Maximum Section Vertical Deformation - Ritschard Dam Crest...38 ft Drawdown - Nov 2012. Ice - Jan...
Transcript of Maximum Section Vertical Deformation - Ritschard Dam Crest...38 ft Drawdown - Nov 2012. Ice - Jan...
7390
7400
7410
7420
7430
7440
7450
7460
7470
7480
7490
7500
-2.50
-2.25
-2.00
-1.75
-1.50
-1.25
-1.00
-0.75
-0.50
-0.25
0.00
0.25
Res
ervo
ir El
evat
ion
ft
Mon
umen
t Set
tlem
ent f
t
Date
Maximum Section Vertical Deformation - Ritschard Dam Crest
DM 1DM 2DM 3DM 4DM 5DM 6DM 7DM 8DM 9DM 10DM 11DM 12DM 13Elevation
7440
7450
7460
7470
7480
7490
7500-1.0
-0.8
-0.6
-0.4
-0.2
0.0
0.2
Rese
rvoi
r Ele
vatio
n ft
MSL
Dow
nstr
eam
Dis
plac
emen
t -Fe
et
Date
Ritschard Downstream Displacement - Crest Monuments
DM05
DM06
DM07
DM08
DM09
DM10
RES EL
28 ft Drawdown - Nov 2002
38 ft Drawdown - Nov 2012
Ice - Jan 2012
24 ft Drawdown - Nov 2004
Begin 10 ft drawdown - July 2014
7497.5
7498.0
7498.5
7499.0
7499.5
7500.0
7500.5
7501.0
7501.5
7502.0
17000 17200 17400 17600 17800 18000 18200 18400 18600 18800 19000
Deformation Monument Easting (Feet)
October 31, 1995July 23, 1996July 17, 1997June 30, 1998November 24, 1999October 30, 2000August 29, 2001November 24, 2002January 16, 2004December 22, 2006September 9, 2008August 4, 2009December 16, 2009July 27, 2010January 27, 2011September 20, 2011January 31, 2012June 28, 2012November 14, 2012April 26, 2013July 30, 2013April 17, 2014July 3, 2014November 14, 2014April 13, 2015July 22, 2015October 15, 2015April 14, 2016June 7, 2016October 14, 2016
SpillwayChannel
DM14 - Tower -0.01 ft
DM1
DM7
DM9
DM13
LeftAbutment
DM8
DM6 - 7497.78 ft MSL - 2.30 ft
Vertical Deformation Across Ritschard Dam Crest Bridge and TowerEl
evat
ion
MSL
(Fee
t)
DM16 - Bridge Abutment
DM15 - Pier 2 Deck -0.07 ft
DM11
DM10
DM5DM4
DM3 DM2
DM12
-0.9
-0.8
-0.7
-0.6
-0.5
-0.4
-0.3
-0.2
-0.1
0.0
0.1
Sett
lem
ent f
t
Date
Downstream Shell DM Settlement 2009-2016
DM24DM25DM26DM27DM28DM29DM30DM31DM32DM33DM34DM35DM36DM37DM38DM39
July 2014November 2014
-0.7
-0.6
-0.5
-0.4
-0.3
-0.2
-0.1
0.0
0.1
0.2
Hor
izon
tal D
ispl
acem
ent f
t
Date
Downstream Shell DM Horizontal Displacement 2009-2016
DM24DM25DM26DM27DM28DM30DM30DM31DM32DM33DM34DM35DM36DM37DM38DM39
Dow
nstr
eam
July 2014
November 2014
-1.00
-0.75
-0.50
-0.25
0.00
0.25
-0.50-0.250.000.25
Sett
lem
ent f
t
Northing Displacement ft
Ritschard Displacement Vectors - Downstream Shell
DM36
DM37
DM38
DM39
Bridge Monuments from 11/2009 to 6/2016
11/09
10/16
-0.75
-0.50
-0.25
0.00
0.25
-0.50-0.250.000.25
Sett
lem
ent f
t
Northing Displacement ft
Ritschard Displacement Vectors - Downstream Shell
DM32
DM33
DM34
DM35
Bridge Monuments from 11/2009 to 6/2016
11/09
10/16
-0.25
0.00
0.25
-0.50-0.250.000.25
Sett
lem
ent f
t
Northing Displacement ft
Ritschard Displacement Vectors - Downstream Shell
DM28
DM29
DM30
DM31
Bridge Monuments from 11/2009 to 6/2016
11/09
10/16
-0.25
0.00
0.25
-0.50-0.250.000.25
Sett
lem
ent f
t
Northing Displacement ft
Ritschard Displacement Vectors - Downstream Shell
DM24
DM25
DM26
DM27
Bridge Monuments from 11/2009 to 6/2016
11/09
10/16
-0.90
-0.80
-0.70
-0.60
-0.50
-0.40
-0.30
-0.20
-0.10
0.00
0.10
-0.60-0.50-0.40-0.30-0.20-0.100.000.10
Sett
lem
ent f
t
Northing Displacement ft
Ritschard Displacement Vectors - Downstream Slope
DM6 DM24 DM28 DM32 DM36 D-S Slope
Downstream Face DMs from 8/2009 to 6/2016
-0.90
-0.80
-0.70
-0.60
-0.50
-0.40
-0.30
-0.20
-0.10
0.00
0.10
-0.60-0.50-0.40-0.30-0.20-0.100.000.10
Sett
lem
ent f
t
Northing Displacement ft
Ritschard Displacement Vectors - Downstream Slope
DM07 DM25 DM29 DM33 DM37 D-S Slope
Downstream Face DMs from 8/2009 to 6/2016
-0.90
-0.80
-0.70
-0.60
-0.50
-0.40
-0.30
-0.20
-0.10
0.00
0.10
-0.60-0.50-0.40-0.30-0.20-0.100.000.10
Sett
lem
ent f
t
Northing Displacement ft
Ritschard Displacement Vectors - Downstream Slope
DM8 DM26 DM30 DM34 DM38 D-S Slope
Downstream Face DMs from 8/2009 to 6/2016
-0.90
-0.80
-0.70
-0.60
-0.50
-0.40
-0.30
-0.20
-0.10
0.00
0.10
-0.60-0.50-0.40-0.30-0.20-0.100.000.10
