RESETTLEMENT ACTION PLAN for - World Bank · 2016. 7. 15. · PUBLIC WORKS & HIGHWAYS along...
Transcript of RESETTLEMENT ACTION PLAN for - World Bank · 2016. 7. 15. · PUBLIC WORKS & HIGHWAYS along...
RESETTLEMENT ACTION PLAN
for
C.P-R.U-2. lob: Landslides and Road Slips Project
May 2006
RP528v 2
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
5.0 RESETTLEMENT ACTION PLAN (RAP)
5.1 RATIONALE AND OBJECTIVES
The DPWH Resettlement Policy was formulated to provide guidelines during the
implementation of road projects for World Bank-assisted First National Roads
Improvement Management Program (NRIMP). The department has promulgated the
social policy framework and specific guidelines that are operationalized for Land
Acquisition Resettlement Rehabilitation (LARR), and are the basis for the drafting of
the Resettlement Action Plan (RAP). 'The main purpose of the policy framework is to
clarify resettlement principles, organizational arrangements, anti design criteria to be
applied to road projects to be prepared during project implementation.
The main objectives for the preparation of the RAP are:
1. So that adverse social and physical impacts are avoided, minimized and or
mitigated;
2. That everybody, particularly the Project Affected Personss(PAPs) will benefit from
the project;
3. Stakeholders (including PAPs) were fully informed, consulted on the projects
design, implementation and operation;
4. See to it that PAPs are provided with sufficient compensation and assistance for lost
of assets and improve or at least maintain their pre-project standard of living;
5.2 PROJECT IMPACTS
5.2.1 Impacts on Land
The area is generally a protected area and has a road-right-of way of 60 meters with
exceptions at Locations No.1 and 2 of Davao-Calinan Road section where the road-
right-of way is 30m. However, there are sections of the road where improvement of
drainage and implementation of the slope protection works extend beyond e RROW
limits. As shown in Figure 5.1, the road passes through the CADC area. here are only
two (2) PAPS whose improvements and land or improvements o111y are affected by the
Appendix C.
drainage improvement and the slope protection works. However both of the identified
PAPs do not live within the CADC area. Details of the survey results are presented in
Table 5.1 -Summary of impacts on land and improvement ( Particulars ( No. of ( Land I Extent of ( Cost of I Cost. of I Total, P I
No possible quarry sites nor stockpile area have been identified within the CADC or
CADT (Certificate of Ancestral Domain Title) area,
1. land and improvement 3 .improvement only
Total
Since the project road has cut across the CADC area, the possibility of quarrying in the
area remains, the Contractor shall be informed during pre-constnlction conference that
the project road is located in the CADC area. This matter should be monitored closely
by the Multi-Partite Monitoring Team (MMT). National Coma~ission on Indigenous
People (NCIP) shall be appointed as one of he members of MMT
/"
5.2.2 Impacts on Structures
PAPs
1
2
/- - __A -- -- ---__I
two ( ~ e s s W . w i U be severely affecied by_ the installation of
piles-based on the RAP census conducted. The said-
--3 CAD-. ased on the census conducted, one (1) of these two
(2) PAPS is Indigenous People ( I . ) . The PAPS identified w ' e properly --dm con* and
informed that they will be affected by the protection works. The: Barangay Captain of /' the area will help in the relocation of the said PAPs. The PAPs were informed about - the compensation package like the replacement cost of the strulcture, inconvenience
allowance, etc.
Classification
Agricultural
Agricultural
Impact
M
M
Land, P
14,653.80
14,653.80
MARAMAG-KIBAWE- BUDA-MARAMAG ROAD KABACAN ROAD \ L = 60 kms
L = 94 kms 1
Table 5.2 Summary of impacts on structure
5.3 CONSULTATION
11,000.00
1 1,000.00
22,000.00
The PAPs were fully consulted during the conduct of the RAP census on the proposed
project. Based on Table 5.2 the PAPs that will be affected by the installation of
landslide protection works are residentials. The PAPs were fully informed about the
compensation package they will receive such as replacement cost of the structure,
Total, P rn \r
50,904.20
126,024.80
176,929.40
inconvenience allowance and the transportav allowance for the PAPs who will
relocate to another place. U e q 4.c W ' 1 3
Series of public consultations were also conducted with local officials in barangay level
to city/municipal level between September 22-November 10, 2004 along the project
road.
