Republic of the Philippines DEPARTMENT OF PUBLIC WORKS … · Prev. Maint. Of Nat'l Arterial Rd...

104
Contract ID No. Contract Package (Description) Procurement Method Pre- Procurement Conference Advertising/Pos ting Pre-Bid Conference Submission & Receipt of Bids Bid Evaluation Post- Qualification Award of Contract Remarks Plan (APP) 10/17/2013 10/23/13 to 10/29/13 10/31/2013 11/12/2013 11/13/13 to 11/15/13 11/18/13 to 11/19/13 1/17/14 to 1/20/14 PPMP 10/17/2013 10/23/13 to 10/29/13 10/31/2013 11/12/2013 11/13/13 to 11/15/13 11/18/13 to 11/19/13 1/17/14 to 1/20/14 Actual 10/17/2013 10/23/13 to 10/29/13 10/31/2013 11/12/2013 11/14/2013 11/14/2013 2/5/2014 Plan (APP) 10/17/2013 10/23/13 to 10/29/13 10/31/2013 11/12/2013 11/13/13 to 11/15/13 11/18/13 to 11/19/13 1/17/14 to 1/20/14 PPMP 10/17/2013 10/23/13 to 10/29/13 10/31/2013 11/12/2013 11/13/13 to 11/15/13 11/18/13 to 11/19/13 1/17/14 to 1/20/14 Actual 10/17/2013 10/23/13 to 10/29/13 10/31/2013 11/12/2013 11/14/2013 11/14/2013 1/20/2014 Plan (APP) 10/17/2013 10/23/13 to 10/29/13 10/31/2013 11/12/2013 11/13/13 to 11/15/13 11/18/13 to 11/19/13 1/17/14 to 1/20/14 PPMP 10/17/2013 10/23/13 to 10/29/13 10/31/2013 11/12/2013 11/13/13 to 11/15/13 11/18/13 to 11/19/13 1/17/14 to 1/20/14 Actual 10/17/2013 10/23/13 to 10/29/13 10/31/2013 11/12/2013 11/14/2013 11/14/2013 1/20/2014 Plan (APP) 10/17/2013 10/25/13 to 10/31/13 10/31/2013 11/13/2013 11/14/13 to 11/18/13 11/19/13 to 11/20/13 1/17/14 to 1/20/14 PPMP 10/17/2013 10/25/13 to 10/31/13 10/31/2013 11/13/2013 11/14/13 to 11/18/13 11/19/13 to 11/20/13 1/17/14 to 1/20/14 Actual 10/17/2013 10/25/13 to 10/31/13 10/31/2013 11/13/2013 11/15/2013 11/15/2013 1/20/2014 Plan (APP) 10/17/2013 10/25/13 to 10/31/13 10/31/2013 11/13/2013 11/14/13 to 11/18/13 11/19/13 to 11/20/13 1/17/14 to 1/20/14 PPMP 10/17/2013 10/25/13 to 10/31/13 10/31/2013 11/13/2013 11/14/13 to 11/18/13 11/19/13 to 11/20/13 1/17/14 to 1/20/14 Actual 10/17/2013 10/25/13 to 10/31/13 10/31/2013 11/13/2013 11/15/2013 11/15/2013 1/20/2014 Plan (APP) 10/17/2013 10/25/13 to 10/31/13 10/31/2013 11/13/2013 11/14/13 to 11/18/13 11/19/13 to 11/20/13 1/17/14 to 1/20/14 PPMP 10/17/2013 10/25/13 to 10/31/13 10/31/2013 11/13/2013 11/14/13 to 11/18/13 11/19/13 to 11/20/13 1/17/14 to 1/20/14 Actual 10/17/2013 10/25/13 to 10/31/13 10/31/2013 11/13/2013 11/15/2013 11/15/2013 4/1/2014 SARO received March 28,2014 Plan (APP) 10/17/2013 10/25/13 to 10/31/13 10/31/2013 11/14/2013 11/15/13 to 11/19/13 11/20/13 to 11/21/13 1/17/14 to 1/20/14 PPMP 10/17/2013 10/25/13 to 10/31/13 10/31/2013 11/14/2013 11/15/13 to 11/19/13 11/20/13 to 11/21/13 1/17/14 to 1/20/14 Tel. Nos. (043) 402-5900 loc. 46000 REVISED ANNUAL PROCUREMENT PLAN FOR FY 2014 Project Cost/ ABC (Php) 13DB0121 Prev. Maint. Of Nat'l Arterial Rd based on PMS/HDM-4 (Intermittent Sec) along Tagaytay Nasugbu Rd 1.K0092+090- K0093+010 w/exception 2. K0100+115- K0100+315 Competitive Bidding 12,482,000.00 Late Award due to Conforme of Revised Project Amount by the Lowest Calculated Bidder Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS REGION IV-A Batangas I District Engineering Office OFFICE OF THE DISTRICT ENGINEER Kumintang Ilaya, Batangas City 13DB0124 Rehab.Recons./Upgrading of Damaged Paved Nat'l Secondary RD based on PMS/HDM-4 (Intermitttent Sec)along Balatan-Balibago Rd K0106+000- K0106+200 Competitive Bidding 3,126,000.00 13DB0125 Rehab./Reconst./Replacement/Retrofitt ing of Existing Permanent Bridge, Kasuyan Bridge along Palico-Balayan- Batangas Road, Calaca Batangas Competitive Bidding 10,000,000.00 13DB0122 Prev. Maint. Of Nat'l Sec. Rd based on PMS/HDM-4 (Intermittent Sec) along Balayan-Balibago K0115+000- K0115+1000 Competitive Bidding 16,007,000.00 13DB0123 Rehab.Recons./Upgrading of Damaged Paved Nat'l Secondary RD based on PMS/HDM-4 (Intermitttent Sec)along Diokno Highway K0078+000-K0078+620 Competitive Bidding 8,492,000.00 13DB0126 Const./Impv't of Access Roads leading to Airports Seaports and Declared Tourism Destinations, Calatagan- Poblacion Leading to various beaches, Calatagan and Nasugbu, Batangas Competitive Bidding 10,936,800.00 13DB0127 Prev./Maint. Of Nat'l Arterial Road based on PMS-HDM-4 (Intermittent Sec.) along Palico-Balayan-Batangas Road at: 1. K0097+535-K0098+002; 2. Competitive Bidding 23,314,000.00

Transcript of Republic of the Philippines DEPARTMENT OF PUBLIC WORKS … · Prev. Maint. Of Nat'l Arterial Rd...

Contract ID No.

Contract Package (Description)Procurement

Method

Pre-Procurement Conference

Advertising/Posting

Pre-Bid Conference

Submission & Receipt of

Bids

Bid Evaluation

Post-Qualification

Award of Contract

Remarks

Plan (APP) 10/17/201310/23/13 to

10/29/1310/31/2013 11/12/2013

11/13/13 to 11/15/13

11/18/13 to 11/19/13

1/17/14 to 1/20/14

PPMP 10/17/201310/23/13 to

10/29/1310/31/2013 11/12/2013

11/13/13 to 11/15/13

11/18/13 to 11/19/13

1/17/14 to 1/20/14

Actual 10/17/201310/23/13 to

10/29/1310/31/2013 11/12/2013 11/14/2013 11/14/2013 2/5/2014

Plan (APP) 10/17/201310/23/13 to

10/29/1310/31/2013 11/12/2013

11/13/13 to 11/15/13

11/18/13 to 11/19/13

1/17/14 to 1/20/14

PPMP 10/17/201310/23/13 to

10/29/1310/31/2013 11/12/2013

11/13/13 to 11/15/13

11/18/13 to 11/19/13

1/17/14 to 1/20/14

Actual 10/17/201310/23/13 to

10/29/1310/31/2013 11/12/2013 11/14/2013 11/14/2013 1/20/2014

Plan (APP) 10/17/201310/23/13 to

10/29/1310/31/2013 11/12/2013

11/13/13 to 11/15/13

11/18/13 to 11/19/13

1/17/14 to 1/20/14

PPMP 10/17/201310/23/13 to

10/29/1310/31/2013 11/12/2013

11/13/13 to 11/15/13

11/18/13 to 11/19/13

1/17/14 to 1/20/14

Actual 10/17/201310/23/13 to

10/29/1310/31/2013 11/12/2013 11/14/2013 11/14/2013 1/20/2014

Plan (APP) 10/17/201310/25/13 to

10/31/1310/31/2013 11/13/2013

11/14/13 to 11/18/13

11/19/13 to 11/20/13

1/17/14 to 1/20/14

PPMP 10/17/201310/25/13 to

10/31/1310/31/2013 11/13/2013

11/14/13 to 11/18/13

11/19/13 to 11/20/13

1/17/14 to 1/20/14

Actual 10/17/201310/25/13 to

10/31/1310/31/2013 11/13/2013 11/15/2013 11/15/2013 1/20/2014

Plan (APP) 10/17/201310/25/13 to

10/31/1310/31/2013 11/13/2013

11/14/13 to 11/18/13

11/19/13 to 11/20/13

1/17/14 to 1/20/14

PPMP 10/17/201310/25/13 to

10/31/1310/31/2013 11/13/2013

11/14/13 to 11/18/13

11/19/13 to 11/20/13

1/17/14 to 1/20/14

Actual 10/17/201310/25/13 to

10/31/1310/31/2013 11/13/2013 11/15/2013 11/15/2013 1/20/2014

Plan (APP) 10/17/201310/25/13 to

10/31/1310/31/2013 11/13/2013

11/14/13 to 11/18/13

11/19/13 to 11/20/13

1/17/14 to 1/20/14

PPMP 10/17/201310/25/13 to

10/31/1310/31/2013 11/13/2013

11/14/13 to 11/18/13

11/19/13 to 11/20/13

1/17/14 to 1/20/14

Actual 10/17/201310/25/13 to

10/31/1310/31/2013 11/13/2013 11/15/2013 11/15/2013 4/1/2014 SARO received March 28,2014

Plan (APP) 10/17/201310/25/13 to

10/31/1310/31/2013 11/14/2013

11/15/13 to 11/19/13

11/20/13 to 11/21/13

1/17/14 to 1/20/14

PPMP 10/17/201310/25/13 to

10/31/1310/31/2013 11/14/2013

11/15/13 to 11/19/13

11/20/13 to 11/21/13

1/17/14 to 1/20/14

Tel. Nos. (043) 402-5900 loc. 46000

REVISED ANNUAL PROCUREMENT PLAN FOR FY 2014

Project Cost/ ABC (Php)

13DB0121

Prev. Maint. Of Nat'l Arterial Rd based on PMS/HDM-4 (Intermittent Sec) along Tagaytay Nasugbu Rd 1.K0092+090-

K0093+010 w/exception 2. K0100+115-K0100+315

Competitive Bidding

12,482,000.00 Late Award due to Conforme of Revised Project Amount by the Lowest Calculated Bidder

Republic of the PhilippinesDEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

REGION IV-ABatangas I District Engineering OfficeOFFICE OF THE DISTRICT ENGINEER

Kumintang Ilaya, Batangas City

13DB0124

Rehab.Recons./Upgrading of Damaged Paved Nat'l Secondary RD based on

PMS/HDM-4 (Intermitttent Sec)along Balatan-Balibago Rd K0106+000-

K0106+200

Competitive Bidding

3,126,000.00

13DB0125

Rehab./Reconst./Replacement/Retrofitting of Existing Permanent Bridge,

Kasuyan Bridge along Palico-Balayan-Batangas Road, Calaca Batangas

Competitive Bidding

10,000,000.00

13DB0122

Prev. Maint. Of Nat'l Sec. Rd based on PMS/HDM-4 (Intermittent Sec) along

Balayan-Balibago K0115+000-K0115+1000

Competitive Bidding

16,007,000.00

13DB0123

Rehab.Recons./Upgrading of Damaged Paved Nat'l Secondary RD based on

PMS/HDM-4 (Intermitttent Sec)along Diokno Highway K0078+000-K0078+620

Competitive Bidding

8,492,000.00

13DB0126

Const./Impv't of Access Roads leading to Airports Seaports and Declared Tourism Destinations, Calatagan-

Poblacion Leading to various beaches, Calatagan and Nasugbu, Batangas

Competitive Bidding

10,936,800.00

13DB0127

Prev./Maint. Of Nat'l Arterial Road based on PMS-HDM-4 (Intermittent Sec.) along Palico-Balayan-Batangas

Road at: 1. K0097+535-K0098+002; 2.

Competitive Bidding

23,314,000.00

Actual 10/17/201310/25/13 to

10/31/1310/31/2013 11/14/2013 11/18/2013 11/18/2013 1/20/2014

Plan (APP) 10/17/201310/25/13 to

10/31/1310/31/2013 11/14/2013

11/15/13 to 11/19/13

11/20/13 to 11/21/13

1/17/14 to 1/20/14

PPMP 10/17/201310/25/13 to

10/31/1310/31/2013 11/14/2013

11/15/13 to 11/19/13

11/20/13 to 11/21/13

1/17/14 to 1/20/14

Actual 10/17/201310/25/13 to

10/31/1310/31/2013 11/14/2013 11/18/2013 11/18/2013 1/20/2014

Plan (APP) 10/17/201310/25/13 to

10/31/1310/31/2013 11/14/2013

11/15/13 to 11/19/13

11/20/13 to 11/21/13

1/17/14 to 1/20/14

PPMP 10/17/201310/25/13 to

10/31/1310/31/2013 11/14/2013

11/15/13 to 11/19/13

11/20/13 to 11/21/13

1/17/14 to 1/20/14

Actual 10/17/201310/25/13 to

10/31/1310/31/2013 11/14/2013 11/18/2013 11/18/2013 1/20/2014

Plan (APP) 10/17/201310/25/13 to

10/31/1310/31/2013 11/15/2013

11/18/13 to 11/20/13

11/21/13 to 11/22/13

1/17/14 to 1/20/14

PPMP 10/17/201310/25/13 to

10/31/1310/31/2013 11/15/2013

11/18/13 to 11/20/13

11/21/13 to 11/22/13

1/17/14 to 1/20/14

Actual 10/17/201310/25/13 to

10/31/1310/31/2013 11/15/2013 11/18/2013 11/18/2013 1/20/2014

Plan (APP) 10/17/201310/25/13 to

10/31/1310/31/2013 11/15/2013

11/18/13 to 11/20/13

11/21/13 to 11/22/13

1/17/14 to 1/20/14

PPMP 10/17/201310/25/13 to

10/31/1310/31/2013 11/15/2013

11/18/13 to 11/20/13

11/21/13 to 11/22/13

1/17/14 to 1/20/14

Actual 10/17/201310/25/13 to

10/31/1310/31/2013 11/15/2013 11/18/2013 11/18/2013 1/20/2014

Plan (APP) 10/17/201310/25/13 to

10/31/1310/31/2013 11/15/2013

11/18/13 to 11/20/13

11/21/13 to 11/22/13

1/17/14 to 1/20/14

PPMP 10/17/201310/25/13 to

10/31/1310/31/2013 11/15/2013

11/18/13 to 11/20/13

11/21/13 to 11/22/13

1/17/14 to 1/20/14

Actual 10/17/201310/25/13 to

10/31/1310/31/2013 11/15/2013 11/18/2013 11/18/2013 1/20/2014

Plan (APP) 10/17/201310/25/13 to

10/31/1310/31/2013 11/15/2013

11/18/13 to 11/20/13

11/21/13 to 11/22/13

1/17/14 to 1/20/14

PPMP 10/17/201310/25/13 to

10/31/1310/31/2013 11/15/2013

11/18/13 to 11/20/13

11/21/13 to 11/22/13

1/17/14 to 1/20/14

Actual 10/17/201310/25/13 to

10/31/1310/31/2013 11/15/2013 11/18/2013 11/18/2013 1/20/2014

Plan (APP) 1/24/20142/3/14 to 2/10/14

2/13/2014 2/24/20142/26/14 to

2/27/142/28/2014 3/3/2014

PPMP 1/24/20142/3/14 to 2/10/14

2/13/2014 2/24/20142/26/14 to

2/27/142/28/2014 3/3/2014

Actual 1/24/20142/3/14 to 2/10/14

2/13/2014 2/24/2014 2/27/2014 2/27/2014 3/3/2014

Plan (APP) 1/24/20142/3/14 to 2/10/14

2/13/2014 2/24/20142/26/14 to

2/27/142/28/2014 3/3/2014

PPMP 1/24/20142/3/14 to 2/10/14

2/13/2014 2/24/20142/26/14 to

2/27/142/28/2014 3/3/2014

Actual 1/24/20142/3/14 to 2/10/14

2/13/2014 2/24/2014 2/27/2014 2/27/2014 3/3/2014

Plan (APP) 1/24/20142/3/14 to 2/10/14

2/13/2014 2/24/20142/26/14 to

2/27/142/28/2014 3/3/2014

PPMP 1/24/20142/3/14 to 2/10/14

2/13/2014 2/24/20142/26/14 to

2/27/142/28/2014 3/3/2014

13DB0128

Prev./Maint. Of Nat'l Sec. Road based on PMS-HDM-4 (Intermittent Sec.)

along Diokno Highway at: 1. K0077+000-K0077+1000; 2. K0078+834-K0078+994;

3. K0082+689-K0083+500 Lemery, Batangas

Competitive Bidding

28,605,000.00

13DB0129Const./Rehab.of Drainage/Protection Works along Palico-Balayan-Batangas

City Road, Calaca Batangas

Competitive Bidding

11,500,000.00

K0098+736-K0099+066; 3. K0103+000-K0103+230; 4. K0113+000-K0113+800

13DB0132

Widening of Nat'l Arterial Road along Palico-Balayan-Batangas Rd including

Drainage, Batangas 1st Legislative District K0125+260-K0125+660 &

K0125+080-K0125+260, Bukal-Tubigan Section, Lemery Batangas

Competitive Bidding

20,000,000.00

13DB0133

Widening of Nat'l Arterial Road along Palico-Balayan-Batangas Rd including

Drainage, Batangas 1st Legislative District K0127+925-K0128+000, Palanas

Section, Lemery Batangas

Competitive Bidding

14,650,000.00

13DB0130

Widening of Nat'l Arterial Road along Palico-Balayan-Batangas Rd including

Drainage, Batangas 1st Legislative District K0097+434-K0097+778, Tuy

Junction, Rizal Tuy, Batangas

Competitive Bidding

11,734,000.00

13DB0131

Widening of Nat'l Arterial Road along Palico-Balayan-Batangas Rd including

Drainage, Batangas 1st Legislative District K0123+535-K0123+935 &

K0123+935-K0124+100, Mahayahay Section, Lemery Batangas

Competitive Bidding

20,000,000.00

14DB0003Const./Rehab of Brgy. Road, Brgy

Kayrilaw, Nasugbu, BatangasCompetitive

Bidding2,000,000.00

14DB0001Const./Rehab of Brgy. Road, Brgy

Matipok, Calaca, BatangasCompetitive

Bidding2,000,000.00

14DB0002Const./Rehab of Brgy. Road, Brgy Taklang Anak, Calaca, Batangas

Competitive Bidding

2,000,000.00

Actual 1/24/20142/3/14 to 2/10/14

2/13/2014 2/24/2014 2/27/2014 2/27/2014 3/3/2014

Plan (APP) 2/12/20142/17/14 to

2/24/142/28/2014 3/11/2014

3/12/14 to 3/14/14

3/17/14 to 3/18/14

3/19/14 to 3/21/14

PPMP 2/12/20142/17/14 to

2/24/142/28/2014 3/11/2014

3/12/14 to 3/14/14

3/17/14 to 3/18/14

3/19/14 to 3/21/14

Actual 2/12/20142/17/14 to

2/24/142/28/2014 3/11/2014 3/13/2014 3/13/2014 3/21/2014

Plan (APP) 2/12/20142/17/14 to

2/24/142/28/2014 3/11/2014

3/12/14 to 3/14/14

3/17/14 to 3/18/14

3/19/14 to 3/21/14

PPMP 2/12/20142/17/14 to

2/24/142/28/2014 3/11/2014

3/12/14 to 3/14/14

3/17/14 to 3/18/14

3/19/14 to 3/21/14

Actual 2/12/20142/17/14 to

2/24/142/28/2014 3/11/2014 3/13/2014 3/13/2014 3/21/2014

Plan (APP) 2/24/20142/27/14 to

3/5/143/7/2014 3/18/2014

3/19/14 to 3/20/14

3/21/2014 3/24/2014

PPMP 2/24/20142/27/14 to

3/5/143/7/2014 3/18/2014

3/19/14 to 3/20/14

3/21/2014 3/24/2014

Actual 2/24/20142/27/14 to

3/5/143/7/2014 3/18/2014 3/20/2014 3/20/2014 3/24/2014

Plan (APP) 2/24/20142/27/14 to

3/5/143/7/2014 3/18/2014

3/19/14 to 3/20/14

3/21/2014 3/24/2014

PPMP 2/24/20142/27/14 to

3/5/143/7/2014 3/18/2014

3/19/14 to 3/20/14

3/21/2014 3/24/2014

Actual 2/24/20142/27/14 to

3/5/143/7/2014 3/18/2014 3/20/2014 3/20/2014 3/24/2014

Plan (APP) 2/24/20142/27/14 to

3/5/143/7/2014 3/18/2014

3/19/14 to 3/20/14

3/21/2014 3/24/2014

PPMP 2/24/20142/27/14 to

3/5/143/7/2014 3/18/2014

3/19/14 to 3/20/14

3/21/2014 3/24/2014

Actual 2/24/20142/27/14 to

3/5/143/7/2014 3/18/2014 3/20/2014 3/20/2014 3/24/2014

Plan (APP) 2/24/20142/27/14 to

3/5/143/7/2014 3/18/2014

3/19/14 to 3/20/14

3/21/2014 3/24/2014

PPMP 2/24/20142/27/14 to

3/5/143/7/2014 3/18/2014

3/19/14 to 3/20/14

3/21/2014 3/24/2014

Actual 2/24/20142/27/14 to

3/5/143/7/2014 3/18/2014 3/20/2014 3/20/2014 3/24/2014

Plan (APP) 3/13/20143/18/14 to

3/24/143/27/2014 4/7/2014

4/8/14 to 4/14/14

4/15/14 to 5/14/14

5/15/14 to 5/26/14

PPMP 3/13/20143/18/14 to

3/24/143/27/2014 4/7/2014

4/8/14 to 4/14/14

4/15/14 to 5/14/14

5/15/14 to 5/26/14

Actual 3/13/20143/18/14 to

3/24/143/27/2014 4/7/2014 4/7/2014 4/10/2014 5/26/2014

Plan (APP) 3/18/20143/24/14 to

3/30/144/3/2014 4/14/2014

4/15/14 to 4/21/14

4/22/14 to 4/28/14

4/29/14 to 5/2/14

1st Bidding - no bidder purchased bidding documents

PPMP 4/16/20142/22/14 to

4/28/144/30/2014 5/12/2014

5/13/14 to 5/18/14

5/19/14 to 5/25/14

5/26/14 to 5/29/14

2nd Bidding - three (3) bidders Ineligible

Actual 3/18/20143/24/14 to

3/30/144/3/2014 7/11/2014

Plan (APP) 4/16/20142/22/14 to

4/28/144/30/2014 5/12/2014

5/13/14 to 5/18/14

5/19/14 to 5/25/14

5/26/14 to 5/29/14

1st Bidding - Bidder declared as Ineligible in CWR

PPMP6/3/14 to

6/6/146/10/2014 6/24/2014

6/25/14 to 6/29/14

6/30/14 to 7/6/14

7/7/14 to 7/10/14

2nd Bidding - Bidder declared as Ineligible in CWR

14DB0004Rehab. Of Local Road Brgy. Talaga

Lemery, BatangasCompetitive

Bidding4,000,000.00

14DB0007Const./Rehab of MPB Structure

(Covered Court)Brgy. Natipuan,Nasugbu,Bats.

