REQUEST FOR QUALIFICATION (F&B) · Page5!sur!15! A.)INTRODUCTION))!! PT.)Angkasa)Pura)I)(Persero)!...

15
Page 1 sur 15 Ngurah Rai International Airport Bali REQUEST FOR QUALIFICATION (RFQ) FOR THE DEVELOPMENT AND OPERATION OF FOOD & BEVERAGE CONCESSIONS 20132018 AT NEW INTERNATIONAL TERMINAL TENDERS 8A, 8B, 8C, 8D, 8E, 8F, 8G, 8H, 8J, 8K, 8L

Transcript of REQUEST FOR QUALIFICATION (F&B) · Page5!sur!15! A.)INTRODUCTION))!! PT.)Angkasa)Pura)I)(Persero)!...

Page 1: REQUEST FOR QUALIFICATION (F&B) · Page5!sur!15! A.)INTRODUCTION))!! PT.)Angkasa)Pura)I)(Persero)! Ngurah!Rai!International!Airport!4!Bali!is!one!the!leading!airports!under!the!managementof!

 

Page  1  sur  15    

 

 

Ngurah  Rai  International  Airport  -­‐  Bali      

   

REQUEST  FOR  QUALIFICATION  (RFQ)      

   

FOR  THE  DEVELOPMENT  AND  OPERATION  OF  FOOD    &  BEVERAGE  CONCESSIONS  2013-­‐2018    AT  NEW  INTERNATIONAL  TERMINAL    

   

 

TENDERS  8A,  8B,  8C,  8D,  8E,  8F,  8G,  8H,  8J,  8K,  8L  

 

 

Page 2: REQUEST FOR QUALIFICATION (F&B) · Page5!sur!15! A.)INTRODUCTION))!! PT.)Angkasa)Pura)I)(Persero)! Ngurah!Rai!International!Airport!4!Bali!is!one!the!leading!airports!under!the!managementof!

 

Page  2  sur  15    

Disclaimer    

   

1-­‐ The   information   contained   in   this   RFQ   document   or   subsequently   provided   to   the  Applicants  (defined  later),  whether  verbally  or  in  documentary  or  any  other  form  by  or  on  behalf  of  PT  ANGKASA  PURA  I  (PERSERO)  or  any  of  their  employees  or  advisers,  is   on   the   terms   and   conditions   set-­‐out   in   this   RFQ,   and   such   other   terms   and  conditions  subject  to  which,  such  information  is  provided.  

2-­‐ This  RFQ  is  neither  an  agreement,  nor,  an  offer  by  PT  ANGKASA  PURA  I  (PERSERO)  to  the   Applicant   or   any   other   person/s.    The   purpose   of   this   RFQ   is   to   provide   the  Applicants  with   the   information   that  may  be   useful   to   them,   in   the   formulation  of  their   RFQ.    This   RFQ   includes   statements,   which   reflect   various   assumptions   and  assessments   arrived   at   by   PT   ANGKASA   PURA   I   (PERSERO)   in   relation   to   the  work.    Such  assumptions,  assessments  and  statements  do  not  purport  to  contain  all  the  information  that  each  Applicant  may  require.    This  RFQ  may  not  be  appropriate  for   all   the   persons,   and   it   is   not   possible   for   PT   ANGKASA   PURA   I   (PERSERO),   its  employees  or  advisers   to  consider   the  objectives,   technical  expertise  and  particular  needs   of   each   party,   who   reads   or   uses   this   RFQ.    The   assumptions,   assessments,  statements  and   information  contained   in   this  RFQ,  may  not  be  complete,  accurate,  adequate   or   correct.    Each   Applicant   should,   therefore,   conduct   its   own  investigations   and   analysis,   and   should   check   the   accuracy,   adequacy,   correctness,  reliability   and   completeness   of   the   assumptions,   assessments   and   information  contained  in  this  RFQ,  and  obtain  independent  advice  from  appropriate  sources.  

3-­‐ Information   provided   in   this   RFQ   to   the   Applicants   is   on   a  wide   range   of  matters,  some  of  which  depends  upon  interpretation  of  law.    The  information  given,  is  not  an  exhaustive   account   of   statutory   requirements,   and   should   not   be   regarded   as   a  complete  or  authoritative  statement  of  law.    PT  ANGKASA  PURA  I  (PERSERO)  accepts  no  responsibility  for  the  accuracy,  or  otherwise  for  any  interpretation  or  opinion  on  the  law  expressed  herein.  

