avoid seabed debris- Hull is above extreme water level- Spudcan to platform / pile proximity - Hull / platform proximity afloat
![Page 5: RIG & LIFTBOAT MOVE PLANNINGmemi.gov.bn/Shared Documents/HSSE/Information Sharing/Presentation... · Rig Move Procedure. Approach Plan. Final Position. Side Profile. Teras Offshore](https://reader030.fdocuments.us/reader030/viewer/2022040109/5e7164a023d8c57c102ebf76/html5/thumbnails/5.jpg)
Rig Strong Enough
Bearing Capacity
![Page 6: RIG & LIFTBOAT MOVE PLANNINGmemi.gov.bn/Shared Documents/HSSE/Information Sharing/Presentation... · Rig Move Procedure. Approach Plan. Final Position. Side Profile. Teras Offshore](https://reader030.fdocuments.us/reader030/viewer/2022040109/5e7164a023d8c57c102ebf76/html5/thumbnails/6.jpg)
Reserve of leg above jack-house
Water depth
Leg penetration
Air gap
Legs Long Enough
Does it fit?Max predicted penetration
Water Depth
Air gap (min or per client)
![Page 7: RIG & LIFTBOAT MOVE PLANNINGmemi.gov.bn/Shared Documents/HSSE/Information Sharing/Presentation... · Rig Move Procedure. Approach Plan. Final Position. Side Profile. Teras Offshore](https://reader030.fdocuments.us/reader030/viewer/2022040109/5e7164a023d8c57c102ebf76/html5/thumbnails/7.jpg)
Location Hazards
Rapid spudcan penetration
Uneven seabed
Footprints
Debris
Pipelines & Cables
Boulders
Spudcan-pile interaction
Buried / infilled channels
![Page 8: RIG & LIFTBOAT MOVE PLANNINGmemi.gov.bn/Shared Documents/HSSE/Information Sharing/Presentation... · Rig Move Procedure. Approach Plan. Final Position. Side Profile. Teras Offshore](https://reader030.fdocuments.us/reader030/viewer/2022040109/5e7164a023d8c57c102ebf76/html5/thumbnails/8.jpg)
Location Hazards
Footprints
Uneven seabed
Pipelines & Cables
![Page 9: RIG & LIFTBOAT MOVE PLANNINGmemi.gov.bn/Shared Documents/HSSE/Information Sharing/Presentation... · Rig Move Procedure. Approach Plan. Final Position. Side Profile. Teras Offshore](https://reader030.fdocuments.us/reader030/viewer/2022040109/5e7164a023d8c57c102ebf76/html5/thumbnails/9.jpg)
Location Hazards
Uneven Seabed Debris
![Page 10: RIG & LIFTBOAT MOVE PLANNINGmemi.gov.bn/Shared Documents/HSSE/Information Sharing/Presentation... · Rig Move Procedure. Approach Plan. Final Position. Side Profile. Teras Offshore](https://reader030.fdocuments.us/reader030/viewer/2022040109/5e7164a023d8c57c102ebf76/html5/thumbnails/10.jpg)
Location Hazards
Boulders
Visible in bathymetry / debris survey
Boulders
![Page 11: RIG & LIFTBOAT MOVE PLANNINGmemi.gov.bn/Shared Documents/HSSE/Information Sharing/Presentation... · Rig Move Procedure. Approach Plan. Final Position. Side Profile. Teras Offshore](https://reader030.fdocuments.us/reader030/viewer/2022040109/5e7164a023d8c57c102ebf76/html5/thumbnails/11.jpg)
Location Hazards
Spudcan-pile Interaction
Safe distance from the existing leg structure
Piled foundation structural integrity interaction
![Page 12: RIG & LIFTBOAT MOVE PLANNINGmemi.gov.bn/Shared Documents/HSSE/Information Sharing/Presentation... · Rig Move Procedure. Approach Plan. Final Position. Side Profile. Teras Offshore](https://reader030.fdocuments.us/reader030/viewer/2022040109/5e7164a023d8c57c102ebf76/html5/thumbnails/12.jpg)
Location Hazards
Buried / Infilled ChannelsDifferent penetration response
Excessive penetration
Eccentric loading
![Page 13: RIG & LIFTBOAT MOVE PLANNINGmemi.gov.bn/Shared Documents/HSSE/Information Sharing/Presentation... · Rig Move Procedure. Approach Plan. Final Position. Side Profile. Teras Offshore](https://reader030.fdocuments.us/reader030/viewer/2022040109/5e7164a023d8c57c102ebf76/html5/thumbnails/13.jpg)