Sett
lem
ent f
t
Northing Displacement ft
Ritschard Displacement Vectors - Downstream Slope
DM9 DM27 DM31 DM35 DM39 D-S Slope
Downstream Face DMs from 8/2009 to 6/2016
-2.25
-2.00
-1.75
-1.50
-1.25
-1.00
-0.75
-0.50
-0.25
0.00
0.25
-1.50-1.25-1.00-0.75-0.50-0.250.000.25
Sett
lem
ent f
t
Northing Displacement ft
Ritschard Displacement Vectors - Bridge and Crest
Crest - DM09
Abutment - DM16
Deck 2 - DM15
Tower - DM14
Bridge Monuments from 10/1995 to 6/2016
10/95
10/16
-0.60
-0.50
-0.40
-0.30
-0.20
-0.10
0.00
0.10
0.20
-0.50-0.40-0.30-0.20-0.100.000.10
Sett
lem
ent f
t
Northing Displacement ft
Ritschard Displacement Vectors - Bridge Piers
Abutment - DM40
Pier 1 Cap - DM41
Pier 2 Cap - DM42
Pier 3 Cap - DM43
Bridge Monuments from 8/2009 to 6/2016
8/09
10/16
ice 02/13/12
-0.80
-0.70
-0.60
-0.50
-0.40
-0.30
-0.20
-0.10
0.00
0.10
0.20
-0.50-0.40-0.30-0.20-0.100.000.10
Sett
lem
ent f
t
Northing Displacement ft
Ritschard Displacement Vectors - Bridge Piers
Crest - DM9
Abutment - DM16
Deck 2 - DM15
Tower - DM14
Abutment - DM40
Pier 1 Cap - DM41
Pier 2 Cap - DM42
Pier 3 Cap - DM43
Bridge Monuments from 8/2009 to 6/2016
8/09
10/16
ice 02/13/12
7320
7340
7360
7380
7400
7420
7440
7460
7480
7500
-1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 4
Elev
eaio
n in
feet
MSL
Cumulative Displacement from 11/17/2009 in inches
Ritschard Inclinometer Cumulative Displacement I-1 A-Axis12/10/20091/14/20102/25/20104/26/20106/2/20106/21/20107/28/20108/24/20109/21/201010/20/201011/18/201012/20/20101/30/20112/23/20113/24/20114/21/20114/27/20115/27/20116/24/20117/27/20118/26/20119/28/201110/24/201111/28/20111/2/20122/2/20122/29/20124/5/20125/2/20126/6/20127/5/20128/8/20129/12/201210/10/201211/7/201212/5/20121/27/20132/6/20133/14/20134/10/20135/15/20136/13/20137/9/20138/14/20139/5/201310/9/201311/7/201312/2/20131/16/20142/11/20143/5/20144/16/20145/15/20146/2/20147/9/20148/5/20149/11/201410/7/201411/6/201412/10/20141/9/20152/12/20153/17/20154/13/20155/14/20156/17/20158/21/20159/18/201510/14/201511/19/201512/9/20151/15/20162/21/20163/16/20164/14/20165/19/20166/16/20167/14/20169/14/201610/7/201611/9/201612/9/20161/12/20172/12/20173/9/20174/15/2017
Bedrock 7362' MSL
Core
Upstream Downstream
2012 Drawdown
2013 Fill
2012 Drawdown
ApproxMonthlyReadings
2014 Fill
2016 Fill
7290
7310
7330
7350
7370
7390
7410
7430
7450
7470
-1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 4
Elev
atio
n in
feet
MSL
Cumulative Displacement from 11/17/2009 in inches
Ritschard Inclinometer Cumulative Displacement I-2 A-Axis12/2/20091/14/20102/11/20103/25/20104/22/20105/25/20106/21/20107/28/20108/24/201010/20/201011/18/201012/20/20101/26/20112/23/20113/24/20115/4/20115/27/20116/24/20117/27/20118/26/20119/28/201110/24/201111/28/20111/2/20122/2/20122/28/20124/5/20125/2/20126/6/20127/5/20128/8/20129/12/201210/3/201211/7/201212/5/20121/27/20132/6/20133/14/20134/10/20135/15/20136/13/20137/3/20138/14/20139/5/201310/9/201311/7/201312/2/20131/16/20142/11/20143/5/20144/16/20145/15/20146/11/20147/9/20148/5/20149/11/201410/7/201411/6/201412/10/20141/9/20152/12/20153/17/20154/13/20155/14/20156/17/20157/29/20158/25/20159/18/201510/14/201511/19/201512/9/20151/15/20162/21/20163/16/20164/14/20165/19/20166/16/20167/14/20168/17/20169/14/201610/7/201611/9/201612/9/20161/12/20172/12/20173/9/20174/15/2017
Bedrock 7361' MSL
Shell
Overburden 7366' MSL
Upstream Downstream
2012 Drawdown
2013 Refill
ApproxMonthlyReadings
2015 Spring Ops
7320
7340
7360
7380
7400
7420
7440
7460
7480
7500
-1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 4
Elev
atio
n in
feet
MSL
Cumulative Displacement from 12/16/2011 in inches
Ritschard Inclinometer Cumulative Displacement I-1 A-Axis1/2/20122/2/20122/28/20124/5/20125/2/20126/6/20127/5/20128/8/20129/5/201210/3/201211/7/201212/5/20121/27/20132/6/20133/14/20134/4/20135/8/20136/4/20137/9/20138/14/20139/5/201310/9/201311/7/201312/2/20131/16/20142/11/20143/5/20144/16/20145/15/20146/2/20147/9/20148/5/20149/11/201410/7/201411/6/201412/10/20141/9/20152/12/20153/17/20154/13/20155/14/20156/17/20158/21/20159/18/201511/19/201512/9/20151/15/20162/21/20163/16/20164/14/20165/19/20166/16/20167/14/20169/14/201610/7/201611/9/201612/9/20161/12/20172/12/20173/9/20174/15/2017