4-­‐ PT  ANGKASA  PURA  I  (PERSERO),  its  employees  and  advisers  make  no  representation  or  warranty,  and  shall  have  no   liability  to  any  person   including  any  Applicant  under  any   law,   statute,   rules   or   regulations   or   tort,   principles   of   restitution   or   unjust  enrichment   or   otherwise   for   any   loss,   damages,   cost   or   expense   which   may   arise  from   or   be   incurred   or   suffered   on   account   of   anything   contained   in   this   RFQ   or  otherwise,  including  the  accuracy,  adequacy,  correctness,  reliability  or  completeness  of   the   RFQ   and   any   assessment,   assumption,   statement   or   information   contained  therein   or   deemed   to   form   part   of   this   RFQ   or   arising   in   any   way   in   this   award  process.  

Page 3: REQUEST FOR QUALIFICATION (F&B) · Page5!sur!15! A.)INTRODUCTION))!! PT.)Angkasa)Pura)I)(Persero)! Ngurah!Rai!International!Airport!4!Bali!is!one!the!leading!airports!under!the!managementof!

 

Page  3  sur  15    

5-­‐ This   RFQ,   along   with   its   Annexures,   is   not   transferable.   It   may   not   be   copied   or  distributed   by   the   recipient   to   third   parties   (other   than   in   confidence   to   the  recipient’s  professional  advisors).    In  the  event  that,  the  recipient  does  not  continue  with   its   involvement   in   the  work   in   accordance  with   this   RFQ,   this   RFQ   document  must  be  kept  confidential.  

6-­‐ PT   ANGKASA   PURA   I   (PERSERO)   also   accepts   no   liability   of   any   nature,   whether  resulting  from  negligence  or  otherwise,  however  caused,  arising  from  reliance  of  any  Prospective  Bidder  upon  the  statements  contained  in  this  RFQ.    It  is  the  responsibility  of   the   Applicants   to  make   their   own   assessment   regarding   the   extent   of   business  opportunity  in  preparing  their  Request.  

7-­‐ PT   ANGKASA   PURA   I   (PERSERO)  may,   in   its   absolute   discretion,   but,  without   being  under   any   obligation   to   do   so,   update,   amend   or   supplement   the   information,  assessment  or  assumption  contained  in  this  RFQ.  

8-­‐ The  Applicant   shall   bear   all   its   costs   associated  with   or   relating   to   the   preparation  and   submission   of   its   Request   including,   but   not   limited   to   preparation,   copying,  postage,  delivery  fees,  expenses  associated  with  any  demonstration  or  presentation,  which  may  be  required  by  PT  ANGKASA  PURA  I  (PERSERO)  or  any  other  cost  incurred  in  connection  with  or  relating  to  its  Request.    All  such  costs  and  expenses  will  remain  with   the   Applicant,   and   PT   ANGKASA   PURA   I   (PERSERO)   shall   not   be   liable   in   any  manner  whatsoever,  for  the  same,  or,  for  any  other  cost,  or,  other  expense,  incurred  by   any   Applicant,   in   preparation   or   submission   of   the   Request,   regardless   of   the  conduct  or  outcome  of  the  selection  process.  

9-­‐ PT   ANGKASA   PURA   I   (PERSERO)   reserves   the   right   to   accept   or   reject   any   or   all  Requests;  qualify  or  disqualify  any  or  all  Applicant  without  giving  any  reason,  and  is  not  obliged   to   correspond  with  any  Applicant   in   this   regard.    Further,   PT  ANGKASA  PURA   I   (PERSERO)   reserves   the   right   to   relax,   change,   review,   revise  or/and   cancel  the   eligibility   criteria   and   the   RFQ   process,   at   any   time,   without   prior   notice   or  without  assigning  any  reason  whatsoever.    This  invitation  for  RFQ  does  not  give  rise  to  any  right  in  rem,  and  is  not  an  offer  or  invitation  to  offer.  

10-­‐ PT  ANGKASA  PURA  I  (PERSERO)  will  not  entertain  any  claim  for  expenses  in  relation  to  the  preparation  of  any  Request  pursuant  hereto.  

11-­‐ PT  ANGKASA  PURA  I  (PERSERO)  at  its  absolute  discretion,  reserves  the  right,  until  the  closure  of  the  RFQ  submission,  to  modify  any  proposed  terms  and  conditions  set-­‐out  in  the  RFQ  as  necessary,  including  but  not  limited  to  cancelling/withdrawing  the  RFQ,  to  meet  its  objectives  and  principles  as  set-­‐out  below  in  this  section.  