Rig Strong Enough
Spudcan Penetration Responses
![Page 14: RIG & LIFTBOAT MOVE PLANNINGmemi.gov.bn/Shared Documents/HSSE/Information Sharing/Presentation... · Rig Move Procedure. Approach Plan. Final Position. Side Profile. Teras Offshore](https://reader030.fdocuments.us/reader030/viewer/2022040109/5e7164a023d8c57c102ebf76/html5/thumbnails/14.jpg)
Rig Move Procedure
![Page 15: RIG & LIFTBOAT MOVE PLANNINGmemi.gov.bn/Shared Documents/HSSE/Information Sharing/Presentation... · Rig Move Procedure. Approach Plan. Final Position. Side Profile. Teras Offshore](https://reader030.fdocuments.us/reader030/viewer/2022040109/5e7164a023d8c57c102ebf76/html5/thumbnails/15.jpg)
Approach Plan
![Page 16: RIG & LIFTBOAT MOVE PLANNINGmemi.gov.bn/Shared Documents/HSSE/Information Sharing/Presentation... · Rig Move Procedure. Approach Plan. Final Position. Side Profile. Teras Offshore](https://reader030.fdocuments.us/reader030/viewer/2022040109/5e7164a023d8c57c102ebf76/html5/thumbnails/16.jpg)
Final Position
![Page 17: RIG & LIFTBOAT MOVE PLANNINGmemi.gov.bn/Shared Documents/HSSE/Information Sharing/Presentation... · Rig Move Procedure. Approach Plan. Final Position. Side Profile. Teras Offshore](https://reader030.fdocuments.us/reader030/viewer/2022040109/5e7164a023d8c57c102ebf76/html5/thumbnails/17.jpg)
Side Profile
![Page 18: RIG & LIFTBOAT MOVE PLANNINGmemi.gov.bn/Shared Documents/HSSE/Information Sharing/Presentation... · Rig Move Procedure. Approach Plan. Final Position. Side Profile. Teras Offshore](https://reader030.fdocuments.us/reader030/viewer/2022040109/5e7164a023d8c57c102ebf76/html5/thumbnails/18.jpg)
Teras OffshoreLiftboat Simulation Training
Manoeuvring & Bridge Resource Management Training
![Page 19: RIG & LIFTBOAT MOVE PLANNINGmemi.gov.bn/Shared Documents/HSSE/Information Sharing/Presentation... · Rig Move Procedure. Approach Plan. Final Position. Side Profile. Teras Offshore](https://reader030.fdocuments.us/reader030/viewer/2022040109/5e7164a023d8c57c102ebf76/html5/thumbnails/19.jpg)
Lift Boat Simulation Training Centre (LSTC)
19 of 23
![Page 20: RIG & LIFTBOAT MOVE PLANNINGmemi.gov.bn/Shared Documents/HSSE/Information Sharing/Presentation... · Rig Move Procedure. Approach Plan. Final Position. Side Profile. Teras Offshore](https://reader030.fdocuments.us/reader030/viewer/2022040109/5e7164a023d8c57c102ebf76/html5/thumbnails/20.jpg)
Lift Boat Simulation Training Centre (LSTC)
Simulator assessment of candidates supported by feedback from other departments, e.g. Technical, Crewing, Operations and HSE.
20 of 23
![Page 21: RIG & LIFTBOAT MOVE PLANNINGmemi.gov.bn/Shared Documents/HSSE/Information Sharing/Presentation... · Rig Move Procedure. Approach Plan. Final Position. Side Profile. Teras Offshore](https://reader030.fdocuments.us/reader030/viewer/2022040109/5e7164a023d8c57c102ebf76/html5/thumbnails/21.jpg)
Lift Boat Simulation Training Centre (LSTC)
Scenarios designed based on Competency Requirements.
Scenarios include environmental factors, i.e. wind, current, swell height.
21 of 23
![Page 22: RIG & LIFTBOAT MOVE PLANNINGmemi.gov.bn/Shared Documents/HSSE/Information Sharing/Presentation... · Rig Move Procedure. Approach Plan. Final Position. Side Profile. Teras Offshore](https://reader030.fdocuments.us/reader030/viewer/2022040109/5e7164a023d8c57c102ebf76/html5/thumbnails/22.jpg)
Lift Boat Simulation Training Centre (LSTC)
Visual aids to facilitate trainee’s learning.
Trainer’s feedback and comments during and immediately after trainee’s session.