Bedrock 7362' MSL
Core
Upstream Downstream
2012 Drawdown
2013 Fill
ApproximatelyMonthlyReadings
2014 Fill
2016 Fill
7320
7340
7360
7380
7400
7420
7440
7460
7480
7500
-1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 4
Elev
atio
n in
feet
MSL
Cumulative Displacement from 12/16/2011 in inches
Ritschard Inclinometer Cumulative Displacement I-3 A-Axis12/20/20111/2/20122/6/20122/29/20124/5/20125/2/20126/6/20127/5/20128/8/20129/5/201210/3/201211/7/201212/5/20121/27/20132/6/20133/14/20134/4/20135/8/20136/4/20137/9/20138/14/20139/5/201310/9/201311/7/201312/2/20131/16/20142/11/20143/5/20144/16/20145/15/20146/11/20147/9/20148/5/20149/11/201410/7/201411/6/201412/10/20141/9/20152/12/20153/17/20154/13/20155/14/20156/17/20157/29/20158/21/20159/18/201510/14/201511/19/201512/9/20151/15/20162/21/20163/16/20164/14/20165/19/20166/16/20167/14/20168/17/20169/14/201610/7/201611/9/201612/9/20161/12/20172/12/20173/9/20174/15/2017
Bedrock 7362' MSL
Core
Upstream Downstream
2012Drawdown
2013 Fill
ApproxMonthlyReadings
2014 Fill
2014 Drawdown
2016 Fill
7320
7340
7360
7380
7400
7420
7440
7460
7480
7500
-1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 4
Elev
atio
n in
feet
MSL
Cumulative Displacement from 12/16/2011 in inches
Ritschard Inclinometer Cumulative Displacement I-5 A-Axis12/20/20111/2/20122/2/20122/29/20124/5/20125/2/20126/6/20127/5/20128/8/20129/5/201210/3/201211/7/201212/5/20121/27/20132/6/20133/14/20134/4/20135/8/20136/4/20137/9/20138/14/20139/5/201310/9/201311/7/201312/2/20131/16/20142/11/20143/5/20144/16/20145/15/20146/11/20147/9/20148/5/20149/11/201410/7/201411/6/201412/10/20141/9/20152/12/20153/17/20154/13/20155/14/20156/17/20157/29/20158/21/20159/18/201510/14/201511/19/201512/9/20151/15/20162/21/20163/16/20164/14/20165/19/20166/16/20167/14/20168/17/20169/14/201610/7/201611/9/201612/9/20161/12/20172/12/20173/9/20174/15/2017
Bedrock 7385' MSL
Core
Upstream Downstream
2012 Drawdown
2013 Refill
ApproxMonthlyReadings
7290
7310
7330
7350
7370
7390
7410
7430
7450
7470
-1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 4
Elev
atio
n in
feet
MSL
Cumulative Displacement from 12/16/2011 in inches
Ritschard Inclinometer Cumulative Displacement I-2 A-Axis1/2/20122/2/20122/28/20124/5/20125/2/20126/6/20127/5/20128/8/20129/5/201210/3/201211/7/201212/5/20121/27/20132/6/20133/14/20134/4/20135/8/20136/4/20137/3/20138/14/20139/5/201310/9/201311/7/201312/2/20131/16/20142/11/20143/5/20144/16/20145/15/20146/11/20147/9/20148/5/20149/11/201410/7/201411/6/201412/10/20141/9/20152/12/20153/17/20154/13/20155/14/20156/17/20157/29/20158/25/20159/18/201511/19/201512/9/20151/15/20162/21/20163/16/20164/14/20165/19/20166/16/20167/14/20168/17/20169/14/201610/7/201611/9/201612/9/20161/12/20172/12/20154/15/2017
Bedrock 7361' MSL
Shell
Overburden 7366' MSL
Upstream Downstream
2012 Drawdown
2013 Refill
ApproximatelyMonthlyReadings
2015 Spring Ops
7310
7330
7350
7370
7390
7410
7430
7450
7470
7490
-1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 4
Elev
atio
n in
feet
MSL
Cumulative Displacement from 12/16/2011 in inches
Ritschard Inclinometer Cumulative Displacement I-4 A-Axis12/20/20111/2/20122/2/20122/29/20124/5/20125/2/20126/6/20127/5/20128/8/20129/5/201211/7/201211/7/201212/5/20121/27/20132/6/20133/14/20134/4/20135/8/20136/4/20137/9/20138/14/20139/5/201310/9/201311/7/201312/2/20131/16/20142/11/20143/5/20144/16/20145/15/20146/2/20147/9/20148/5/20149/11/201410/7/201411/6/201412/10/20141/9/20152/12/20153/17/20154/13/20155/14/20156/17/20157/29/20158/25/20159/18/201510/14/201511/19/201512/9/20151/15/20162/21/20163/16/20164/14/20165/19/20166/16/20167/14/20168/17/20169/14/201610/7/201611/9/201612/9/20161/12/20172/12/20173/9/2017
Bedrock 7360' MSL
Shell
Upstream Downstream
2012Drawdown
