Retail Market Update August 6, 2003. Load Profile Guides In accordance with section §25.131 (e) (3)...

13
Retail Market Update August 6, 2003

description

Load Profile Guides RMS requests TAC approval of the changes to the Load Profile Guides section 12.3 as presented in Load Profiling Guide Change Control dated 7/1/03.

Transcript of Retail Market Update August 6, 2003. Load Profile Guides In accordance with section §25.131 (e) (3)...

Page 1: Retail Market Update August 6, 2003. Load Profile Guides In accordance with section §25.131 (e) (3) and PUCT Project 25516, Load Profiling and Load Research.

Retail Market UpdateAugust 6, 2003

Page 2: Retail Market Update August 6, 2003. Load Profile Guides In accordance with section §25.131 (e) (3) and PUCT Project 25516, Load Profiling and Load Research.

Load Profile Guides• In accordance with section §25.131 (e) (3) and PUCT Project 25516, Load Profiling and Load Research Rulemaking, “Within six months of the effective date of this section, ERCOT shall establish and implement a process to collect a fee from any REP who seeks to assign customers to a non-ERCOT sponsored profile. • Make modifications to the Load Profiling Guides:1)     To specify the procedure for providing cost recovery to a Market Participant for the development costs associated with a new profile segment request; 2)     To modify the procedure for reviewing new profile segment requests to allow for conditional approval.

Page 3: Retail Market Update August 6, 2003. Load Profile Guides In accordance with section §25.131 (e) (3) and PUCT Project 25516, Load Profiling and Load Research.

Load Profile Guides

RMS requests TAC approval of the changes to the Load Profile Guides section 12.3 as presented in Load Profiling Guide Change Control dated 7/1/03.

Page 4: Retail Market Update August 6, 2003. Load Profile Guides In accordance with section §25.131 (e) (3) and PUCT Project 25516, Load Profiling and Load Research.

2004 Test Flights V1.6-0104 (Testing New Market Participants in TX SET Version 1.6)

• Connectivity to start Dec 8, 2003 (to avoid Christmas/New Years)• Jan 12, 2004 - Feb 20, 2004 (6 weeks for scripts)

V1.6-0304 (Testing New Market Participants in TX SET Version 1.6)• Connectivity to start Feb 23• March 15, 2004 - Apr. 23, 2004 (6 weeks for scripts)

V2.0-0504 (Full Market Test of TX SET Version 2.0• Connectivity to start April 26• May 17, 2004 - July 23, 2004 (10 weeks for scripts)

Version 2.0 Production Implementation Date (RMS Approved)

August 1, 2004 V2.0-0904 (Testing New Market Participants in TX SET Version 2.0)

• Connectivity to start Aug. 23• Sept 13, 2004 - Nov. 19, 2004 (10 weeks for scripts)

Page 5: Retail Market Update August 6, 2003. Load Profile Guides In accordance with section §25.131 (e) (3) and PUCT Project 25516, Load Profiling and Load Research.

2004 Test Flights• RMS requests TAC approve the initial

Market Testing timelines for Flights V1.6-0104, V1.6-0304, V2.0-0504 and V2.0-0904 as adopted by the TTPT.

• TAC further directs that any material changes to these timelines or changes in scope of the test flights must be approved by RMS and TAC.

Page 6: Retail Market Update August 6, 2003. Load Profile Guides In accordance with section §25.131 (e) (3) and PUCT Project 25516, Load Profiling and Load Research.

Reconnect Time Frames• PUCT Staff requested the retail market develop time frames to reconnect customers that have been disconnected for nonpayment.• CR and a TDSP may agree upon other operational timeframes as long as those timeframes do not exceed the below maximum timeframes.• TDSP field operational business day is defined as the time field personnel will routinely reconnect service. This field operational work time will vary by each TDSP.

Page 7: Retail Market Update August 6, 2003. Load Profile Guides In accordance with section §25.131 (e) (3) and PUCT Project 25516, Load Profiling and Load Research.

Reconnect Time Frames  Customer Pays CR must send

650_01Reconnect Deadline

1 Today’s Business Day between 8:00:00 am and 12:00:00 pm CPT

Before 2:00 pm CPT in today’s TDSP field operational business day

Close of business on the next TDSP field operational business day

2 Today’s Business Day between 12:01 pm and 5:00 pm CPT

Before 7:00 pm CPT in today’s TDSP field operational business day

Close of business on the next TDSP field operational business day

Page 8: Retail Market Update August 6, 2003. Load Profile Guides In accordance with section §25.131 (e) (3) and PUCT Project 25516, Load Profiling and Load Research.

Reconnect Time Frames  Customer Pays CR must send

650_01Reconnect Deadline

3 Customer pays after 5:00 PM CPT and up to 7:00 pm

Before 9:00 pm CPT in today’s TDSP field operational business day

Close of business on the next TDSP field operational business day

4 Customer pays after 7pm and before 8:00 am the next business day

Before 2:00 pm CPT in next TDSP field operational business day

Close of business on the second TDSP field operational business day

5 Customer pays on Saturday, Sunday or holiday

By 2:00 pm CPT the first TDSP operational business day following the weekend or holiday

End of the next TDSP operational business day

Page 9: Retail Market Update August 6, 2003. Load Profile Guides In accordance with section §25.131 (e) (3) and PUCT Project 25516, Load Profiling and Load Research.

Reconnect Time Frames

RMS requests TAC approve the reconnect fornonpayment time frames.

Page 10: Retail Market Update August 6, 2003. Load Profile Guides In accordance with section §25.131 (e) (3) and PUCT Project 25516, Load Profiling and Load Research.

Heads Up #1• RMS has several task forces seeking to improve business process that use point-to-point transactions. Examples are TDSP invoicing, CR payment, service orders or safety net move-in.• Currently, business rules for these type of business process may be found in Substantive Rules, TDSP tariffs, RMS minutes, task force minutes, Texas SET, etc. • The current business rules in most cases have gaps, vagueness or require additional details.

Page 11: Retail Market Update August 6, 2003. Load Profile Guides In accordance with section §25.131 (e) (3) and PUCT Project 25516, Load Profiling and Load Research.

• RMS is recommending new Protocol sections be developed for these Point-To-Point business processes modeled after Section 15: Registration.• Why Protocols?

• Protocols are a single repository for detailed Retail Market business rules.• Protocols are easier to modify as business needs will change.• Protocols are enforceable since all market participants have agreed to abide by all Protocols.• Protocols have a formal review and approval process.

Heads Up #1

Page 12: Retail Market Update August 6, 2003. Load Profile Guides In accordance with section §25.131 (e) (3) and PUCT Project 25516, Load Profiling and Load Research.

• RMS has approved a recommendation to place Point-To-Point business rules in Protocols.

• RMS will be seeking PRS endorsement of this recommendation at August PRS meeting with a TAC approval of this recommendation at TAC’s September meeting.

• Today’s purpose was to begin the discussion on this recommendation in preparation for August PRS and TAC September actions.

Heads Up #1

Page 13: Retail Market Update August 6, 2003. Load Profile Guides In accordance with section §25.131 (e) (3) and PUCT Project 25516, Load Profiling and Load Research.

Heads Up #2• Competitive Metering Rule requires ERCOT to file a quarterly status report. • COMET and ERCOT have developed the report based upon the COMET work products and RMS and TAC approved motions.• ERCOT will file the quarterly report and share it with RMS and TAC.• This process will be followed for subsequent quarterly reports.