Resume Civil Professional (10:19:16)

1
Alexander P. Baker linkedin.com/in/alexanderbakerp 1004 W. Royal Blvd. Apt 234D – Boise ID 83706 (208) 946.1167 [email protected] OBJECTIVE Seeking a Civil Engineering summer internship EDUCATION Civil Engineering major; Fall 2015 – Present Boise State University, Boise, ID Expected Graduation: Spring 2020 GPA: 3.417 SKILLS AND PROJECTS Service Learning Project, Fall 2015 – Worked in a team of three to develop a sound recognition device for a blind client. Obtained information on product specifications, and constraints of the client. Experience with MatLab, SolidWorks, Microsoft Word, Excel, PowerPoint Attention to detail developed from extensive design and construction experience Strong interpersonal skills honed through working in a professional setting Excellent use of hand tools and heavy machinery EXPERIENCE Framer, Garfield Bay Construction, Sagle, ID (Seasonal 2011-2016) Completed more than a dozen residential projects (1000-3000 sqft) Used transit and dry-line to set elevations, check for square, and snap layout Constructed pony walls for floor joist, set rim and plates, framed interior and exterior walls, added backing and blocking where needed, used ladder jacks for rake walls, rolled trusses, set ridges/valleys/hips, installed outlookers and sub fascia, sheeted roof, wrapped exterior walls in Tyvek Referred to blueprints to obtain information on construction specifics. Framer, Mitchells Oil Field Services, Sidney, MT (Summer 2015) Traveled to various oil sites to build structures for the winter climate Sheeted fresh water tanks and facilities with corrugated metal Gained knowledge of piping and pressure systems Filled out Job Safety Analysis’s prior to work; involved hourly measurements of gases on site including: H 2 S, O 2 , CO, and LEL’s Adhered to OSHA safety regulations and precautions Lift, Forklift, and H 2 S certified Worked 70+ hours a week Contractor, Jerry Straussland, Sagle, ID (Spring 2015) Placed and won bid for rebuilding a storm damaged dock; included: cost analysis, materials, supplier, and expected time of completion Leveled steel girders to correct elevation with transit, checked with plumb bob, then poured concrete forms to secure structure. Installed PT rim joists, and cedar decking extending 50’ Detailed dock with rubber bumpers and foldable ladder ACTIVITIES AND LEADERSHIP College of Engineering Dean’s List 2016 Honors in Civil Engineering Program 2016 Future City Assistant Volunteer 2016 Turtle Speed Racing Club member 2016 ASCE Student Member 2016 – Present NSF-STEM Scholarship Recipient 2015 – Present FIJI (Phi Gamma Delta) Vice President and Treasurer 2015 – 2016 Engineering Residential College (ERC) 2015 – 2016

Transcript of Resume Civil Professional (10:19:16)

Page 1: Resume Civil Professional (10:19:16)

Alexander P. Baker linkedin.com/in/alexanderbakerp 1004 W. Royal Blvd. Apt 234D – Boise ID 83706 (208) 946.1167 [email protected]

O B J E C T I V E Seeking a Civil Engineering summer internship

E D U C A T I O N Civil Engineering major; Fall 2015 – Present

Boise State University, Boise, ID Expected Graduation: Spring 2020 GPA: 3.417

S K I L L S A N D P R O J E C T S • Service Learning Project, Fall 2015 – Worked in a team of three to develop a sound recognition

device for a blind client. Obtained information on product specifications, and constraints of the client. • Experience with MatLab, SolidWorks, Microsoft Word, Excel, PowerPoint • Attention to detail developed from extensive design and construction experience • Strong interpersonal skills honed through working in a professional setting • Excellent use of hand tools and heavy machinery

E X P E R I E N C E Framer, Garfield Bay Construction, Sagle, ID (Seasonal 2011-2016)

• Completed more than a dozen residential projects (1000-3000 sqft) • Used transit and dry-line to set elevations, check for square, and snap layout • Constructed pony walls for floor joist, set rim and plates, framed interior and exterior walls, added

backing and blocking where needed, used ladder jacks for rake walls, rolled trusses, set ridges/valleys/hips, installed outlookers and sub fascia, sheeted roof, wrapped exterior walls in Tyvek

• Referred to blueprints to obtain information on construction specifics. Framer, Mitchells Oil Field Services, Sidney, MT (Summer 2015)

• Traveled to various oil sites to build structures for the winter climate • Sheeted fresh water tanks and facilities with corrugated metal • Gained knowledge of piping and pressure systems • Filled out Job Safety Analysis’s prior to work; involved hourly measurements of gases on site

including: H2S, O2, CO, and LEL’s • Adhered to OSHA safety regulations and precautions • Lift, Forklift, and H2S certified • Worked 70+ hours a week

Contractor, Jerry Straussland, Sagle, ID (Spring 2015) • Placed and won bid for rebuilding a storm damaged dock; included: cost analysis, materials, supplier,

and expected time of completion • Leveled steel girders to correct elevation with transit, checked with plumb bob, then poured concrete

forms to secure structure. • Installed PT rim joists, and cedar decking extending 50’ • Detailed dock with rubber bumpers and foldable ladder

A C T I V I T I E S A N D L E A D E R S H I P • College of Engineering Dean’s List 2016 • Honors in Civil Engineering Program 2016 • Future City Assistant Volunteer 2016 • Turtle Speed Racing Club member 2016 • ASCE Student Member 2016 – Present • NSF-STEM Scholarship Recipient 2015 – Present • FIJI (Phi Gamma Delta) Vice President and Treasurer 2015 – 2016 • Engineering Residential College (ERC) 2015 – 2016