Reuse of Stormwater for Irrigation of Municipal Ballfields in Centerville, Minnesota Dallas Larson – City Administrator – Centerville
Dan Edgerton – Water Resources Engineer – Stantec
Mark Statz – City Engineer - Stantec
Minnesota Water Resources Conference 10/17/2012
![Page 2: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/2.jpg)
Centerville Location Map
![Page 3: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/3.jpg)
Rice Creek Watershed District Map
![Page 4: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/4.jpg)
Key Resource to Protect: Centerville Lake
![Page 5: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/5.jpg)
Downtown Redevelopment
![Page 6: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/6.jpg)
RCWD Rules
Rate Control • No increase from existing for 2-year and 100-year
events Water Quality and Volume Control • Infiltrate 0.8 - 2.8 inch event, depending on site
conditions • Alternative sequencing if infiltration is infeasible
![Page 7: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/7.jpg)
Options
• Stormwater ponding
![Page 8: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/8.jpg)
Options
• Stormwater ponding • Infiltration features
![Page 9: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/9.jpg)
Options
• Stormwater ponding • Infiltration features • In-line treatment devices
Source: Metro Vancouver Best Management Practices Guide for Stormwater
![Page 10: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/10.jpg)
Options
• Stormwater ponding • Infiltration features • In-line treatment devices • Underground storage
![Page 11: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/11.jpg)
Options
• Stormwater ponding • Infiltration features • In-line treatment devices • Underground storage • Stormwater reuse
![Page 12: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/12.jpg)
Selected Option: Stormwater Reuse for
Irrigation of Laurie LaMotte Park Ballfields
![Page 13: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/13.jpg)
Selected Option: Stormwater Reuse for
Irrigation of Laurie LaMotte Park Ballfields
![Page 14: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/14.jpg)
Advantages of Stormwater Reuse Option
• Saves space in downtown redevelopment area vs. stormwater ponds or infiltration features
• Provides needed irrigation system to ballfields with “free” water
• Reduces stress on aquifer from irrigation demands • Keeps stormwater on the land – reduces runoff peaks
and volumes • Protects quality of Centerville Lake
![Page 15: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/15.jpg)
Questions to be Answered
• Is the stormwater safe for use in a city park? • Will the stormwater kill turf grass due to high salinity? • Will the sprinkler system clog from sediment in the
stormwater? • What if the pond water for irrigation runs out? • What permit requirements need to be met?
![Page 16: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/16.jpg)
Is the stormwater safe for use in a city
park?
• Water quality tests on pond water and sediment – fecal coliforms, heavy metals, PAHs, volatile organics, pH, chloride, Legionella – Results below MnDNR standards for swimmable waters
• Soil testing in ballfields to establish baselines – heavy metals, PAHs, volatile organics, pH, chloride – Results below Health Department guidelines
• Will continue to test periodically
![Page 17: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/17.jpg)
Will the stormwater kill turf grass due to
high salinity?
• Chloride levels in pond water did not indicate problem • City will incorporate best management practices to
reduce risk – Sprinkling protocols – Fertilizer formulas
![Page 18: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/18.jpg)
Will the sprinkler system clog from
sediment in the stormwater?
• Learned from practices in golf course industry • Pond and intake designed to minimize sediment in
irrigation system • Sprinkler heads selected based on performance under
these types of conditions
![Page 19: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/19.jpg)
What if the pond water for irrigation runs
out?
• Pond designed with capacity for three weeks of operation with no rain
• City’s potable water system can be used to refill pond – without direct interconnection between potable water system and irrigation system
![Page 20: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/20.jpg)
What permit requirements need to be met?