Competitive Bidding

5,000,000.00

14DB0008Const./Rehab of MPB Structure (Covered Court)Brgy. Taludtod,

Balayan, Batangas

Competitive Bidding

3,500,000.00

14DB0005Rep/Maint of National Road Along

Tagaytay-Nasugbu Rd K0102+499.4-K0102+813.9

Competitive Bidding

2,350,000.00

14DB0006Const./Rehab of MPB Structure

(Covered Court)Brgy. Halang, Taal, Batangas

Competitive Bidding

5,000,000.00

14DB0011

Const. Of RWCS 1. Matala ES Cahil Calaca, 2. Bagong Paraiso ES Lemery, 3.

Tamayo ES Calaca, 4. Calambuyan ES Brgy. Sta. Ana Calatagan

Competitive Bidding

500,000.00

14DB0012Const./Rahab of MPB Pob. 1 Lemery, Competitive

2 000 000 00

14DB0009Const./Rehab of MPB Structure

(Covered Court)Brgy. Sambat, Balayan, Batangas

Competitive Bidding

3,000,000.00

14DB0010Rd Opening of Aguinaldo-Magallanes-

NasugbuCompetitive

Bidding50,000,000.00

PPMP Rev. 6/30/20147/1/14 to

7/7/147/10/2014 7/21/2014

7/22/14 to 7/26/14

7/27/14 to 8/2/14

8/3/14 to 8/6/14

Actual 6/30/20147/1/14 to

7/7/147/10/2014

Plan (APP) 5/9/20145/14/14 to

5/20/145/22/2014 6/3/2014

6/4/14 to 6/6/14

6/9/14 to 6/15/14

6/16/14 to 6/19/14

1st Bidding - Bidder's declared as Ineligible in CWR

PPMP 5/9/20145/14/14 to

5/20/145/22/2014 6/16/2014

6/17/14 to 6/21/14

6/22/14 to 6/28/14

6/16/14 to 6/19/14

Manual Eligibility Checking due to Motion for Reconsideration of Bidder

Actual 5/9/20145/14/14 to

5/20/145/22/2014 6/16/2014 6/18/2014 6/18/2014 7/2/2014

Plan (APP) 5/9/20145/14/14 to

5/20/145/22/2014 6/3/2014

6/4/14 to 6/6/14

6/9/14 to 6/15/14

6/16/14 to 6/19/14

1st Bidding - Bidder declared as Ineligible in CWR

PPMP 5/9/20145/14/14 to

5/20/145/22/2014 6/16/2014

6/17/14 to 6/21/14

6/22/14 to 6/28/14

6/16/14 to 6/19/14

Manual Eligibility Checking due to Motion for Reconsideration of Bidder

Actual 5/9/20145/14/14 to

5/20/145/22/2014 6/16/2014 6/18/2014 6/18/2014 7/2/2014

Plan (APP) 5/9/20145/14/14 to

5/20/145/22/2014 6/3/2014

6/4/14 to 6/9/14

6/10/14 to 6/16/14

6/17/14 to 6/20/14

PPMP 5/9/20145/14/14 to

5/20/145/22/2014 6/3/2014

6/4/14 to 6/9/14

6/10/14 to 6/16/14

6/17/14 to 6/20/14

Actual 5/9/20145/14/14 to

5/20/145/22/2014 6/3/2014 6/9/2014 6/16/2014 6/20/2014

Plan (APP) 6/5/20146/18/14 to

6/24/146/26/2014 7/7/2014

7/8/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

PPMP 6/5/20146/18/14 to

6/24/146/26/2014 7/7/2014

7/8/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

Actual 6/5/20146/18/14 to

6/24/146/26/2014 7/7/2014

Waiting Un-locking Process of Gershli Const. & Supply prior to MR Request

Plan (APP) 6/5/20146/18/14 to

6/24/146/26/2014 7/7/2014

7/8/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

PPMP 6/5/20146/18/14 to

6/24/146/26/2014 7/7/2014

7/8/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

Actual 6/5/20146/18/14 to

6/24/146/26/2014 7/7/2014

Waiting Un-locking Process of Gershli Const. & Supply prior to MR Request

Plan (APP) 6/5/20146/18/14 to

6/24/146/26/2014 7/7/2014

7/8/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

PPMP 6/5/20146/18/14 to

6/24/146/26/2014 7/7/2014

7/8/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

Actual 6/5/20146/18/14 to

6/24/146/26/2014 7/7/2014

Waiting Un-locking Process of Gershli Const. & Supply prior to MR Request

Plan (APP) 6/5/20146/18/14 to

6/24/146/26/2014 7/7/2014

7/8/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

PPMP 6/5/20146/18/14 to

6/24/146/26/2014 7/7/2014

7/8/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

Actual 6/5/20146/18/14 to

6/24/146/26/2014 7/7/2014 7/10/2014 7/15/2014

Plan (APP) 6/5/20146/18/14 to

6/24/146/26/2014 7/7/2014

7/8/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

PPMP 6/5/20146/18/14 to

6/24/146/26/2014 7/7/2014

7/8/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

Actual 6/5/20146/18/14 to

6/24/146/26/2014 7/7/2014

Waiting Un-locking Process of Gershli Const. & Supply prior to MR Request

Plan (APP) 6/5/20146/18/14 to

6/24/146/26/2014 7/7/2014

7/8/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

14DB0012 Batangas

Bidding

2,000,000.00

14DB0015Const. of Two (2) Storey Ten (10)

Classroom Academic School Building At Payapa NHS

Competitive Bidding

19,956,126.10

14DB0016Construction of 1 Storey-3 Classroom at

Calan E/SCompetitive

Bidding2,900,174.43

14DB0013Rep/Maint of National Secondary Road

Along Diokno Highway K0088+588-K0088+949

Competitive Bidding

2,655,000.00

14DB0014Rep/Maint of National ArterialRoad Along Palico-Balayan-Batangas Road

K0128+230-K0128+254

Competitive Bidding

210,260.00

14DB0019Construction of 1 Storey-1 Classroom at

Jose Chua Ben Chong MESCompetitive

Bidding1,112,329.12

14DB0020Construction of 1 Storey-1 Classroom at

Hukay E/SCompetitive

Bidding1,092,329.12

14DB0017Construction of 1 Storey-4 Classroom at

Arumahan E/SCompetitive

Bidding3,760,805.49

14DB0018Construction of 1 Storey-1 Classroom at

Dilao E/SCompetitive

Bidding1,112,329.12

PPMP 6/5/20146/18/14 to

6/24/146/26/2014 7/7/2014

7/8/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

Actual 6/5/20146/18/14 to

6/24/146/26/2014 7/7/2014 7/10/2014 7/15/2014

Plan (APP) 6/5/20146/19/14 to

6/25/146/27/2014 7/8/2014

7/9/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

PPMP 6/5/20146/19/14 to

6/25/146/27/2014 7/8/2014

7/9/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

Actual 6/5/20146/19/14 to

6/25/146/27/2014 7/8/2014 7/11/2014 7/18/2014

Plan (APP) 6/5/20146/19/14 to

6/25/146/27/2014 7/8/2014

7/9/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

PPMP 6/5/20146/19/14 to

6/25/146/27/2014 7/8/2014

7/9/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

Actual 6/5/20146/19/14 to

6/25/146/27/2014 7/8/2014 7/11/2014 7/18/2014

Plan (APP) 6/5/20146/19/14 to

6/25/146/27/2014 7/8/2014

7/9/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

PPMP 6/5/20146/19/14 to

6/25/146/27/2014 7/8/2014

7/9/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

Actual 6/5/20146/19/14 to

6/25/146/27/2014 7/8/2014 7/11/2014 7/18/2014

Plan (APP) 6/5/20146/19/14 to

6/25/146/27/2014 7/8/2014

7/9/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

PPMP 6/5/20146/19/14 to

6/25/146/27/2014 7/8/2014

7/9/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

Actual 6/5/20146/19/14 to

6/25/146/27/2014 7/8/2014 7/11/2014 7/18/2014

Plan (APP) 6/5/20146/19/14 to

6/25/146/27/2014 7/8/2014

7/9/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

PPMP 6/5/20146/19/14 to

6/25/146/27/2014 7/8/2014

7/9/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

Actual 6/5/20146/19/14 to

6/25/146/27/2014 7/8/2014 7/11/2014 7/18/2014

Plan (APP) 6/5/20146/19/14 to

6/25/146/27/2014 7/8/2014

7/9/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

PPMP 6/5/20146/19/14 to

6/25/146/27/2014 7/8/2014

7/9/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

Actual 6/5/20146/19/14 to

6/25/146/27/2014 7/8/2014 7/11/2014 7/18/2014

Plan (APP) 6/5/20146/20/14 to

6/26/146/27/2014 7/9/2014

7/10/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

PPMP 6/5/20146/20/14 to

6/26/146/27/2014 7/9/2014

7/10/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

Actual 6/5/20146/20/14 to

6/26/146/27/2014 7/9/2014 7/14/2014 7/18/2014

Plan (APP) 6/5/20146/20/14 to

6/26/146/27/2014 7/9/2014

7/10/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

PPMP 6/5/20146/20/14 to

6/26/146/27/2014 7/9/2014

7/10/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

Actual 6/5/20146/20/14 to

6/26/146/27/2014 7/9/2014 7/14/2014 7/18/2014

Plan (APP) 6/5/20146/20/14 to

6/26/146/27/2014 7/9/2014

7/10/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

14DB0023Construction of 1 Storey-2 Classroom at

Gulod E/SCompetitive

Bidding2,005,417.57

14DB0024Construction of 1 Storey-2 Classroom at

Masalisi E/SCompetitive

Bidding2,005,417.57

14DB0021Construction of 1 Storey-1 Classroom at

Angelita Zobel E/SCompetitive

Bidding1,092,329.12

14DB0022Construction of 1 Storey-1 Classroom at

Parola P/SCompetitive

Bidding1,107,329.12

14DB0027Construction of 1 Storey-2 Classroom at

KaylawayII E/SCompetitive

Bidding1,970,417.57

14DB0028Construction of 1 Storey-2 Classroom at

Bilaran E/SCompetitive

Bidding1,970,417.57

14DB0025Construction of 1 Storey-2 Classroom at

San Isidro Itaas E/SCompetitive

Bidding2,030,417.57

14DB0026Construction of 1 Storey-2 Classroom at

Ananias C. Hernandez E/SCompetitive

Bidding1,970,417.57

14DB0029Construction of 1 Storey-2 Classroom at

Natipuan E/SCompetitive

Bidding1,995,417.57

PPMP 6/5/20146/20/14 to

6/26/146/27/2014 7/9/2014

7/10/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

Actual 6/5/20146/20/14 to

6/26/146/27/2014 7/9/2014

July 10, 2014 - Received MR from TDR Construction

Plan (APP) 6/5/20146/20/14 to

6/26/146/27/2014 7/9/2014

7/10/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

PPMP 6/5/20146/20/14 to

6/26/146/27/2014 7/9/2014

7/10/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

Actual 6/5/20146/20/14 to

6/26/146/27/2014 7/9/2014 7/14/2014 7/18/2014

Plan (APP) 6/5/20146/20/14 to

6/26/146/27/2014 7/9/2014

7/10/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

PPMP 6/5/20146/20/14 to

6/26/146/27/2014 7/9/2014

7/10/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

Actual 6/5/20146/20/14 to

6/26/146/27/2014 7/9/2014

July 10, 2014 - Received MR from TDR Construction

Plan (APP) 6/5/20146/20/14 to

6/26/146/27/2014 7/9/2014

7/10/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

PPMP 6/5/20146/20/14 to

6/26/146/27/2014 7/9/2014

7/10/14 to 7/14/14

7/15/14 to 7/21/14

7/22/14 to 7/25/14

Actual 6/5/20146/20/14 to

6/26/146/27/2014 7/9/2014 7/14/2014 7/18/2014

Plan (APP) 6/16/20146/23/14 to

6/29/147/3/2014 7/14/2014

7/15/14 to 7/21/14

7/22/14 to 7/28/14

7/29/14 to 8/1/14

PPMP 6/16/20146/23/14 to

6/29/147/3/2014 7/14/2014

7/15/14 to 7/21/14

7/22/14 to 7/28/14

7/29/14 to 8/1/14

Actual 6/16/20146/23/14 to

6/29/147/3/2014 7/14/2014 7/18/2014

Plan (APP) 6/16/20146/23/14 to

6/29/147/3/2014 7/14/2014

7/15/14 to 7/21/14

7/22/14 to 7/28/14

7/29/14 to 8/1/14

PPMP 6/16/20146/23/14 to

6/29/147/3/2014 7/14/2014

7/15/14 to 7/21/14

7/22/14 to 7/28/14

7/29/14 to 8/1/14

Actual 6/16/20146/23/14 to

6/29/147/3/2014 7/14/2014 7/18/2014

Plan (APP) 6/16/20146/23/14 to

6/29/147/3/2014 7/14/2014

7/15/14 to 7/21/14

7/22/14 to 7/28/14

7/29/14 to 8/1/14

PPMP 6/16/20146/23/14 to

6/29/147/3/2014 7/14/2014

7/15/14 to 7/21/14

7/22/14 to 7/28/14

7/29/14 to 8/1/14

Actual 6/16/20146/23/14 to

6/29/147/3/2014 7/14/2014 7/18/2014

Plan (APP) 6/16/20146/23/14 to

6/29/147/3/2014 7/14/2014

7/15/14 to 7/21/14

7/22/14 to 7/28/14

7/29/14 to 8/1/14

PPMP 6/16/20146/23/14 to

6/29/147/3/2014 7/14/2014

7/15/14 to 7/21/14

7/22/14 to 7/28/14

7/29/14 to 8/1/14

Actual 6/16/20146/23/14 to

6/29/147/3/2014 7/14/2014 7/18/2014

Plan (APP) 6/16/20146/23/14 to

6/29/147/3/2014 7/14/2014

7/15/14 to 7/21/14

7/22/14 to 7/28/14

7/29/14 to 8/1/14

PPMP 6/16/20146/23/14 to

6/29/147/3/2014 7/14/2014

7/15/14 to 7/21/14

7/22/14 to 7/28/14

7/29/14 to 8/1/14

Actual 6/16/20146/23/14 to

6/29/147/3/2014 7/14/2014 7/18/2014

Plan (APP) 6/16/20146/23/14 to

6/29/147/3/2014 7/14/2014

7/15/14 to 7/21/14

7/22/14 to 7/28/14

7/29/14 to 8/1/14

14DB0031Construction of 1 Storey-2 Classroom at

Cultihan-Bolbok E/SCompetitive

Bidding1,995,417.57

14DB0032Construction of 1 Storey-2 Classroom at

Halang E/SCompetitive

Bidding1,995,417.57

14DB0030Construction of 1 Storey-2 Classroom at

Cubamba-Gahol E/SCompetitive

Bidding2,050,417.57

14DB0035Construction of 1 Storey-1 Classroom at

Esteban E. Vito MESCompetitive

Bidding1,137,329.12

14DB0036Construction of 1 Storey-1 Classroom at

Tubuan E/SCompetitive

Bidding1,152,329.12

14DB0033Construction of 1 Storey-2 Classroom at

Gregorio Agoncillo E/SCompetitive

Bidding1,970,417.57

14DB0034Construction of 1 Storey-2 Classroom at

San Jose E/SCompetitive

Bidding2,040,417.57

14DB0037Construction of 1 Storey-1 Classroom at

Payapa Ibaba E/SCompetitive

Bidding1,102,329.12

14DB0038Construction of 1 Storey-1 Classroom at

Dita E/SCompetitive

Bidding1,102,329.12

PPMP 6/16/20146/23/14 to

6/29/147/3/2014 7/14/2014

7/15/14 to 7/21/14

7/22/14 to 7/28/14

7/29/14 to 8/1/14

Actual 6/16/20146/23/14 to

6/29/147/3/2014 7/14/2014 7/18/2014

Plan (APP) 6/16/20146/24/14 to

6/30/147/4/2014 7/15/2014

7/16/14 to 7/21/14

7/22/14 to 7/28/14

7/29/14 to 8/1/14

PPMP 6/16/20146/24/14 to

6/30/147/4/2014 7/15/2014

7/16/14 to 7/21/14

7/22/14 to 7/28/14

7/29/14 to 8/1/14

Actual 6/16/20146/24/14 to

6/30/147/4/2014 7/15/2014

Plan (APP) 6/16/20146/24/14 to

6/30/147/4/2014 7/15/2014

7/16/14 to 7/21/14

7/22/14 to 7/28/14

7/29/14 to 8/1/14

PPMP 6/16/20146/24/14 to

6/30/147/4/2014 7/15/2014

7/16/14 to 7/21/14

7/22/14 to 7/28/14

7/29/14 to 8/1/14

Actual 6/16/20146/24/14 to

6/30/147/4/2014 7/15/2014

Plan (APP) 6/16/20146/24/14 to

6/30/147/4/2014 7/15/2014

7/16/14 to 7/21/14

7/22/14 to 7/28/14

7/29/14 to 8/1/14

PPMP 6/16/20146/24/14 to

6/30/147/4/2014 7/15/2014

7/16/14 to 7/21/14

7/22/14 to 7/28/14

7/29/14 to 8/1/14

Actual 6/16/20146/24/14 to

6/30/147/4/2014 7/15/2014

Plan (APP) 6/16/20146/24/14 to

6/30/147/4/2014 7/15/2014

7/16/14 to 7/21/14

7/22/14 to 7/28/14

7/29/14 to 8/1/14

PPMP 6/16/20146/24/14 to

6/30/147/4/2014 7/15/2014

7/16/14 to 7/21/14

7/22/14 to 7/28/14

7/29/14 to 8/1/14

Actual 6/16/20146/24/14 to

6/30/147/4/2014 7/15/2014

Plan (APP) 6/16/20146/24/14 to

6/30/147/4/2014 7/15/2014

7/16/14 to 7/21/14

7/22/14 to 7/28/14

7/29/14 to 8/1/14

PPMP 6/16/20146/24/14 to

6/30/147/4/2014 7/15/2014

7/16/14 to 7/21/14

7/22/14 to 7/28/14

7/29/14 to 8/1/14

Actual 6/16/20146/24/14 to

6/30/147/4/2014 7/15/2014

Plan (APP) 6/16/20146/24/14 to

6/30/147/4/2014 7/15/2014

7/16/14 to 7/21/14

7/22/14 to 7/28/14

7/29/14 to 8/1/14

PPMP 6/16/20146/24/14 to

6/30/147/4/2014 7/15/2014

7/16/14 to 7/21/14

7/22/14 to 7/28/14

7/29/14 to 8/1/14

Actual 6/16/20146/24/14 to

6/30/147/4/2014 7/15/2014

Plan (APP) 6/16/20146/23/14 to

6/29/147/3/2014 7/14/2014

7/15/14 to 7/21/14

7/22/14 to 7/28/14

7/29/14 to 8/1/14

PPMP 6/16/20146/23/14 to

6/29/147/3/2014 7/14/2014

7/15/14 to 7/21/14

7/22/14 to 7/28/14

7/29/14 to 8/1/14

Actual 6/16/20146/23/14 to

6/29/147/3/2014 7/14/2014 7/18/2014

Plan (APP) 6/30/20147/8/14 to 7/14/14

7/17/2014 7/28/20147/29/14 to

8/4/148/5/14 to 8/11/14

8/12/14 to 8/15/14

PPMP 6/30/20147/8/14 to 7/14/14

7/17/2014 7/28/20147/29/14 to

8/4/148/5/14 to 8/11/14

8/12/14 to 8/15/14

Actual 6/30/20147/8/14 to 7/14/14

Plan (APP) 7/1/20147/15/14 to

7/21/147/22/2014 8/4/2014

8/5/14 to 8/11/14

8/12/14 to 8/18/14

8/19/14 to 8/22/14

14DB0039Construction of 1 Storey-1 Classroom at

V. Ornales MESCompetitive

Bidding1,102,329.12

14DB0040Construction of 1 Storey-1 Classroom at

Carmino Biscocho MESCompetitive

Bidding1,172,329.12

14DB0043Construction of 1 Storey-1 Classroom at

Catandaan E/SCompetitive

Bidding1,127,329.12

14DB0044Construction of 1 Storey-1 Classroom at

Luyahan E/SCompetitive

Bidding1,132,329.12

14DB0041Construction of 1 Storey-1 Classroom at

Catandaan-Yabut NHSCompetitive

Bidding1,127,329.12

14DB0042Construction of 1 Storey-1 Classroom at

Pingkian E/SCompetitive

Bidding1,122,329.12

14DB0047Construction of Canda Bridge (Mabey

Bridge) K0107 + 663 Brgy. Sambat,Balayan, Batangas

Competitive Bidding

27,406,527.44

14DB0045Construction of 1 Storey-1 Classroom at

Lumaniag E/SCompetitive

Bidding1,142,329.12

14DB0046Construction of Bridge at Brgy. Tanggoy

Balayan BatangasCompetitive

Bidding9,404,985.33

PPMP 7/1/20147/15/14 to

7/21/147/22/2014 8/4/2014

8/5/14 to 8/11/14

8/12/14 to 8/18/14

8/19/14 to 8/22/14

Actual 7/1/20147/15/14 to

7/21/14

Plan (APP) 7/1/20147/15/14 to

7/21/147/22/2014 8/4/2014

8/5/14 to 8/11/14

8/12/14 to 8/18/14

8/19/14 to 8/22/14

PPMP 7/1/20147/15/14 to

7/21/147/22/2014 8/4/2014

8/5/14 to 8/11/14

8/12/14 to 8/18/14

8/19/14 to 8/22/14

Actual 7/1/20147/15/14 to

7/21/14

Plan (APP) 7/1/20147/15/14 to

7/21/147/22/2014 8/4/2014

8/5/14 to 8/11/14

8/12/14 to 8/18/14

8/19/14 to 8/22/14

PPMP 7/1/20147/15/14 to

7/21/147/22/2014 8/4/2014

8/5/14 to 8/11/14

8/12/14 to 8/18/14

8/19/14 to 8/22/14

Actual 7/1/20147/15/14 to

7/21/14

Plan (APP) 7/1/20147/15/14 to

7/21/147/22/2014 8/4/2014

8/5/14 to 8/11/14

8/12/14 to 8/18/14

8/19/14 to 8/22/14

PPMP 7/1/20147/15/14 to

7/21/147/22/2014 8/4/2014

8/5/14 to 8/11/14

8/12/14 to 8/18/14

8/19/14 to 8/22/14

Actual 7/1/20147/15/14 to

7/21/14

ubmitted by: Recommending Approval: Approved:

Head, BAC, Secretariat District Engineer

14DB0048Construction of Multi-Purpose Building,

Lemery, BatangasCompetitive

Bidding5,000,000.00

14DB0051Construction of Barangay Health Station, San Isidro Itaas, Lemery,

Batangas

Competitive Bidding

1,000,000.00

BAC Chairman, Officer-in-ChargeOffice of the Assistanst District Engineer

14DB0049Construction of Barangay Health

Station, Brgy Bungahan, Lian, BatangasCompetitive

Bidding1,000,000.00

14DB0050Construction of Barangay Health Station, Brgy Matabungkay, Lian,

Batangas

Competitive Bidding

1,000,000.00

Pre- Submission Post AwardProcurement & Receipt of Bid Evaluation Qualification ofConference Bids Evaluation Contract