5.4 COMPENSATION PACKAGE
Extent of Impact Particulars Marginal Total, P
1 1.Land and I 1 1 18,693.80 v 1 I I
a. Inconvenience allowance b. Transportation allowance Sub-total TOTAL 22,920.72
C. 5.5 TOTAL RAP COST
The following is the summary of the total estimated cost of the ]RAP including the cost
of implementation:
Compensation Package: Land and Improvement Structure Other Entitlement Subtotal Contingencies (1 0%)
Subtotal Management Cost (min.cost, P50,000.00
each DEO concerned or 6% )
I
I 5.6 IMPLEMENTATION SCHEDULE
The implementation of the RAP follows as soon as the World Bank concurs with the
salient features of the RAP as endorsed by the GOP through DPWHIIBRD-PMO. After
the approval of the RAP Report, it will be implemented by two (2) DEOs; Davao City
Engineering District, Region XI and Midsayap Engineering District, Region XI1
J managed by ESSO with closecoordination with IBRD-PMO. IIPWH-Region XI and
XII will be the primary link to the DEOs.
1 5.7 MOU AND ESTABLISHMENTS OF RIC
I After receiving the approval to implement the RAP, a Memorandum of Understanding
I (MOU) between the DPWH and the government of Davao City ;and the municipalities
I of Arakan and Carmen, North Cotabato shall be executed to ensure commitment of
1 parties concerned. This MOU between the DPWH and the Local Government Units I
i will be used in the establishment of the RAP Implementation Committee (RIC) and
1 execute the function for the Grievance Redress Committee.
5.7.1 Formation and Training of the RIC
1 The composition of RIC are the following:
(i) Mayor of Davao City or his representative
(ii) Mayor of Arakan or his representative
(iii) Mayor of Carmen or his representative
Entitlement Forms shall be accomplished, signed by the PAP, and noted by the
concerned Barangay Captain.
5.7.5 Implementation Schedule
Before the start of civil works, RAP implementation shall be completed first.
This means that the PAPs have been paid, reorganized or relocated and the RAP
process has been fully complied.
Table 5-3. RAP implementation schedule by activity
5.8 GRIEVANCE REDRESS PROCEDURE
During the validation survey, if a PAP disagrees on the compena;ation package offered
to them, the same shall be handled through negotiations following the succeeding
procedures:
(i) PAPs may file their grievances to the RIC, who in turn must properly document
the complaint and act on it within 15 days upon receipt of the said complaint;
(ii) If no action undertaken or amicable solution is reached, or if the PAP do not
receive a response from the RIC, the complainant can appeal to the Office of the
DPWH Regional Director which should act on the complaint/grievance within
15 days fiom the day of filing;
(iii) If the PAP is not satisfied with the Office of the DPWH Regional Director
Office's decision, they can now elevate the case to the court of law.
APPENDIX A CERTIFICATE OF NON-COVERAGE
Republic of the Philippines
4 ~~ a d % W rEhwca @;~q~~j@&$\~4y~~&$g,gy{~~,q/[~ ~~jjlk~#&\,@;~g@gg;ffj(yj;~ @~~~!j~<j;,!$~,~J2~,j>
OPHCE OF THE REGIONAL DIRECTQR Region XI Door 7 & 8 Felbet's Bldg., Lanang, Davao Clty
MANAGEMENT BUREAU " 191. NOS. 234-0166 234-0061 234-01 74 233-0809 235-1 354 (fax] I email address: [email protected] or [email protected] k
,v,,,, :,, .*., ,,... 8 .,, ',. !',' ' ' . (,.. ,' , , CNC-7 7-2004-786 q +dl; ,::l.,,,!: . . , , l . , , . I . . 'il.. . . ., ' - l i . . $ : . , . , . . , , ~ . . lj ,:: . , I . ! , ,
' . . ' ) 2.; . \ : i .. - ,, ,
,, {, ;) ?:.:; ; * , '; ,i,!?; ,:) , ,:: .!,, ,, , :,, ::: , . .... ,,A .. , , , : .,: ..': : " - .
a ,
, ,
The Director DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS Bonifacio Drive, Port Area, Manila C N V ~ W O N ~ ~ ~ ~ wUMENT "'
Rec& seem Subject: Certificate of Non-Coverage (CNC) ~rc4hrd ~eleaee
D* sate 121
nme n q n
Dear Sir:
This is to inform you that your proposed 81.0 kms. Davao-Calinan-Buda Road Remedial Works Project, is not covered by the EIS System (P.D. 1586). Hence, exempted from securing an Environmental Compliance Certificate (ECC), subject however, to the following conditions:
1. That it shall be the responsibility of the Project Proponent to secure necessary permits from other agencies concerned to include, but not limited, to the following:
DENR-CENROIPENRO on Permit to Cut Trees, whenever applicable.
