    How to Use This Document

    This document is a template designed to assist in the development of a Resolution Plan.

    A Resolution Plan will be developed when a Project is unable to complete established entry criteria for an

    individual testing phase. Regular checkpoint meetings are established as part of the Entry/Exit Criteria

    design and will be scheduled with the Project Teams to monitor progress prior to and during testexecution for each testing phase.

    The intent of the Resolution Plan is to allow the Testing Support Team to understand what Entry Criteria

    was not met by the Project Team, what steps are being taken to resolve the issues preventing the team

    from completing all entry criteria, and what is the timeline for resolution. It will also allow both theProject Team and the Testing Support Team to manage risks associated with entry criteria not met and

    plan for contingencies.

    The file should be named using the following naming standard:

    XXXX Resolution Plan MMDD.doc

    XXXX Name of Project Team

    MMDD Month and Day Resolution Plan submitted

    Once the Resolution Plan has been competed by the Project Team, it should be emailed to the Testing

    Support Group at testing [email protected].

    Page 2 of 3 01/03/2011Yourcompany Proprietary

    mailto:[email protected]:[email protected]
  • 8/8/2019 Resolution Plan Template V1

    3/3

    Entrance Criteria Not Met

    List the entrance criteria that your Project was unable to complete. This may be taken from the Entry/Exit

    Criteria checklist.

    Defects/Issues Requiring Attention

    State any issues outstanding that are preventing the Project from completing the entrance criteria. If there

    are specific high priority defects that are preventing you to enter a test phase use this section to list and

    give status on those defects.

    Dependencies/Impacts

    Specifically state all applications that will be affected by the inability of the Project Team to satisfy

    entrance criteria for the testing phase. This list should include all internal and external interfaces.

    Action Plan

    List what activities the Project or Application Team is doing to meet the entrance criteria for the testing

    phase. This section should specify specifically the actions taken by each team to resolve the issues and/or

    defects listed in section 2. Status reporting methods for reporting progress to the Testing Support Team

    must be included as part of the Project Teams action plan.

    Date for Resolution

    Specify the target date in which all issues/defects preventing the Project from entering the test phase will

    be resolved.

    Date for Test Phase Entry

    Specify the date in which the Project Team would like to begin testing in the Integrated Test Environment

    (ITE). The Project Team will need to consider the Testing Calendar published by the Testing Supportteam when proposing a date for entry into a test phase. Entry into a test phase will occur at the beginning

    of a test cycle since code migration occurs prior to a testing cycle.

    Communication Plan

    The Testing Support Team will work with the individual Project Teams to identify risks of being

    excluded from the release due to not meeting entry criteria for a test phase. Status will be reported on a

    daily basis during the Daily Defect Meetings with the Testing Support team (time of which varies by

    Release). The Testing Support Team will notify Release Planning of any Project Team that is unable to

    enter a test phase. Specific impacts to the release based on outstanding issues or defects will be

    communicated to Release Planning and escalated to the PMG (Program Management Group).