14DE-0001 Competitive PLAN

Public Bidding (APP) 4,500,000.00 N/A March 24-30,2014 April 1,2014 April 15,2014 April 16-22,2014 April 23-29,2014 May 6,2014

(PPMP)

ACTUAL

(PPMP) 4,500,000.00 N/A March 24-30,2014 April 1,2014 April 15,2014 April 16-22,2014 April 23-29,2014 May 6,2014

14DE-0002 Competitive PLAN

Public Bidding (APP) 5,000,000.00 N/A March 24-30,2014 April 1,2014 April 15,2014 April 16-22,2014 April 23-29,2014 May 6,2014

(PPMP)

ACTUAL

(PPMP) 5,000,000.00 N/A March 24-30,2014 April 1,2014 April 15,2014 - - -

14DE - 0003 Competitive PLAN

Public Bidding (APP) 2,500,000.00 N/A March 24-30,2014 April 1,2014 April 15,2014 April 16-22,2014 April 23-29,2014 May 6,2014

(PPMP)

ACTUAL

(PPMP) 2,500,000.00 N/A March 24-30,2014 April 1,2014 April 15,2014 April 16-22,2014 April 23-29,2014 May 6,2014

14DE - 0004 Construction of Roads - Municipality of Tingloy Competitive PLAN

Public Bidding (APP) 2,000,000.00 N/A March 24-30,2014 April 1,2014 April 15,2014 April 16-22,2014 April 23-29,2014 May 6,2014

(PPMP)

ACTUAL

(PPMP) 2,000,000.00 N/A March 24-30,2014 April 1,2014 April 15,2014 April 16-22,2014 April 23-29,2014 May 6,2014

14DE-0005 Competitive PLAN

Public Bidding (APP) 4,000,000.00 N/A March 24-30,2014 April 1,2014 April 15,2014 April 16-22,2014 April 23-29,2014 May 6,2014

(PPMP)

ACTUAL

(PPMP) 4,000,000.00 N/A March 24-30,2014 April 1,2014 April 15,2014 April 16-22,2014 April 23-29,2014 May 6,2014

14DE-0006 Construction of Roads - Municipality of Bauan Competitive PLAN

Public Bidding (APP) 4,000,000.00 N/A May 6-12,2014 May 13,2014 May 27,2014 May 28-June 3,2014 June 4-10,2014 June 17,2014

(PPMP)

ACTUAL

(PPMP) 4,000,000.00 N/A May 6-12,2014 May 13,2014 May 27,2014 May 28-June 3,2014 June 4-10,2014 June 17,2014

Page 1 of 4

Pre- Submission Post AwardNo. Contract Package Procurement Procurement Posting/ Pre-Bid & Receipt of Bid Evaluation Qualification of

(Description) Method Conference Advertisement Conference Bids Evaluation Contract14DE-0007 Competitive PLAN

Advertisement/Posting Pre-Bid Conference

Construction of Four (4) Classroom School Building – As-is Elementary School, Bgy. As-is, Bauan, Batangas

Construction of Sorosoro Ibaba New Road - Brgy. Sorosoro Ibaba, Batangas City

Construction of Alangilan Multi-Purpose Building - Brgy. Alangilan, Batangas City

Construction of Roads - Municipality of San Pascual

Allocated AmountApproved Budget for the

Contract (ABC)Construction of Roads - Municipality of San Luis

Reference No.

Contract Package (Description)Procurement

MethodProject Cost/ABC (P)

Republic of the PhilippinesDepartment of Public Works and Highways

Batangas II District Engineering officeKumintang Ilaya, Batangas City

REVISED ANNUAL PROCUREMENT PLAN FOR FY 2014 FOR BATANGAS II DEO PROCURED PROJECTS

Public Bidding (APP) 4,000,000.00 N/A May 6-12,2014 May 13,2014 May 27,2014 May 28-June 3,2014 June 4-10,2014 June 17,2014

(PPMP)

ACTUAL

(PPMP) 4,000,000.00 N/A May 6-12,2014 May 13,2014 May 27,2014 May 28-June 3,2014 June 4-10,2014 June 17,2014

14DE-0008 Construction of Roads - City of Batangas Competitive PLAN

Public Bidding (APP) 4,000,000.00 N/A May 6-12,2014 May 13,2014 May 27,2014 May 28-June 3,2014 June 4-10,2014 June 17,2014

(PPMP)

ACTUAL

(PPMP) 4,000,000.00 N/A May 6-12,2014 May 13,2014 May 27,2014 May 28-June 3,2014 June 4-10,2014 June 17,2014

14DE-0009 Construction of Roads - Municipality of Lobo Competitive PLAN

Public Bidding (APP) 2,500,000.00 N/A May 6-12,2014 May 13,2014 May 27,2014 May 28-June 3,2014 June 4-10,2014 June 17,2014

(PPMP)

ACTUAL

(PPMP) 2,500,000.00 N/A May 6-12,2014 May 13,2014 May 27,2014 May 28-June 3,2014 June 4-10,2014 June 17,2014

14DE-0010 Competitive PLAN

Public Bidding (APP) 500,000.00 N/A May 6-12,2014 May 13,2014 May 27,2014 May 28-June 3,2014 June 4-10,2014 June 17,2014

(PPMP)

ACTUAL

(PPMP) 500,000.00 N/A May 6-12,2014 May 13,2014 May 27,2014 May 28-June 3,2014 June 4-10,2014 June 17,2014

14DE-0011 Competitive PLAN

Public Bidding (APP) 5,000,000.00 N/A May 8-14,2014 May 15,2014 June 18,2014 June 19-23,2014 June 24-30,2014 July 4,2014

(PPMP)

ACTUAL

(PPMP) 5,000,000.00 N/A May 8-14,2014 May 15,2014 June 18,2014 June 19-23,2014 June 24-30,2014 July 4,2014

14DE-0012 Competitive PLAN

Public Bidding (APP) 3,000,860.09 N/A June 18-24,2014 June 25,2014 July 8,2014 July 9-13,2014 July 14-20,2014 July 25,2014

(PPMP)

ACTUAL

(PPMP) 3,000,860.09 N/A June 18-24,2014 June 25,2014 July 8,2014 July 9-13,2014 July 14-20,2014

14DE-0013 Competitive PLAN

Public Bidding (APP) 9,800,000.00 June 18,2014 June 25-July 1,2014 July 2,2014 July 14,2014 July 15-19,2014 July 20-26,2014 July 31,2014

(PPMP)

ACTUAL

(PPMP) 9,800,000.00 June 18,2014 June 25-July 1,2014 July 2,2014 July 14,2014 July 15-19,2014

Page 2 of 4

Pre- Submission Post AwardNo. Contract Package Procurement Procurement Posting/ Pre-Bid & Receipt of Bid Evaluation Qualification of

(Description) Method Conference Advertisement Conference Bids Evaluation Contract14DE-0014 Competitive PLAN

Public Bidding (APP) 4,000,000.00 June 18,2014 June 25-July 1,2014 July 2,2014 July 14,2014 July 15-19,2014 July 20-26,2014 July 31,2014

(PPMP)

ACTUAL

(PPMP) 4,000,000.00 June 18,2014 June 25-July 1,2014 July 2,2014 July 14,2014 July 15-19,2014

Maintenance by Contract along Bauan Mabini Road w/in K0146+ -072 - K0180+532

Construction/Widening of Roads - Brgy. Sorosoro Ilaya, Brgy. Sorosoro Ibaba, and Tinga Itaas, Batangas City

Allocated AmountApproved Budget for the

Contract (ABC)Construction of Roads - Municipality of Mabini

Construction of Multi-Purpose Building-Brgy. Poblacion, Mabini, Batangas

Construction/Rehabilitation of Water Supply/Septage and Sewerage/Rain Water Collectors (RWCS) FY 2014

14DE-0015 Competitive PLAN

Public Bidding (APP) 1,122,329.12 June 19,2014 June 26-July 2,2014 July 3,2014 July 15,2014 July 16-20,2014 July 21-27,2014 July 31,2014

(PPMP)

ACTUAL

(PPMP) 1,122,329.12 June 19,2014 June 26-July 2,2014 July 3,2014 July 15,2014 July 16-20,2014

14DE-0016 Competitive PLAN

Public Bidding (APP) 2,239,658.24 June 19,2014 June 26-July 2,2014 July 3,2014 July 15,2014 July 16-20,2014 July 21-27,2014 July 31,2014

(PPMP)

ACTUAL

(PPMP) 2,239,658.24 June 19,2014 June 26-July 2,2014 July 3,2014 July 15,2014 July 16-20,2014

14DE-0017 Competitive PLAN

Public Bidding (APP) 5,113,164.26 June 19,2014 June 26-July 2,2014 July 3,2014 July 15,2014 July 16-20,2014 July 21-27,2014 July 31,2014

(PPMP)

ACTUAL

(PPMP) 5,113,164.26 June 19,2014 June 26-July 2,2014 July 3,2014 July 15,2014 July 16-20,2014

14DE-0018 Competitive PLAN

Public Bidding (APP) 7,250,250.24 June 19,2014 June 26-July 2,2014 July 3,2014 July 15,2014 July 16-20,2014 July 21-27,2014 July 31,2014

(PPMP)

ACTUAL

(PPMP) 7,250,250.24 June 19,2014 June 26-July 2,2014 July 3,2014 July 15,2014 July 16-20,2014

Page 3 of 4

Pre- Submission Post AwardNo. Contract Package Procurement Procurement Posting/ Pre-Bid & Receipt of Bid Evaluation Qualification of

(Description) Method Conference Advertisement Conference Bids Evaluation Contract14DE-0019 Competitive PLAN

Public Bidding (APP) 6,112,921.12 June 19,2014 June 26-July 2,2014 July 3,2014 July 15,2014 July 16-20,2014 July 21-27,2014 July 31,2014

(PPMP)

ACTUAL

(PPMP) 6,112,921.12 June 19,2014 June 26-July 2,2014 July 3,2014 July 15,2014 July 16-20,2014

14DE-0020 Competitive PLAN

Public Bidding (APP) 27,866,460.00 July 18,2014 July 25-31,2014 August 1,2014 August 13,2014 August 14-18,2014 August 19-25,2014 August 29,2014

(PPMP)

ACTUAL

(PPMP) 27,866,460.00 July 18,2014 July 25-31,2014

Page 4 of 4

Prepared by: Recommended by: Approved by:

(sgd)

GEMMA O. ANURANHead, BAC Secretariat Assistant District Engineer District Engineer

Contract (ABC)Cluster IV - Construction of Classrooms in Areas Experiencing Acute Classroom Shortage: 1. Construction of Classroom 1STY 3CL at Balibago Es, Lobo 2. Construction of Classroom 1STY 2CL at Biga ES, Lobo 3. Construction of Classroom 1STY 1CL at Lagadlarin-Olo-Olo Es, Lobo

Rehabilitation/Reconstruction/ Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management System/Highway Development and Management - 4 (HDM-4), (Intermittent Sections) - National Secondary Roads Bauan-Mabini Road a. K0172+427- K0172+634 b. K0176+203 - K0177+201

(sgd) (sgd)

EDWIN D. ABRIGONDA CARLITO C. JOSE

Approved Budget for the

Construction of Classrooms in Areas Experiencing Acute Classroom Shortage: 1. Construction of Classroom 1STY 1CL at Inicbulan NHS, Bauan

Cluster I - Construction of Classrooms in Areas Experiencing Acute Classroom Shortage: 1. Construction of Classroom 1STY 1CL at Mataas na Lupa - Palsahingin ES, San Pascual 2. Construction of Classroom 1STY 1CL at Papaya NHS, Tingloy

Cluster II - Construction of Classrooms in Areas Experiencing Acute Classroom Shortage: 1. Construction of Classroom 1STY 1CL at Boboy ES, San Luis 2. Construction of Classroom 1STY 2CL at Bonliw ES, San Luis 3. Construction of Classroom 1STY 2CL at Talon ES, San Luis

Cluster III - Construction of Classrooms in Areas Experiencing Acute Classroom Shortage: 1. Construction of Classroom 1STY 1CL at Apar ES, Lobo 2. Construction of Classroom 1STY 2CL at Jaybanga NHS, Lobo 3. Construction of Classroom 1STY 1CL at Malapad na Parang NHS, Lobo 4. Construction of Classroom 1STY 3CL at Masaguitsit ES, Lobo

Allocated Amount

Pre- Submission Post AwardNo. Contract Package Procurement Procurement Posting/ Pre-Bid & Receipt of Bid Evaluation Qualification of

(Description) Method Conference Advertisement Conference Bids Evaluation Contract13DE-0085 Construction of Seawall and Drainage Canal at Brgy. Competitive PLAN

Banoyo, San Luis, Batangas Public Bidding (APP) 1,000,000.00 Sept. 20, 2013 Sept. 26, 2013 to October 3, 2013 October 15, 2013 October 22, 2013 October 29, 2013 November 5, 2013(PPMP) October 2, 2013ACTUAL(PPMP)

13DE-0086 Implementation of the Department of Health-CY 2013 Competitive PLANHealth Facilities Enhancement Program (HFEP): Public Bidding (APP) 2,000,000.00 Sept. 20, 2013 Sept. 26, 2013 to October 3, 2013 October 15, 2013 October 22, 2013 October 29, 2013 November 5, 2013Expansion, San Luis RHU 2, San Luis (PPMP) October 2, 2013

ACTUAL 2,000,000.00 Sept. 20, 2013 Sept. 26, 2013 to October 3, 2013 October 18, 2013 October 25, 2013 November 4, 2014 November 8, 2013(PPMP) October 2, 2013

13DE-0087 Rehabilitation of Barangay Road, Aplaya, Bauan, Competitive PLANBatangas Public Bidding (APP) 1,500,000.00 Sept. 22, 2013 Sept. 28, 2013 to October 4, 2013 October 17, 2013 October 24, 2013 October 31, 2013 November 7, 2013

(PPMP) October 4, 2013ACTUAL(PPMP)

13DE-0088 Implementation of the Department of Health-CY 2013 Competitive PLANHealth Facilities Enhancement Program (HFEP): Public Bidding (APP) 2,000,000.00 Sept. 22, 2013 Sept. 28, 2013 to October 4, 2013 October 17, 2013 October 24, 2013 October 31, 2013 November 7, 2013Expansion, Bauan RHU 1, Bauan (PPMP) October 4, 2013

ACTUAL 2,000,000.00 Sept. 22, 2013 Sept. 28, 2013 to October 4, 2013 October 17, 2013 October 24, 2013 October 31, 2013 November 7, 2013(PPMP) October 4, 2013

13DE-0089 Implementation of the Department of Health-CY 2013 Competitive PLANHealth Facilities Enhancement Program (HFEP): Public Bidding (APP) 2,000,000.00 Sept. 24, 2013 October 1, 2013 to October 8, 2013 October 21, 2013 October 28, 2013 November 4, 2013 November 8, 2013Expansion, Bauan RHU 2, Bauan (PPMP) October 7, 2013

ACTUAL 2,000,000.00 Sept. 24, 2013 October 1, 2013 to October 8, 2013 October 21, 2013 October 28, 2013 November 4, 2013 November 8, 2013(PPMP) October 7, 2013

13DE-0090 Construction of 3-Storey, 9-Classroom RGR Type Competitive PLANSchool Building , Batangas State University-Main Public Bidding (APP) 23,030,000.00 Sept. 27, 2013 October 4, 2013 to October 11, 2013 October 23, 2013 October 30, 2013 November 6, 2013 November 12, 2013Campus II (Alangilan Campus), Brgy. Alangilan, (PPMP) October 10, 2013Batangas City ACTUAL 23,030,000.00 Sept. 27, 2013 October 4, 2013 to October 11, 2013 December 10, 2013 December 13, 2013 December 17, 2013 December 19, 2013

(PPMP) December 9, 2013

Page 5 of 6

Allocated AmountApproved Budget for the

Contract (ABC)

Pre- Submission Post AwardNo. Contract Package Procurement Procurement Posting/ Pre-Bid & Receipt of Bid Evaluation Qualification of

(Description) Method Conference Advertisement Conference Bids Evaluation Contract13DE-0098 Preventive Maintenance based on Pavement Competitive PLAN

Management System/Highway Development and Public Bidding (APP) P 20,975,920.00 November 19, 2013 November 26 to December 3, 2013 Dec. 16, 2013 December 18, 2013 December 20, 2013 December 26, 2013Maintenance-4 (HDM-4), (Intermittent Sections) (PPMP) December 2, 2013Secondary Road along Batangas Port Diversion Road, ACTUAL P 20,975,920.00 November 19, 2013 November 26 to December 3, 2013 Dec. 16, 2013 December 18, 2013 December 20, 2013 January 27, 2014K0102+194 - K0102+824 (PPMP) December 2, 2013

13DE-0099 Widening with Road Protection Works at Batangas- Competitive PLANTabangao-Ilijan-Lobo Road K0137+222 - K0137+369 Public Bidding (APP) P 11,559,103.26 November 19, 2013 November 26 to December 3, 2013 Dec. 16, 2013 December 18, 2013 December 20, 2013 December 26, 2013

(PPMP) December 2, 2013ACTUAL P 11,559,103.26 November 19, 2013 November 26 to December 3, 2013 Dec. 16, 2013 December 18, 2013 December 20, 2013 December 26, 2013(PPMP) December 2, 2013

13DE-0100 Construction/Repair/Rehabilitation of Water Sanitation Competitive PLANFacilities Batch 2 under CY 2013 Basic Educational Public Bidding (APP) P 1,798,000.00 November 19, 2013 November 26 to December 3, 2013 Dec. 16, 2013 December 18, 2013 December 20, 2013 December 26, 2013Facilities Fund (BEFF) at Batangas NHS (PPMP) December 2, 2013

ACTUAL P 1,798,000.00 November 19, 2013 November 26 to December 3, 2013 Dec. 16, 2013 December 18, 2013 December 20, 2013 December 26, 2013(PPMP) December 2, 2013

13DE-0101 Cluster: Construction/Repair/Rehabilitation of Water Competitive PLANand Sanitation Facilities Batch 2 under CY 2013 Basic Public Bidding (APP) P 3,033,000.00 November 19, 2013 November 26 to December 3, 2013 Dec. 16, 2013 December 18, 2013 December 20, 2013 December 26, 2013Educational Facilities Fund (BEFF): 1. Bauan Agric'l. & (PPMP) December 2, 2013Voc. HS, Bauan 2. Sta. Monica NHS San Luis 3. Batangas ACTUAL P 3,033,000.00 November 19, 2013 November 26 to December 3, 2013 Dec. 16, 2013 December 18, 2013 December 20, 2013 December 26, 2013Province HS For Culture and Arts 4. New Danglayan ES (PPMP) December 2, 2013

Bauan 5. San Teodoro ES Bauan 6. Laurel ES Mabini7. Mabini CS Mabini 8. Malimatoc ES Mabini9. Malaking Pook ES San Pascual

Page 1 of 3

Pre- Submission Post Award

FOR FY 2013 (BELOW P50M)

Republic of the PhilippinesDepartment of Public Works and Highways

Batangas Second District Engineering officeKumintang Ilaya, Batangas City

ANNUAL PROCUREMENT PLAN FOR PROJECTS TO BE PROCURED IN OFFICES WITHIN BATANGAS 2ND DEO

Allocated AmountApproved Budget for the

Contract (ABC)

Allocated Amount

No. Contract Package Procurement Procurement Posting/ Pre-Bid & Receipt of Bid Evaluation Qualification of(Description) Method Conference Advertisement Conference Bids Evaluation Contract

13DE-0102 Concreting/Widening of Bauan Mabini Circumferential Competitive PLANRoad, Mabini, Batangas Public Bidding (APP) P 3,916,527.98 November 22, 2013 November 29 to December 6, 2013 Dec. 18, 2013 December 20, 2013 December 24, 2014 December 27, 2013

(PPMP) December 5, 2013ACTUAL P 3,916,527.98 November 22, 2013 November 29 to December 6, 2013 Dec. 18, 2013 December 20, 2013 December 23, 2014 December 27, 2013(PPMP) December 5, 2013

13DE-0103 Concreting of Bridge along Arterial Road: Sawang Competitive PLANBridge along Lobo-Malabrigo-San Juan Road Public Bidding (APP) P 17,640,000.00 November 22, 2013 November 29 to December 6, 2013 Dec. 18, 2013 December 20, 2013 December 24, 2014 December 27, 2013

(PPMP) December 5, 2013ACTUAL P 17,640,000.00 November 22, 2013 November 29 to December 6, 2013 Dec. 18, 2013 December 20, 2013 December 23, 2014 January 27, 2014(PPMP) December 5, 2013

13DE-0104 Construction of San Jose-Sico Bridge and Approaches Competitive PLANalong Batangas-Lobo Road Public Bidding (APP) P 19,434,004.49 November 22, 2013 November 29 to December 6, 2013 Dec. 18, 2013 December 20, 2013 December 24, 2014 December 27, 2013

(PPMP) December 5, 2013ACTUAL P 19,434,004.49 November 22, 2013 November 29 to December 6, 2013 Dec. 18, 2013 December 20, 2013 December 23, 2014 December 27, 2013(PPMP) December 5, 2013

13DE-0105 Road Upgrading (Gravel to Paved) based on Gravel Road Competitive PLANStrategies, Traffic Benchmark for Upgrading to Paved Public Bidding (APP) P 16,506,000.00 November 22, 2013 November 29 to December 6, 2013 Dec. 18, 2013 December 20, 2013 December 24, 2014 December 27, 2013Road Standard (HDM-4 Analysis) (Intermittent Section) (PPMP) December 5, 2013 Arterial Road along Batangas-Tabangao-Lobo Road ACTUAL P 16,506,000.00 November 22, 2013 November 29 to December 6, 2013 Dec. 18, 2013 December 20, 2013 December 23, 2014 January 27, 2014a.) K0137+222 - K0137+369 (PPMP) December 5, 2013b.) K0145+476 - K0145+540

13DE-0106 Cluster II: Construction/Repair/Rehabilitation of Water Competitive PLANand Sanitation Facilities Batch 2 under the CY 2013 Basic Public Bidding (APP) P 1,348,000.00 November 22, 2013 November 29 to December 6, 2013 Dec. 18, 2013 December 20, 2013 December 24, 2014 December 27, 2013Educational Facilities Fund (BEFF): (PPMP) December 5, 20131. Maricaban ES Tingloy 2. San Pedro ES Tingloy ACTUAL P 1,348,000.00 November 22, 2013 November 29 to December 6, 2013 Dec. 18, 2013 December 20, 2013 December 23, 2014 December 27, 20133. Sto. Tomas Tingloy 4. Tingloy CS Tingloy (PPMP) December 5, 2013

13DE-0107 Cluster: Construction/Repair/Rehabilitation of Competitive PLANClassrooms in various Congressional District under Public Bidding (APP) P 4,039,000.00 November 22, 2013 November 29 to December 6, 2013 Dec. 18, 2013 December 20, 2013 December 24, 2014 December 27, 2013DepEd's CY 2013 Regular School Building Program (PPMP) December 5, 2013(RSBP)-Batch 2: ACTUAL P 4,039,000.00 November 22, 2013 November 29 to December 6, 2013 Dec. 18, 2013 December 20, 2013 December 23, 2014 December 27, 20131. Construction of 2STY 2CL with Security Grills at Sta. (PPMP) December 5, 2013Clara ES, Batangas City2. Construction of 1STY 2CL with Hauling Cost at AparES, Lobo