I THAT THE MONITORING OF THE ABOVE-STATED PERMITSICLEARANCES SHALL BE THE SOLE RESPONSIBILITY OF THE 1 : RESPECTIVE GOVERNMENT AGENCIES CONCERNED.
Given this $!3d. day of 7?At%* , 2004, at Davao City. Philippines.
1 Recommending Approval:
I i , 01- Division
Filing & Processing Fee: P 600.00 O.R. No. 8836387 F Date Issued: 11-12-2004
A - 1
Republic of the Philippines
Department of Environment and ..atural Resources ENVIRONMENTAL MANAGEME
& Office of t @#m&Qmm #&$ma @ Region-10, Mac
CERTIFICATE OF NON-COV 2004-CNC-PW- 10 13-822
.U .
The Environmental Management Bureau (EMB)-DENR 10 hereby grants this Certificate of Non-Coverage (CNC) to the REMEDIAL WORKS ON SPECIFIIED LANDSLIDE AREAS AND ROAD SLIP .SECTIONS PROJECT of the DEPARTMENT OF PUBLIC WORKS & HIGHWAYS along Buda-Mararnag-Kibawe-Kabacan Road. The remedial works shall cover Station 85+990 - 86+035; Station 89+720 - 89+920; Station 107+650 - 107+665; station 107+900 - 107+950; Station 109+346 - 109+370; and Station 1608+770 - 1608+920 passing through Barangays Buda, Sinuda, Palacapao and portions of Municipalities of Quezon, Carmen & Kibawe. Any expsionlalteration of the approved plans and operation shall be subjected to a separate EIA as may be required under the Philippine EIS System (PD 1586).
This certificate is being issued pursuant to Section 2, Article I1 of DENR Administrative '
' Order No. 96-37 and does. not exempt the holder from securing the necessary permitslclearances from other concerned agencies.
Given this
I ', 1 4 DEC 2004 d- l 1
i /
Cc: PENRO Bukidnon Filing Fee ... .P.600.00 O.R, No. 5398969 Date Issued: 12-7-04
< 10. (08822) 72-62-43 (088) 8%-9x2 Save the Ozone Layer . I
APPENDIX B ENDORSEMENT OF NO OBJECTION
FROM VARIOUS LGU
Republic of the Philippines SAWGGIIIPIIAMG PAWI..IJIYGSOO
Da ~ a o City
PZESOLUTIOM. XAITEfiPDSIWG #O OIR.JEETI01W TO THE FIRST', IRIERflATIICJRdr9L BAMU FOR WECOIYISTRUCTIOEQ AffD DEVEL.DP#EWT (I&RR)- ASSISTED 10ATlUEhllAL ROAD IRPROVIEMEMT PROGMM (WRIWP) OF THE DEPARTMEWT Of PUBI..JC waaus (UPWH) FOR REHEDIM. WORKS CR SPECIFIED LANUSLIW AREAS AMID SLIP SECTIONS AL.OME DAVAQ-GALIWH- BUDA ROAD, -r.Hrs ~ I I Y
WIIRREAS, tho Carnr'nitt~s on Pubfic Worko and Hbhwavs Itas: received a letter togett~or with its project design fr-om Japan F3weusms Cl.nnsnltanB Cu, LTB relative t~ tbfi abrwe-stated project;
WHEREAS, the primary artd irltirnsto objective of wid project is to remediate a ~ l d prevent the OCCIJMBIICB of landslitie ~m high .cut ~;lboes and rt~adslip sections all along the project road:
WHEREAS, the Dapartmont. of Public Works and Highways i& likewise now undertaking to institute rernedial works in specified landside areas and slip sections a t , certain ~drtiorls t3P the Davaa- Calinan-Ruda Road;
FIWE~IIERW'S, the Bararrgay Councils OF Cajina1.1 Publacion and l-acson, both in Calioan Di~t~ict and Hla Barangay Caurrcil of SrJaNfan, Marjiog Dii:trRt, all in this City manifested its syp!aorl and supressing rro objection since they are the banef~iarks for the said project;
WtQEREAS, as a mandatory requirernon! For the irnplementatiorr of the above-mentioned project, the Environment Managelllent: Hul-eau (EMS), Department of Environment a.nd Natljr~I KesoIArCeS, Regi~ll X I reqc~ested a Resolution whereby ttta Sanggciniang Panlmr~y sad interposo~ nu objection and support to remedial worlcs in ~pscified sraas and slip. sectbns at certain portions of the Davao-CaIinan-Buda Road ; , .