2013 Fill
ApproxMonthlyReadings
2015 Fill
2016 Fill
7310
7330
7350
7370
7390
7410
7430
7450
7470
7490
-1 -0.5 0 0.5 1 1.5 2 2.5 3 3.5 4
Elev
atio
n in
feet
MSL
Cumulative Displacement from 12/16/2011 in inches
Ritschard Inclinometer Cumulative Displacement I-6 A-Axis12/20/20111/2/20122/6/20122/28/20124/5/20125/2/20126/6/20127/5/20128/8/20129/12/201210/3/201211/7/201212/5/20121/27/20132/6/20133/14/20134/10/20135/8/20136/4/20138/14/20138/14/20139/5/201310/9/201311/7/201312/2/20131/16/20142/11/20143/5/20144/16/20145/15/20146/2/20147/9/20148/5/20149/11/201410/7/201411/6/201412/10/20141/9/20152/12/20153/17/20154/13/20155/14/20156/17/20158/21/20159/18/201510/14/201511/19/201512/9/20151/15/20162/21/20163/16/20164/14/20165/19/20166/16/20167/14/20168/17/20169/14/201610/7/201611/9/201612/9/20161/12/20172/12/20173/9/20174/15/2017
Bedrock 7378' MSL
Shell
Upstream Downstream
2012 Drawdown
2013 Fill
ApproxMonthlyReadings
7310
7330
7350
7370
7390
7410
7430
7450
7470
7490
-1 -0.75 -0.5 -0.25 0 0.25 0.5 0.75 1
Elev
atio
n in
feet
MSL
Cumulative Displacement from 8/2/2012 in inches
Ritschard Inclinometer Cumulative Displacement I-7 A-Axis8/8/20128/15/128/22/20128/29/20129/5/20129/12/20129/19/20129/25/201210/3/201210/10/201210/17/201210/22/201210/31/201211/7/201211/14/201212/5/20126/13/20137/9/20138/14/20139/5/201310/9/201311/7/201312/2/20131/16/20142/11/20143/5/20144/16/20145/15/20146/2/20147/9/20148/5/20149/11/201410/7/201411/6/201412/10/20141/9/20152/12/20153/17/20154/13/20155/14/20156/17/20158/21/20159/18/201510/14/201511/19/201512/9/20151/15/20162/21/20163/16/20164/14/20165/19/20166/16/20167/14/20168/17/20169/14/201610/7/201611/9/201612/9/20161/12/20172/12/20173/9/20174/15/2017
Bedrock 7363' MSL
Shell
Upstream Downstream
2012 Drawdown
Post-2012 Drawdown and Refill
Mix ofMonthly/WeeklyReadings
7310
7330
7350
7370
7390
7410
7430
7450
7470
7490
-1 -0.75 -0.5 -0.25 0 0.25 0.5 0.75 1
Elev
atio
n in
feet
MSL
Cumulative Displacement from 8/2/2012 in inches
Ritschard Inclinometer Cumulative Displacement I-8 A-Axis8/8/20129/5/20129/12/20129/19/20129/25/201210/3/201210/10/201210/31/201211/7/201212/5/20121/27/20136/13/20137/9/20138/14/20139/5/201310/9/201311/7/201312/2/20131/16/20142/11/20143/5/20144/16/20145/15/20146/2/20147/9/20148/5/20149/11/201410/7/201411/6/201412/10/20141/9/20152/12/20153/17/20154/13/20155/14/20156/17/20157/16/20158/21/20159/18/201510/14/201511/19/201512/9/20151/15/20162/21/20163/16/20164/14/20165/19/20166/16/20167/14/20168/17/20169/14/201610/7/201611/9/201612/9/20161/12/20172/12/20173/9/20174/15/2017
Bedrock 7385' MSL
Shell
Upstream Downstream
2012 Drawdown
Post-201 Drawdown and Refill
Mix ofMonthly/WeeklyReadings
7310
7330
7350
7370
7390
7410
7430
7450
7470
7490
-2 -1.5 -1 -0.5 0 0.5 1 1.5 2 2.5
Elev
atio
n in
feet
MSL
Cumulative Displacement from 8/2/2012 in inches
Ritschard Inclinometer Cumulative Displacement I-9 A-Axis8/8/20129/5/201210/10/201211/7/201212/5/20121/27/20132/6/20133/14/20134/10/20135/8/20135/29/20136/13/20137/9/20138/14/20139/5/201310/9/201311/7/201312/2/20131/16/20142/11/20143/5/20144/16/20145/7/20146/2/20147/1/20148/5/20149/11/201410/7/201411/6/201412/10/20141/9/20152/12/20153/17/20154/13/20155/14/20156/17/20157/16/20158/21/20159/18/201510/14/201511/19/201512/9/20151/15/20162/21/20163/16/20164/14/20165/19/20166/16/20168/17/20169/14/201610/7/201611/9/201612/9/20161/12/20172/12/20173/9/20174/15/2017
Bedrock 7363' MSL
Shell
Upstream Downstream
Post-2012 Drawdown and Refill
2012 Drawdown
2014 Fill
ApproxMonthlyReadings
2016 Fill
7290
7310
7330
7350
7370
7390
7410
7430
7450
7470
-1.0 -0.5 0.0 0.5 1.0 1.5 2.0 2.5 3.0
Elev
atio
n in
feet
MSL
Cumulative Displacement from 9/14/2016 in inches
Ritschard Inclinometer Cumulative Displacement I-10 A-Axis
10/7/2016
11/9/2016
12/12/2016
1/12/2017
2/12/2017
3/9/2017
4/15/2017
Bedrock 7372.5' MSL
Shell
Upstream DownstreamApproxMonthlyReadings
7290
7310
7330
7350
7370
7390
7410
7430
7450
7470
-1.0 -0.5 0.0 0.5 1.0 1.5 2.0 2.5 3.0
Elev
atio