Page 2 of 3

Pre- Submission Post AwardNo. Contract Package Procurement Procurement Posting/ Pre-Bid & Receipt of Bid Evaluation Qualification of

Approved Budget for theContract (ABC)

Allocated AmountApproved Budget for the

(Description) Method Conference Advertisement Conference Bids Evaluation Contract13DE-0108 Cluster: Restoration/Improvement of Damaged Competitive PLAN

Structure at Batangas-Lobo and San Juan-Laiya- Public Bidding (APP) P 32,383,500.00 November 26, 2013 December 3 to December 10, 2013 December 23, 2013 December 26, 2013 December 26, 2013 December 27, 2013Malabrigo-Lobo Roads: (PPMP) December 9, 20131. Const. of Slope Protection along Batangas-Lobo Road ACTUAL P 32,383,500.00 November 26, 2013 December 3 to December 10, 2013 December 23, 2013 December 26, 2013 December 26, 2013 December 27, 2013a. K0133+653 - K0135+677.70 b. K0135+853 - K0135+862 PLAN December 9, 2013c. K0135+684 - K0135+707.20 d. K0135+485 - K0135+497.60e. K0135+528 - K0135+552 f. K0135+960 - K0135+985g. K0136+017 - K0136+047 h. K0136+595 - K0136+630i. K0134+950 - K0134+9712. Restoration of Damaged Spillway at San Juan-Laiya-Malabrigo-Lobo Roads K0106+900

13DE-0109 Supply and Installation of Road Safety Devices along Competitive PLANBatangas Tabangao Lobo Road K0142+279 to K0145+000 Public Bidding (APP) P 517,920.26 November 28, 2013 December 5 to NONE December 23, 2013 December 26, 2013 December 26, 2013 December 27, 2013

(PPMP) December 11, 2013ACTUAL P 517,920.26 November 28, 2013 December 5 to NONE December 23, 2013 December 26, 2013 December 26, 2013 December 27, 2013(PPMP) December 11, 2013

13DE-0110 Supply and Installation of Road Safety Devices along Competitive PLANBatangas Lobo Road K0128+279 to K0134+000 Public Bidding (APP) P 491,357.55 November 28, 2013 December 5 to NONE December 23, 2013 December 26, 2013 December 26, 2013 December 27, 2013

(PPMP) December 11, 2013ACTUAL P 491,357.55 November 28, 2013 December 5 to NONE December 23, 2013 December 26, 2013 December 26, 2013 December 27, 2013(PPMP) December 11, 2013

13DE-0111 Construction, Rehabilitation, Replacement, Completion Competitive PLANand Repair of Kindergarten, Elementary and Secondary Public Bidding (APP) P 461,000.00 November 29, 2013 December 6 to NONE December 23, 2013 December 26, 2013 December 26, 2013 December 27, 2013School Building at Locloc ES, Bauan, Batangas (PPMP) December 12, 2013

ACTUAL P 461,000.00 November 29, 2013 December 6 to NONE December 23, 2013 December 26, 2013 December 26, 2013 December 27, 2013(PPMP) December 12, 2013

Page 3 of 3

Prepared by: Recommended by: Approved by:

GEMMA O. ANURANHead, BAC Secretariat

EDWIN D. ABRIGONDA CARLITO C. JOSEAssistant District Engineer District Engineer

Contract (ABC)

Reference No. Contract Package (Description)Procurement

MethodPre-Procurement

ConferenceAdvertisement/

PostingPre-Bid

ConferenceSubmission &

Receipt of BidsBid Evaluation

Post-Qualification Evaluation

Award of Contract

PLAN (APP) 14,586,940.00 9/10/20139/19/2013 to

9/25/2013 9/26/20139/25/2013 to 10/08/2013

10/08/2013 to 10/13/2013

10/14/2013 to 10/20/2013

Upon receipt of allotment advice

(PPMP) 14,586,940.00 9/10/20139/19/2013 to

9/25/2013 9/26/20139/25/2013 to 10/08/2013

10/08/2013 to 10/13/2013

10/14/2013 to 10/20/2013

10/21/2013 to 10/24/2013

ACTUAL 14,586,940.00 9/10/2013 9/20/2013 9/26/20139/20/2013 to 10/08/2013

10/08/2013 to 10/13/2013

10/14/2013 to 10/20/2013 1/15/2014

(PPMP) 14,586,940.00 9/10/2013 9/20/2013 9/26/20139/20/2013 to 10/08/2013

10/08/2013 to 10/13/2013

10/14/2013 to 10/20/2013 1/15/2014

PLAN (APP) 9,776,414.98 9/22/201310/02/2013 to

10/08/2013 10/8/201310/08/2013 to

10/21/201310/21/2013 to

10/26/201310/27/2013 to

11/03/2013Upon receipt of

allotment advice

(PPMP) 9,776,414.98 9/23/201310/02/2013 to

10/08/2013 10/8/201310/08/2013 to

10/21/201310/21/2013 to

10/26/201310/27/2013 to

11/02/201311/03/2013 to

11/06/2013

ACTUAL 9,776,414.98 9/23/2013 10/2/2013 10/8/201310/02/2013 to

10/21/201310/21/2013 to

10/26/201310/27/2013 to

11/02/2013 1/15/2014

(PPMP) 9,776,414.98 9/23/2013 10/2/2013 10/8/201310/02/2013 to

10/21/201310/21/2013 to

10/26/201310/27/2013 to

11/02/2013 1/15/2014

PLAN (APP) 16,857,959.90 9/25/201310/04/2013 to

10/10/2013 10/11/201310/10/2013 to

10/23/201310/23/2013 to

10/28/201310/29/2013 to

11/04/2013Upon receipt of

allotment advice

(PPMP) 16,857,959.90 9/25/201310/04/2013 to

10/10/2013 10/11/201310/10/2013 to

10/23/201310/23/2013 to

10/28/201310/29/2013 to

11/04/201311/05/2013 to

11/08/2013

ACTUAL 16,857,959.90 9/25/2013 10/5/2013 10/11/201310/05/2013 to

10/23/201310/23/2013 to

10/28/201310/29/2013 to

11/04/2013 1/15/2014

(PPMP) 16,857,959.90 9/25/2013 10/5/2013 10/11/201310/05/2013 to

10/23/201310/23/2013 to

10/28/201310/29/2013 to

11/04/2013 1/15/2014

PLAN (APP) 19,300,000.00 10/8/201310/17/2013 to

10/23/2013 10/24/201310/18/2013 to

11/05/201311/05/2013 to

11/10/201311/11/2013 to

11/17/2013Upon receipt of

allotment advice

(PPMP) 19,300,000.00 10/8/201310/17/2013 to

10/23/2013 10/24/201310/18/2013 to

11/05/201311/05/2013 to

11/10/201311/11/2013 to

11/17/201311/18/2013 to

11/21/2013

ACTUAL 19,300,000.00 10/8/2013 10/18/2013 10/24/201310/18/2013 to

11/05/201311/05/2013 to

11/10/201311/11/2013 to

11/17/2013 1/15/2014

(PPMP) 19,300,000.00 10/8/2013 10/18/2013 10/24/201310/18/2013 to

11/05/201311/05/2013 to

11/10/201311/11/2013 to

11/17/2013 1/15/2014

Submitted by: Recommending Approval: Approved:

EDNA V. AGGARIHead, BAC Secretariat

ALBERTO C. GUERRERO CELESTIAL S. FLANCIAOIC, Assistant District Engineer District Engineer

Project Cost/ABC (P')

13DD0122 Asphalt Overlay along Manila-Batangas Road, K0091+616 - K0092+536

Competitive Public Bidding

13DD0133 Asphalt Overlay along Batangas-Lobo Road, Taysan section, Taysan, Batangas, K0120+036 - K0120+726

Competitive Public Bidding

13DD0134 Asphalt Overlay along Batangas-Quezon Road (Padre Garcia & Ibaan, Batangas) a) K0114+646 to K0114+966 b) K0115+502 - K0115+602 c) K0132+230 to K0132+950

Competitive Public Bidding

13DD0135 Widening of Batangas - Quezon Road (Rosario Section) Rosario, Batangas K0117+600 - K0118+194.50 K0117+600-K0118+555.70

Competitive Public Bidding

Republic of the PhilippinesDepartment of Public Works and Highways

BATANGAS IV DISTRICT ENGINEERING OFFICELipa City

REVISED ANNUAL PROCUREMENT PLAN FOR FY 2014

PLAN (APP) 38,599,999.90 10/15/201310/24/2013 to

10/30/2013 10/31/201410/30/2013 to

11/12/201311/12/2013 to

11/17/201311/18/2013 to

11/24/2014Upon receipt of

allotment advice

(PPMP) 38,599,999.90 10/15/201310/24/2013 to

10/30/2013 10/31/201410/30/2013 to

11/12/201311/12/2013 to

11/17/201311/18/2013 to

11/24/201411/25/2013 to

11/28/2013

ACTUAL 38,599,999.90 10/15/2013 10/25/2013 10/31/201410/25/2013 to

11/12/201311/12/2013 to

11/17/201311/18/2013 to

11/24/2014 1/15/2014

(PPMP) 38,599,999.90 10/15/2013 10/25/2013 10/31/201410/25/2013 to

11/12/201311/12/2013 to

11/17/201311/18/2013 to

11/24/2014 1/15/2014

PLAN (APP) 28,950,000.00 10/15/201310/24/2013 to

10/30/2013 10/31/201410/30/2013 to

11/12/201311/12/2013 to

11/17/201311/18/2013 to

11/24/2014Upon receipt of

allotment advice

(PPMP) 28,950,000.00 10/15/201310/24/2013 to

10/30/2013 10/31/201410/30/2013 to

11/12/201311/12/2013 to

11/17/201311/18/2013 to

11/24/201411/25/2013 to

11/28/2013

ACTUAL 28,950,000.00 10/15/2013 10/25/2013 10/31/201410/25/2013 to

11/12/201311/12/2013 to

11/17/201311/18/2013 to

11/24/2014 1/15/2014

(PPMP) 28,950,000.00 10/15/2013 10/25/2013 10/31/201410/25/2013 to

11/12/201311/12/2013 to

11/17/201311/18/2013 to

11/24/2014 1/15/2014

PLAN (APP) 10,421,999.00 10/15/201310/24/2013 to

10/30/2013 10/31/201410/30/2013 to

11/12/201311/12/2013 to

11/17/201311/18/2013 to

11/24/2014Upon receipt of

allotment advice

(PPMP) 10,421,999.00 10/15/201310/24/2013 to

10/30/2013 10/31/201410/30/2013 to

11/12/201311/12/2013 to

11/17/201311/18/2013 to

11/24/201411/25/2013 to

11/28/2013

ACTUAL 10,421,999.00 10/15/2013 10/25/2013 10/31/201410/25/2013 to

11/12/201311/12/2013 to

11/17/201311/18/2013 to

11/24/2014 1/15/2014

(PPMP) 10,421,999.00 10/15/2013 10/25/2013 10/31/201410/25/2013 to

11/12/201311/12/2013 to

11/17/201311/18/2013 to

11/24/2014 1/15/2014

PLAN (APP) 38,599,999.90 10/22/201310/31/2013 to

11/06/2013 11/7/201311/06/2013 to

11/19/201311/19/2013 to

11/24/201311/25/2013 to

12/01/2013Upon receipt of

allotment advice

(PPMP) 38,599,999.90 10/22/201310/31/2013 to

11/06/2013 11/7/201311/06/2013 to

11/19/201311/19/2013 to

11/24/201311/25/2013 to

12/01/201312/02/2013 to

12/05/2013

ACTUAL 38,599,999.90 10/22/2013 11/1/2013 11/7/201311/01/2013 to

11/19/201311/19/2013 to

11/24/201311/25/2013 to

12/01/2013 1/15/2014

(PPMP) 38,599,999.90 10/22/2013 11/1/2013 11/7/201311/01/2013 to

11/19/201311/19/2013 to

11/24/201311/25/2013 to

12/01/2013 1/15/2014

Submitted by: Recommending Approval: Approved:

EDNA V. AGGARIHead, BAC Secretariat

ALBERTO C. GUERRERO CELESTIAL S. FLANCIAOIC, Assistant District Engineer District Engineer

Competitive Public Bidding

13DD0137 Widening of Lipa-Rosario Road (Antipolo Section), Lipa City K0082+673 - K0083+574 (Right Side) K0082+675-K0083+574 (Left Side)

Competitive Public Bidding

13DD0136 Widening of Manila-Batangas Road (San Jose Section) K0086+405 - K0087+720 (Right Side) K0086+620-K0087+720 (Left Side)

13DD0138 Rehabilitation/Reconstruction/Replacement/Retrofitting of Existing Permanent Bridge, Munting Tubig Bridge along Batangas-Quezon Road, Ibaan, Batangas

Competitive Public Bidding

13DD0142 Widening of Manila-Batangas Road, Bugtong-Maraouy Section, Lipa City K0073+620 - K0073+834.40 (Right Side) K0072+305-K0074+156.20 (Left Side)

Competitive Public Bidding

PLAN (APP) 28,950,000.00 10/22/201310/31/2013 to

11/06/2013 11/7/201311/06/2013 to

11/19/201311/19/2013 to

11/24/201311/25/2013 to

12/01/2013Upon receipt of

allotment advice

(PPMP) 28,950,000.00 10/22/201310/31/2013 to

11/06/2013 11/7/201311/06/2013 to

11/19/201311/19/2013 to

11/24/201311/25/2013 to

12/01/201312/02/2013 to

12/05/2013

ACTUAL 28,950,000.00 10/22/2013 11/1/2013 11/7/201311/01/2013 to

11/19/201311/19/2013 to

11/24/201311/25/2013 to

12/01/2013 1/15/2014

(PPMP) 28,950,000.00 10/22/2013 11/1/2013 11/7/201311/01/2013 to

11/19/201311/19/2013 to

11/24/201311/25/2013 to

12/01/2013 1/15/2014

PLAN (APP) 38,599,999.90 10/29/201311/07/2013 to

11/13/2013 11/14/201311/13/2013 to

11/26/201311/26/2013 to

12/01/201312/02/2013 to

12/08/2013Upon receipt of

allotment advice

(PPMP) 38,599,999.90 10/29/201311/07/2013 to

11/13/2013 11/14/201311/13/2013 to

11/26/201311/26/2013 to

12/01/201312/02/2013 to

12/08/201312/09/2013 to

12/12/2013

ACTUAL 38,599,999.90 10/29/2013 11/8/2013 11/14/201311/08/2013 to

11/26/201311/26/2013 to

12/01/201312/02/2013 to

12/08/2013 1/15/2014

(PPMP) 38,599,999.90 10/29/2013 11/8/2013 11/14/201311/08/2013 to

11/26/201311/26/2013 to

12/01/201312/02/2013 to

12/08/2013 1/15/2014

PLAN (APP) 34,739,934.28 10/29/201311/07/2013 to

11/13/2013 11/14/201311/13/2013 to

11/26/201311/26/2013 to

12/01/201312/02/2013 to

12/08/2013Upon receipt of

allotment advice

(PPMP) 34,739,934.28 10/29/201311/07/2013 to

11/13/2013 11/14/201311/13/2013 to

11/26/201311/26/2013 to

12/01/201312/02/2013 to

12/08/201312/09/2013 to

12/12/2013

ACTUAL 34,739,934.28 10/29/2013 11/8/2013 11/14/201311/08/2013 to

11/26/201311/26/2013 to

12/01/201312/02/2013 to

12/08/2013 1/15/2014

(PPMP) 34,739,934.28 10/29/2013 11/8/2013 11/14/201311/08/2013 to

11/26/201311/26/2013 to

12/01/201312/02/2013 to

12/08/2013 1/15/2014

PLAN (APP) 11,097,499.00 11/19/201311-29-2013 to

12/5/2013 12/5/201312/05/2013 to

12/18/201312/17/2013 to

12/22/201312/23/2013 to

12/29/2013Upon receipt of

allotment advice

(PPMP) 11,097,499.00 11/19/201311/29/2013 to

12/05/2013 12/5/201312/05/2013 to

12/18/201312/17/2013 to

12/22/201312/23/2013 to

12/29/201312/30/2013 to

1/02/2014

ACTUAL 11,097,499.00 11/19/2013 11/29/2013 12/5/201311/29/2013 to

12/17/201312/17/2013 to

12/22/201312/23/2013 to

12/29/2013 1/15/2014

(PPMP) 11,097,499.00 11/19/2013 11/29/2013 12/5/201311/29/2013 to

12/17/201312/17/2013 to

12/22/201312/23/2013 to

12/29/2013 1/15/2014

Submitted by: Recommending Approval: Approved:

EDNA V. AGGARIHead, BAC Secretariat

ALBERTO C. GUERRERO CELESTIAL S. FLANCIAOIC, Assistant District Engineer District Engineer

Competitive Public Bidding

13DD0147 Widening of Manila-Batangas Road, Aguila Section K0093+960.00 - K0095+465.30 (Both Sides)

Competitive Public Bidding

13DD0148 Rehabilitation/Reconstruction/Replacement/Retrofitting of Existing Permanent Bridge, Dayapan Bridge along Batangas-Quezon Road, Ibaan, Batangas

Competitive Public Bidding

13DD0151 Construction/Rehabilitation of Drainage/Protection works along National Roads and Bridges, Batangas-Quezon Road, Padre Garcia, Poblacion Section K0114+205 - K0114+645 (Right Side) K0114+205 - K0114+465 (Left Side)

Competitive Public Bidding

13DD0143 Widening of Lipa-Rosario Road, San Felipe-Poblacion Section, Padre Garcia K0087+208 - K0088+604 (Right Side) K0088+920-K0089+199.50 (Left Side)

PLAN (APP) 4,499,999.00 2/19/20142/28/2014 to

3/06/2014 3/7/20143/06/2014 to

3/20/20143/20/2014 to

3/25/20143/26/2014 to

3/27/2014 3/28/2014

(PPMP) 4,499,999.00 2/19/20142/28/2014 to

3/06/2014 3/7/20143/06/2014 to

3/20/20143/20/2014 to

3/25/20143/26/2014 to

3/27/2014 3/28/2014

ACTUAL 4,499,999.00 2/19/2014 3/1/2014 3/7/20143/01/2014 to

3/20/20143/20/2014 to

3/25/20143/25/2014 to

3/26/2014 3/27/2014

(PPMP) 4,499,999.00 2/19/2014 3/1/2014 3/7/20143/01/2014 to

3/20/20143/20/2014 to

3/25/20143/25/2014 to

3/26/2014 3/27/2014

PLAN (APP) 2,500,000.00 2/19/20142/28/2014 to

3/06/2014 3/7/20143/06/2014 to

3/20/20143/20/2014 to

3/25/20143/26/2014 to

3/27/2014 3/28/2014

(PPMP) 2,500,000.00 2/19/20142/28/2014 to

3/06/2014 3/7/20143/06/2014 to

3/20/20143/20/2014 to

3/25/20143/26/2014 to

3/27/2014 3/28/2014

ACTUAL 2,500,000.00 2/19/2014 3/1/2014 3/7/20143/01/2014 to

3/20/20143/20/2014 to

3/25/20143/25/2014 to

3/26/2014 3/27/2014

(PPMP) 2,500,000.00 2/19/2014 3/1/2014 3/7/20143/01/2014 to

3/20/20143/20/2014 to

3/25/20143/25/2014 to

3/26/2014 3/27/2014

PLAN (APP) 1,999,980.40 2/19/20142/28/2014 to

3/06/2014 3/7/20143/06/2014 to

3/20/20143/20/2014 to

3/25/20143/26/2014 to

3/27/2014 3/28/2014

(PPMP) 1,999,980.40 2/19/20142/28/2014 to

3/06/2014 3/7/20143/06/2014 to

3/20/20143/20/2014 to

3/25/20143/26/2014 to

3/27/2014 3/28/2014

ACTUAL 1,999,980.40 2/19/2014 3/1/2014 3/7/20143/01/2014 to

3/20/20143/20/2014 to

3/25/20143/25/2014 to

3/26/2014 3/27/2014

(PPMP) 1,999,980.40 2/19/2014 3/1/2014 3/7/20143/01/2014 to

3/20/20143/20/2014 to

3/25/20143/25/2014 to

3/26/2014 3/27/2014

PLAN (APP) 2,999,999.99 3/7/20143/11/2014 to

3/17/2014 3/20/20143/17/2014 to

4/01/20144/01/2014 to

4/06/20144/07/2014 to

4/13/2014 4/17/2014

(PPMP) 2,999,999.99 3/7/20143/11/2014 to

3/17/2014 3/20/20143/17/2014 to

4/01/20144/01/2014 to

4/06/20144/07/2014 to

4/13/2014 4/17/2014

ACTUAL 2,999,999.99 3/7/2014 3/17/2014 3/24/20143/17/2014 to

4/04/20144/04/2014 to

4/06/20144/07/2014 to

4/13/2014 4/11/2014

(PPMP) 2,999,999.99 3/7/2014 3/17/2014 3/24/20143/17/2014 to

4/04/20144/04/2014 to

4/06/20144/07/2014 to

4/13/2014 4/11/2014

Submitted by: Recommending Approval: Approved:

EDNA V. AGGARIHead, BAC Secretariat

ALBERTO C. GUERRERO CELESTIAL S. FLANCIAOIC, Assistant District Engineer District Engineer

14DD0001 Construction of Multi-Purpose Building - Brgy. Bawi, Padre Garcia, Batangas

Competitive Public Bidding

14DD0002 Construction of Multi-Purpose Building - Brgy. Manggas, Padre Garcia, Batangas

14DD0004 Repair/ Rehabilitation of San Juan-Laiya Road, Brgy. Talahiban-Putting Buhangin Section (Reblocking), San Juan, Batangas

Competitive Public Bidding

Competitive Public Bidding

14DD0003 Construction of Multi-Purpose Building - Brgy. Salaban I, Ibaan, Batangas

