Reservoir Slope Stability, Vegetation Management, and Dam Material Sources
May 7, 2014
![Page 2: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream](https://reader033.fdocuments.us/reader033/viewer/2022042809/5f95ccc71ea9b96afb7e401f/html5/thumbnails/2.jpg)
2
Outline
• Reservoir Slope Stability
• Reservoir Vegetation, Debris, and Sediment Management
• Dam Material Sources
![Page 3: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream](https://reader033.fdocuments.us/reader033/viewer/2022042809/5f95ccc71ea9b96afb7e401f/html5/thumbnails/3.jpg)
3
Reservoir Slope Stability
• Watershed GeoDynamics: Geomorphology study, estimates of sediment delivery to river from landslides
• Shannon & Wilson: Characterization of large landslides
![Page 4: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream](https://reader033.fdocuments.us/reader033/viewer/2022042809/5f95ccc71ea9b96afb7e401f/html5/thumbnails/4.jpg)
4
LANDSLIDES – at Dam Site
Partial Excavation Required
Partial Excavation Required
Potential Hazard to Outlet – Plugging, Debris
Consideration for Spillway Construction and Erosion by Reservoir Discharge
![Page 5: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream](https://reader033.fdocuments.us/reader033/viewer/2022042809/5f95ccc71ea9b96afb7e401f/html5/thumbnails/5.jpg)
5
LANDSLIDES – in Reservoir
Potential Large Displacement Wave Hazard, Movement could block river.
Movement could block river.
Debris sources from above Reservoir
Low Hazard
![Page 6: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream](https://reader033.fdocuments.us/reader033/viewer/2022042809/5f95ccc71ea9b96afb7e401f/html5/thumbnails/6.jpg)
6
LANDSLIDES – in Reservoir
Large Landslide. Slow movement likely. Sudden movement could block river.
Debris sources from above Reservoir
Source zone
Deposit zone
![Page 7: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream](https://reader033.fdocuments.us/reader033/viewer/2022042809/5f95ccc71ea9b96afb7e401f/html5/thumbnails/7.jpg)
7
Reservoir Vegetation, Debris, and Sediment Management
• USACE – Seattle and Portland Districts
• Site Visit – Mud Mountain (MMD) and Howard Hanson (HHD)
![Page 8: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream](https://reader033.fdocuments.us/reader033/viewer/2022042809/5f95ccc71ea9b96afb7e401f/html5/thumbnails/8.jpg)
8
Mud Mountain Dam
• MMD is a flood control only
• Pool only during flood events
• Few occurrences of high temporary reservoir pool elevations
• Never overtopped spillway
![Page 9: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream](https://reader033.fdocuments.us/reader033/viewer/2022042809/5f95ccc71ea9b96afb7e401f/html5/thumbnails/9.jpg)
9
Mud Mountain Dam - Vegetation
• Most of the reservoir is vegetated • Willow shrub land on the lower slopes
• Flooded ~ 3 times / year
• Deciduous species on mid slopes • Flooded ~ 1 to 2 times / year
• Conifer forest on the highest slopes
![Page 10: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream](https://reader033.fdocuments.us/reader033/viewer/2022042809/5f95ccc71ea9b96afb7e401f/html5/thumbnails/10.jpg)
10
Mud Mountain Dam – Vegetation Mgt
5/7/2014
![Page 11: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream](https://reader033.fdocuments.us/reader033/viewer/2022042809/5f95ccc71ea9b96afb7e401f/html5/thumbnails/11.jpg)
11
Mud Mountain Dam – Vegetation Mgt
• Initially logged; little vegetation management • Vegetation and trees not cut or removed • Log storage areas are cleared • During flood LWD (from upstream sources) can be
backed up for miles • Floating booms to collect LWD • Let LWD pass through outlet if possible • 18 inch opening on bar rack
![Page 12: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream](https://reader033.fdocuments.us/reader033/viewer/2022042809/5f95ccc71ea9b96afb7e401f/html5/thumbnails/12.jpg)