   

   

   

Page 4: REQUEST FOR QUALIFICATION (F&B) · Page5!sur!15! A.)INTRODUCTION))!! PT.)Angkasa)Pura)I)(Persero)! Ngurah!Rai!International!Airport!4!Bali!is!one!the!leading!airports!under!the!managementof!

 

Page  4  sur  15    

   

   

CONTENTS    

   

   

INTRODUCTION  .....................................................................................................  5    

CONCESSION  PLAN  ................................................................................................  7    

QUALIFICATION  CRITERIA  .....................................................................................  11    

DETAILS  OF  REQUEST  FOR  QUALIFICATION  (RFQ)  .................................................  11    

     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 5: REQUEST FOR QUALIFICATION (F&B) · Page5!sur!15! A.)INTRODUCTION))!! PT.)Angkasa)Pura)I)(Persero)! Ngurah!Rai!International!Airport!4!Bali!is!one!the!leading!airports!under!the!managementof!

 

Page  5  sur  15    

 

 

A.  INTRODUCTION    

   

PT.  Angkasa  Pura  I  (Persero)    

Ngurah  Rai  International  Airport  -­‐  Bali  is  one  the  leading  airports  under  the  management  of  PT.  Angkasa  Pura  I  (Persero),  A  State-­‐Owned  Enterprise  specialized  in  airport  management.  PT.  Angkasa  Pura  I  (Persero)  manages  a  total  of  13  airports  spread  across  the  central,  all  the  way  up  to  the  eastern  part  of  Indonesia,  from  Ahmad  Yani  Airport  in  Semarang,  up  to  Frans  Kaisiepo  Airport  in  Biak  located  in  the  far  eastern  tip  of  Indonesia.    

Vision    

Become  one  of  the  best  10  airport  management  companies  in  Asia.  

Mission    

• Increase  stakeholder’s  value  • Become  government’s  partner  and  promote  economic  growth  • Manage   airport   through   excellent   services   that   meets   Safety,   Security   and   Comfortability  

standards.  • Enhance  the  Enterprise’s  Competitiveness  through  creativity  and  innovation.  • Provide  positive  contribution  to  the  environment.  

Our  commitment  

 

Ngurah  Rai  International  Airport  -­‐  Bali    

Ngurah  Rai   International  Airport  Bali   lies  right   in  the  centre  of  the   Indonesian  Archipelago.  We   represent   the   gateway   to   Bali,   an   island   well   known   as   the   island   of   paradise.   We  continue  to  evoke  pride  within  our  employees,  positive  impression  in  the  public,  trust  from  the   customers,   while   meeting   the   standards   and   operational   requirements   of   an  international  airport.  

Since   our   establishment   as  Ngurah  Rai   International   Airport   on  August   1st   1969,  we  have  proudly   contributed   to   Bali's   economic   growth   by   providing   an   efficient   access   to   this  beautiful   island,   with   the   operations   of   the   airport   and   by   enhancing   air   transportation  

Page 6: REQUEST FOR QUALIFICATION (F&B) · Page5!sur!15! A.)INTRODUCTION))!! PT.)Angkasa)Pura)I)(Persero)! Ngurah!Rai!International!Airport!4!Bali!is!one!the!leading!airports!under!the!managementof!

 

Page  6  sur  15    

movements.   Ngurah   Rai   International   Airport   has   become   a   gateway   that   provides  impressive  customer  services.  

Ngurah  Rai  International  Airport  with  its  foundation  firmly  standing  on  Safety,  Security  and  Service,  is  an  active  participant  who  contributes  to  attract  more  people  coming  to  Bali.  We  continue  to  embody  trust  and  love  of  the  customers.  We  are  consistent  in  fulfilling  our  social  responsibilities  and  at  the  same  time  give  our  best  to  provide  better  services,  to  care  for  our  environment,  our  neighbourhood  and  the  society  in  general,  for  the  future  and  our  beloved  next  generations.  

Airport  Master  Plan    

Tuban  Airport  Development  Settlement  marked  by  the   inauguration  by  President  Soeharto  on  August  1,  1969,  which  also  became  the  moment  of  change  the  name  of  Tuban  Airport  to  Ngurah  Rai  International  Airport  Bali.  

To   anticipate   the   surge   of   passengers   and   cargo,   then   in   1975   until   1978   the   Indonesian  Government   rebuilt   the   aviation   facilities,   among   others,   by   building   a   new   international  terminal.  The  existing  terminal  building  was  converted  into  domestic  terminal,  while  the  old  domestic  terminal  building  was  used  as  cargo,  catering  services  business  and  mixed-­‐use.  