Competitive Public Bidding

PLAN (APP) 500,000.00 5/7/20145/8/2014 to 5/14/2014 5/16/2014

5/14/2014 to 5/29/2014

5/30/2014 to 6/3/2014

6/4/2014 to 6/10/2014

6/111/2014 to 6/17/2014

(PPMP) 500,000.00 5/7/20145/8/2014 to 5/14/2014 5/16/2014

5/14/2014 to 5/29/2014

5/30/2014 to 6/3/2014

6/4/2014 to 6/10/2014

6/111/2014 to 6/17/2014

ACTUAL 500,000.00 5/7/2014 5/9/2014 5/15/20145/09/2014 to

5/27/20145/27/2014 to

6/3/20146/4/2014 to 6/10/2014 5/29/2014

(PPMP) 500,000.00 5/7/2014 5/9/2014 5/15/20145/09/2014 to

5/27/20145/27/2014 to

6/3/20146/4/2014 to 6/10/2014 5/29/2014

PLAN (APP) 4,453,410.28 5/14/20145/23/2014 to

5/29/2014 5/30/20145/29/2014 to

6/11/20146/11/2014 to

6/16/20146/17/2014 to

6/23/20146/24/2014 to

6/27/2014

(PPMP) 4,453,410.28 5/14/20145/23/2014 to

5/29/2014 5/30/20145/29/2014 to

6/11/20146/11/2014 to

6/16/20146/17/2014 to

6/23/20146/24/2014 to

6/27/2014

ACTUAL 4,453,410.28 5/14/2014 5/24/2014 5/30/20145/24/2014 to

6/11/20146/11/2014 to

6/16/20146/17/2014 to

6/23/2014 6/19/2014

(PPMP) 4,453,410.28 5/14/2014 5/24/2014 5/30/20145/24/2014 to

6/11/20146/11/2014 to

6/16/20146/17/2014 to

6/23/2014 6/19/2014

PLAN (APP) 1,978,000.00 5/14/20145/23/2014 to

5/29/2014 5/30/20145/29/2014 to

6/11/20146/11/2014 to

6/16/20146/17/2014 to

6/23/20146/24/2014 to

6/27/2014

(PPMP) 1,978,000.00 5/14/20145/23/2014 to

5/29/2014 5/30/20145/29/2014 to

6/11/20146/11/2014 to

6/16/20146/17/2014 to

6/23/20146/24/2014 to

6/27/2014

ACTUAL 1,978,000.00 5/14/2014 5/24/2014 5/30/20145/24/2014 to

6/11/20146/11/2014 to

6/16/20146/17/2014 to

6/23/2014 6/19/2014

(PPMP) 1,978,000.00 5/14/2014 5/24/2014 5/30/20145/24/2014 to

6/11/20146/11/2014 to

6/16/20146/17/2014 to

6/23/2014 6/19/2014

PLAN (APP) 9,701,949.21 5/14/20145/23/2014 to

5/29/2014 5/30/20145/29/2014 to

6/11/20146/11/2014 to

6/16/20146/17/2014 to

6/23/20146/24/2014 to

6/27/2014

(PPMP) 9,701,949.21 5/14/20145/23/2014 to

5/29/2014 5/30/20145/29/2014 to

6/11/20146/11/2014 to

6/16/20146/17/2014 to

6/23/20146/24/2014 to

6/27/2014

ACTUAL 9,701,949.21 5/14/2014 5/24/2014 5/30/20145/24/2014 to

6/11/20146/11/2014 to

6/16/20146/17/2014 to

6/23/2014 6/19/2014

(PPMP) 9,701,949.21 5/14/2014 5/24/2014 5/30/20145/24/2014 to

6/11/20146/11/2014 to

6/16/20146/17/2014 to

6/23/2014 6/19/2014

Submitted by: Recommending Approval: Approved:

EDNA V. AGGARIHead, BAC Secretariat

ALBERTO C. GUERRERO CELESTIAL S. FLANCIAOIC, Assistant District Engineer District Engineer

14DD0008 Construction of Multi-Purpose Building - Batangas State University, Lipa City Campus (Phase I)

Competitive Public Bidding

14DD0006

Construction/Rehabilitation of Water Supply/Septage and Sewerage/Rain Water Collectors (RWCS), San Juan, Batangas

Competitive Public Bidding

Construction of Multi-Purpose Building - Brgy. Poblacion B, Rosario, Batangas

Competitive Public Bidding

14DD0007 Rehabilitation of Multi-Purpose Building - Don Luis, San Jose, Batangas

Competitive Public Bidding

14DD0005

PLAN (APP) 3,107,133.16 6/19/20146/20/2014 to

6/25/2014 7/1/2014 7/14/2014 7/15/2014 7/16/20147/17/2014 to

7/18/2014

(PPMP) 3,107,133.16 6/19/20146/20/2014 to

6/25/2014 7/1/2014 7/14/2014 7/15/2014 7/16/20147/17/2014 to

7/18/2014

ACTUAL 3,107,133.16 6/19/2014 6/25/2014 7/1/20146/25/2014 to

7/14/2014 7/15/2014 7/16/2014 -

(PPMP) 3,107,133.16 6/19/2014 6/25/2014 7/1/20146/25/2014 to

7/14/2014 7/15/2014 7/16/2014 -

PLAN (APP) 2,204,884.94 6/19/20146/20/2014 to

6/25/2014 7/1/2014 7/14/2014 7/15/2014 7/16/20147/17/2014 to

7/18/2014

(PPMP) 2,204,884.94 6/19/20146/20/2014 to

6/25/2014 7/1/2014 7/14/2014 7/15/2014 7/16/20147/17/2014 to

7/18/2014

ACTUAL 2,204,884.94 6/19/2014 6/25/2014 7/1/20146/25/2014 to

7/14/2014 7/15/2014 7/16/2014 -

(PPMP) 2,204,884.94 6/19/2014 6/25/2014 7/1/20146/25/2014 to

7/14/2014 7/15/2014 7/16/2014 -

PLAN (APP) 4,849,055.08 6/19/20146/20/2014 to

6/25/2014 6/25/2014 7/14/2014 7/15/2014 7/16/20147/17/2014 to

7/18/2014

(PPMP) 4,849,055.08 6/19/20146/20/2014 to

6/25/2014 7/1/2014 7/14/2014 7/15/2014 7/16/20147/17/2014 to

7/18/2014

ACTUAL 4,849,055.08 6/19/2014 6/25/2014 7/1/20146/25/2014 to

7/14/2014 7/15/2014 7/16/2014 -

(PPMP) 4,849,055.08 6/19/2014 6/25/2014 7/1/20146/25/2014 to

7/14/2014 7/15/2014 7/16/2014 -

PLAN (APP) 3,057,416.12 6/24/20146/25/2014 to

6/30/2014 7/4/2014 7/16/2014 7/17/2014 7/18/20147/19/2014 to

7/20/2014

(PPMP) 3,057,416.12 6/24/20146/25/2014 to

6/30/2014 7/4/2014 7/16/2014 7/17/2014 7/18/20147/19/2014 to

7/20/2014

ACTUAL 3,057,416.12 6/20/2014 6/28/2014 7/4/20146/28/2014 to

7/16/2014 7/17/2014 7/18/2014 -

(PPMP) 3,057,416.12 6/20/2014 6/28/2014 7/4/20146/28/2014 to

7/16/2014 7/17/2014 7/18/2014 -

Submitted by: Recommending Approval: Approved:

EDNA V. AGGARIHead, BAC Secretariat

ALBERTO C. GUERRERO CELESTIAL S. FLANCIAOIC, Assistant District Engineer District Engineer

14DD0011 a.) Construction of One (1) Storey Two (2) Classroom at Aplaya ES, b.) Construction of One (1) Storey Three (3) Classroom at Laiya National High School, San Juan, Batangas

Competitive Public Bidding

Competitive Public Bidding

14DD0012 a.) Construction of One (1) Storey One (1) Classroom at Hugom ES, b.) Construction of One (1) Storey Two (2) Classroom at Wenceslao I. Llana Memorial School (Aplaya Annex), San Juan, Batangas

a. Construction of One (1) Storey One Classroom at Quilo-Quilo ES b.) Construction of One (1) Storey Two (2) Classroom at Pansol ES, Padre Garcia

Competitive Public Bidding

14DD0010 Construction of One (1) Storey One Classroom at a.) Mayuro National High School, Brgy. Mayuro, b.) Timbugan National High School, Brgy. Timbugan, Rosario, Batangas

Competitive Public Bidding

14DD0009

PLAN (APP) 3,936,055.96 6/24/20146/25/2014 to

6/30/2014 7/4/2014 7/16/2014 7/17/2014 7/18/20147/19/2014 to

7/20/2014

(PPMP) 3,936,055.96 6/24/20146/25/2014 to

6/30/2014 7/4/2014 7/16/2014 7/17/2014 7/18/20147/19/2014 to

7/20/2014

ACTUAL 3,936,055.96 6/24/2014 6/28/2014 7/4/20146/28/2014 to

7/16/2014 7/17/2014 7/18/2014 -

(PPMP) 3,936,055.96 6/24/2014 6/28/2014 7/4/20146/28/2014 to

7/16/2014 7/17/2014 7/18/2014 -

PLAN (APP) 1,101,792.47 6/24/20146/25/2014 to

6/30/2014 7/4/2014 7/16/2014 7/17/2014 7/18/20147/19/2014 to

7/20/2014

(PPMP) 1,101,792.47 6/24/20146/25/2014 to

6/30/2014 7/4/2014 7/16/2014 7/17/2014 7/18/20147/19/2014 to

7/20/2014

ACTUAL 1,101,792.47 6/24/2014 6/28/2014 7/4/20146/28/2014 to

7/16/2014 7/17/2014 7/18/2014 -

(PPMP) 1,101,792.47 6/24/2014 6/28/2014 7/4/20146/28/2014 to

7/16/2014 7/17/2014 7/18/2014 -

PLAN (APP) 3,132,007.95 6/24/20146/25/2014 to

6/30/2014 7/4/2014 7/16/2014 7/17/2014 7/18/20147/19/2014 to

7/20/2014

(PPMP) 3,132,007.95 6/24/20146/25/2014 to

6/30/2014 7/4/2014 7/16/2014 7/17/2014 7/18/20147/19/2014 to

7/20/2014

ACTUAL 3,132,007.95 6/24/2014 6/28/2014 7/4/20146/28/2014 to

7/16/2014 7/17/2014 7/18/2014 -

(PPMP) 3,132,007.95 6/24/2014 6/28/2014 7/4/20146/28/2014 to

7/16/2014 7/17/2014 7/18/2014 -

PLAN (APP) 1,136,617.47 6/25/20146/26/2014 to

7/01/2014 7/7/2014 7/21/2014 7/22/2014 7/23/20147/20/2014 to

7/25/2014

(PPMP) 1,136,617.47 6/25/20146/26/2014 to

7/01/2014 7/7/2014 7/21/2014 7/22/2014 7/23/20147/20/2014 to

7/25/2014

ACTUAL 1,136,617.47 6/25/2014 7/01/2014 7/7/20147/01/2014 to

7/21/2014 7/22/2014 7/23/2014 -

(PPMP) 1,136,617.47 6/25/2014 7/01/2014 7/7/20147/01/2014 to

7/21/2014 7/22/2014 7/23/2014 -

Submitted by: Recommending Approval: Approved:

EDNA V. AGGARIHead, BAC Secretariat

ALBERTO C. GUERRERO CELESTIAL S. FLANCIAOIC, Assistant District Engineer District Engineer

a.) Construction of One (1) Storey One (1) Classroom at Tilaga ES, Brgy. Tulos, Rosario, Batangas

Competitive Public Bidding

14DD0015 a.) Construction of One (1) Storey One (1) Classroom at Balanga ES, b.) Construction of One (1) Storey Two (2) Classroom at Talaibon ES, Ibaan, Batangas

Competitive Public Bidding

14DD0016 a.) Construction of One (1) Storey One (1) Classroom at Calantas ES, Rosario, Batangas

Competitive Public Bidding

14DD0013 a.) Construction of One (1) Storey Two (2) Classroom at Alupay ES, b.) Construction of One (1) Storey Two (2) Classroom at Rosario West CS, Brgy. Namunga, Rosario, Batangas

Competitive Public Bidding

14DD0014

PLAN (APP) 2,243,260.36 6/25/20146/26/2014 to

7/01/2014 7/7/2014 7/21/2014 7/22/2014 7/23/20147-24-2014 to

7/25/2014

(PPMP) 2,243,260.36 6/25/20146/26/2014 to

7/01/2014 7/7/2014 7/21/2014 7/22/2014 7/23/20147-24-2014 to

7/25/2014

ACTUAL 2,243,260.36 6/25/2014 7/01/2014 7/7/20147-01-2014 to

7/21/2014 7/22/2014 7/23/2014 -

(PPMP) 2,243,260.36 6/25/2014 7/01/2014 7/7/20147-01-2014 to

7/21/2014 7/22/2014 7/23/2014 -

PLAN (APP) 3,937,118.48 6/25/20146/26/2014 to

7/01/2014 7/7/2014 7/21/2014 7/22/2014 7/23/20147-24-2014 to

7/25/2014

(PPMP) 3,937,118.48 6/25/20146/26/2014 to

7/01/2014 7/7/2014 7/21/2014 7/22/2014 7/23/20147-24-2014 to

7/25/2014

ACTUAL 3,937,118.48 6/25/2014 7/01/2014 7/7/20147-01-2014 to

7/21/2014 7/22/2014 7/23/2014 -

(PPMP) 3,937,118.48 6/25/2014 7/01/2014 7/7/20147-01-2014 to

7/21/2014 7/22/2014 7/23/2014 -

PLAN (APP) 2,880,023.24 6/25/20146/26/2014 to

7/01/2014 7/7/2014 7/21/2014 7/22/2014 7/23/20147-24-2014 to

7/25/2014

(PPMP) 2,880,023.24 6/25/20146/26/2014 to

7/01/2014 7/7/2014 7/21/2014 7/22/2014 7/23/20147-24-2014 to

7/25/2014

ACTUAL 2,880,023.24 6/25/2014 7/01/2014 7/7/20147-01-2014 to

7/21/2014 7/22/2014 7/23/2014 -

(PPMP) 2,880,023.24 6/25/2014 7/01/2014 7/7/20147-01-2014 to

7/21/2014 7/22/2014 7/23/2014 -

PLAN (APP) 1,949,591.90 6/23/20147/02/2014 to

7/08/2014 7/9/20147/08/2014 to

7/21/20147/21/2014 to

7/26/20147/27/2014 to

8/02/20148/03/2014 to

8/06/2014

(PPMP) 1,949,591.90 6/23/20147/02/2014 to

7/08/2014 7/9/20147/08/2014 to

7/21/20147/21/2014 to

7/26/20147/27/2014 to

8/02/20148/03/2014 to

8/06/2014

ACTUAL 1,949,591.90 6/25/2014 7/1/2014 7/7/20147/01/2014 to

7/21/20147/21/2014 to

7/26/20147/27/2014 to

8/02/2014 -

(PPMP) 1,949,591.90 6/25/2014 7/1/2014 7/7/20147/01/2014 to

7/21/20147/21/2014 to

7/26/20147/27/2014 to

8/02/2014 -

Submitted by: Recommending Approval: Approved:

EDNA V. AGGARIHead, BAC Secretariat OIC, Assistant District Engineer District Engineer

ALBERTO C. GUERRERO CELESTIAL S. FLANCIA

14DD0019 Construction of One (1) Storey Three (3) Classroom at Lipahan National High School, San Juan, Batangas

Competitive Public Bidding

14DD0020 Construction/Iprovement of Road at Brgy. Banay-Banay, Lipa City, Batangas

Competitive Public Bidding

14DD0017 a.) Construction of One (1) Storey One (1) Classroom at Panghayaan ES, b.) Construction of One (1) Storey One (1) Classroom at Pinagbayanan NHS, Taysan, Batangas

Competitive Public Bidding

14DD0018 a.) Construction of One (1) Storey One (1) Classroom at Catmon ES, b.) Construction of One (1) Storey Three (3) Classroom at Paaralang Elementarya ng Tipas, San Juan, Batangas

Competitive Public Bidding

PLAN (APP) 1,949,264.35 6/23/20147/02/2014 to

7/08/2014 7/9/20147/08/2014 to

7/21/20147/21/2014 to

7/26/20147/27/2014 to

8/02/20148/03/2014 to

8/06/2014

(PPMP) 1,949,264.35 6/23/20147/02/2014 to

7/08/2014 7/9/20147/08/2014 to

7/21/20147/21/2014 to

7/26/20147/27/2014 to

8/02/20148/03/2014 to

8/06/2014

ACTUAL 1,949,264.35 6/25/2014 7/1/2014 7/7/20147/01/2014 to

7/21/20147/21/2014 to

7/26/20147/27/2014 to

8/02/2014 -

(PPMP) 1,949,264.35 6/25/2014 7/1/2014 7/7/20147/01/2014 to

7/21/20147/21/2014 to

7/26/20147/27/2014 to

8/02/2014 -

PLAN (APP) 3,394,000.00 7/1/20147/10/2014 to

7/16/2014 7/16/20147/16/2014 to

7/29/20147/29/2014 to

8/3/20148/4/2014 to 8/10/2014

8/11/2014 to 8/14/2014

(PPMP) 3,394,000.00 7/1/20147/10/2014 to

7/16/2014 7/16/20147/16/2014 to

7/29/20147/29/2014 to

8/3/20148/4/2014 to 8/10/2014

8/11/2014 to 8/14/2014

ACTUAL 3,394,000.00 7/1/2014 7/10/2014 7/16/20147/10/2014 to

7/29/20147/29/2014 to

8/3/20148/4/2014 to 8/10/2014 -

(PPMP) 3,394,000.00 7/1/2014 7/10/2014 7/16/20147/10/2014 to

7/29/20147/29/2014 to

8/3/20148/4/2014 to 8/10/2014 -

PLAN (APP) 4,383,539.01 7/1/20147/10/2014 to

7/16/2014 7/16/20147/08/2014 to

7/21/20147/29/2014 to

8/3/20148/4/2014 to 8/10/2014

8/11/2014 to 8/14/2014

(PPMP) 4,383,539.01 7/1/20147/10/2014 to

7/16/2014 7/16/20147/16/2014 to

7/29/20147/29/2014 to

8/3/20148/4/2014 to 8/10/2014

8/11/2014 to 8/14/2014

ACTUAL 4,383,539.01 7/1/2014 7/10/2014 7/16/20147/10/2014 to

7/29/20147/29/2014 to

8/3/20148/4/2014 to 8/10/2014 -

(PPMP) 4,383,539.01 7/1/2014 7/10/2014 7/16/20147/10/2014 to

7/29/20147/29/2014 to

8/3/20148/4/2014 to 8/10/2014 -

PLAN (APP) 16,449,410.80 7/1/20147/02/2014 to

7/08/2014 7/16/20147/16/2014 to

7/29/20147/29/2014 to

8/3/20148/4/2014 to 8/10/2014

8/11/2014 to 8/14/2014

(PPMP) 16,449,410.80 7/1/20147/10/2014 to

7/16/2014 7/16/20147/16/2014 to

7/29/20147/29/2014 to

8/3/20148/4/2014 to 8/10/2014

8/11/2014 to 8/14/2014

ACTUAL 16,449,410.80 7/1/2014 7/10/2014 7/16/20147/10/2014 to

7/29/20147/29/2014 to

8/3/20148/4/2014 to 8/10/2014 -

(PPMP) 16,449,410.80 7/1/2014 7/10/2014 7/16/20147/10/2014 to

7/29/20147/29/2014 to

8/3/20148/4/2014 to 8/10/2014 -

Submitted by: Recommending Approval: Approved:

EDNA V. AGGARIHead, BAC Secretariat

14DD0021 Construction/Iprovement of Road at DA Housing Compound, Brgy. Maraouy, Lipa City, Batangas

Competitive Public Bidding

ALBERTO C. GUERRERO

14DD0024 Construction of Reinforced Concrete Box Culvert including approaches at Brgy. Lumil along Taysan, San Jose - Sambat, San Pascual Road, San Jose, Batangas

Competitive Public Bidding

14DD0022 Construction of Reinforced Concrete Box Culvert including approaches at Brgy. San Isidro along Bukal - Pinagbayanan Road, Taysan, Batangas

Competitive Public Bidding

14DD0023 Rehabilitation of Sto. Niño Bridge inlcuding approaches along Poblacion - Dagatan Road, Taysan, Batangas

Competitive Public Bidding

CELESTIAL S. FLANCIADistrict EngineerOIC, Assistant District Engineer

DISTRICT: CAVITE I DEOProcurement Pre-Procurement Posting/ Pre-Bid Submission Bid Post Qua/ Award of

Reference Contract Package Description Method Conference Advertisement Conference and Receipt Evaluation Evaluation ContractNo. of Bids

Construction/Rehabilitation of Drainage Protection Works along PLAN (APP) P 49,000,000.00 10/30/2013 11/6-12/2013 11/13/2013 11/26/13 11/27 to 12/3/13 12/4/2013 1/30/201413DF0226 National Roads and Bridges/Secondary Roads/Const/Rehabilitation Public (PPMP) P 49,000,000.00 10/30/2013 11/6-12/2013 11/13/2013 11/26/13 11/27 to 12/3/13 12/4/2013 1/30/2014

of Drainage System along Noveleta-Rosario Diversion Road, Cavite Bidding ACTUAL P 38,430,460.63 5/7/2014 5/14-20/2014 5/21/2014 6/3/2014 6/4 to 6/6/2013 6/6/2013 6/09/2014Cavite ist LD (PPMP) P 38,430,460.63 5/7/2014 5/14-20/2014 5/21/2014 6/3/2014 6/4 to 6/6/2013 6/6/2013 6/09/2014Flood Control and Drainage Projects, Construction/Maintenance of PLAN (APP) P 39,200,000.00 10/30/2013 11/6-12/2013 11/13/2013 11/26/13 11/27 to 12/3/13 12/4/2013 1/30/2014

13DF0225 Flood Mitigation Structures and Drainage Systems, Revetment of the Public (PPMP) P 39,200,000.00 10/30/2013 11/6-12/2013 11/13/2013 11/26/13 11/27 to 12/3/13 12/4/2013 1/30/2014following Flood Control Projects in Cavite, Zapote River (Bacoor, Bidding ACTUAL P 37,100,376.12 10/30/2013 6/24-30/2014 7/1/2014 7/15/2014 7/16-22/2014 7/22/2014 7/23/2014Cavite), Cavite 2nd LD (PPMP) P 37,100,376.12 10/30/2013 6/24-30/2014 7/1/2014 7/15/2014 7/16-22/2014 7/22/2014 7/23/2014Construction/Rehabilitation of Drainage Protection Works along PLAN (APP) P 49,000,000.00 10/30/2013 11/6-12/2013 11/13/2013 11/26/13 11/27 to 12/3/13 12/4/2013 1/30/2014

13DF0227 National Roads and Bridges/Rehabilitation/Improvement of Drainage Public (PPMP) P 49,000,000.00 10/30/2013 11/6-12/2013 11/13/2013 11/26/13 11/27 to 12/3/13 12/4/2013 1/30/2014System along Daang Hari Road, Imus Section, Cavite 3rd LD Bidding ACTUAL P 48,585,286.37 10/30/2013 7/4-10/2014 7/11/2014 7/18/2014 7/19-25/2014 7/25/2014

(PPMP) P 48,585,286.37 10/30/2013 7/4-10/2014 7/11/2014 7/18/2014 7/19-25/2014 7/25/2014Construction/Rehabilitation of Drainage Protection Works along PLAN (APP) P 49,000,000.00 10/30/2013 11/6-12/2013 11/13/2013 11/26/13 11/27 to 12/3/13 12/4/2013 1/30/2014

13DF0228 National Roads and Bridges, Construction/Rehabilitation of Drainage Public (PPMP) P 49,000,000.00 10/30/2013 11/6-12/2013 11/13/2013 11/26/13 11/27 to 12/3/13 12/4/2013 1/30/2014System along Zapote-Salawag-Salitran Road, Km. 27+930 to Km. 30+ Bidding ACTUAL P 48,211,700.01 10/30/2013 7/4-10/2014 7/11/2014 7/18/2014 7/19-25/2014 7/25/2014110 (both sides), Dasmarinas City (PPMP) P 48,211,700.01 10/30/2013 7/4-10/2014 7/11/2014 7/18/2014 7/19-25/2014 7/25/2014Construction/Improvement of Access Roads Leading to Airports, PLAN (APP) P 49,000,000.00 10/30/2013 11/6-12/2013 11/13/2013 11/26/13 11/27 to 12/3/13 12/4/2013 1/30/2014