12
Mud Mountain Dam – Debris Mgt
5/7/2014
Log boom
![Page 13: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream](https://reader033.fdocuments.us/reader033/viewer/2022042809/5f95ccc71ea9b96afb7e401f/html5/thumbnails/13.jpg)
13
Mud Mountain Dam – Debris Mgt
• Lowering pool may be delayed for days or weeks following flood events that deliver large amounts of LWD
• LWD is made available to various stakeholders • Excess LWD temporarily stored in reservoir • Use boats to gather and haul LWD to storage areas • USACE developing management plan to address
LWD management, including disposal
![Page 14: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream](https://reader033.fdocuments.us/reader033/viewer/2022042809/5f95ccc71ea9b96afb7e401f/html5/thumbnails/14.jpg)
14
Mud Mountain Dam – Sediment Mgt
• Soil, gravel, cobbles, and boulders flushed through low elevation tunnel through dam
• Recently, USACE passing additional flow through higher tunnel to facilitate downstream fish passage
• Material carried through tunnel damages steel liner • Liner replaced and due for replacement • Used to have rails in invert • Full steel liner now • Lower strength steel lasts longer
![Page 15: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream](https://reader033.fdocuments.us/reader033/viewer/2022042809/5f95ccc71ea9b96afb7e401f/html5/thumbnails/15.jpg)
15
Mud Mountain Dam – Sediment Mgt
![Page 16: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream](https://reader033.fdocuments.us/reader033/viewer/2022042809/5f95ccc71ea9b96afb7e401f/html5/thumbnails/16.jpg)
16
Mud Mountain Dam – Reservoir Landslides
• USACE takes no actions to prevent landslides • Has no procedures limiting drawdown rate for
potential reservoir slope instability • Has slumping in reservoir • Yearly reconnaissance
![Page 17: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream](https://reader033.fdocuments.us/reader033/viewer/2022042809/5f95ccc71ea9b96afb7e401f/html5/thumbnails/17.jpg)
17
Mud Mountain Dam – Drawdown
• As quickly as possible • As fast as need to get storage for next storm • Drawdown limited by downstream flow capacity • ~10 ft/day max rate is typical • Drawdown may be delayed for LWD removal • Slower drawdown now because of sediment in
channel downstream
![Page 18: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream](https://reader033.fdocuments.us/reader033/viewer/2022042809/5f95ccc71ea9b96afb7e401f/html5/thumbnails/18.jpg)
18
Howard Hanson Dam
• HHD is multipurpose • Flood
• Summer stream augmentation
• Ecosystem restoration
• Drinking Water (City of Tacoma)
• Pool increase starting Feb., maintained in summer
• Never overtopped spillway
![Page 19: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream](https://reader033.fdocuments.us/reader033/viewer/2022042809/5f95ccc71ea9b96afb7e401f/html5/thumbnails/19.jpg)
19
Howard Hanson Dam - Vegetation
• The reservoir has bare slopes • Reservoir is maintained high for months • Above maximum pool, slopes are forested • Reservoir was likely logged during construction
![Page 20: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream](https://reader033.fdocuments.us/reader033/viewer/2022042809/5f95ccc71ea9b96afb7e401f/html5/thumbnails/20.jpg)
20
Howard Hanson Dam – Vegetation and Debris Mgt
• Little vegetation management • Vegetation and trees not cut or removed • LWD cannot pass through the dam • More LWD during big floods • Floating booms to collect LWD • Booms anchored at multiple elevations • Use boats to gather and haul LWD to storage areas
![Page 21: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream](https://reader033.fdocuments.us/reader033/viewer/2022042809/5f95ccc71ea9b96afb7e401f/html5/thumbnails/21.jpg)
21
Howard Hanson Dam – Debris Mgt