n in
feet
MSL
Cumulative Displacement from 9/14/2016 in inches
Ritschard Inclinometer Cumulative Displacement I-10 B-Axis
10/7/2016
11/9/2016
12/12/2016
1/12/2017
2/12/2017
3/9/2017
4/15/2017
Bedrock 7372.5' MSL
Shell
Upstream DownstreamApproxMonthlyReadings
7280
7300
7320
7340
7360
7380
7400
7420
7440
7460
7480
7500
-0.5 0 0.5 1 1.5 2 2.5 3 3.5 4
Elev
atio
n in
feet
MSL
Cumulative Displacement 11/28/2011 to 3/16/2016 in inches
Ritschard Core Inclinometers Cumulative Displacement A-Axis
I-1
I-3
I-5
Bedrock 7362' MSL
Core
Upstream Downstream
Bedrock 7362' MSL
Bedrock 7385' MSL
movement since November 2011
7280
7300
7320
7340
7360
7380
7400
7420
7440
7460
7480
7500
-0.5 0 0.5 1 1.5 2 2.5 3 3.5 4
Elev
atio
n in
feet
MSL
Cumulative Displacement 11/28/2011 to 3/16/2016 in inches
Ritschard Shell Inclinometers Cumulative Displacement A-Axis
I-2
I-4
I-6
Bedrock 7360' MSL
Shell
Upstream Downstream
Bedrock 7378' MSL
Bedrock 7361' MSL
movement since November 2011
7450
7452
7454
7456
7458
7460
7462
7464
7466
7468
7470
7472
7474
7476
7478
7480
7482
7484
7486
7488
7490
7492
-0.4
-0.2
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
2.2
2.4
2.6
2.8
3.0
3.2
3.4
3.6
3.8
Rese
rvoi
r Ele
vatio
n in
feet
Disp
lace
men
t in
inch
es
Date
Ritschard Inclinometer Displacement by Depth Compared to Water Surface Elevation I-1 A-Axis
10
20
30
40
50
60
70
Elevation
0.4"
0.74"
7450
7452
7454
7456
7458
7460
7462
7464
7466
7468
7470
7472
7474
7476
7478
7480
7482
7484
7486
7488
7490
7492
-0.4
-0.2
0
0.2
0.4
0.6
0.8
1
1.2
1.4
1.6
1.8
2
2.2
2.4
2.6
2.8
3
3.2
3.4
3.6
3.8
Rese
rvoi
r Ele
vatio
n in
feet
Disp
lace
men
t in
inch
es
Date
Ritschard Inclinometer Displacement by Depth Compared to Water Surface Elevation I-3 A-Axis
10
20
30
40
50
60
70
Elevation
7450
7452
7454
7456
7458
7460
7462
7464
7466
7468
7470
7472
7474
7476
7478
7480
7482
7484
7486
7488
7490
7492
-0.4
-0.2
0
0.2
0.4
0.6
0.8
1
1.2
1.4
1.6
1.8
2
2.2
2.4
2.6
2.8
3
3.2
3.4
3.6
3.8
Rese
rvoi
r Ele
vatio
n in
feet
Disp
lace
men
t in
inch
es
Date
Ritschard Inclinometer Displacement by Depth Compared to Water Surface Elevation I-5 A-Axis
10
20
30
40
50
60
70
Elevation
7450
7452
7454
7456
7458
7460
7462
7464
7466
7468
7470
7472
7474
7476
7478
7480
7482
7484
7486
7488
7490
7492
-0.4
-0.2
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
2.2
2.4
2.6
2.8
3.0
3.2
3.4
3.6
3.8
Rese
rvoi
r Ele
vatio
n in
feet
Disp
lace
men
t in
inch
es
Date
Ritschard Inclinometer Displacement by Depth Compared to Water Surface Elevation I-2 A-Axis
10
20
30
40
50
60
70
Elevation
0.3"
0.48"
0.38"
7450
7452
7454
7456
7458
7460
7462
7464
7466
7468
7470
7472
7474
7476
7478
7480
7482
7484
7486
7488
7490
7492
-0.4
-0.2
0
0.2
0.4
0.6
0.8
1
1.2
1.4
1.6
1.8
2
2.2
2.4
2.6
2.8
3
3.2
3.4
3.6
3.8
Rese
rvoi
r Ele
vatio
n in
feet
Disp
lace
men
t in
inch
es
Date
Ritschard Inclinometer Displacement by Depth Compared to Water Surface Elevation I-4 A-Axis
10
20
30
40
50
60
70
Elevation
7450
7452
7454
7456
7458
7460
7462
7464
7466
7468
7470
7472
7474
7476
7478
7480
7482
7484
7486
7488
7490
7492
-0.4
-0.2
0
0.2
0.4
0.6
0.8
1
1.2
1.4
1.6
1.8
2
2.2
2.4
2.6
2.8
3
3.2
3.4
3.6
3.8
Rese
rvoi
r Ele
vatio
n in
feet
Disp
lace
men
t in
inch
es
Date
Ritschard Inclinometer Displacement by Depth Compared to Water Surface Elevation I-6 A-Axis
10
20
30
40
50
60
70
Elevation
7435
7440
7445
7450
7455
7460
7465
7470
7475
7480
7485
7490
7495
7500
7505
-0.8
-0.7
-0.6
-0.5
-0.4
-0.3
-0.2
-0.1
0
0.1
0.2
0.3
0.4
0.5
0.6
Rese
rvoi
r Ele
vatio
n in
feet
Disp
lace
men
t in
inch
es
Date
Ritschard Inclinometer Displacement by Depth Compared to Water Surface Elevation I-7 A-Axis
26364658667686Elevation
7435
7440
7445
7450
7455
7460
7465
7470
7475
7480
7485
7490
7495
7500
7505
-1
-0.9
-0.8
-0.7
-0.6
-0.5
-0.4
-0.3
-0.2
-0.1
0
0.1
0.2
0.3
0.4
Rese
rvoi
r Ele
vatio
n in
feet
Disp
lace
men
t in
inch
es
Date
Ritschard Inclinometer Displacement by Depth Compared to Water Surface Elevation I-8 A-Axis
26364656667686Elevation
7435
7440
7445
7450