13DF0229 Seaports, and Declared Tourism Destinations, Cavite-Batangas Rd. Public (PPMP) P 49,000,000.00 10/30/2013 11/6-12/2013 11/13/2013 11/26/13 11/27 to 12/3/13 12/4/2013 1/30/2014(S01799LZ), Bacoor, Imus and Dasmarinas, Cavite, Bidding ACTUAL 10/30/2013 7/4-10/2014 7/11/2014Km. 26+859 to Km. 30+404, 4th LD (PPMP) 10/30/2013 7/4-10/2014 7/11/2014

PLAN (APP) P 29,400,000.00 10/30/2013 11/6-12/2013 11/13/2013 11/26/13 11/27 to 12/3/13 12/4/2013 1/30/201413DF0224 Widening of Permanent Bridges, Tejero Bridge along Noveleta-Naic- Public (PPMP) P 29,400,000.00 10/30/2013 11/6-12/2013 11/13/2013 11/26/13 11/27 to 12/3/13 12/4/2013 1/30/2014

Tagaytay Road Bidding ACTUAL P 29,399,783.25 10/30/2013 6/17-23/2014 6/24/2014 7/9/2014 7/10-15/2014 7/15/2014 7/16/2014(PPMP) P 29,399,783.25 10/30/2013 6/17-23/2014 6/24/2014 7/9/2014 7/10-15/2014 7/15/2014 7/16/2014

PLAN (APP) P 29,400,000.00 10/30/2013 11/6-12/2013 11/13/2013 11/26/13 11/27 to 12/3/13 12/4/2013 1/30/201413DF0223 Widening of Permanent Bridges, Malabon Bridge along Dasmarinas- Public (PPMP) P 29,400,000.00 10/30/2013 11/6-12/2013 11/13/2013 11/26/13 11/27 to 12/3/13 12/4/2013 1/30/2014

Trece Martires City-Naic Road Bidding ACTUAL P 29,067,932.90 10/30/2013 3/7-13/2014 3/14/2014 3/26/2014 3/26-31/2014 3/31/2014 4/23/2014(PPMP) P 29,067,932.90 10/30/2013 3/7-13/2014 3/14/2014 3/26/2014 3/26-31/2014 3/31/2014 4/23/2014

PLAN (APP) P 29,400,000.00 10/31/2013 11/8-14/2013 11/15/2013 11/28/13 11/29 to 12/5/13 12/6/2013 1/30/201413DF0235 Widening of Permanent Bridges, Mag-asawang Layon Bridge along Public (PPMP) P 29,400,000.00 10/31/2013 11/8-14/2013 11/15/2013 11/28/13 11/29 to 12/5/13 12/6/2013 1/30/2014

Dasmarinas-Trece Martires City-Naic Road Bidding ACTUAL P 28,857,140.62 10/31/2013 3/7-13/2014 3/14/2014 4/21/2014 4/22-24/2014 4/24/2014 5/6/2014(PPMP) P 28,857,140.62 10/31/2013 3/7-13/2014 3/14/2014 4/21/2014 4/22-24/2014 4/24/2014 5/6/2014

Project Cost/ABC

REVISED ANNUAL PROCUREMENT PLAN FOR FY 2014 DISTRICT PROCURED PROJECTS

Republic of the PhilippinesDepartment of Public Works and Highways

Regional Office No. IV-AEDSA, Quezon City

DISTRICT: CAVITE I DEOProcurement Pre-Procurement Posting/ Pre-Bid Submission Bid Post Qua/ Award of

Reference Contract Package Description Method Conference Advertisement Conference and Receipt Evaluation Evaluation ContractNo. of Bids

PLAN (APP) P 49,000,000.00 10/31/2013 11/8-14/2013 11/15/2013 11/28/13 11/29 to 12/5/13 12/6/2013 1/30/201413DF0239 Widening of National Roads, Widening of Zapote-Salawag-Salitran Public (PPMP) P 49,000,000.00 10/31/2013 11/8-14/2013 11/15/2013 11/28/13 11/29 to 12/5/13 12/6/2013 1/30/2014

Road, K0027+000 to K0028+000, including Drainage System Bidding ACTUAL 10/31/2013 7/4-10/2014 7/11/2014(PPMP) 10/31/2013 7/4-10/2014 7/11/2014

Flood Control and Drainage Projects, Construction/Maintenance of PLAN (APP) P 29,400,000.00 10/31/2013 11/8-14/2013 11/15/2013 11/28/13 11/29 to 12/5/13 12/6/2013 1/30/201413DF0234 Flood Mitigation Structures and Drainage System, Revetment of the Public (PPMP) P 29,400,000.00 10/31/2013 11/8-14/2013 11/15/2013 11/28/13 11/29 to 12/5/13 12/6/2013 1/30/2014

following flood control projects in Cavite, Ilang-ilang River, (Gen. Trias Bidding ACTUAL P 29,335,648.18 10/31/2013 7/4-10/2014 7/11/2014Section), Cavite 6th LD (PPMP) P 29,335,648.18 10/31/2013 7/4-10/2014 7/11/2014Flood Control and Drainage Projects, Construction/Maintenance of PLAN (APP) P 39,200,000.00 10/31/2013 11/8-14/2013 11/15/2013 11/28/13 11/29 to 12/5/13 12/6/2013 1/30/2014

13DF0236 Flood Mitigation Structures and Drainage Systems, Revetment of the Public (PPMP) P 39,200,000.00 10/31/2013 11/8-14/2013 11/15/2013 11/28/13 11/29 to 12/5/13 12/6/2013 1/30/2014following Flood Control Projects in Cavite, Salinas River (Imus River, Bidding ACTUAL P 39,111,245.09 10/31/2013 7/4-10/2014 7/11/2014Bacoor Section) Cavite 2nd LD (PPMP) P 39,111,245.09 10/31/2013 7/4-10/2014 7/11/2014

PLAN (APP) P 49,000,000.00 10/31/2013 11/8-14/2013 11/15/2013 11/28/13 11/29 to 12/5/13 12/6/2013 1/30/201413DF0238 Network Development, Widening of National Roads, Arterial Road, Public (PPMP) P 49,000,000.00 10/31/2013 11/8-14/2013 11/15/2013 11/28/13 11/29 to 12/5/13 12/6/2013 1/30/2014

Widening of Daang Hari Road, Imus Section, Cavite 3rd LD Bidding ACTUAL P 49,000,000.00 10/31/2013 4/29-5/5/13 5/6/2014 5/21/2014 5/22 to 5/26/14 5/26/2014 6/3/2014(PPMP) P 49,000,000.00 10/31/2013 4/29-5/5/13 5/6/2014 5/21/2014 5/22 to 5/26/14 5/26/2014 6/3/2014

Construction/Rehabilitation of Drainage Protection Works along PLAN (APP) P 49,000,000.00 10/31/2013 11/8-14/2013 11/15/2013 11/28/13 11/29 to 12/5/13 12/6/2013 1/30/201413DF0237 National Roads and Bridges/Secondary Roads/Const/Rehabilitation Public (PPMP) P 49,000,000.00 10/31/2013 11/8-14/2013 11/15/2013 11/28/13 11/29 to 12/5/13 12/6/2013 1/30/2014

of Drainage System along Kawit-Noveleta Diversion Road, Cavite Bidding ACTUAL P 48,999,466.02 10/31/2013 3/7-13/2014 3/14/2014 3/26/2014 3/26-31/2014 3/31/2014 4/23/20141st LD (PPMP) P 48,999,466.02 10/31/2013 3/7-13/2014 3/14/2014 3/26/2014 3/26-31/2014 3/31/2014 4/23/2014Flood Control and Drainage Projects, Const./Maintenance of Flood PLAN (APP) P 48,797,853.68 7/1/2014 7/8-14/2014 7/15/2014 7/30/2014 7/31 to 8/6/2014 8/7/2014 8/8/2014

14DF019 Mitigation Structures and Drainage Systems, Rehab./Improvement Public (PPMP) P 48,797,853.68 7/1/2014 7/8-14/2014 7/15/2014 7/30/2014 7/31 to 8/6/2014 8/7/2014 8/8/2014of Drainage System including Roadway along Molino Boulevard, Bidding ACTUAL P 48,797,853.68 7/1/2014 7/8-14/2014 7/15/2014Bacoor City (PPMP) P 48,797,853.68 7/1/2014 7/8-14/2014 7/15/2014

Submitted by: Recommending Approval Approved:

JENNIFER F. ALMANZOR NENETTE K. IGNA OSCAR U. DELA CRUZHead, BAC Secretariat Asst. District Engineer District Engineer

Republic of the Philippines

Project Cost/ABC

Department of Public Works and HighwaysRegional Office No. IV-A

EDSA, Quezon City

REVISED ANNUAL PROCUREMENT PLAN FOR FY 2014 DISTRICT PROCURED PROJECTS

DISTRICT: CAVITE DEOProcurement Pre-Procurement Posting/ Pre-Bid Submission Bid Post Qua/ Award of

No. Contract Package Description Method Project Cost / ABC Conference Advertisement Conference and Receipt Evaluation Evaluation Contractof Bids

13DF0172 Assets Preservation of National Roads,Preventive Public Bidding PLAN (APP) ₱ 15,729,000.00 9/26/13 10/3/13 to 10/9/13 11-Oct-13 24-Oct-13 10/25 to 10/31/13 11/4/13 1/30/14Maint. Based on Pavement Management System/ (PPMP) ₱ 15,729,000.00 9/26/13 10/3/13 to 10/9/13 11-Oct-13 24-Oct-13 10/25 to 10/31/13 11/4/13 1/30/14Higway Dev't. & Management-4(HDM-4),(Intermittent ACTUAL ₱ 15,729,000.00 9/26/13 10/3/13 to 10/9/13 11-Oct-13 24-Oct-13 10/25 to 10/31/13 11/4/13 1/30/14 Section), Secondary Road,Manila-Cavite Road, (PPMP) ₱ 15,729,000.00 9/26/13 10/3/13 to 10/9/13 11-Oct-13 24-Oct-13 10/25 to 10/31/13 11/4/13 1/30/14K0030+240 to K0030+807

13DF0176 Assets Preservation of National Road, Preventive Public Bidding PLAN (APP) ₱ 9,083,620.00 10/7/2013 10/14 to 10/20/13 22-Oct-13 11/5/2013 11/4 to 11/11/13 11/12/13 1/30/14Maintenance Based on Pavement Management (PPMP) ₱ 9,083,620.00 10/7/2013 10/14 to 10/20/13 22-Oct-13 11/5/2013 11/4 to 11/11/13 11/12/13 1/30/14

System/Highway Development & Management-4(HDM-4),(Intermittent Section), Secondary Road, ACTUAL ₱ 9,083,620.00 10/7/2013 10/14 to 10/20/13 22-Oct-13 11/5/2013 11/4 to 11/11/13 11/12/13 1/30/14

McDonald Junction-Aguinaldo Highway K0051+(-290) (PPMP) ₱ 9,083,620.00 10/7/2013 10/14 to 10/20/13 22-Oct-13 11/5/2013 11/4 to 11/11/13 11/12/13 1/30/14to K0015+000, Bacoor City,Cavite

13DF0177 Assets Preservation of National Roads, Preventive Public Bidding PLAN (APP) ₱ 11,487,000.00 10/7/2013 10/14 to 10/20/13 22-Oct-13 11/5/2013 11/4 to 11/11/13 11/12/13 1/30/14Maintenance Based on Pavement Management (PPMP) ₱ 11,487,000.00 10/7/2013 10/14 to 10/20/13 22-Oct-13 11/5/2013 11/4 to 11/11/13 11/12/13 1/30/14

System/Highway Development & Management-4(HDM-4),(Intermittent Section), National Secondary

Road;Cavite-Batangas Road,K0036+820 to K0037+069 ACTUAL ₱ 11,487,000.00 10/7/2013 10/14 to 10/20/13 22-Oct-13 11/5/2013 11/4 to 11/11/13 11/12/13 1/30/14Palapala Diversion Rd.,Chainage 0548 0 Chainage (PPMP) ₱ 11,487,000.00 10/7/2013 10/14 to 10/20/13 22-Oct-13 11/5/2013 11/4 to 11/11/13 11/12/13 1/30/14

0631 & Zapote-Salawag-Salitran Road, K0031+787 toK0031+931, Dasmariñas City, Cavite

13DF0178 Construction of Flood Control Projects,Cavite 3rd L.D. Public Bidding PLAN (APP) ₱ 16,464,000.00 10/7/2013 10/14 to 10/20/13 22-Oct-13 11/5/2013 11/4 to 11/11/13 11/12/13 1/30/14Construction of Flood Control in Imus River,Phase II (PPMP) ₱ 16,464,000.00 10/7/2013 10/14 to 10/20/13 22-Oct-13 11/5/2013 11/4 to 11/11/13 11/12/13 1/30/14

ACTUAL ₱ 16,464,000.00 10/7/2013 10/14 to 10/20/13 22-Oct-13 11/5/2013 11/4 to 11/11/13 11/12/13 1/30/14(PPMP) ₱ 16,464,000.00 10/7/2013 10/14 to 10/20/13 22-Oct-13 11/5/2013 11/4 to 11/11/13 11/12/13 1/30/14

13DF0179 Assets Preservation of National Roads, Preventive Public Bidding PLAN (APP) ₱ 18,119,440.00 10/7/2013 10/14 to 10/20/13 22-Oct-13 11/5/2013 11/4 to 11/11/13 11/12/13 1/30/14Maintenance Based on Pavement Management (PPMP) ₱ 18,119,440.00 10/7/2013 10/14 to 10/20/13 22-Oct-13 11/5/2013 11/4 to 11/11/13 11/12/13 1/30/14

System/Highway Development & Management-4(HDM-4),(Intermittent Section), National Arterial,Dasmariñas-Trece Martires City-Naic Road,K0038+ ACTUAL ₱ 18,119,440.00 10/7/2013 10/14 to 10/20/13 22-Oct-13 11/5/2013 11/4 to 11/11/13 11/12/13 1/30/14758 to K0039+740 (6-5 Lane) & Tejero-Gen.Trias- (PPMP) ₱ 18,119,440.00 10/7/2013 10/14 to 10/20/13 22-Oct-13 11/5/2013 11/4 to 11/11/13 11/12/13 1/30/14

Amadeo-Tagaytay Road,K0045+600 to K0045+870Gen.Trias, Cavite

Republic of the PhilippinesDepartment of Public Works and Highways

Cavite I District Engineering OfficeTrece Martires City,Cavite

REVISED ANNUAL PROCUREMENT PLAN (APP) FOR FY 2014 FOR DISTRICT CAVITE I DEO PROCURED PROJECTS

DISTRICT: CAVITE DEOProcurement Pre-Procurement Posting/ Pre-Bid Submission Bid Post Qua/ Award of

No. Contract Package Description Method Project Cost / ABC Conference Advertisement Conference and Receipt Evaluation Evaluation Contractof Bids

14DF0001 Construction of Flood Control Projects,Cavite 3rd L.D. Public Bidding PLAN (APP) ₱ 19,600,000.00 12/26/13 1/2 to 1/9/14 1/10/14 1/23/14 1/24 to 1/28/14 1/29/14 1/30/14Construction of Flood Control in Imus River, Phase I (PPMP) ₱ 19,600,000.00 12/26/13 1/2 to 1/9/14 1/10/14 1/23/14 1/24 to 1/28/14 1/29/14 1/30/14

ACTUAL ₱ 19,600,000.00 12/26/13 1/2 to 1/9/14 1/10/14 1/23/14 1/24 to 1/28/14 1/29/14 1/30/14(PPMP) ₱ 19,600,000.00 12/26/13 1/2 to 1/9/14 1/10/14 1/23/14 1/24 to 1/28/14 1/29/14 1/30/14

13DF0181 Construction of Flood Control Projects,Cavite 1st L.D. Public Bidding PLAN (APP) ₱ 19,600,000.00 10/7/13 10/14 to 10/20/13 10/22/13 11/5/13 11/1 to 11/8/13 11/9/13 1/30/14Construction of Flood Control in San Juan River,Brgy. (PPMP) ₱ 19,600,000.00 10/7/13 10/14 to 10/20/13 10/22/13 11/5/13 11/1 to 11/8/13 11/9/13 1/30/14Marulas,Kainagen,Poblacion,Wakas,Kawit(Phase X) ACTUAL ₱ 19,600,000.00 10/7/13 10/14 to 10/20/13 10/22/13 11/5/13 11/1 to 11/8/13 11/9/13 1/30/14

(PPMP) ₱ 19,600,000.00 10/7/13 10/14 to 10/20/13 10/22/13 11/5/13 11/1 to 11/8/13 11/9/13 1/30/1413DF0182 Network Development,Widening of National Road, Public Bidding PLAN (APP) ₱ 19,640,000.00 10/7/13 10/14 to 10/20/13 10/22/13 11/5/13 11/1 to 11/8/13 11/9/13 1/30/14

Secondary Road, Widening of Cavite-Batangas Rd.: (PPMP) ₱ 19,640,000.00 10/7/13 10/14 to 10/20/13 10/22/13 11/5/13 11/1 to 11/8/13 11/9/13 1/30/14Km.31+284.80 to Km.31+409.30(Left Side);Km.35+161.70to Km.35+440.20 (Right Side), Km.35+918.80 to Km.35+

933.80 (Right Side), Km.36+212.20 to Km.36+378.40(Right Side), Km.36+663.70 to Km.36+863.20 (Right ACTUAL ₱ 19,640,000.00 10/7/13 10/14 to 10/20/13 10/22/13 11/5/13 11/1 to 11/8/13 11/9/13 1/30/14Side), Km.37+706.20 to Km.37+732.00 (Right Side), (PPMP) ₱ 19,640,000.00 10/7/13 10/14 to 10/20/13 10/22/13 11/5/13 11/1 to 11/8/13 11/9/13 1/30/14

Km.37+775.70 to Km.37+839.10 (Right Side), Km.37+949.10 to Km.38+249.10 (Right Side) & Km.34+721.90

to Km.35+121.90 (Both Sides), Km.35+685.30 to Km.35+712 (Left Side) Dasmariñas City, Cavite

13DF0185 Network Development,Widening of National Road, Public Bidding PLAN (APP) ₱ 12,250,000.00 10/9/13 10/16 to 10/22/13 10/23/13 11/7/13 11/5 to 11/12/13 11/13/13 1/30/14Secondary Road, Widening of Marcos Alvarez Road, (PPMP) ₱ 12,250,000.00 10/9/13 10/16 to 10/22/13 10/23/13 11/7/13 11/5 to 11/12/13 11/13/13 1/30/14including Drainage System,K000+000 to K001+396, ACTUAL ₱ 12,250,000.00 10/9/13 10/16 to 10/22/13 10/23/13 11/7/13 11/5 to 11/12/13 11/13/13 1/30/14

(PPMP) ₱ 12,250,000.00 10/9/13 10/16 to 10/22/13 10/23/13 11/7/13 11/5 to 11/12/13 11/13/13 1/30/1413DF0186 Assets Preservation of National Rd.Preventive Main- Public Bidding PLAN (APP) ₱ 17,598,840.00 10/9/13 10/16 to 10/22/13 10/23/13 11/7/13 11/5 to 11/12/13 11/13/13 1/30/14

tenance,Based on Preventive Management System/ (PPMP) ₱ 17,598,840.00 10/9/13 10/16 to 10/22/13 10/23/13 11/7/13 11/5 to 11/12/13 11/13/13 1/30/14Highway Dev't & Management-4(HDM-4)(Intermittent ACTUAL ₱ 17,598,840.00 10/9/13 10/16 to 10/22/13 10/23/13 11/7/13 11/5 to 11/12/13 11/13/13 1/30/14

Sec.)National Arterial,Tanza-TMC-Indang Rd.K0037+ (PPMP) ₱ 17,598,840.00 10/9/13 10/16 to 10/22/13 10/23/13 11/7/13 11/5 to 11/12/13 11/13/13 1/30/14737-K0038+260 &K0046+197-K0046+900,TMC, Cavite

13DF0187 Assets Preservation of National Rd.Preventive Main- Public Bidding PLAN (APP) ₱ 17,883,040.00 10/9/13 10/16 to 10/22/13 10/23/13 11/7/13 11/5 to 11/12/13 11/13/13 1/30/14tenance,Based on Preventive Management System/ (PPMP) ₱ 17,883,040.00 10/9/13 10/16 to 10/22/13 10/23/13 11/7/13 11/5 to 11/12/13 11/13/13 1/30/14

Highway Dev't & Management-4(HDM-4)(Intermittent ACTUAL ₱ 17,883,040.00 10/9/13 10/16 to 10/22/13 10/23/13 11/7/13 11/5 to 11/12/13 11/13/13 1/30/14Sec.)National Arterial,Tanza-TMC-Indang Rd.K0042+ (PPMP) ₱ 17,883,040.00 10/9/13 10/16 to 10/22/13 10/23/13 11/7/13 11/5 to 11/12/13 11/13/13 1/30/14

900 - K0044+080,Trece Martires City, Cavite

Republic of the PhilippinesDepartment of Public Works and Highways

Cavite I District Engineering OfficeTrece Martires City,Cavite

REVISED ANNUAL PROCUREMENT PLAN (APP) FOR FY 2014 FOR DISTRICT CAVITE I DEO PROCURED PROJECTS

DISTRICT: CAVITE DEOProcurement Pre-Procurement Posting/ Pre-Bid Submission Bid Post Qua/ Award of

No. Contract Package Description Method Project Cost / ABC Conference Advertisement Conference and Receipt Evaluation Evaluation Contractof Bids

13DF0188 Construction of Flood Control Projects,Cavite 1st L.D. Public Bidding PLAN (APP) ₱ 19,600,000.00 10/09/13 10/16 to 10/22/13 10/23/13 11/07/13 11/5 to 11/12/13 11/13/13 01/30/14Revetment of the ff. Flood Control Projects in Cavite, (PPMP) ₱ 19,600,000.00 10/09/13 10/16 to 10/22/13 10/23/13 11/07/13 11/5 to 11/12/13 11/13/13 01/30/14

Ilang-Ilang River (Noveleta Sec.),Cavite 1st. L.D. ACTUAL ₱ 19,600,000.00 10/09/13 10/16 to 10/22/13 10/23/13 11/07/13 11/5 to 11/12/13 11/13/13 01/30/14(PPMP) ₱ 19,600,000.00 10/09/13 10/16 to 10/22/13 10/23/13 11/07/13 11/5 to 11/12/13 11/13/13 01/30/14

13DF0189 Construction of Flood Control Projects, Cavite 3rd L.D. Public Bidding PLAN (APP) ₱ 19,600,000.00 10/09/13 10/16 to 10/22/13 10/23/13 11/07/13 11/5 to 11/12/13 11/13/13 01/30/14Construction of Flood Control in Brgy. Medicion & (PPMP) ₱ 19,600,000.00 10/09/13 10/16 to 10/22/13 10/23/13 11/07/13 11/5 to 11/12/13 11/13/13 01/30/14

Brgy. Pag-asa, Imus City, Cavite ACTUAL ₱ 19,600,000.00 10/09/13 10/16 to 10/22/13 10/23/13 11/07/13 11/5 to 11/12/13 11/13/13 01/30/14(PPMP) ₱ 19,600,000.00 10/09/13 10/16 to 10/22/13 10/23/13 11/07/13 11/5 to 11/12/13 11/13/13 01/30/14