MIOW. INEIIEFOHIF:, BE IT RESOLVED, AS nr rs MEWERY IPESCZLIVED, to intel-pose no objection tr, the First Tntematjnna! Rank for. Re.t:onstr.uct.ion and D~ualapment (IBRD) -.Assisted Rla tir~nal Road Xrnprovernerrt Program (NRIMP) of the Depart~~anl.of Puhlic Works and ilicjhwsys (DPWIi) for retnedial works in specified la~~dslide areas and sltu sections along Davau-C7alinan-B1!rfa Road, this City; *
RESOLVED FURTHER, drat copies of this Reso!ution be C. hnrr~khed to the Offices of the Environment: Management Burearl (E-NIB), De~aftment of Environment and Naturat Resoi~rces (DENR), Department of Public Works and f-Iighways (DPWH), Japan Overseas Cotrsultanb Co, LTB., City Mayor's Ofice, City Engineers Ofhe, City Planning and Development Office, Barangay Councils ~f Calinan PobBcGan and Lacson, both in C~linan District and Bararrsay Council of Suawan, Maribg District, all in this City and at! others concerned fur their information, guidance and appropriate actio!~.
ADOPlbED, ---- by a unanimous vote of all the Members of the Sanggunian present there being a quorum.
Republic of the Philippines City of Davao
'my 1 OFFICE OF THE SANGGUNIANG BARANGAY 9-* Barangay Calinan, District of Calinan
WlERB&'asa m-~m6rtba:@1dondthe abm- slated project, the Eh9B-DENk Region XI has reqwsktba reswhtirn3br Btmmgg Council af C a l k to express na objection in ktitptirrg r a d i a l wwks in specified labslide areas aad r ~ a d slip section at certain portions ofthe' Davm-Calk-Buda Rod.
NOW ORE
' .
Upan mntian: of SB.,&tuber ~ t & s , sacoaaled by SB Member Cakigks, be it resohrad as it is &by resohnd+ lo express 00 objection to dbs rmwdill,w& in specified I d s I i k amas .d mad sI@ secti,m by tkr, IBW - Assisted First National
' Rids Imy#mmat and M a n a g e Project A
clty of Davao 4
cr* ~FFICE V t T H E SANGGUNIANG' E-RANGAY Barangay Calinan, District of Caban
C1 E w e fan tbs Mkwtes d ))ts 44& SReplar Snwim of*fbe Laog
Barqgy of C a h i Pobiacion, District of Cdinan, City of Dww, held on September 13,2004 at C a t ' l p u ~ E a r ~ Hall, Calman, Dmao C i .
Psdrita C. &c~------~cwi&tmg CMicer R k l q L ~ s Leonard0 G. Cmlotes '
Gemwey P. Pepito Joel V. Jmqr Antonio 3. ~~o Renab C. Goles, Sr. K s i h C e l t 8 E kgao
S P E m m w E m m R m S I l P , S E m B Y . m I E R D - C ASSEflED m . S T MA?ION. ROADS: &O- AND W A -
PRO..CIT
WHEREAS, the Esimngq Ckmcii ef +inan bra3 received a copy of a Project Design &m th Jw k n ~ e a s i CQWU&J& Chi, TA. w b k aMaats hii an endorsement tom the Bppogry Cou.cP d C a l b eqres~ing DD objection to $e project ofinstihhg mimiid w w b i spel.i& tdstide miw and slip at c b puAms pfh D m - M h a d a r d ;
.. .-. MEEREAS,, the bscly ~~iplmdd he si@cme ofthe ~ ~ @ t ' ' k a w e it wiU
w g e m programs ,&at will etasure ihe .* af ihe c m and Lbe ,
re~depts bat hrni to and fro mswecified. mas; . . . ,
WHEREAS, hem lapses in the cmstrucfion of mss-haiued has msulhed iu Ltrc C, a ~ ~ s ~ ~ ~ s a $ d ~ ~ b a ~ ~ ~ ~ ' ~ ~ h i ~ ~ + ~ i r n m c d i ~ l a l q p o k s aad to be hqJW ib fbe prcrjer4
Republic of the Philippines OFFICE'OF THE BARANGAY COUNCIL
Lacson, Calinan District, Davao City
.3XGdPW!SI PROM 2&4 MIAUWl OR' 2MLJ S;tPBCU;br &IYXON QF 2W NUAX AX J
COUNCIL 03' WO@QIII, OAbZNAN D3Y'J!RICr\p DAVAQ OX?RT W3XD A2 BARANGAY HAL& ON WPTdMB4R 22, 2004 A!! 1 re0 Pq M*
A &~OL.UTIOI 8UYPOH!l!I;iV@ ZW BIB3 X l ! P BUK $OR fi$CO1~3!f!RUC-~ 'J!fON AND Ii3VdLCEKSi~l ( .ZB~I))* h$YISTdP NASEOPTAL ROAD, IMPlKlVdMdN $'m+ PAM (HRIXI-') OF Ill$ DdPAM?MdP?I! OF PUBJLXO W O W &i'U iiS0.&iJdiY;i (~kdki ) 3'QR THBIR PROJ'dO'P WMI~DUL WOP$$$ IM SIP8Qf BL.iJl3 U N D S L I U ~ ARliAd A2JD .8:LI3! SCC'PlOlld, A L O M 2AVA.G rlA.LIIArJcOUWA RQAl) .
