Review of superconductors and magnet laboratories
Summary of measurements and instrumentation issues
12.5.2009
Instrumentation for SC wires and cables (D. Richter) Status of present instrumentation (H/W and S/W) in
163/103/288 Inventory of dedicated electronics (e.g. protection,
power converters) and support required Maintenance plan (to keep functionality)
Cabling/recabling of installations (FRESCA) Development plan (to improve measurement
capability) Magnetization and AC loss measurement Faster DAQ for transient measurements (plan for test)
Instrumentation for SC magnets (TBD) Status of present instrumentation (H/W and S/W) in
SM-18 and B-4 (180 ?) Inventory of dedicated electronics (e.g. protection,
PLC, security matrix, amplifiers, power converters) and support required
Maintenance plan (to keep functionality) Development plan (to improve measurement
capability) New protection electronics ? DAQ for vertical test benches in SM-18 ?
Instrumentation for magnetic measurements (M. Buzio) Status of present instrumentation (H/W and S/W) at
CERN Inventory of dedicated equipment and electronics
(e.g. shafts, moles, integrators, amplifiers, …) and support required
Maintenance plan (to keep functionality) Development plan (to improve measurement
capability) FAME status and plans F2M2 status and plans
Measurement control and acquisition (A. Rijllart) Status of control and DAQ systems for
measurements at CERN Maintenance plan (to keep present functionality) Development plan (to insure long-term functionality)
Phasing out of H/W PXI proposal
Management Information System for SC’s (E. Charifoullina) Business model design Data repository and interfaces with control and
acquisition applications Maintenance plan for LHC-MIS (LHC “CableDB”) Development plan (TE-MSC-SCD “LaboratoryDB”)
MIS design Interface and compatibility with MTF
Management Information System for magnets (TBD) Design Data repository and interfaces with control and
acquisition applications Role of MTF and alternatives