13DF0193 Network Development, Widening of National Road, Public Bidding PLAN (APP) ₱ 18,620,000.00 10/11/13 10/18 to 10/28/13 10/29/13 11/11/13 11/7 to 11/14/13 11/15/13 01/30/14Arterial Roads, Widening of Dasmariñas-Carmona Rd. (PPMP) ₱ 18,620,000.00 10/11/13 10/18 to 10/28/13 10/29/13 11/11/13 11/7 to 11/14/13 11/15/13 01/30/14

(Governors Drive) Km.36+000 to Km.37+000 (Right Side) ACTUAL ₱ 18,620,000.00 10/11/13 10/18 to 10/28/13 10/29/13 11/11/13 11/7 to 11/14/13 11/15/13 01/30/14including RROW acquisition, Dasmariñas Section (PPMP) ₱ 18,620,000.00 10/11/13 10/18 to 10/28/13 10/29/13 11/11/13 11/7 to 11/14/13 11/15/13 01/30/14

13DF0194 Construction of Flood Control Projects, Cavite 1st L.D. Public Bidding PLAN (APP) ₱ 19,600,000.00 10/11/13 10/18 to 10/28/13 10/29/13 11/11/13 11/7 to 11/14/13 11/15/13 01/30/14Construction of Road Dike in Brgy. Gahak, Kawit w/in (PPMP) ₱ 19,600,000.00 10/11/13 10/18 to 10/28/13 10/29/13 11/11/13 11/7 to 11/14/13 11/15/13 01/30/14

Kawit-Noveleta Diversion Road, Kawit, Cavite ACTUAL ₱ 19,600,000.00 10/11/13 10/18 to 10/28/13 10/29/13 11/11/13 11/7 to 11/14/13 11/15/13 01/30/14(PPMP) ₱ 19,600,000.00 10/11/13 10/18 to 10/28/13 10/29/13 11/11/13 11/7 to 11/14/13 11/15/13 01/30/14

13DF0195 Const. of Flood Control Proj.,Cavite 3rd LD,Revetment Public Bidding PLAN (APP) ₱ 19,600,000.00 10/11/13 10/18 to 10/28/13 10/29/13 11/11/13 11/7 to 11/14/13 11/15/13 01/30/14of the ff. Flood Control Proj. in Cavite,Imus River(Imus (PPMP) ₱ 19,600,000.00 10/11/13 10/18 to 10/28/13 10/29/13 11/11/13 11/7 to 11/14/13 11/15/13 01/30/14

Cavite),3rd LD, Imus City, Cavite ACTUAL ₱ 19,600,000.00 10/11/13 10/18 to 10/28/13 10/29/13 11/11/13 11/7 to 11/14/13 11/15/13 01/30/14(PPMP) ₱ 19,600,000.00 10/11/13 10/18 to 10/28/13 10/29/13 11/11/13 11/7 to 11/14/13 11/15/13 01/30/14

13DF0196 Construction of Flood Control Projects, Cavite 3rd L.D. Public Bidding PLAN (APP) ₱ 19,600,000.00 10/11/13 10/18 to 10/28/13 10/29/13 11/11/13 11/7 to 11/14/13 11/15/13 01/30/14Rehabilitation/Improvement of Drainage System (PPMP) ₱ 19,600,000.00 10/11/13 10/18 to 10/28/13 10/29/13 11/11/13 11/7 to 11/14/13 11/15/13 01/30/14(Revetment) along Imus River, Imus, Cavite 3rd.L.D. ACTUAL ₱ 19,600,000.00 10/11/13 10/18 to 10/28/13 10/29/13 11/11/13 11/7 to 11/14/13 11/15/13 01/30/14

(PPMP) ₱ 19,600,000.00 10/11/13 10/18 to 10/28/13 10/29/13 11/11/13 11/7 to 11/14/13 11/15/13 01/30/1413DF0197 Network Development, Widening of National Road, Public Bidding PLAN (APP) ₱ 19,600,000.00 10/11/13 10/18 to 10/28/13 10/29/13 11/11/13 11/7 to 11/14/13 11/15/13 01/30/14

Arterial Road, Noveleta-Naic-Tagaytay Road,K0038+ (PPMP) ₱ 19,600,000.00 10/11/13 10/18 to 10/28/13 10/29/13 11/11/13 11/7 to 11/14/13 11/15/13 01/30/14025 to K0042+531, Tanza, Cavite ACTUAL ₱ 19,600,000.00 10/11/13 10/18 to 10/28/13 10/29/13 11/11/13 11/7 to 11/14/13 11/15/13 01/30/14

(PPMP) ₱ 19,600,000.00 10/11/13 10/18 to 10/28/13 10/29/13 11/11/13 11/7 to 11/14/13 11/15/13 01/30/1413DF0202 Construction/Rehab. of Drainage Protection Works Public Bidding PLAN (APP) ₱ 19,600,000.00 10/14/13 10/22 to 10-29-13 10/30/13 11/13/13 11/6 to 11/13/13 11/14/13 01/30/14

along National Roads & Bridges/Secondary Roads/ (PPMP) ₱ 19,600,000.00 10/14/13 10/22 to 10-29-13 10/30/13 11/13/13 11/6 to 11/13/13 11/14/13 01/30/14Construction/Rehabilitation of Drainage System ACTUAL ₱ 19,600,000.00 10/14/13 10/22 to 10-29-13 10/30/13 11/13/13 11/6 to 11/13/13 11/14/13 01/30/14along Noveleta Diversion Road, Cavite 1st LD. (PPMP) ₱ 19,600,000.00 10/14/13 10/22 to 10-29-13 10/30/13 11/13/13 11/6 to 11/13/13 11/14/13 01/30/14

Republic of the PhilippinesDepartment of Public Works and Highways

Cavite I District Engineering OfficeTrece Martires City,Cavite

REVISED ANNUAL PROCUREMENT PLAN (APP) FOR FY 2014 FOR DISTRICT CAVITE I DEO PROCURED PROJECTS

DISTRICT: CAVITE DEOProcurement Pre-Procurement Posting/ Pre-Bid Submission Bid Post Qua/ Award of

No. Contract Package Description Method Project Cost / ABC Conference Advertisement Conference and Receipt Evaluation Evaluation Contractof Bids

13DF0203 Const. of Flood Control Projects, Cavite 4th LD, Const. Public Bidding PLAN (APP) ₱ 19,600,000.00 10/14/13 10/22 to 10-29-13 10/30/13 11/13/13 11/11 to 11/18/13 11/19/13 01/30/14of Flood Control Structures,Upstream & Downstream (PPMP) ₱ 19,600,000.00 10/14/13 10/22 to 10-29-13 10/30/13 11/13/13 11/11 to 11/18/13 11/19/13 01/30/14of Salitran Bridge, Salitran I, Salitran II & Salitran III ACTUAL ₱ 19,600,000.00 10/14/13 10/22 to 10-29-13 10/30/13 11/13/13 11/11 to 11/18/13 11/19/13 01/30/14Dasmariñas City, Cavite 4th LD. (PPMP) ₱ 19,600,000.00 10/14/13 10/22 to 10-29-13 10/30/13 11/13/13 11/11 to 11/18/13 11/19/13 01/30/14

13DF0209 Const./Rehab. of Drainage Protection Works along Public Bidding PLAN (APP) ₱ 19,600,000.00 10/17/13 10/24 to 10-30-13 10/31/13 11/15/13 11/13 to 11/20/13 11/21/13 01/30/14National Roads & Bridges/Arterial Roads/Const./ (PPMP) ₱ 19,600,000.00 10/17/13 10/24 to 10-30-13 10/31/13 11/15/13 11/13 to 11/20/13 11/21/13 01/30/14Rehab. of Drainage System along Noveleta-Naic- ACTUAL ₱ 19,600,000.00 10/17/13 10/24 to 10-30-13 10/31/13 11/15/13 11/13 to 11/20/13 11/21/13 01/30/14Tagyaty Road, Rosario Section, Cavite 1st LD,Rosario (PPMP) ₱ 19,600,000.00 10/17/13 10/24 to 10-30-13 10/31/13 11/15/13 11/13 to 11/20/13 11/21/13 01/30/14

13DF0210 Widening of Permanent Bridges, Panaysayan Bridge Public Bidding PLAN (APP) ₱ 19,600,000.00 10/17/13 10/24 to 10-30-13 10/31/13 12/19/13 12/19 to 12/26/13 12/27/13 01/30/14along Dasmariñas-Trece Martires City-Naic Road (PPMP) ₱ 19,600,000.00 10/17/13 10/24 to 10-30-13 10/31/13 12/19/13 12/19 to 12/26/13 12/27/13 01/30/14

ACTUAL ₱ 19,600,000.00 10/17/13 10/24 to 10-30-13 10/31/13 12/19/13 12/19 to 12/26/13 12/27/13 01/30/14(PPMP) ₱ 19,600,000.00 10/17/13 10/24 to 10-30-13 10/31/13 12/19/13 12/19 to 12/26/13 12/27/13 01/30/14

13DF0211 Construction of Flood Control Projects,Cavite 1st LD. Public Bidding PLAN (APP) ₱ 19,600,000.00 10/17/13 10/24 to 10-30-13 10/31/13 11/15/13 11/13 to 11/20/13 11/21/13 01/30/14Const./Improvement of Dike along Rosario Section (PPMP) ₱ 19,600,000.00 10/17/13 10/24 to 10-30-13 10/31/13 11/15/13 11/13 to 11/20/13 11/21/13 01/30/14

ACTUAL ₱ 19,600,000.00 10/17/13 10/24 to 10-30-13 10/31/13 11/15/13 11/13 to 11/20/13 11/21/13 01/30/14(PPMP) ₱ 19,600,000.00 10/17/13 10/24 to 10-30-13 10/31/13 11/15/13 11/13 to 11/20/13 11/21/13 01/30/14

13DF0218 Const. of Flood Control Projects,Cavite 1st LD.,Const. Public Bidding PLAN (APP) ₱ 9,800,000.00 10/23/13 10/30 to 11/5/13 11/06/13 11/19/13 11/20 to 11/26/13 11/27/13 01/30/14Flood Control along Manila-Cavite Road,Brgy. San (PPMP) ₱ 9,800,000.00 10/23/13 10/30 to 11/5/13 11/06/13 11/19/13 11/20 to 11/26/13 11/27/13 01/30/14Juan (East Side),Noveleta (Phase I) Noveleta, Cavite ACTUAL ₱ 9,800,000.00 10/23/13 10/30 to 11/5/13 11/06/13 11/19/13 11/20 to 11/26/13 11/27/13 01/30/14

(PPMP) ₱ 9,800,000.00 10/23/13 10/30 to 11/5/13 11/06/13 11/19/13 11/20 to 11/26/13 11/27/13 01/30/1413DF0219 Construction of Flood Control Projects,Cavite 1st LD., Public Bidding PLAN (APP) ₱ 9,800,000.00 10/23/13 10/30 to 11/5/13 11/06/13 11/19/13 11/20 to 11/26/13 11/27/13 01/30/14

Const. of Flood Control along Manila-Cavite Road, (PPMP) ₱ 9,800,000.00 10/23/13 10/30 to 11/5/13 11/06/13 11/19/13 11/20 to 11/26/13 11/27/13 01/30/14Brgy. San Juan (West Side),Noveleta (Phase I) ACTUAL ₱ 9,800,000.00 10/23/13 10/30 to 11/5/13 11/06/13 11/19/13 11/20 to 11/26/13 11/27/13 01/30/14

(PPMP) ₱ 9,800,000.00 10/23/13 10/30 to 11/5/13 11/06/13 11/19/13 11/20 to 11/26/13 11/27/13 01/30/14

Republic of the PhilippinesDepartment of Public Works and Highways

Cavite I District Engineering OfficeTrece Martires City,Cavite

REVISED ANNUAL PROCUREMENT PLAN (APP) FOR FY 2014 FOR DISTRICT CAVITE I DEO PROCURED PROJECTS

PLAN (APP) 12,124,999.76 October 21, 2013 October 24-30,

2013 October 31, 2013 October 30-November 13, 2013

November 14-20, 2013

November 21-27, 2013 December 02, 2013

PPMP 12,500,000.00 October 15, 2013 October 18-24, 2014 October 25, 2014 October 24-Nov. 7,

2013November 8-14,

2013November 15-

21, 2013 short of award

ACTUAL (APP) 11,409,671.12 October 21, 2013 October 24-30,

2013 October 31, 2013 Nov. 13, 2013 November 14-20, 2013

January 1-16, 2014 January 23, 2014

PPMP 12,124,999.76 October 21, 2013 October 24-30, 2013 October 31, 2013 October 30-

November 13, 2013November 14-20,

2013November 21-27,

2013 December 02, 2013

PLAN (APP) 12,124,999.06 October 21, 2013 October 24-30,

2013 October 31, 2013 October 30-November 13, 2013

November 14-20, 2013

November 21-27, 2013 December 02, 2013

PPMP 12,500,000.00 October 15, 2013 October 18-24, 2013 October 25, 2013 October 24-Nov. 7,

2013November 8-14,

2013November 15-

21, 2013 short of award

ACTUAL (APP) 11,351,145.75 October 21, 2013 October 24-30,

2013 October 31, 2013 Nov. 13, 2013 November 14-20, 2013

January 1-16, 2014 January 23, 2014

PPMP 12,124,999.06 October 21, 2013 October 24-30, 2013 October 31, 2013 October 30-

November 13, 2013November 14-20,

2013November 21-27,

2013 December 02, 2013

PLAN (APP) 24,124,629.20 November 22, 2013

November 28-December 4,

2013December 06, 2013 December 4,-19,

2013December 19-26, 2013

Dec. 26, 2013 - Jan. 2, 2014 January 07, 2014

PPMP 25,000,000.00 November 04, 2013 November 7-13, 2013 November 15, 2013 November 13-27,

2013November 28-Dec. 4, 2013

December 5-11, 2013 short of award

ACTUAL (APP) 22,372,867.71 November 04, 2013 November 7-

13, 2013 November 15, 2013 March 28, 2014 March 29, 2014 March 30, 2014 April 02, 2014

PPMP 24,096,083.22 November 22, 2013November 28-December 4,

2013December 06, 2013 December 4,-19,

2013December 19-26, 2013

Dec. 26, 2013 - Jan. 2, 2014 January 07, 2014

PLAN (APP) 28,949,950.40 November 04, 2013 November 8-14,

2013 November 15, 2013 November 14-29, 2013

November 30-Dec. 6, 2013

December 7-13, 2014 December 18, 2013

PPMP 30,000,000.00 November 04, 2013 November 7-13, 2013 November 15, 2013 November 13-27,

2013November 28-Dec. 4, 2013

December 5-11, 2013 short of award

ACTUAL (APP) 26,766,833.96 November 04, 2013 November 8-14,

2013 November 15, 2013 March 25, 2014 March 25-27, 2014

March 27-30, 2014 April 02, 2014

PPMP 28,837,877.20 November 04, 2013 November 8-14, 2013 November 15, 2013 November 14-29,

2013November 30-Dec. 6, 2013

December 7-13, 2014 December 18, 2013

PLAN (APP) 36,339,999.99 November 22, 2013

November 28-December 4,

2013December 06, 2013 December 4,-19,

2013December 19-26, 2013

Dec. 26, 2013 - Jan. 2, 2014 January 07, 2014

PPMP 38,000,000.00 November 04, 2013 November 7-13, 2013 November 15, 2013 November 13-27,

2013November 28-Dec. 4, 2013

December 5-11, 2013 short of award

13DG0097

Construction of Flood Control at Cavite-Batangas Road, J.P. Rizal Section, Silang, Cavite, K0041+600 – K0042+960, 5th Legislative District

Competitive Public Bidding

Construction of flood Control at Silang By

Competitive

13DG0084

Construction/Improvement of Drainage System along Cavite-Batangas Road, Silang Section, Cavite, K0045+150 to K0045+250 and K0052+364 to K0052+649, 5th Legislative District

Competitive Public Bidding

13DG0117

Widening of Cavite-Batangas Road Silang Section Including Drainage System K0041+000 – K0041+678; 5th Legislative District

Competitive Public Bidding

Pre-Bid Conference Submission and Receipt of Bids Bid Evaluation

Republic of the PhlippinesDepartment of Public Works and Highways

Regional Office No. IV-AEDSA, Quezon City

REVISED ANNUAL PROCUREMENT PLAN FOR FY 2014 FOR REGIONAL PROCURED PROJECTS.Post

Qualification Evaluation

Award of Contract

13DG0083Construction/Improvement of Drainage System along Sta. Rosa-Ulat-Tagaytay Road, Silang Section, Cavite 5th Legislative District

Competitive Public Bidding

Reference No.

Contract Package (Description)

Procurement Method

Project Cost/ABC (P)

Pre-procurement Conference

Posting / Advertisement

ACTUAL (APP) 33,825,004.99 November 22, 2013

November 28-December 4,

2013December 06, 2013 April 16, 2014 May 28, 2014 June 03, 2014 June 09, 2014

PPMP 36,445,662.90 November 22, 2013November 28-December 4,

2013December 06, 2013 December 4,-19,

2013December 19-26, 2013

Dec. 26, 2013 - Jan. 2, 2014 January 07, 2014

Page 1 of 4

PLAN (APP) 24,249,854.53 November 04, 2013 November 8-14,

2013 November 15, 2013 November 14-29, 2013

November 30-Dec. 6, 2013

December 7-13, 2014 December 18, 2013

PPMP 25,000,000.00 November 04, 2013 November 7-13, 2013 November 15, 2013 November 13-27,

2013November 28-Dec. 4, 2013

December 5-11, 2013 short of award

ACTUAL (APP) 22,484,475.34 November 04, 2013 November 7-

13, 2013 November 15, 2013 January 17, 2014 January 18-21, 2014

January 21-24, 2014 January 27, 2014

PPMP 24,124,918.15 November 04, 2013 November 8-14, 2013 November 15, 2013 November 14-29,

2013November 30-Dec. 6, 2013

December 7-13, 2014 December 18, 2013

PLAN (APP) 2,999,820.29 none October 24-30,

2013 October 31, 2013 October 30-Nov. 13, 2013

November 14-20, 2013

November 21-27, 2013 December 02, 2013

PPMP 3,000,000.00 November 04, 2013 November 7-13, 2013 November 15, 2013 November 13-27,

2013November 28-Dec. 4, 2013

December 5-11, 2013 short of award

ACTUAL (APP) 2,818,308.93 none October 24-30,

2013 October 31, 2013 Nov. 13, 2013 November 14-20, 2013

January 10-16, 2014 January 23, 2014

PPMP 2,999,820.29 none October 24-30, 2013 October 31, 2013 October 30-Nov. 13,

2013November 14-20,

2013November 21-27,

2013 December 02, 2013

PLAN (APP) 11,154,939.86 October 21, 2013 October 24-30,

2013 October 31, 2013 October 30-Nov.13, 2013

November 14-20, 2013

November 21-27, 2013 December 02, 2013

PPMP 11,500,000.00 October 21, 2013 October 24-30, 2013 October 30, 2013 October 30-Nov.12,

2013November 13-19,

2013November 20-26,

2013 short of award

ACTUAL (APP) 11,623,873.90 October 21, 2013 October 24-30,

2013 October 31, 2013 Nov. 13, 2013 November 14-20, 2013

January 10-16, 2014 January 13, 2014

PPMP 12,400,380.66 October 21, 2013 October 24-30, 2013 October 31, 2013 October 30-Nov.13,

2013November 14-20,

2013November 21-27,

2013 December 02, 2013

PLAN (APP) 11,155,000.00 October 21, 2013 October 24-30,

2013 October 31, 2013 October 30-Nov. 13, 2013

November 14-20, 2013

November 21-27, 2013 December 02, 2013

PPMP 11,500,000.00 October 21, 2013 October 24-30, 2013 October 30, 2013 October 30-Nov.12,

2013November 13-19,

2013November 20-26,

2013 short of award

ACTUAL (APP) 10,485,699.88 October 21, 2013 October 24-30,

2013 October 31, 2013 Nov. 13, 2013 November 14-20, 2013

January 10-16, 2014 January 13, 2014

PPMP 11,155,000.00 October 21, 2013 October 24-30, 2013 October 31, 2013 October 30-Nov. 13,

2013November 14-20,

2013November 21-27,

2013 December 02, 2013

13DG0086Construction of Flood Control along Tagaytay-Manila via Silang Road, K0054+612 – K0056+100, 7th Legislative District

Competitive Public Bidding

13DG0082Construction of Flood Control at Brgy. Sabutan, Silang, Cavite 5th Legislative District

Competitive Public Bidding

13DG0085Construction of Flood Control along Crisanto M. Delos Reyes Avenue, K0060+494 – K0061+337, 6th Legislative District

Competitive Public Bidding

Pre-Bid Conference Submission and Receipt of Bids Bid Evaluation

Post Qualification Evaluation

Award of Contract

13DG0098

Construction of Flood Control at Brgy. Bulihan, Silang, Cavite with Drainage Outfall Connecting to National Road 5th Legislative District

Competitive Public Bidding

Reference No.

Contract Package (Description)

Procurement Method

Project Cost/ABC (P)

Pre-procurement Conference

Posting / Advertisement

Republic of the PhlippinesDepartment of Public Works and Highways

Regional Office No. IV-AEDSA, Quezon City

REVISED ANNUAL PROCUREMENT PLAN FOR FY 2014 FOR REGIONAL PROCURED PROJECTS.

13DG0118

Pass Road, Silang, Cavite K0043+000 – K0044+000; 5th Legislative District

Competitive Public Bidding

PLAN (APP) 43,370,640.00 November 04, 2013 November 7-14,

2013 November 15, 2013 November 14-28, 2013

Nov. 29-Dec. 5, 2013

December 6-13, 2013 December 18, 2013

PPMP 44,712,000.00 November 04, 2013 November 7-14, 2013 November 14, 2013 November 14-26,

2013Nov. 27-Dec. 3,

2013December 4-10,

2013 short of award

ACTUAL (APP) 40,349,791.35 November 04, 2013 November 7-14,

2013 November 15, 2013 January 17, 2014 January 18-21, 2014

January 21-24, 2014 January 27, 2014

PPMP 43,340,458.72 November 04, 2013 November 7-14, 2013 November 15, 2013 November 14-28,

2013Nov. 29-Dec. 5,

2013December 6-13,

2013 December 18, 2013

Page 2 of 4

PLAN (APP) 13,727,439.00 October 21, 2013 October 24-30,

2013 October 31, 2013 October 30-Nov. 13, 2013

November 14-20, 2013

November 21-27, 2013 December 02, 2013

PPMP 14,152,000.00 October 21, 2013 October 24-30, 2013 October 30, 2013 October 30-Nov. 12,

2013November 13-19,

2013November 20-26,

2013 short of award

ACTUAL (APP) 12,807,708.02 October 21, 2013 October 24-30,

2013 October 31, 2013 Nov. 13, 2013 November 14-20, 2013

January 10-16, 2014 January 23, 2014

PPMP 13,727,439.00 October 21, 2013 October 24-30, 2013 October 31, 2013 October 30-Nov. 13,

2013November 14-20,

2013November 21-27,

2013 December 02, 2013

PLAN (APP) 9,874,444.30 October 22, 2013 October 25 - 31,

2013 November 04, 2013 October 31-November 15, 2013

November 16-22, 2013

November 23-29, 2013 December 04, 2013

PPMP 10,180,000.00 October 20, 2013 October 25-31, 2013 October 29, 2013 October 31-Nov.