W E d & ? W , s b p i %ra.n,$ay Lacson IEI one of the bnsf kciary o f tha rsaid ramdial wozkes, %he, bod2 &n$arporse no ohaacation of the' enid pro je at .
A f t e r oa* Pul delimration and on motion f Kagawad Exnaldo Parralio Sr , duly aocondsd i)y all. !ha hPrwgeg.y. &agsWads prdB@nt 4 i D WRs
MBOLVID AS X.2 Z$ WRI~BX I?dSO::LV&D,l?Q SUPPORT TEd PIR!3T gfJTP% .. NAQION~I;UI W K ia.r~.%aona$rwtI~?a orzag ,&h~rel~-.,mslO (wRU)- ~ a y i s t a d i! NaC ional. Road ~ r n p ~ v o ~ m r ~ t Program ( I ~ ~ I : s P ) o the. Utq&r6luea t of Pub-. 1 t c Work@ and ~~ighwaya' ( o ~ W H ) for dhia ir. pro Jqet D ramdial works 'In ~pecif'irsd landslide amas and slig 0a08i.amI1 mvso - Buda road,'
Bopuhtic of tho PhilipgIn@m City @f BrrvaQ
mxOIE m m3 MRANIOAY comcfb. ahlaw, ibaizog DSstndot
Dervm a t y
lbawpt fm the abuts6 sf .?ha Rwulm s e m i o ~ of l h o M q a Bomcil d B U Q W ~ , Mmilog D b d o t , Ihvm City, ha4 an mtsbra 4, 3044 at b y a n IWangaj 8d.l at lor 00. A.M.
2eodalsc 0. Amoy Bmardo Le M~QM N-ta Q. Anmj RPgaio b e % k i l l s @ Jdmo 8. 4-a %yea Jr. Jeell A. hqpmam he. CaUi *o Y. Pu*emto eP24ar M e w Mi Araey
L. ,,
-6, the ~ u u y w ~ o l l ~ i l OT mangay -winl ~ u i l o g W.tliiat, p~.ao c i ty , M no obJootioa tm the zrepda an8 p~sliatensnce (Pi Depmtmea$ ~f PuWio W m k ~ and H3(Ibwe ~?lxwE);
-, thme i 8 B polstian ) ~ a t i e d h u i a 'm8hyay at tho juxtsdfiotion oi B-W WW-, MQIrll~g Wstsict1 Dav@ Uitr thaO lua W.e& Qown d ~ @ to '
. . ooptgnt land8Zbda appmdtuat6Uy hw (2) Idlomoters( o m blwnwm BxLdg@ I &me Mo-Enghdag pnojwt ie Chew md'ned consbant d t o o i n g and ou+ .$urn %dgs 11 going iaeide the mqay b t h Appowhea no@ %o bo ]aipI?aped *. be , e ~ ~ ~ e *
NOW m-, on motion of Kaa:aw& BeRnamdo Le L i r ; u l m r r , C d t t o s on Imimstructllzle, duly eecondak by aU lcagawQd pea&, be it;
BEBOLm, ars i t is hsneby r@solvaS fin Xnt-dng no objeotion and trhg Bammgay Cl0Woil nhnirl 8Uppgplt tbe mpnir and. r(dnteawncs of the Depwtrnent of Publio Works and Biglawaye (DBW1E); . I
X beeby ooz?ti* t o the oorweetn~aa of the above exaeqt.