Phase  I  1990  -­‐  1992    

Phase   I   Includes   the   expansion   of   terminals   equipped   with   aviobridge,   extension   of   the  runway  to  3,000  meters,  the  relocated  taxiway,  apron  expansion,  renovation  and  expansion  of   the   terminal   buildings,   expansion   of   the   parking   lot   of   vehicles,   cargo   building  development,   operation   building   and   air   avigation   &   supply   of   aircraft   fuel   facilities  development.  

Phase  II  1998  -­‐  2000    

Project  phase  II  (1998-­‐2000),  airport  development  undertaken  by  the  Directorate  General  of  Civil  Aviation,  among  others,  by  exploiting  an  area  of  12  hectares  of  mangroves  for  use  as  an  aviation  safety  facilities.  

Phase  III  2011  -­‐  2013  

Project   Plan   Development   Phase   III   includes   a   New   International   Terminal   Building   of  130,000  m2,   a   New  Multilevel   Storage   Car   Parking,   and   Apron.   The   existing   international  terminal   will   be   converted   into   new   domestic   terminal   which   will   raise   the   capacity   of  Ngurah  Rai  International  Airport  to  accommodate  up  to  approximately  25  million  passengers  per  year.  

 

 

Page 7: REQUEST FOR QUALIFICATION (F&B) · Page5!sur!15! A.)INTRODUCTION))!! PT.)Angkasa)Pura)I)(Persero)! Ngurah!Rai!International!Airport!4!Bali!is!one!the!leading!airports!under!the!managementof!

 

Page  7  sur  15    

 

International  Passenger  Traffic  Data  

The  international  passenger  traffic  has  grown  from  2007  until  2012  at  CAGR  12.27  %  and  will  continue  to  grow  from  2012  to  2015  at  CAGR  16.14  %  as  displayed  below:  

Year   Passenger  2007    3,613,908    2008    4,203,062    2009    4,936,867    2010    5,651,015    2011    6,138,648    2012    6,447,192  

Projected  2013    8,000,000    Projected  2014    9,000,000    Projected  2015    10,100,000    

 

B.  CONCESSION  PLAN    

As   part   of   the   continuous     development   of   Ngurah   Rai   International   Airport   to   offer   the  passengers  world-­‐class  facilities  and  services,  the  airport  is  currently  completely  re-­‐designing  and  re-­‐developing  the  commercial  area  in  the  new  international  terminal  building.        

The  new  commercial  concept  will  offer  passengers  a  modern,  diverse,  localized  and  exciting  new    shopping    and    food    &    beverage    experience.    It    will    be    characterized    by    modern  architecture    and    design,    with    a    wide    range    of    commercial    offerings,    colours,    a    friendly  environment  and  everything  else  you  expect  to  find  at  an  Indonesian  Airport.  The  objective  of  the    new    commercial    concept    is    to    give    the    airport    a    vibrant     image    with    a    true    sense     of     Bali     and     to     increase     passenger     comfort     and     spending,     allowing    concessionaires    to  increase  their  performance  and  PT  Angkasa  Pura  I  (Persero)  to  increase  its  non-­‐aviation  revenues.    

PT   Angkasa   Pura   I   (Persero)   is   inviting   experienced   world-­‐class   operators   to   submit   an  Request   For   Qualification   (RFQ)   to   establish     operations   at   the   Ngurah   Rai   International  Airport  –  Bali  (except  for  Tender  8H  open  only  to  Indonesian  Brand  Owners).  

Full  details  of  the  Concession  Plan  including  floor  plans  will  be  disclosed  in  the  Request  for  Proposal  (RFP)  period  which  follows  the  RFQ  period.  

The  applicants  once   selected  will   have   the  possibility   to   formulate  an  offer   for  one  of   the  Tenders   or   for   a   group   of   Tenders   under   conditions   which   will   be   defined   in   the   RFP  documents.      

 

Page 8: REQUEST FOR QUALIFICATION (F&B) · Page5!sur!15! A.)INTRODUCTION))!! PT.)Angkasa)Pura)I)(Persero)! Ngurah!Rai!International!Airport!4!Bali!is!one!the!leading!airports!under!the!managementof!

