Agenda/Overview Purpose and importance of
requirements Requirements management process Project artifacts Tools Case study
What is Requirements Management?
Requirements Management is a systematic approach to eliciting, organizing, documenting, and targeting system requirements
Descriptions of necessary system functionality
Descriptions of how the system should respond to user interactions
Constraints on system design
Requirements vs. design decisions Allows flexibility Reduces overhead
What Are Requirements?
To... Establish agreement with the
stakeholders on what the system must do Provide system developers with an
understanding of the functionality a system must provide
Provide a basis for planning development Provide a means of measuring progress
and success
Purpose of Requirements
Kinds of Requirements
System Vision
Use Case Specification
Supplemental Specification
Stakeholder Needs
Functional Requirements
Global and Non-functional Requirements
Use Cases Provide description of system behavior Give context to functional requirements Supported by supplemental specs to
capture non-functional requirements Use case example (following page)
Importance of Managing Requirements Common causes for failure
Poor stakeholder involvement Unclear vision and objectives Changing requirements
Requirements errors are costly Need to reduce errors Need to find errors sooner Need to reduce cost of change
Approach and Traceability Agree on scope for current release Document and implement in-scope
requirements Changes may affect schedule
Record out of scope requirements for future releases May be identified during any stage of
development or operations
Process Flow
Input
Need Identified Disposition Request Assign Resources
RA
Preliminary Requirements Gathered
PM
Conduct PCRB
RA
Detailed Requirement(s) Finalized
RA
Document Requirement(s)
Output
Code Developed Based on Requirements
This Includes:Technical Meetings
NegotiationsRisk Identification
Customer Needs DocumentedFeatures Documented
PrioritizationTargeting
Screen ShotsMock-upsWireframe
(visual aids)
Prioritization and Targeting Activities
RUP Phase Color-Code Legend
Inception Elaboration Construction
Mapping RUP to EPLC
TransitionInception ConstructionElaborationCPIC
Pre-Select phase
RUP Phases
EPLC Phases
InceptionConcept
DevelopmentPlanning
Requirements Definition
Design DevelopmentIntegration &
TestImplemen-
tationOperations & Maintenance
Disposition
Preliminary Draft Version
Final BaselinedVersion
Artifacts / Phase Inc El Con Tran
Vision
Use Case Summary
Use Case
Supplemental Specs
UI Prototype
Software Architecture Document
Data Model (Logical & Physical)
PIA
System Executables
Test Plans
TAR
ISDS Project DeliverablesArtifacts / Phase Inc El Con Tran
UAT
Deploy Plan
User Guide
Training Material
Security Plan
CM Plan
SVD
Project Plan
Project Schedule
Risk Plan
Baselining vs. gate reviews
Requisite Pro Store current
requirements Store working
documents Rational Clear
Quest Track work flow Store future
requirements
Rational Clear Case Manage versions Publish baselined
documents Rational Rose
Modeling & Design
Requirements Tools
CMR Meeting Support System (CMS2) Case Study
Putting it All Together
Requirements Management Success Delivered critical functionality
On time Within budget
Stakeholder satisfaction Positioned for future enhancements
CMS2 Inception Stakeholder needs Schedule driven Agreement on scope Vision & Use Case Summary
CMS2 Elaboration Gathering of detailed requirements Mock-ups & wire-frames Current requirements in Req Pro
Use case specifications Supplemental specifications
Future requirements in Clear Quest
CMS2 Construction Documents baselined into Clear Case Code created using Clear Case for CM Initial functionality split
Core functionality readied for original date
Additional requirements targeted for enhancement release (in Clear Quest)
CMS2 Transition Testing using test manager
Link to Req Pro with new version Demo to users and service desk User acceptance testing (UAT)
Defects remedied immediately New requirements entered in CQ
Operations and future releases Enhancements vs. defects Enhancement requests in CQ
Enhancements for Version 1.1
Future Enhancement Requests
Wrap Up ... Q & A