., , , I., . ,
Republic of the Philippines,. City of Davao
OFFICE OF THE SANGGUNIANG , BARANGAY . , I Tamugan, Marilog District .
. ,
. ' EXCERPTS FROM THE 'MINUTES OF THE REGUL~R SESSION OF THE *GAY COUNCIL OF TAWGAN, MARILOG DISTRICT, DAVAO. CITY HELD, AT THE SK BUILDING ON OCTOBER 6, 2004 AT 9:00 O'CLOCK IN THE' MORNING. '
PRESENT : presiding Officer/
, ' Punong . Barangay Barangay Kagawads
SK Chairmen
: RENIE C. LIM : DIOMEDES DELA CRUZ : ANTONINO BALDOS : RUDY MODELO, . . : ROGELIO BALDOS '
: MILA REWPAGOS : CIRILIA DACUYAN * . .
: GLENN JOAQUIN : JAMES BRIAN ALDEPOLLA
ABSENT: NONE .,BRGY. RESOLUTION NO. 13 ,
Series of 2004
A passage of a resolution interposing' no objection on the project First International Bank for Reconstruction and Development .(IBW), - Assisted National Road Improv&ent Program. (NRIP of the Department of Public Works and Highways (DPWH)Remedial Works in specified landslide areas and slip sections along Davao-Calinan-Buda Road. I ,
WHEREAS, Brgy. Tamugqn needs for repair & maintenance of Bridges, canals 6 drainages, side ditches, road shoulders should be properly. paved, road curves shou1,d be provided with concrete guards and slopes should be properly secured with forest trees.
WHEREAS, Houses, Commercial ~stablishment & . Others should be properly consulted, respected, compensated end if relocated, , should be properly assisted and provided with relocation area.
W&REAS, the s.aid project was brought to the immediate attention of the Body!
WHEREAS, the Body .interposes no objectidn on the said project; .
NOW, THEREFORE, after careful deliberation, on motion by Brgy. Kgd. Antonino Baldos & duly seconded by Brgy. Kqd., Dela Cruz & kgd., Joaquin, it was i
RESOLVED AS IT .IS &EREBY RESOLVED AND APPROVED interposing no objection on the pro) ect ~irst International .Bank for Reconstrttction and Development (IBRD) -'Assisted National R6ad Improvement Program (NRIP of the Department of Public Works and ' Highways (DPWW) Remedial Works in specified landslide areaa and slip sections along Davao-Calinap-Buda Road.. '
. .
APPROVED ,unanimous1 y . . %
I hereby certify ta the correctness of the above resolution.
RFYNALDO P. QUIAOIT Brgy. Secretary
ATTESTED: RENIE C. LIM
Presiding Officer/Punong Barangay . .
1. MXA@APIW 4Prea. Wtioer~r l ly , L. WLBIN -Barcara#ay Ota#awad
K. P1ZBU JR. - -4.-
QwIwOn rsa. - -8.-
E. R O m S A . - 4 e -
0. TAN SBL. , - -4.-
4, U'PA - -do-
a. lgmamo .- 44e-
Bes.1utk.a He, 1 W@0C h f l 4 a @C % a&IO
PPAV@lClU&O SPlP lPO~5~~ AND XI!!@ 2EE 'PXO&BC5? OB EIM9 TSE@EM#APJCOHAL Bm P18AB zm-m
B-(Mlm rrm ( D m ) Ta6 m- C, a ~ I D W womm m 1wa PONS A W ~ ~m -
ww-MW11; JOI[IBIQlOl x w .
,the Darangq Ceupeil e t Dorrang~y Bud& iatezpesee ~e e1Jee- tieor eC the ellfr(r r ~ ~ ~ a d % a l weebe a d F@T IB&IA(DI Bwtm8ixq Dada i e , ene ek the tesek&~%qf a t the laad pregett.
W ,the bed8 delbbcaxat&er that the enderaemelat, oe thiar 3.48 3ar ere v S t d t e ~e e~ wEkb trlre$r ~lrrep/scat.