 

Page  8  sur  15    

 

FOOD  &  BEVERAGE  TENDER  PACKETS  

TENDER  8A  :  Champagne  Bar        

Location:  International  Departure  –  10  m2  

Terms:  5  years  concession  agreement  

Sales  Rights:  Champagne  &  Wine  

Pricing  Policy:  High  price  but  not  higher  than  downtown  

 

TENDER  8B  :  Food  Village        

Location:  International  Departure  –  1,129  m2  

Terms:  5  years  concession  agreement  

Sales  Rights:  Italian/Pizza,  American/Burger,  Japanese/Sushi,  Chinese/Noodle,  Food  Market,  Ice  cream,  Pub  

Pricing  Policy:  Medium  price  but  not  higher  than  downtown  

 

TENDER  8C  :  Coffee  Shops        

Locations:  1.  International  Departure  –  50  m2  

         2.  International  Departure  (landside)  –  159  m2  

         3.  International  Arrival  –  60  m2  

         4.  Domestic  Departure  –  Optional  

Terms:  5  years  concession  agreement  

Concept  Ideas:  High  Quality  Coffee  Shop  

Pricing  Policy:  Not  higher  than  downtown  

 

 

 

Page 9: REQUEST FOR QUALIFICATION (F&B) · Page5!sur!15! A.)INTRODUCTION))!! PT.)Angkasa)Pura)I)(Persero)! Ngurah!Rai!International!Airport!4!Bali!is!one!the!leading!airports!under!the!managementof!

 

Page  9  sur  15    

TENDER  8D  :  Family  Restaurant        

Location:  International  Departure  –  700  m2            

Terms:  5  years  concession  agreement  

Concept  Ideas:  High  Quality  Family  Restaurant  

Pricing  Policy:  Not  higher  than  downtown  

 

TENDER  8E  :  Sport  Bar  

Locations:  1.  International  Departure  –  505  m2        

             2.  International  Departure  (landside)  –  148  m2      

Terms:  5  years  concession  agreement  

Concept  Ideas:  High  Quality  Branded  Theme  Bar    

Pricing  Policy:  Medium  +  price  and  not  higher  than  downtown  

 

TENDER  8F  :  Asian  Bar  &  Food      

Location:  International  Departure    –  206  m2            

Terms:  5  years  concession  agreement  

Concept  Ideas:  High  Quality  Branded  Asian  Bar  &  Food      

Pricing  Policy:  Medium  +  price  and  not  higher  than  downtown  

 

TENDER  8G  :  Grab  &  Go        

Location:  International  Piers  (2  units)  -­‐  50  m2            

Terms:  5  years  concession  agreement  

Concept  Ideas:  High  Quality  Take  away      

Pricing  Policy:  Medium  price  and  not  higher  than  downtown  

 

 

Page 10: REQUEST FOR QUALIFICATION (F&B) · Page5!sur!15! A.)INTRODUCTION))!! PT.)Angkasa)Pura)I)(Persero)! Ngurah!Rai!International!Airport!4!Bali!is!one!the!leading!airports!under!the!managementof!

 

Page  10  sur  15    

TENDER  8H  :  Bali  Icon  Restaurant  (Tender  reserved  to  Indonesian  Brand  Owner)  

Location:  International  Departure  -­‐  417  m2            

Terms:  5  years  concession  agreement  

Sales  Rights:  Modern  Indonesian  gourmet  food  

Concept  Ideas:  Well  known  Restaurant  concept  in  Bali    

Pricing  Policy:  High  price  

 

TENDER  8J  :  Landside  Arrival  Fast  Food  (2  units)        

Location:  International  Landside  Arrival  –  309  m2            

Terms:  5  years  concession  agreement  

Concept  Ideas:    Branded  Fast  Food      

Pricing  Policy:  Low  price  (quick  serving)  

 

TENDER  8K  :  Landside  Departure  Bakery        

Location:  International  Landside  –  159  m2    

Terms:  5  years  concession  agreement  

Concept  Ideas:  High  Quality  Bakery  

Pricing  Policy:  Medium  price  and  not  higher  than  downtown  

 

TENDER  8L  :  Landside  Departure  Bar  

Location:  International  Landside  –  148  m2    

Terms:  5  years  concession  agreement  

Concept  Ideas:  Beer  Bar  with  snack  

Pricing  Policy:  Medium  price  and  not  higher  than  downtown  

 

 

Page 11: REQUEST FOR QUALIFICATION (F&B) · Page5!sur!15! A.)INTRODUCTION))!! PT.)Angkasa)Pura)I)(Persero)! Ngurah!Rai!International!Airport!4!Bali!is!one!the!leading!airports!under!the!managementof!