• MnDNR Water Appropriations permit was needed • Future permit requirements? TBD • At the same time, the project helped meet (and
exceed) RCWD requirements
![Page 21: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/21.jpg)
System Design
• Components of system – Pond – Intake – Supply line – Pump and wet well – Controls – Irrigation system
![Page 22: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/22.jpg)
System Design: Pond • No immediate modifications
to pond • Future improvements to
pond to increase storage capacity
• Floating dock section for use in inlet screen maintenance
![Page 23: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/23.jpg)
System Design: Intake • Important to keep inlet clean • Designed for inlet velocities of less than 0.5 fps • Well screen utilized to keep aquatic life out (frogs, etc.) • Fabric/Rip Rap/Sump to keep sediment and vegetation out
![Page 24: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/24.jpg)
System Design: Supply Line • HDD used to avoid prairie plantings and deep cuts in
County Regional park
• HDD used to avoid prairie plantings and deep cuts in regional park
• Flat grade used to avoid sediment build-up at low point in line
![Page 25: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/25.jpg)
System Design: Pump and Wet Well • City reused existing well control panel • System utilizes city-owned well pump that was no longer
being used • Wet well was installed like a standard water supply well
![Page 26: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/26.jpg)
System Design: Controls
• Keep it simple • Pump is triggered by drop in pressure • Sprinklers are opened by standard irrigation control
system creating pressure drop • System has ability to add moisture probe and wind
gauge
![Page 27: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/27.jpg)
System Design: Gun-Style Irrigation System • Let’s see it work! • 200’ spray radius • 400 gpm @ 100 psi
• Just 7 irrigation heads cover 11 acres of ballfields
• 50% less capital cost vs. traditional
![Page 28: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/28.jpg)
Project Costs
Pond, intake, supply line $125,000 Pump, wet well, controls $ 52,0001
Irrigation system $ 52,000 Design, administration $ 40,000 Total $269,0002
1 City reused existing pump and control panel 2 Funding sources: City of Centerville, Clean Water Legacy Fund, RCWD
![Page 29: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/29.jpg)
System Maintenance
• A lot is yet to be determined • Examine and clean (if necessary) inlet screen • Treat well pump like any other well pump • Treat irrigation system like any other irrigation system
![Page 30: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/30.jpg)
Results and Conclusions
• System is fully operational and was successful throughout the summer
• At the very end of this year’s drought, the city did fill the pond with their water supply. However, the pond lasted longer than the estimated 3 weeks without rain.
• Volume used is to be monitored over a 3-year period for use in determining actual volume credits through RCWD
• Don’t be afraid to try something new
![Page 31: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/31.jpg)
Questions?
Dallas Larson, City of Centerville, [email protected]
Dan Edgerton, Stantec, [email protected]
Mark Statz, Stantec, [email protected]
![Page 32: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/32.jpg)
701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 Tel: (763) 541-4800 · Fax: (763) 541-1700 wsbeng.com
Taft Lake Watershed Regional Stormwater Treatment Partnership
A cooperative venture between the Minnehaha Creek Watershed District and the City of Richfield
![Page 33: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/33.jpg)
701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 Tel: (763) 541-4800 · Fax: (763) 541-1700 wsbeng.com
Partnership Financial Features
Minnehaha Creek WSD commitment
• $2.7 million funds for capital improvement
City of Richfield commitment
• $3.0 million of 20-year O&M
• City willing to bond for project to spread MCWD costs over time
![Page 34: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/34.jpg)
701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 Tel: (763) 541-4800 · Fax: (763) 541-1700 wsbeng.com
Area Treated by Water Quality Improvement Project
Richfield: 1,234 Acres
MAC: 318 Acres
Hig
hw
ay 7
7
Minneapolis
Bloomington
Lake Nokomis
Taft Lake 1,600 acres treated Fully developed $2.7 million
Legion Lake
Airport
![Page 35: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/35.jpg)
701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 Tel: (763) 541-4800 · Fax: (763) 541-1700 wsbeng.com
What is a Regional Approach?
Centralized treatment (not site by site) using the full spectrum of treatment options:
Active: - Irrigation - Flocculation* - Infiltration pipes
* Flocculation, in the field of chemistry, is a process wherein colloids come out of suspension in the form of floc or flakes by the addition of a clarifying agent.
Passive - Buffers - Sumps - Ponds
![Page 36: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/36.jpg)
701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 Tel: (763) 541-4800 · Fax: (763) 541-1700 wsbeng.com
Regional vs. Site by Site Approach
Regional (centralized)
•Public (long-term)
•Immediate results
•Entire area treated
•Public maintenance
Site by site (piecemeal)
•Private (mostly)
•Delayed results
•Fragmented treatment
•Private (no?) maintenance
![Page 37: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/37.jpg)
701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 Tel: (763) 541-4800 · Fax: (763) 541-1700 wsbeng.com
Regional vs. Site by Site Approach (continued)
Regional (centralized)
•Measurable results
•Wellheads protected
•Economy of scale
•Compatible land use
•Long-term planning
Site by site (piecemeal)
•Fragmented measurement
•Little control of wellheads
•Small-scale inefficiency
•Maybe incompatible land use
•Defies planning
![Page 38: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/38.jpg)