7455
7460
7465
7470
7475
7480
7485
7490
7495
7500
7505
-0.4
-0.3
-0.2
-0.1
0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1
Rese
rvoi
r Ele
vatio
n in
feet
Disp
lace
men
t in
inch
es
Date
Ritschard Inclinometer Displacement by Depth Compared to Water Surface Elevation I-9 A-Axis
26364656667686Elevation
7435
7440
7445
7450
7455
7460
7465
7470
7475
7480
7485
7490
7495
7500
7505
-0.2
-0.1
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
1.1
1.2
Rese
rvoi
r Ele
vatio
n in
feet
Disp
lace
men
t in
inch
es
Date
Ritschard Inclinometer Displacement Comparison I-1 minus I-2 A-Axis
7450
7457
7464
7471
7478
7485
7492
-0.5
0.0
0.5
1.0
1.5
2.0
2.5
Rese
rvoi
r Ele
vatio
n in
feet
Disp
lace
men
t in
inch
es
Date
Ritschard Inclinometer Displacement Comparison I-1 minus I-2; I-3 minus I-4; I-5 minus I-6: A-Axis
I-1 minus I-2I-3 minus I-4I-5 minus I-6Elevation
-0.54-0.52-0.50-0.48-0.46-0.44-0.42-0.40-0.38-0.36-0.34-0.32-0.30-0.28-0.26-0.24-0.22-0.20-0.18-0.16-0.14-0.12-0.10-0.08-0.06-0.04-0.020.000.020.040.06
Diffe
renc
e fr
om In
itial
Ele
vatio
n 11
/17/
09 (
ft)
Date
Ritschard Dam 2009 Instrumentation Extensometer ME-1 Readings
CHANGE TOP (7499' MSL)
CHANGE SM 4 (7480' MSL)
CHANGE SM 3 (7445' MSL)
CHANGE SM 2 (7415' MSL)
CHANGE SM 1 (7385' MSL)
CHANGE DATUM (7322' MSL)
(Assumes Datum Magnet is Fixed)
-0.54-0.52-0.50-0.48-0.46-0.44-0.42-0.40-0.38-0.36-0.34-0.32-0.30-0.28-0.26-0.24-0.22-0.20-0.18-0.16-0.14-0.12-0.10-0.08-0.06-0.04-0.020.000.020.040.06
Diffe
renc
e fr
om In
itial
Ele
vatio
n 11
/17/
09 (
ft)
Date
Ritschard Dam 2009 Instrumentation Extensometer ME-2 Readings
CHANGE TOP (7465' MSL)
CHANGE SM 4 (7440' MSL)
CHANGE SM 3 (7419' MSL)
CHANGE SM 2 (7400' MSL)
CHANGE SM 1 (7379' MSL)
CHANGE DATUM (7289' MSL)
(Assumes Datum Magnet Fixed)
-0.16
-0.14
-0.12
-0.10
-0.08
-0.06
-0.04
-0.02
0.00
0.02
0.04
0.06
Diffe
renc
e fr
om In
itial
Ele
vatio
n 8/
2/12
(ft
)
Date
Ritschard Dam 2009 Instrumentation Extensometer ME-3 Readings
CHANGE TOP (7495' MSL)
CHANGE SM 4 (7466' MSL)
CHANGE SM 3 (7440' MSL)
CHANGE SM 2 (7406' MSL)
CHANGE SM 1 (7391' MSL)
CHANGE DATUM (7344' MSL)
(Assumes Datum Magnet Fixed)
-0.16
-0.14
-0.12
-0.10
-0.08
-0.06
-0.04
-0.02
0.00
0.02
0.04
0.06
Diffe
renc
e fr
om In
itial
Ele
vatio
n 8/
2/12
(ft
)
Date
Ritschard Dam 2009 Instrumentation Extensometer ME-4 Readings
CHANGE TOP (7495' MSL)
CHANGE SM 4 (7469' MSL)
CHANGE SM 3 (7453' MSL)
CHANGE SM 2 (7432' MSL)
CHANGE SM 1 (7413' MSL)
CHANGE DATUM (7372' MSL)
(Assumes Datum Magnet Fixed)
7360
7370
7380
7390
7400
7410
7420
7430
7440
7450
7460
7470
7480
7490
7500
7510
Elev
atio
n M
SL (f
t)
Date
Ritschard Dam Core Piezometers
P-1 OSP
P-5A OSP
P-6A OSP
P-7A OSP
P-5 VWP
P-6 VWP
P-7 VWP
P-9 OSP
P-10 OSP
P-11 OSP
Elevation
Reservoir Surface
P-5, P-5A isolated in foundation near P-1
P-6, P-6A isolated in core @90-100' near bridge abutment 7' u/s of centerline
P-7, P-7A isolated in core @90-100'near bridge abutment 7' d/s of centerline
P-1 isolated in core @125-135' 7' d/s of centerline
P-9, 10, 11 isolated in core @90-100' (east to west)
7360
7370
7380
7390
7400
7410
7420
7430
7440
7450
7460
7470
7480
7490
7500
7510
7520
Elev
atio
n M
SL (f
t)
Date
Ritschard Dam Core Piezometers P-1 OSPP-5A OSPP-6A OSPP-7A OSPP-5 VWPP-6 VWPP-7 VWPP-9 OSPP-10 OSPP-11 OSPP-12 OSPElevationVW-10VW-11VW-12VW-13VW-14VW-15VW-16VW-17VW-18VW-19VW-20VW-21VW-22VW-23VW-24VW-25VW-26VW-27VW-28VW-29VW-30VW-31VW-32VW-33VW-34VW-35
Reservoir Surface
7450
7455
7460
7465
7470
7475
7480
7485
7490
7495
7500
7505
Elev
atio
n (ft
)
Date
Ritschard Dam Core Piezometers
P-6 VWP
P-7 VWP
Reservoir
Full Pool
P-6A OSP
P-7A OSP
Spill Spill Spill2012 Drawdown Spill
y = 0.1381x + 6462.9R² = 0.3318
y = 0.1153x + 6626.2R² = 0.3837
7480
7485
7490
7495
7500
7465 7470 7475 7480 7485 7490 7495
Piez
omet
er W
ater
Sur
face
Ele
vatio
n ft
MSL
Reservoir Surface Elevation ft MSL
Piezometer Response to Reservoir Load
P-6
P-7
Linear (P-6)
Linear (P-7)
August 2013 - January 2017
May 18, 2016- rapid fill