 

Page  11  sur  15    

C.  QUALIFICATION  CRITERIA    

For  all  the  Tenders  (8A,  8B,  8C,  8D,  8E,  8F,  8G,  8H,  8J,  8K,  8L)  

Total  range  of  current  activities  

• Run  at  least  3  outlets  in  the  proposed  activity  (in  airport  and/or  off  airport)  

Financial,  managerial  and  operational  capabilities  

  All  conditions  below  regarding  outlets  working  in  the  proposed  activity  

• Minimum  turnover  in  the  proposed  activity:  USD  3,000,000  (2012)  • Minimum  number  of  outlets  opened  since  at  least  2  years  :  1  • Minimum  annual  turnover  of  the  biggest  outlet:  USD  2,000,000  (2012)  • Minimum  number  of  outlets  opened  24/  7  days  a  week:  1  • Minimum   number   of   outlets   dedicated   to   international   customers  

(Tourism/Business):  1  

The  applicants  should  declare  on  honour  

• He  has  no  final  conviction  for  tax  purposes  over  the  last  5  years  • He  has  no  final  conviction  for  acts  contrary  to  labour  law  over  the  last  5  years  • He  has  have  not  been  subject  to  liquidation  or  bankruptcy  • He  have  a  tax  situation  perfectly  accurate  at  the  time  of  filing  the  application  • Board  of  Directors   and  Participating  Companies   are  not   involved   in   any   legal   cases  

during  last  5  years  • The  Participating  Companies  not  have   record   in   law   issue  and  not  have  blacklist   in  

same  tender  over  the  last  5  years  

   

D.  DETAILS  OF  REQUEST  FOR  QUALIFICATION  (RFQ)    

This   section  addresses   the   time-­‐schedules  and  procedures  applying   to   the   tender  process.  Each  Applicant  shall  observe  every  deadline  mentioned,  and  include  all  the  information  and  documentation  needed  on  or  before  the  due  date  of  submission.  

 

Qualification  criteria  to  submit  Request  For  Qualification  (RFQ)        

As  per  the  table:  QUALIFICATION  CRITERIA    

Submit    all    credentials    to    support    the    qualification    criteria    such    as,    last  3  years  audited  annual    financial    reports,  bank  certificates,  experience  letter,  capability  statements,  etc.    

Page 12: REQUEST FOR QUALIFICATION (F&B) · Page5!sur!15! A.)INTRODUCTION))!! PT.)Angkasa)Pura)I)(Persero)! Ngurah!Rai!International!Airport!4!Bali!is!one!the!leading!airports!under!the!managementof!

 

Page  12  sur  15    

The  Applicant  is  expected  to  examine  carefully  the  contents  of  this  RFQ.    Failure  to  comply  with  the  requirements  for  the  submission  of  the  RFQ  shall  be  at  the  Applicant’s  risk.  

The  RFQ  that  are  not  responsive  to  the  requirements  will  be  summarily  rejected.  

The  Applicant  shall  be  responsible  for  all  of  the  costs  associated  with  the  preparation  of  its  RFQ,  and  its  participation  in  the  bidding  process.  PT  ANGKASA  PURA  I  (PERSERO)  will  not  be  responsible  or  in  any  way  liable  for  any  cost,  expense  and  charge  incurred  by  any  Applicant  in  connection  with  the  preparation  and  submission  of  its  RFQ,  or  the  bidding  process  in  any  manner  whatsoever,  regardless  of  the  conduct  or  outcome  of  the  bidding  process.    

 

Question  and  Answers  (Q  &  A)  under  tender  process  

If  discrepancies  or  omissions  are  found  by  any  Applicant,  or  there  is  a  doubt  as  to  the  true  meaning  of  any  part  of  this  RFQ,  a  written  request  for  a  clarification  or  interpretation  must  be  submitted  to  PT  Angkasa  Pura  I  (Persero),  so  as  to  reach  PT  Angkasa  Pura  I  (Persero)  on  or  before  January  23rd  2013.  

Any   query   or   clarification   related   to   this   RFQ   document,   must   be   made   directly   on   the  website    in  the  Q  &  A  section  provided  for  this  purpose.    

Copies  of  PT  Angkasa  Pura  I  (Persero)’s  response  will  be  shown  on  our  website  in  the  Q  &  A  section  provided  for  this  purpose    to  all  the  Applicants,  with  a  description  of  the  enquiry;  but  without  identifying  its  source.  