701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 Tel: (763) 541-4800 · Fax: (763) 541-1700 wsbeng.com
Richfield – 1950s: Wells and Septic Systems
![Page 39: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/39.jpg)
701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 Tel: (763) 541-4800 · Fax: (763) 541-1700 wsbeng.com
Richfield Urbanization: Centralized Infrastructure
• Met the post-WWII housing need
• Not viable long-term water and septic solution
• 1950s – built centralized sewer system
• 1960s – built centralized water system
• 1970s – built all residential streets
• 1980s – retrofitted 100-year flood protection
• 2013 – build centralized surface water treatment
![Page 40: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/40.jpg)
701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 Tel: (763) 541-4800 · Fax: (763) 541-1700 wsbeng.com
High or very high Vulnerability Drinking Water Supply Management Areas
Richfield
![Page 41: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/41.jpg)
701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 Tel: (763) 541-4800 · Fax: (763) 541-1700 wsbeng.com
Taft Lake
Richfield
![Page 42: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/42.jpg)
701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 Tel: (763) 541-4800 · Fax: (763) 541-1700 wsbeng.com
Project Elements
• Water reuse irrigation system
• Water reuse infiltration system
• Habitat enhancement – shoreline buffers
• Grit chambers
• Flocculation treatment
![Page 43: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/43.jpg)
701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 Tel: (763) 541-4800 · Fax: (763) 541-1700 wsbeng.com
![Page 44: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/44.jpg)
701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 Tel: (763) 541-4800 · Fax: (763) 541-1700 wsbeng.com
Stormwater Reuse Irrigation
• Install irrigation systems in Veterans Park/Taft Lake Park
• Operate systems for up to 30 weeks
• Systems can annually reduce:
– Runoff volumes by 14-40 acre-ft
– Total phosphorus loadings by 17-50 lb
![Page 45: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/45.jpg)
701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 Tel: (763) 541-4800 · Fax: (763) 541-1700 wsbeng.com
Stormwater Reuse Infiltration
• Install infiltration/drain tile systems in Veterans Park/ Taft Lake Park
• Operate system for up to 180 days
• Systems can annually reduce:
– Runoff volumes up to 240 acre-ft
– Total phosphorus loadings up to 216 lb
![Page 46: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/46.jpg)
701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 Tel: (763) 541-4800 · Fax: (763) 541-1700 wsbeng.com
Native Wetland Buffer Plantings
• Reduce phosphorus loadings by 2-8 lb
• Enhance habitat for wide range of benefits
![Page 47: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/47.jpg)
701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 Tel: (763) 541-4800 · Fax: (763) 541-1700 wsbeng.com
Construct Grit Chambers
• Will remove sediment prior to discharge into Legion Lake
• Reduce coarse phosphorus load by 10-30 lb
![Page 48: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/48.jpg)
701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 Tel: (763) 541-4800 · Fax: (763) 541-1700 wsbeng.com
Flocculation Treatment System
• Construct/install intake and outfall pipes, pumps, storage tanks, metering systems, controls
• Treats water to an extremely high quality standard
• Removes soluble phosphorus
• Reduces total phosphorus loading by 40-160 lb/year
• Treats water from 1,600 acres
• Less than one acre of land used
![Page 49: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/49.jpg)
701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 Tel: (763) 541-4800 · Fax: (763) 541-1700 wsbeng.com
![Page 50: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/50.jpg)
701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 Tel: (763) 541-4800 · Fax: (763) 541-1700 wsbeng.com
![Page 51: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/51.jpg)
701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 Tel: (763) 541-4800 · Fax: (763) 541-1700 wsbeng.com
![Page 52: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/52.jpg)
701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 Tel: (763) 541-4800 · Fax: (763) 541-1700 wsbeng.com
![Page 53: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/53.jpg)
701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 Tel: (763) 541-4800 · Fax: (763) 541-1700 wsbeng.com
![Page 54: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/54.jpg)
701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 Tel: (763) 541-4800 · Fax: (763) 541-1700 wsbeng.com
Potential Annual Load Reduction for Proposed Improvements
Improvement Annual Reduction
(pounds)
Water Reuse Irrigation System 17 to 50
Water Reuse Infiltration System 108 to 216
Habitat Enhancement 2 to 8
Construct Grit Chambers -
Reduction of Impervious Surface 1
Flocculation Treatment 40 to 160
TOTAL 167 to 413
![Page 55: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/55.jpg)
701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 Tel: (763) 541-4800 · Fax: (763) 541-1700 wsbeng.com
Taft/Legion Regional Partnership: Creativity & Leadership
• Technical
– Active and passive treatment methods
– Treating the lake itself, but not in-lake treatment
• Bureaucratic
– Regional concept
– Multi-agency: MAC, MnDOT, Hennepin County, MPCA, DNR
• Financial
– City sells bond, MCWD makes payments
– Spread costs over the life of the project
![Page 56: Reuse of Stormwater for Irrigation of Municipal Ballfields ...701 Xenia Avenue South, Suite 300 . Minneapolis, MN 55416 . Tel: (763) 541-4800 · Fax: (763) 541-1700 . wsbeng.com .](https://reader036.fdocuments.us/reader036/viewer/2022062610/6109ff94b4a3650d842c846e/html5/thumbnails/56.jpg)
701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 Tel: (763) 541-4800 · Fax: (763) 541-1700 wsbeng.com
QUESTIONS & ANSWERS