14 Ibt resalved br the Brgp. O*tmdP eB Erw., Burda, Mlarileg &l l t l ~ ic t , Davae CAtp,tie au~poct a d e ~ d l e r n e , ~ ~ ~ QO favexablp ~iuppert the nr@t Smterra - t i e aa l laark fer %he BeaemtnrrtSera md Devs1e)maat: ( I E ~ ) - & i t ~ % ~ ~ c a d Ma%konal Bead3 bpeavement fPrreg;raa(Fl'iWP)ad the Bepnstmmt eC Wnlllc W*rkss and % i & w ~ s (DWl)de~ Bhdr )regs& rb BemeQkal Werbar %a apedfie4 Pmdelider areass and r m a d al$p eer t ime sleug BuQalh4ar~~1~ag read.
bWl%ED, this g6th dIag ed Oe~ebdr,Et@h, en saetier e t Sea. Jsrw b. @elbi&,md duw ~eQoeaQle% bg all m~~~bsrm jrrsrarewt.
Z bs?s);y a e ~ , t k Q ~ t o the cerrectnut~ra
b ~ ~ S 9 E D BY8
OFFICE OB THE SANGGUIIANQ PAMBARAIGAY
C BXCBERPTB FROM FEIHl MINUTES OB THE BlJGDLAB SESSION OF THE SANCCU~IANU ~~AIIBARAITGAY OF PALABAPAO, QUEZON, BUKIDHON QN N O V E M B ~ R i 0,2004 H E ~ D :AT BARANCAY 118161101 HAL& AT 9 too occtocn IN THE MORSVIBC P R ~ S I D E D BY HON. RODBIQO B. NERI PUNON6 BARANGAY,
Pxesea-&: Eon*
It::: BOO* " He&* H O h * Hoa. HOEP. Eden*
ROd~i@0 B. Ne=i Permagoraen Wasasrao Rudy P a r a l i o n Bryaaldo Ni e f rs l a p e r i d i s r Alaenerdo Saver. L*vifos ga t i v idad Gereemio Domimabox Abelor Rawerr Abalor
A REOOLUTION SUPPORTIHG !fHE FIRST INTEBBATZOlAL BANK FOR RICOISTB'CIC~If3I AN3 DEVE&QPMB~~~ZBP~B)-~$~~~S~EB. BA1IQ1BTAXII ROAP ZRlPB@TlllRl[eN7P 'F]KIC~BAN{'$~XIP) OF ~ P Z I ~ R T H B ~ T ' P 09 PUBLIC WORKS
C1 ARD HT@HWAYS(PPWH) FOR T H l I R PBOJlCT: R ~ E D I A l i WORKS AND SM SPEaTFIEB LAIDGLIDE AREA8 AND $LIP S I C T I O N AbONO C U P 1-BUDA ROAD*
WEIREAS, a U o e barangay Polaoapaa i s o s s of the b e n e f i c i a r y of the r a i d remedial works, t h e body ea t e rpaee no a b j e c % i a n of t h e r a i d gxojoat .
NOW THEREPORB, a f t e r orrofwl d e l i b e r a t i o n and ea motian of Kogaweil Pe rmo~eree I a z a ~ e n o and Kadawra Mativiaad Gersamia du ly aeaomdlod by a11 fhe l r r a r g r y K~geweB gre~eat,it waa xeselved#
PEOhVlD PBR!!PER,ta ouppart t h e b i r e t I r t s x n a t i o n a l Bank f o r r r o o a s f r u o t i o a and davele n e r t ( ~ ~ ~ ~ ) - ~ a s i r t e d Nst iaaek Bosd Inproveneat b r o ~ x s m ( ~ ~ 1 ~ 0 7 ef the DeparOmo~t of Pwblio Works end H ~ ~ ~ W ~ ~ B ( D P W H ) f a 2 t h e i r px03eot( rerneaisl woxke l a speo i - f i a d l a r d r l i d e sro@a and s l i p mrcthaae a l o a 8 Camp I-Buda read.
UNANIMOUSLY OABBIEDt f avernler l o , 2004 x-x-r-x-x-x-~-,x-x-x-~-~-~-~-x-x-~-~-x-~-x-x-x-x-x-x-x-x-x-x-x-x
I HEREBY CERTIFY t e t h e corxeotmsee af the f a r ego in&
APPENDIX C-1 LOCATION NO. 32
Appendix C-1 Loc. 32 of Katipunan, Arakan, North Cotabato
Owned by Francisco Densing
Pig Pen
Chicken Pen
Top View in meters
No. 26 Corr. GI Sheet (12 ft2 . .+--.-- 1 Pcs Gemelina (l/2"x6'xlO')
dm .------- + ! bundle (4's) - 1 44 (Z"x2"xlZ') (Good Lumber) Pcs .......... .............................-.-. (2"x2"x4') Good .. Lumber Pcs .............. 7,920.00 ......... Bamboo Sticks
. ... .... ....I... ........ Nails . .. kilograms ............................