No  liability  whatsoever,  will  be  admitted  by  PT  Angkasa  Pura  I  (Persero),  nor  will  a  claim  to  PT   Angkasa   Pura   I   (Persero   )   be   considered,   with   respect   to   the   errors   or   ambiguities  contained   in   the   RFQ,  which   the   Applicant   should   request   PT   Angkasa   Pura   I   (Persero)   to  rectify.  

Description  of  Tentative  Dates  

• Publication  of  the  RFQ  on  PT  ANGKASA  PURA  I  (PERSERO)  website:    January  15th  2013  • PT  ANGKASA  PURA  I  (PERSERO)  Receiving  queries  on  the  website  until  January  23rd  2013  • PT  ANGKASA  PURA  I  (PERSERO)  Clarification  on  the  website  January  28th  2013  • Applicant   Submission  of  RFQ  by  email   and  hardcopy   sent  by   courier:   5th   February  2013  

before  16:00  hours  Bali  Standard  Time  • Applicant   will   be   given   access   on   PT   ANGKASA   PURA   I   (PERSERO)   website   to   the   RFP  

documents  on  11th  February  2013    

 

 

Page 13: REQUEST FOR QUALIFICATION (F&B) · Page5!sur!15! A.)INTRODUCTION))!! PT.)Angkasa)Pura)I)(Persero)! Ngurah!Rai!International!Airport!4!Bali!is!one!the!leading!airports!under!the!managementof!

 

Page  13  sur  15    

Issuance  of  Request  for  Proposal  (RFP)  Document    

The    RFP    documents     shall    be     issued    only     to     the     short-­‐listed    parties,    who     fulfil    all    criteria  mentioned    in    this      RFQ    document.    The    RFP    period    starts    on    11th  February  2013    with    a  submission  of  proposal  deadline  on  11th  March  2013.      

   

Document  Costs  in  the  RFP  phase    

There    will    be    a    non-­‐refundable    fee    to    be    paid    by    all    bidders    in    order    to    obtain    the    RFP   document   to   cover   administrative   and   legal   costs   of   US$   3,000   (Three   thousand   US  dollars).  PT  Angkasa  Pura  I  (Persero)  will  contact    all    candidates    eligible    to    obtain    the    RFP    documentation    on    or    before    11  February  2013.    

 

Documents  required  

All  the  copies  of  these  documents  have  to  be  registered  on  a  USB  key.  

• The   last  3  years  audited  balance  sheets  of  the  company  (or  of  each  member  of  the  Consortium)  in  soft  copy  (.pdf  format)  and  hard  copy.  

• The  last  3  years  audited  income  statements  of  the  company  (or  of  each  member  of  the  Consortium)  in  soft  copy  (.pdf  format)  and  hard  copy.      

• Reference   letters   from   Airports   or   Commercial   Centers   where   the   Company   (or   a  member  of  the  Consortium)  operates  in  soft  copy  (.pdf  format)  and  hard  copy.  

• Bank  letter  of  agreement  to  cover  possible  future  investment  specifying  the  amount  in  soft  copy  (.pdf  format)  and  hard  copy.  

• The  “Request  For  Qualification  F&B  -­‐  Forms  1   to  6  –  Template”   in     soft  copy   (Excel  format)  and  hard  copy  with  date  and  signature.    

 

Documents  Submission    

Please  send  the  Request  For  Qualification  (RFQ)  (including  all  the  documents  above  in  hard  copies  and  soft  copies)  with  company  presentations  in  a  double  envelope  and  A4  paper  size.  

   

The  inner  envelope  should  be  in  the  inscription:    

Request  for  Qualification    for    the    development    and    operation    of    Food    &    Beverage  at  New  International  Terminal  of  Ngurah  Rai  International  Airport  –  Bali  

Tender:  Indicate  the  number  of  the  tender  subject  of  RFQ  (e.g.  TENDER  8A  :  Champagne  Bar)      

Page 14: REQUEST FOR QUALIFICATION (F&B) · Page5!sur!15! A.)INTRODUCTION))!! PT.)Angkasa)Pura)I)(Persero)! Ngurah!Rai!International!Airport!4!Bali!is!one!the!leading!airports!under!the!managementof!