• 50% LWD reintroduced to river downstream • Other LWD is available to various stakeholders • Excess LWD stored in reservoir to decompose
![Page 22: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream](https://reader033.fdocuments.us/reader033/viewer/2022042809/5f95ccc71ea9b96afb7e401f/html5/thumbnails/22.jpg)
22
Howard Hanson Dam – Debris Mgt
5/7/2014
Log boom
Dead Trees in Inundation zone
![Page 23: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream](https://reader033.fdocuments.us/reader033/viewer/2022042809/5f95ccc71ea9b96afb7e401f/html5/thumbnails/23.jpg)
23
Howard Hanson Dam – Sediment Mgt
• Sediment trapped in reservoir • Have not yet had to remove sediment to maintain
pool • No plan for dealing with sediment • Purchase gravel, cobbles, and boulders. Place
downstream on bank for river to erode • Adaptive management approach
![Page 24: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream](https://reader033.fdocuments.us/reader033/viewer/2022042809/5f95ccc71ea9b96afb7e401f/html5/thumbnails/24.jpg)
24
Howard Hanson Dam – Reservoir Landslides
• USACE takes no actions to prevent landslides • Has no procedures limiting drawdown rate for
potential reservoir slope instability • Yearly reconnaissance • Right abutment is a landslide deposit
• Has been seepage problem • Drainage tunnel recently installed/upgraded
![Page 25: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream](https://reader033.fdocuments.us/reader033/viewer/2022042809/5f95ccc71ea9b96afb7e401f/html5/thumbnails/25.jpg)
25
Howard Hanson Dam – Drawdown
• As quickly as possible • As fast as need to get storage for next storm • Limited by downstream flow capacity • ~10 ft/day max rate is typical • 13 ft/day two events • Delayed to reduce downstream impacts and for in-
reservoir debris management
![Page 26: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream](https://reader033.fdocuments.us/reader033/viewer/2022042809/5f95ccc71ea9b96afb7e401f/html5/thumbnails/26.jpg)
26
MMD – HHD – Operating Costs
• $3.5M / year operating budget • $150k / year LDW and gravel placement
downstream of HHD • 8 people at each dam • Includes boats and land-based equipment
![Page 27: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream](https://reader033.fdocuments.us/reader033/viewer/2022042809/5f95ccc71ea9b96afb7e401f/html5/thumbnails/27.jpg)
27
Material Sources Study
• Task is to Determine: • Is suitable rock within reasonable distance of dam site? • Ascertain rock qualities
![Page 28: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream](https://reader033.fdocuments.us/reader033/viewer/2022042809/5f95ccc71ea9b96afb7e401f/html5/thumbnails/28.jpg)
28
Material Sources Study
• DNR permitted and active rock pits in hard rock in the Pe Ell/Chehalis area.
• WSDOT-owned pit information • Other rock pits in Pe Ell/Chehalis area • WSDOT’s Aggregate Source Approval (ASA) reports • Not yet synthesized data
![Page 29: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream](https://reader033.fdocuments.us/reader033/viewer/2022042809/5f95ccc71ea9b96afb7e401f/html5/thumbnails/29.jpg)
29
Grande Ronde Basalt
• Grande Ronde Basalt is major formation near site • Suitable rock for RCC dam • Previously performed test results
• LA Abrasion • Absorption • Specific Gravity.
• No test results found for alkali reactivity • We will perform alkali reactivity test for a source near dam
![Page 30: Reservoir Geotechnical Challenges and Dam …...Howard Hanson Dam – Drawdown • As quickly as possible • As fast as need to get storage for next storm • Limited by downstream](https://reader033.fdocuments.us/reader033/viewer/2022042809/5f95ccc71ea9b96afb7e401f/html5/thumbnails/30.jpg)
30
Filter Sand / Gravel
• Needed for Rock fill dam • Sources being identified • Glacial outwash deposit in the Chehalis/Centralia