.... .................
---v-
Nails ilomarns 1 45.00 Construction Cost ....... ..............
Su b-Total ... I
TOTAL / 39,904.60
APPENDIX C-2 LOCATION NO. 26
Appendix C-2 Loc. 26 of Calinan, Buda Road Sta. 69+045 Right Side Owned By: Mr. Lervin P. Dizon
Residential House
Kitchen
Pig Pen
RESIDENTIAL HOUSE No. 3 1 Corr. GI Sheet (10 ft) (2"x4"~12') (Good Lumber) (2"x2"x20t) (Good Lumber) Gutter (3m) (4"~4"x20') (Good Lumber) (lix6"x10') (Good Lumber) (1 /2"x8"~10') (Gernelina) (1 "~8~x12) (Good Lumber)
12 11 26
3 4
Nails Construction Cost Delivery Cost
KITCHEN
6 23 20
No. 3 1 Corr. GI Sheet (6 fl) (2"~2"x6') (Good Lumber) Bamboo Sticks Small
I Subtotal 3,843.00,
pcs - pcs pcs pcs pcs
Nails Construction Cost
pcs bundles
65 1 780.00 45,202.00 1 18,080.80
1
1 2,000.00 Subtotal 1 65,282.80
I
12 1 Kgs
3 12 5
290
--"- 43 2 466
40%
1 40%
PIGPEN --- No. 3 1 Corr. GI Sheet (6 ft)
3,480.00 4,752.00 . .-
12,116.00
pcs I 560 1 1 1,200.00
350 180
Miterial Cost
pcs pcs
(1 "x8"xlO) (Good Lumber) (2"x2"~12') (Good Lumber) (1 "x6"xlO') (Good Lumber) Nails Construction Cost
290 1 870.00 1441 - 1 5,764.00
2,100.00 4,140.00
kilo Material Cost
4
1 I
bundles , , 95 , 475.00
175 1 525.00
65 1 65.00 2,745.00 1 1.098.00
5 8
28 1
40??
Subtotal I 21,O-
GRAM) TOT& 1 6,153.80
140
pcs
\/
1,680.00
700.00 pcs pcs pcs kilo Material Cost
443 1 2,215.00 280 2,240.00 350 9,800.00 65 65.00
15,020.00 q o o s . 0 0 -
APPENDIX C-3 SUMMARY OF PAPS SURVEY
\
TABLE : SUMMARY OF PAPS SURVEY
Impacts on Land
Area Affected Current Affected crops1
Total Amount, P -- Locs. 112 Amador Villanueva Agricultural 244.23 60 14,6~.80
Tamugan. Mango 3 880.00 2.640.00
Davao City Banana Hill 10 140.00 1,400.00
Sub-TotaL 18,693.80
) Tarnbad. Carmen, 1 1 1 I I Sugarcane I 1 602 1 34.600.00 /ha I 2,082.92 1
MaramagXibaweXabacan
Sub-Total I I I 1 i I I I I 4,226.92
Total for Land 22,920.72
LocJBgy. Name of Claimant Land
Municipality classificat'n
Loc. 1 Alvin Oyaren Agricultural
Total for Land, Structure and Other Entitlement P 199,850.12
Affected cmpsl Trdperreniak
Banana Hill
Impacts on Structure Davao-Calinan-Buda Road Section
Area Affected (~q-m.)
Current Va1uelsq.m.
a Y
Total for Structure and Other Entitlement LL1c23)W-- - - /
Cat of Impact
S
S
LOC. IBgy. Municipali i
Loc. 32
Katipunan.
Arakan,
North Cotabato
Loc 26
Marilog
Davao City
Amount, P Each
268.00
' each -------- 8
Use of Bldg.
ReS.
Res
~-
Name of Claimant
Francisco Densing
Lewin P. Dizon
Total Amount, P
2.144.00
sq.m.
Other Structure
Pigpen
Chickenpen
Kitchen
Pigpen
Area Affected Total Area 6q.m-) (sq.m.1 - -
Replacement Cost
Total Amount, P
50.904.60
-
Replacement Cost, Other
P Transpo Allow - l.OOO 33,928.00
- Inconvenience
Allow
10.000.00
- 14 10,ODO.O
,'-
3.843.00
21.028.00
14
f . :d
l8o00
_ __
90,153.80 -