June 16, 2016
7400
7410
7420
7430
7440
7450
7460
7470
7480
7490
7500
7510
7520
7530
Elev
atio
n M
SL (f
t)
Date
Ritschard Dam Core Piezometers P-1 OSPP-5A OSPP-6A OSPP-7A OSPP-5 VWPP-6 VWPP-7 VWPP-9 OSPP-10 OSPP-11 OSPElevationVW-10VW-11VW-12VW-13VW-14VW-15VW-16VW-17VW-18VW-19VW-20VW-21VW-22VW-23VW-24VW-25VW-26VW-27VW-28VW-29VW-30VW-30VW-32VW-33VW-34VW-35
Reservoir Surface
7460
7465
7470
7475
7480
7485
7490
7495
7500
7505
7510
Elev
atio
n M
SL (f
t)
Date
Ritschard Dam Core Piezometers
P-1 OSP
P-5A OSP
P-6A OSP
P-7A OSP
P-5 VWP
P-6 VWP
P-7 VWP
P-9 OSP
P-10 OSP
P-11 OSP
P-12 OSP
Elevation
VW-10 @45 ft
VW-11 @53 ft
VW-12 @62 ft
VW-13 @75 ft
Reservoir Surface
7460
7465
7470
7475
7480
7485
7490
7495
7500
7505
7510
Elev
atio
n M
SL (f
t)
Date
Ritschard Dam Core Piezometers
P-1 OSP
P-5A OSP
P-6A OSP
P-7A OSP
P-5 VWP
P-6 VWP
P-7 VWP
P-9 OSP
P-10 OSP
P-11 OSP
Elevation
VW-14 @45 ft
VW-15 @53 ft
VW-16 @62 ft
VW-17 @75 ft
Reservoir Surface
7460
7465
7470
7475
7480
7485
7490
7495
7500
7505
7510
Elev
atio
n M
SL (f
t)
Date
Ritschard Dam Core Piezometers
P-1 OSP
P-5A OSP
P-6A OSP
P-7A OSP
P-5 VWP
P-6 VWP
P-7 VWP
P-9 OSP
P-10 OSP
P-11 OSP
Elevation
VW-18 @45 ft
VW-19 @53 ft
VW-20 @62 ft
VW-21 @75 ft
Reservoir Surface
7420
7430
7440
7450
7460
7470
7480
7490
7500
7510
7520
7530
Elev
atio
n M
SL (f
t)
Date
Ritschard Dam Core Piezometers
P-1 OSP
P-5A OSP
P-6A OSP
P-7A OSP
P-5 VWP
P-6 VWP
P-7 VWP
P-9 OSP
P-10 OSP
P-11 OSP
Elevation
VW-22 @45 ft
VW-23 @53 ft
VW-24 @60 ft
VW-25 @75 ft
Reservoir Surface
7420
7430
7440
7450
7460
7470
7480
7490
7500
7510
7520
7530
Elev
atio
n M
SL (f
t)
Date
Ritschard Dam Core Piezometers
P-1 OSP
P-5A OSP
P-6A OSP
P-7A OSP
P-5 VWP
P-6 VWP
P-7 VWP
P-9 OSP
P-10 OSP
P-11 OSP
Elevation
VW-26 @20 ft
VW-27 @28 ft
VW-28 @36 ft
VW-29 @45 ft
VW-30 @80 ft
Reservoir Surface
7400
7410
7420
7430
7440
7450
7460
7470
7480
7490
7500
7510
7520
7530
Elev
atio
n M
SL (f
t)
Date
Ritschard Dam Core Piezometers
P-1 OSP
P-5A OSP
P-6A OSP
P-7A OSP
P-5 VWP
P-6 VWP
P-7 VWP
P-9 OSP
P-10 OSP
P-11 OSP
Elevation
VW-31 @20 ft
VW-32 @28 ft
VW-33 @36 ft
VW-34 @45 ft
VW-35 @80 ft
Reservoir Surface
7350
7360
7370
7380
7390
7400
7410
7420
7430
7440
7450
7460
7470
7480
7490
7500
Elev
atio
n (ft
)
Date
Ritschard Dam Core Piezometers
Reservoir
Full Pool
P-1
P-6A
P-7A
P-9
P-10
P-11
Spill SpillSpill
Completion Interval
SpillOvertopping Spill
7400
7410
7420
7430
7440
7450
7460
7470
7480
7490
7500
Elev
atio
n (ft
)
Date
Ritschard Dam Core OSP Piezometers
Reservoir
Full Pool
P-1
P-6A
P-7A
P-9
P-10
P-11
SpillSpillOvertopping
Spill
7400
7410
7420
7430
7440
7450
7460
7470
7480
7490
7500
Elev
atio
n (ft
)
Date
Ritschard Dam Core Piezometers - Upstream of Dam Axis
Reservoir
Full Pool
P-9
P-6A
P-10
SpillOvertopping
SpillSpill
7400
7410
7420
7430
7440
7450
7460
7470
7480
7490
7500
Elev
atio
n (ft
)
Date
Ritschard Dam Core Piezometers - Downstream of Dam Axis
Reservoir
Full Pool
P-1
P-7A
P-11
Spill Spill Spill
7360
7370
7380
7390
7400
7410
7420
7430
7440
7450
7460
7470
7480
7490
7500
7510
7520
7530
7540
Elev
atio
n (ft
)
Date
Ritschard Dam Foundation Piezometers Reservoir
Full Pool
VW-3
VW-4
VW-5
P-5A
VW-8
VW-9
Spill
Spill Spill
7360
7370
7380
7390
7400
7410
7420
7430
7440
7450
7460
7470
7480
7490
7500
Elev
atio
n (ft
)
Date
Ritschard Dam Foundation Piezometers ReservoirFull PoolVW-3VW-4P-5A
Spill Spill Spill
7370
7375
7380
7385
7390
Elev
atio
n (ft
)
Date
Ritschard Dam Foundation Piezometers
VW-3
VW-4
P-5A
Spill Spill
Spill
7370
7380
7390
7400
7410
7420
7430
7440
7450
7460
7470
7480
7490
7500
Elev
atio
n (ft
)
Date
Ritschard Dam Piezometers
Reservoir
Full Pool
P-1
P-5
P-5A
VW-3
VW-4
Spill Spill Spill
-0.20
-0.19
-0.18
-0.17
-0.16
-0.15
-0.14
-0.13
-0.12
-0.11
-0.10
-0.09
-0.08
-0.07
7355
7365
7375
7385
7395
7405
7415
7425
7435
7445
7455
7465
7475
7485
Pore
Wat
er P
ress
ure
(atm
)
Dept
h (ft
)
Date
Ritschard Dam Piezometers
P-1 P-2
P-3 P-4
PM-1 PM-2
VW-2 (7362') VW-1 (7391')
7445
7450
7455
7460
7465
7470
7475
7480
7485
7490
7495