 

Page  14  sur  15    

NGURAH  RAI  COMMERCIAL  SBU  Attn.  SALES  DEPARTMENT  HEAD  PT  ANGKASA  PURA  I  (PERSERO)  GED.  WISTI  SABHA  LT.  3  BANDARA  INTERNASIONAL  NGURAH  RAI  BALI  BALI  -­‐  80361  INDONESIA    

The  outer  envelope  must  bear  the  following  address:    

NGURAH  RAI  COMMERCIAL  SBU  PT  ANGKASA  PURA  I  (PERSERO)  GED.  WISTI  SABHA  LT.  3  BANDARA  INTERNASIONAL  NGURAH  RAI  BALI  BALI  -­‐  80361  INDONESIA    Attention:  Mr.  Hardiansyah,  Sales  Department  Head    The  document  must   be   sent  with   acknowledgement   of   receipt     or     be     delivered     against    receipt    to    the    address    above,    in    both    cases    no    later    than  5th  February  2013.    

All  the  applicant’s  RFQ  Documentation  shall  be  also  submitted  by  email  at  this  address:  [email protected]  

PT  Angkasa  Pura  I  (Persero)  does  not  take  any  responsibility  for  delayed  delivery.  

The  documents  submitted  will  not  be  returned.  

   

Right  of  Verification  

The  Applicant  by  submission  of  its  RFQ  agrees  to  transmit  the  most  up-­‐to-­‐date  information.  PT   ANGKASA   PURA   I   (PERSERO)   may   invite   any   or   all   Applicants   to   provide   a   complete  record.   PT   ANGKASA   PURA   I   (PERSERO)’s   determination   as   to   whether   an   Applicant   is  qualified  and  selected  will  be  based  upon   the   information  provided  by   the  Applicant   in   its  RFQ,   economic  disclosure.   Statements   and  affidavits   (if   requested  by  PT  ANGKASA  PURA   I  (PERSERO)),  interviews  (if  applicable)  and  other  sources  deemed  to  be  valid  by  PT  ANGKASA  PURA  I  (PERSERO).    

PT  ANGKASA  PURA  I   (PERSERO)  reserves  the  right  to  verify  any,  or  all  statements  made  by  the   Applicants   in   response   to   this   RFQ,   and   to   inspect   the   Applicants’   outlets,   places   of  business,   etc.,   if   necessary   to   establish   to   its   satisfaction   about   the  Applicants’   ability   and  expertise  to  set-­‐up,  develop,  operate,  maintain  and  manage  the  Outlets.  

Page 15: REQUEST FOR QUALIFICATION (F&B) · Page5!sur!15! A.)INTRODUCTION))!! PT.)Angkasa)Pura)I)(Persero)! Ngurah!Rai!International!Airport!4!Bali!is!one!the!leading!airports!under!the!managementof!

 

Page  15  sur  15    

 

Responsibility  of  Applicant    

The   Applicant   agrees   that,   all   information   pertaining   to   PT   ANGKASA   PURA   I   (PERSERO)’s  business   and   other   information   by   PT   ANGKASA   PURA   I   (PERSERO)   are   confidential  information  of  PT  ANGKASA  PURA  I  (PERSERO).  The  same  shall  be  kept  confidential  and  will  not  be  disclosed  to  any  third  party  without  the  prior  written  approval  of  PT  ANGKASA  PURA  I  (PERSERO).  

This  RFQ  has  been  designed  so  that,  the  Applicant  can  follows  a  step-­‐by-­‐step  process  from  RFQ  preparation,  to  submittal,  to  evaluation  and  award.  Each  Applicant  shall  conduct  its  own  investigations   and   analysis,   check   the   accuracy,   reliability   and   completeness   of   the  information  provided  in  this  RFQ.  

 

Other  Conditions  

This   RFQ   does   not   bind   PT   ANGKASA   PURA   I   (PERSERO)   to   award   contract   to   the   any  Applicant,   and   PT   ANGKASA   PURA   I   (PERSERO)   shall   not   under   any   circumstance,   be  responsible  for  any  cost  incurred  by  any  Applicant,  who  has  involved  in  the  bidding  process,  irrespective  of  whether  PT  ANGKASA  PURA  I   (PERSERO)  actually  proceeds  with  such  award  or  not.  

All   Applicants   have   been,   and   will   continue   to   be   provided,   with   the   same   background  information,  supplementary  information  and  any  Corrigendum  or  Addendum  to  the  RFQ.  

All   matters   in   relation   to   this   RFQ,   shall   be   governed   by   the   laws   of   Indonesia;   and   any  dispute  shall  be  subject  to  the  exclusive  jurisdiction  of  the  Court  at  Central  Jakarta.  

By  submitting  a  Request,  the  Applicant  will  be  deemed  to  have  accepted  all  the  terms  and  conditions  of  this  RFQ.