Elev
atio
n (ft
)
Date
Ritschard Dam Piezometers
P-1
Reservoir
Full Pool
Spill Spill Spill Spill
7450
7457
7464
7471
7478
7485
7492
7373
7375
7377
7379
7381
7383
7385
Rese
rvoi
r Ele
vatio
n ft
MSL
Piez
omet
er E
leva
tion
ft M
SL
Date
Ritschard Dam Downstream Shell Piezometers P-2P-3P-4PM-1Stilling BasinPM-2ReservoirFull Pool
Spill Spill Spill SpillSpill
7375
7385
7395
7405
7415
7425
7435
7445
7455
7465
7475
7485
7495Pi
ezom
eter
Ele
vatio
n ft
MSL
Date
Ritschard Dam Downstream Shell Piezometers
P-2P-3P-4PM-1Stilling BasinReservoirFull PoolPM-2
Spill Spill Spill SpillSpill
7400
7410
7420
7430
7440
7450
7460
7470
7480
7490
7500
7510
7520
7530
Elev
atio
n M
SL (f
t)
Date
Ritschard Dam Core Piezometers ML-1
P-1 OSP
P-5A OSP
P-6A OSP
P-7A OSP
P-5 VWP
P-6 VWP
P-7 VWP
P-9 OSP
P-10 OSP
P-11 OSP
Elevation
VW-10 @45 ft
VW-11 @53 ft
VW-12 @62 ft
VW-13 @75 ft
Reservoir Surface
7400
7410
7420
7430
7440
7450
7460
7470
7480
7490
7500
7510
7520
7530
Elev
atio
n M
SL (f
t)
Date
Ritschard Dam Core Piezometers ML-2
P-1 OSP
P-5A OSP
P-6A OSP
P-7A OSP
P-5 VWP
P-6 VWP
P-7 VWP
P-9 OSP
P-10 OSP
P-11 OSP
Elevation
VW-14 @45 ft
VW-15 @53 ft
VW-16 @62 ft
VW-17 @75 ft
Reservoir Surface
7400
7410
7420
7430
7440
7450
7460
7470
7480
7490
7500
7510
7520
7530
Elev
atio
n M
SL (f
t)
Date
Ritschard Dam Core Piezometers ML-3
P-1 OSP
P-5A OSP
P-6A OSP
P-7A OSP
P-5 VWP
P-6 VWP
P-7 VWP
P-9 OSP
P-10 OSP
P-11 OSP
Elevation
VW-18 @45 ft
VW-19 @53 ft
VW-20 @62 ft
VW-21 @75 ft
Reservoir Surface
7400
7410
7420
7430
7440
7450
7460
7470
7480
7490
7500
7510
7520
7530
Elev
atio
n M
SL (f
t)
Date
Ritschard Dam Core Piezometers ML-4
P-1 OSP
P-5A OSP
P-6A OSP
P-7A OSP
P-5 VWP
P-6 VWP
P-7 VWP
P-9 OSP
P-10 OSP
P-11 OSP
Elevation
VW-22 @45 ft
VW-23 @53 ft
VW-24 @60 ft
VW-25 @75 ft
Reservoir Surface
7400
7410
7420
7430
7440
7450
7460
7470
7480
7490
7500
7510
7520
7530
Elev
atio
n M
SL (f
t)
Date
Ritschard Dam Core Piezometers ML-5
P-1 OSP
P-5A OSP
P-6A OSP
P-7A OSP
P-5 VWP
P-6 VWP
P-7 VWP
P-9 OSP
P-10 OSP
P-11 OSP
Elevation
VW-26 @20 ft
VW-27 @28 ft
VW-28 @36 ft
VW-29 @45 ft
VW-30 @80 ft
Reservoir Surface
7400
7410
7420
7430
7440
7450
7460
7470
7480
7490
7500
7510
7520
7530
Elev
atio
n M
SL (f
t)
Date
Ritschard Dam Core Piezometers ML-6
P-1 OSP
P-5A OSP
P-6A OSP
P-7A OSP
P-5 VWP
P-6 VWP
P-7 VWP
P-9 OSP
P-10 OSP
P-11 OSP
Elevation
VW-31 @20 ft
VW-32 @28 ft
VW-33 @36 ft
VW-34 @45 ft
VW-35 @80 ft
Reservoir Surface
7400
7410
7420
7430
7440
7450
7460
7470
7480
7490
7500
7510
7520
7530
Elev
atio
n M
SL (f
t)
Date
Ritschard Dam Core Piezometers
VW-10
VW-11
VW-12
VW-13
VW-14
VW-15
VW-16
VW-17
VW-18
VW-19
VW-20
VW-21
VW-22
VW-23
VW-24
VW-25
VW-26
VW-27
VW-28
VW-29
VW-30
VW-30
VW-32
VW-33
VW-34
VW-35
Elevation
Reservoir Surface
7370
7380
7390
7400
7410
7420
7430
7440
7450
7460
7470
7480
7490
7500
7510
7520
7530
Elev
atio
n M
SL (f
t)
Date
Ritschard Dam Core Piezometers VW-10VW-11VW-12VW-13VW-14VW-15VW-16VW-17VW-18VW-19VW-20VW-21VW-22VW-23VW-24VW-25VW-26VW-27VW-28VW-29VW-30VW-31VW-32VW-33VW-34VW-35P-1 OSPP-5A OSPP-6A OSPP-7A OSPP-5 VWPP-6 VWPP-7 VWPP-9 OSPP-10 OSPP-11 OSPP-12Elevation
Reservoir Surface
7360
7380
7400
7420
7440
7460
7480
7500
Res
ervo
ir El
evat
ion
Date
Ritschard Dam Open Stand Pipe Piezometer ElevationsReservoir Elevation OSP-1 OSP-2 OSP-3 OSP-4 OSP-5
7400
7410
7420
7430
7440
7450
7460
7470
7480
7490
7500
0
5
10
15
20
25
30
35
40
45
50
Res
ervo
ir El
evat
ion
Gal
lons
per
Min
ute
Date
Ritschard Dam East Valley Drain Flows
East Valley Drain Flow Reservoir Elevation Full Elevation
Note: when the tailwater elevation exceeds 7373.5 ft MSL the drain weir box is inundated and cannot be measured
Date Res Elev Flow 9/5/13 7474 ft 0.1 gpm10/16/13 7473 ft 0.0 gpm4/14/14 7472 ft 0.0 gpm 5/15/14 7476 ft 0.5 gpm
Date Res Elev Flow 8/6/14 7479 ft 0.2 gpm9/12/14 7475 ft 0.0 gpm
Date Res Elev Flow 10/9/12 7456.7 ft 0.1 gpm10/16/12 7458.1 ft 0.0 gpm5/15/13 7465.5 ft 0.0 gpm 5/22/13 7471.7 ft 0.4 gpm
approx. reservoir elevation below which drain is dry