14, 2013November 15-

21, 2013November 22-

28, 2013 short of award

ACTUAL (APP) 9,281,707.42 October 22, 2013 October 25 - 31,

2013 November 04, 2013 Nov. 15, 2013 November 16-22, 2013

January 10-16, 2014 January 24, 2014

PPMP 9,874,444.30 October 22, 2013 October 25 - 31, 2013 November 04, 2013 October 31-

November 15, 2013November 16-22,

2013November 23-29,

2013 December 04, 2013

PLAN (APP) 33,949,999.08 November 04, 2013 November 7-14,

2013 November 15, 2013 November 14-28, 2013

Nov. 29-Dec. 5, 2013

December 6-13, 2013 December 18, 2013

PPMP 35,000,000.00 November 04, 2013 November 7-14, 2013 November 14, 2013 November 14-26,

2013Nov. 27-Dec. 3,

2013December 4-10,

2013 short of award

ACTUAL (APP) 30,554,999.00 November 04, 2013 November 7-14,

2013 November 15, 2013 March 25, 2014 March 26-April 1, 2014 April 2-8, 2014 April 15, 2014

PPMP 33,762,711.08 November 04, 2013 November 7-14, 2013 November 15, 2013 November 14-28,

2013Nov. 29-Dec. 5,

2013December 6-13,

2013 December 18, 2013

PLAN (APP) 34,763,354.70 October 22, 2013 October 25 - 31,

2013 November 04, 2013 October 31-November 15, 2013

November 16-22, 2013

November 23-29, 2013 December 04, 2014

13DG0089

Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage along Naic Junction-Caylabne Road, K0058+200 – K0058+870, 7th Legislative District

Competitive Public Bidding

13DG0093

Widening of Naic Diversion including Major Junction with Indang and Governor’s Drive Leading to Ternate – Nasugbu Road, K0046+ 053 – K0047+517, 7th Legislative District

Competitive Public Bidding

Pre-Bid Conference Submission and Receipt of Bids Bid Evaluation

Post Qualification Evaluation

Award of Contract

13DG0087Widening of Crisanto M. Delos Reyes Avenue (including Drainage System) K0068+000 to K0068+490, 7th Legislative District

Competitive Public Bidding

Reference No.

Contract Package (Description)

Procurement Method

Project Cost/ABC (P)

Pre-procurement Conference

Posting / Advertisement

Republic of the PhlippinesDepartment of Public Works and Highways

Regional Office No. IV-AEDSA, Quezon City

REVISED ANNUAL PROCUREMENT PLAN FOR FY 2014 FOR REGIONAL PROCURED PROJECTS.

13DG0092

Preventive Maintenance (MFO-1), Asphalt Overlay with Corrections along Naic-Junction-Caylabne Road, Naic Section, K0049+786– K0049+272, K0049+272 – K0051+076, 7th Legislative District

Competitive Public Bidding

PPMP 36,500,000.00 November 05, 2013 November 8-14, 2013 November 15, 2013 November 14-28,

2013Nov. 29-Dec. 5,

2013December 6-12,

2013 short of award

ACTUAL (APP) 32,329,914.37 October 22, 2013 October 25 - 31,

2013 November 04, 2013 March 14, 2014 March 14-21, 2014

March 21-24, 2014 March 25, 2014

PPMP 34,763,354.70 October 22, 2013 October 25 - 31, 2013 November 04, 2013 October 31-

November 15, 2013November 16-22,

2013November 23-29,

2013 December 04, 2014

PLAN (APP) 42,197,205.68 November 04, 2013 November 7-14,

2013 November 15, 2013 November 14-28, 2013

Nov. 29-Dec. 5, 2013

December 6-13, 2013 December 18, 2013

PPMP 44,100,000.00 November 05, 2013 November 8-14, 2013 November 15, 2013 November 14-28,

2013Nov. 29-Dec. 5,

2013December 6-12,

2013 short of award

ACTUAL (APP) 42,197,205.68 July 03, 2014 July 4-10, 2014 July 11, 2014 July 10-24, 2014 July 25-28, 2014 July 28-30, 2014 July 31, 2014

PPMP 42,197,205.68 November 04, 2013 November 7-14, 2013 November 15, 2013 July 01, 2014 July 02, 2014 July 03, 2014 Failure of Bidding, for re-

ad./re-bidding

Page 3 of 4

PLAN (APP) 26,054,494.06 November 04, 2013 November 7-14,

2013 November 15, 2013 November 14-28, 2013

Nov. 29-Dec. 5, 2013

December 6-13, 2013 December 18, 2013

PPMP 27,000,000.00 November 05, 2013 November 8-14, 2013 November 15, 2013 November 14-28,

2013Nov. 29-Dec. 5,

2013December 6-12,

2013 short of award

ACTUAL (APP) 26,054,494.06 July 03, 2014 July 4-10, 2014 July 11, 2014 July 10-24, 2014 July 25-28, 2014 July 28-30, 2014 July 31, 2014

PPMP 26,054,494.06 November 04, 2013 November 7-14, 2013 November 15, 2013 July 01, 2014 Failure of Bidding, for re-ad./re-bidding

PLAN (APP) 5,819,999.84 October 22, 2013 October 25 - 31,

2013 November 04, 2013 October 31-November 15, 2013

November 16-22, 2013

November 23-29, 2013 December 04, 2013

PPMP 6,000,000.00 October 20, 2013 October 25-31, 2013 October 29, 2013 October 31-Nov.

14, 2013November 15-

21, 2013November 22-

28, 2013 short of award

ACTUAL (APP) 5,470,221.47 October 22, 2013 October 25 - 31,

2013 November 04, 2013 Nov. 15, 2013 November 16-22, 2013

January 10-16, 2014 January 24, 2014

PPMP 5,819,999.84 October 22, 2013 October 25 - 31, 2013 November 04, 2013 October 31-

November 15, 2013November 16-22,

2013November 23-29,

2013 December 04, 2013

PLAN (APP) 23,420,539.27 November 04, 2013 November 7-14,

2013 November 15, 2013 November 14-28, 2013

Nov. 29-Dec. 5, 2013

December 6-13, 2013 December 18, 2013

13DG0090Widening of Caputatan Bridge along Naic Junction-Caylabne road, 7th Legislative District

Competitive Public Bidding

Pre-Bid Conference Submission and Receipt of Bids Bid Evaluation

Post Qualification Evaluation

Award of Contract

13DG0095Replacement of Red Bridge along Maragondon-Magallanes-Amuyong Road, K0067+425, 7th Legislative District

Competitive Public Bidding

Reference No.

Contract Package (Description)

Procurement Method

Project Cost/ABC (P)

Pre-procurement Conference

Posting / Advertisement

Republic of the PhlippinesDepartment of Public Works and Highways

Regional Office No. IV-AEDSA, Quezon City

REVISED ANNUAL PROCUREMENT PLAN FOR FY 2014 FOR REGIONAL PROCURED PROJECTS.

13DG0091

Widening of Mahogany Avenue (including drainage system), K0059+(-990) - K0059+(-096), K0059+(-096) - K0059+084, Cavite; 7th Legislative District

Competitive Public Bidding

13DG0094Replacement of Hagdan Bridge along Maragondon-Magallanes-Amuyong Road, K0067+181; 7th Legislative District

Competitive Public Bidding

PPMP 24,270,000.00 November 05, 2013 November 8-14, 2013 November 15, 2013 November 14-28,

2013Nov. 29-Dec. 5,

2013December 6-12,

2013 short of award

ACTUAL (APP) 21,681,340.91 November 04, 2013 November 7-14,

2013 November 15, 2013 March 13, 2014 March 14-21, 2014

March 21-24, 2014 March 25, 2014

PPMP 23,311,105.78 November 04, 2013 November 7-14, 2013 November 15, 2013 November 14-28,

2013Nov. 29-Dec. 5,

2013December 6-13,

2013 December 18, 2013

Submitted by: Recommending Approval: Approved:

ARIEL P. UMIPONHead, BAC Secretariat

Page 4 of 4

TEOFILO A. AYON ERIC A. AYAPANAAssistant District Engineer District Engineer

13DG0096Widening of Convento Bridge along Naic Junction –Caylabne Road, K0048+252; 7th Legislative District

Competitive Public Bidding

Pre-Procurement Advertisement/ Pre-bid Submission & Post-QualificationConference Posting Conference Receipt of Bids Evaluation

PLAN (APP) 2,164.00 10/28/13- 10/30/13- 11/06/13 11/19/13 11/19/13 11/20/13- 11/25/13-

(PPMP) 10/29/13 11/05/13 11/22/13 11/27/13

ACTUAL 2,164.00 10/28/13- 10/30/13- 11/06/13 11/19/13 11/19/13 11/20/13- 1/16/14

(PPMP) 10/29/13 11/05/13 11/25/13

PLAN (APP) 8,211.58 10/28/13- 10/30/13- 11/06/13 11/19/13 11/19/13 11/20/13- 11/25/13-

(PPMP) 10/29/13 11/05/13 11/22/13 11/27/13

ACTUAL 8,211.58 10/28/13- 10/30/13- 11/06/13 11/19/13 11/19/13 11/20/13- 2/27/14

(PPMP) 10/29/13 11/05/13 11/25/13

PLAN (APP) 14,700.00 10/28/13- 10/30/13- 11/06/13 11/19/13 11/19/13 11/20/13- 11/25/13-

(PPMP) 10/29/13 11/05/13 11/22/13 11/27/13

ACTUAL 14,700.00 10/28/13- 10/30/13- 11/06/13 11/19/13 11/19/13 11/20/13- 1/16/14

(PPMP) 10/29/13 11/05/13 11/25/13

PLAN (APP) 18,767.00 10/28/13- 10/30/13- 11/06/13 11/19/13 11/19/13 11/20/13- 11/25/13- (PPMP) 10/29/13 11/05/13 11/22/13 11/27/13ACTUAL 18,767.00 10/28/13- 10/30/13- 11/06/13 11/19/13 11/19/13 11/20/13- 3/19/14

(PPMP) 10/29/13 11/05/13 11/25/13

PLAN (APP) 8,820.00 10/28/13- 10/30/13- 11/06/13 11/19/13 11/19/13 11/20/13- 11/25/13- (PPMP) 10/29/13 11/05/13 11/22/13 11/27/13ACTUAL 8,820.00 10/28/13- 10/30/13- 11/06/13 11/19/13 11/19/13 11/20/13- 1/16/14

(PPMP) 10/29/13 11/05/13 11/25/13

PLAN (APP) 15,862.28 10/28/13- 10/30/13- 11/06/13 11/19/13 11/19/13 11/20/13- 11/25/13-

(PPMP) 10/29/13 11/05/13 11/22/13 11/27/13

ACTUAL 15,862.28 10/28/13- 10/30/13- 11/06/13 11/19/13 11/19/13 11/20/13- 1/16/14

(PPMP) 10/29/13 11/05/13 11/25/13

Prepared by: Reviewed by: Submitted by:

DPWH-INFR-03-072105

EDUARDO L. GALLARDO JEFFREY MICHAEL C. JAMIAS JOEL F. LIMPENGCOHead, BAC Secretariat BAC Chairman OIC-District Engineer

13DI0090 Widening of Biñan- Cavite Road, K0035+(-672) - K0035+(-972), Binan City, Laguna Public Bidding

13DI0088

Preventive Maintenance (MFO-1) based on Pavement Management System/Highway

Development and Management-4 (HDM-4) (Intermittent Section) Overlay 80mm with

corrections at Manila South Road, K0029+650 -K0030+170 with corrections, San Pedro, Laguna

Public Bidding

13DI0089Construction/Rehabilitation of Flood Control in

Laguna 2nd DEO/1st LD Along Macabling River at Brgy. Macabling, Sta. Rosa City

Public Bidding

13DI0086Construction/Improvement of Access Road Leading To Declared Tourism Destinations, Mt. Makiling Eco-

Tourism Road, Los Baños, LagunaPublic Bidding

13DI0085

Preventive Maintenance (MFO-1) based on Pavement Management System/Highway

Development and Management-4 (HDM-4) (Intermittent Section) Overlay 80 mm with

corrections of Bay-Poblacion Road, K0068+460 - K0068+605, Bay, Laguna

Public Bidding

13DI0087

Preventive Maintenance (MFO-1) based on Pavement Management System/Highway

Development and Management-4 (HDM-4) (Intermittent Section)Overlay 80 mm with

corrections of Mayapa-Canlubang- Cadre Road, a. K0050+330 - K0050+500 , b. K0051+674 -

K0051+864

Public Bidding

Reference No. Contract Package (Description) Procurement

Method Project Cost ABC (P '000) Bid Evaluation Award of Contract

Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

Region IV-A LAGUNA II DISTRICT ENGINEERING OFFICE

Los Banos, Laguna

REVISED ANNUAL PROCUREMENT PLAN FOR FY 2014

Pre-Procurement Advertisement/ Pre-bid Submission & Post-QualificationConference Posting Conference Receipt of Bids Evaluation

PLAN (APP) 14,700.00 10/29/13- 10/31/13- 11/08/13 11/20/13 11/20/13 11/21/13- 11/26/13-

(PPMP) 10/30/13 11/07/13 11/25/13 11/28/13

ACTUAL 14,700.00 10/29/13- 10/31/13- 11/08/13 11/20/13 11/20/13 11/21/13- 1/16/2014

(PPMP) 10/30/13 11/07/13 11/26/13

PLAN (APP) 14,700.00 10/29/13- 10/31/13- 11/08/13 11/20/13 11/20/13 11/21/13- 11/26/13-

(PPMP) 10/30/13 11/07/13 11/25/13 11/28/13

ACTUAL 14,700.00 10/29/13- 11/22/13- 1/31/14 2/12/14 2/12/14 2/15/14- 3/10/14

(PPMP) 10/30/13 11/28/14 3/6/14

PLAN (APP) 5,880.00 10/29/13- 10/31/13- 11/08/13 11/20/13 11/20/13 11/21/13- 11/26/13-

(PPMP) 10/30/13 11/07/13 11/25/13 11/28/13

ACTUAL 5,880.00 10/29/13- 10/31/13- 11/08/13 11/20/13 11/20/13 11/21/13- 1/16/14

(PPMP) 10/30/13 11/06/13 11/26/13

PLAN (APP) 14,700.00 10/29/13- 10/31/13- 11/08/13 11/20/13 11/20/13 11/21/13- 11/26/13-

(PPMP) 10/30/13 11/07/13 11/25/13 11/28/13

ACTUAL 14,700.00 10/29/13- 10/31/13- 11/08/13 11/20/13 11/20/13 11/21/13- 1/16/14

(PPMP) 10/30/13 11/06/13 11/26/13

PLAN (APP) 11,760.00 10/29/13- 10/31/13- 11/08/13 11/20/13 11/20/13 11/21/13- 11/26/13-

(PPMP) 10/30/13 11/07/13 11/25/13 11/28/13

ACTUAL 11,760.00 10/29/13- 10/31/13- 11/08/13 11/20/13 11/20/13 11/21/13- 1/16/14

(PPMP) 10/30/13 11/06/13 11/26/13

Prepared by: Recommended by: Approved by:

DPWH-INFR-03-072105

Chief, Plannning and Design Section OIC-Asst. District Engineer OIC-District Engineer

13DI0095Construction of Bridge, Pansol

Bridge(K0055+744),Calamba-Sta. Cruz-Famy Junction Road, Calamba City

Public Bidding

JOVEL G. MENDOZA DANILO J. VILLA JR. JOEL F. LIMPENGCO

13DI0093Construction/Rehabilitation of Flood Control in

Laguna 2nd DEO/1st LD, Along Macabling River at Brgy. Labas, Sta. Rosa City

Public Bidding

13DI0094Construction of Bridge, Eldridge Bridge

(K0059+359),Calamba-Sta.Cruz- Famy Junction Road, Los Banos

Public Bidding

13DI0091Construction/Rehabilitation of Flood Control in

Laguna 2nd DEO/1st LD along Pooc Creek at Brgy. Balibago (Purok1), , Sta. Rosa City

Public Bidding

13DI0092 Construction of Bridges,Balibago Bridge(K0038+902),Pooc-Sta. Rosa Section, Public Bidding

Reference No. Contract Package (Description) Procurement

Method Project Cost ABC (P '000) Bid Evaluation Award of Contract

Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

Region IV-A LAGUNA II DISTRICT ENGINEERING OFFICE

Los Banos, Laguna

REVISED ANNUAL PROCUREMENT PLAN FOR FY 2014

Pre-Procurement Advertisement/ Pre-bid Submission & Post-QualificationConference Posting Conference Receipt of Bids Evaluation

PLAN (APP) 11,760.00 10/29/13- 10/31/13- 11/08/13 11/20/13 11/20/13 11/21/13- 11/26/13-

(PPMP) 10/30/13 11/07/13 11/25/13 11/28/13

ACTUAL 11,760.00 10/29/13- 10/31/13- 11/08/13 11/20/13 11/20/13 11/21/13- 1/16/14

(PPMP) 10/30/13 11/06/13 11/26/13

PLAN (APP) 11,760.00 10/29/13- 10/31/13- 11/08/13 11/20/13 11/20/13 11/21/13- 11/26/13-

(PPMP) 10/30/13 11/07/13 11/25/13 11/28/13

ACTUAL 11,760.00 10/29/13- 10/31/13- 11/08/13 11/20/13 11/20/13 11/21/13- 1/16/14

(PPMP) 10/30/13 11/06/13 11/26/13

PLAN (APP) 1,000.00 10/29/13- 10/31/13- 11/08/13 11/20/13 11/20/13 11/21/13- 11/26/13-

(PPMP) 10/30/13 11/07/13 11/25/13 11/28/13

ACTUAL 1,000.00 10/29/13- 10/31/13- 11/08/13 11/20/13 11/20/13 11/21/13- 1/16/14

(PPMP) 10/30/13 11/06/13 11/26/13

PLAN (APP) 7,840.00 10/30/13- 11/04/13- 11/12/13 11/25/13 11/25/13 11/26/13- 11/29/13-

(PPMP) 10/31/13 11/11/13 11/28/13 12/02/13

ACTUAL 7,840.00 10/30/13- 11/04/13- 11/12/13 11/25/13 11/25/13 11/26/13- 1/16/14

(PPMP) 10/31/13 11/10/13 12/2/13

PLAN (APP) 9,800.00 10/30/13- 11/04/13- 11/12/13 11/25/13 11/25/13 11/26/13- 11/29/13- (PPMP) 10/31/13 11/11/13 11/28/13 12/02/13ACTUAL 9,800.00 10/30/13- 11/04/13- 11/12/13 11/25/13 11/25/13 11/26/13- 1/16/14

(PPMP) 10/31/13 11/10/13 12/2/13

Prepared by: Recommended by: Approved by:

DPWH-INFR-03-072105

Chief, Plannning and Design Section OIC-Asst. District Engineer OIC-District Engineer

13DI0100Construction/Rehabilitation of Flood Control in

Laguna 2nd DEO/1st LD Along Manila South Road at Brgy. Tagapo, Sta. Rosa City

Public Bidding

JOVEL G. MENDOZA DANILO J. VILLA JR. JOEL F. LIMPENGCO

13DI0098Construction of Bridge, Bukal Bridge (K0054+450), Calamba-Sta. Cruz-Famy Junction Road, Calamba

CityPublic Bidding

13DI0099Construction/Rehabilitation of Flood Control in

Laguna 2nd DEO/1st LD along Sta. Rosa River at Brgy. Tagapo, Sta. Rosa City

Public Bidding

13DI0096 Construction of Bridges, San Antonio (K0032+000), San Pedro Section, San Pedro, Laguna Public Bidding

13DI0097Construction of Bridges,Canlalay Bridge

(K0032+840),Canlalay- Biñan Section, Binan City, Laguna

Public Bidding

LAGUNA II DISTRICT ENGINEERING OFFICELos Banos, Laguna

REVISED ANNUAL PROCUREMENT PLAN FOR FY 2014Reference

No. Contract Package (Description) Procurement Method Project Cost ABC (P '000) Bid Evaluation Award of Contract

Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

Region IV-A

Pre-Procurement Advertisement/ Pre-bid Submission & Post-QualificationConference Posting Conference Receipt of Bids Evaluation

PLAN (APP) 9,800.00 10/30/13- 11/04/13- 11/12/13 11/25/13 11/25/13 11/26/13- 11/29/13-

(PPMP) 10/31/13 11/11/13 11/28/13 12/02/13

ACTUAL 9,800.00 10/30/13- 11/04/13- 11/12/13 11/25/13 11/25/13 11/26/13- 1/16/14

(PPMP) 10/31/13 11/10/13 12/2/13

PLAN (APP) 14,700.00 10/30/13- 11/04/13- 11/12/13 11/25/13 11/25/13 11/26/13- 11/29/13-

(PPMP) 10/31/13 11/11/13 11/28/13 12/02/13

ACTUAL 14,700.00 10/30/13- 11/04/13- 11/12/13 11/25/13 11/25/13 11/26/13- 1/16/14

(PPMP) 10/31/13 11/10/13 12/2/13

PLAN (APP) 11,760.00 10/30/13- 11/04/13- 11/12/13 11/25/13 11/25/13 11/26/13- 11/29/13-

(PPMP) 10/31/13 11/11/13 11/28/13 12/02/13

ACTUAL 11,760.00 10/30/13- 11/04/13- 11/12/13 11/25/13 11/25/13 11/26/13- 1/16/14

(PPMP) 10/31/13 11/10/13 12/2/13

PLAN (APP) 14,700.00 10/30/13- 11/06/13- 11/13/13 11/25/13 11/25/13 11/26/13- 11/29/13-

(PPMP) 10/31/13 11/12/13 11/28/13 12/02/13

ACTUAL 14,700.00 10/30/13- 11/04/13- 11/12/13 11/25/13 11/25/13 11/26/13- 1/16/14

(PPMP) 10/31/13 11/10/13 12/2/13

PLAN (APP) 17,640.00 10/30/13- 11/06/13- 11/13/13 11/25/13 11/25/13 11/26/13- 11/29/13-

(PPMP) 10/31/13 11/12/13 11/28/13 12/02/13

ACTUAL 17,640.00 10/30/13- 11/04/13- 11/12/13 11/25/13 11/25/13 11/26/13- 1/16/14

(PPMP) 10/31/13 11/10/13 12/2/13

Prepared by: Recommended by: Approved by:

DPWH-INFR-03-072105

Chief, Plannning and Design Section OIC-Asst. District Engineer OIC-District Engineer

13DI0106Construction/Rehabilitation of Flood Control in

Laguna 2nd DEO/1st LD along Cabuyao River at Brgy. Caingin, Sta. Rosa City

Public Bidding

JOVEL G. MENDOZA DANILO J. VILLA JR. JOEL F. LIMPENGCO

13DI0103Construction/Rehabilitation of Flood Control in

Laguna 2nd DEO/1st LD along Cabuyao River at Brgy. Malitlit, Sta. Rosa City

Public Bidding

13DI0105Construction/Rehabilitation of Flood Control in

Laguna 2nd DEO/1st LD along Manila South Road Salang Bago Bridge, Sta Rosa, Sta. Rosa City

Public Bidding

13DI0101Construction/Rehabilitation of Flood Control in

Laguna 2nd DEO/1st LD Along Macabling River at Brgy. Labas (Sitio Masiit), Sta.Rosa City

Public Bidding

13DI0102

Construction/Rehabilitation of Flood Control in Laguna 2nd DEO/1st LD along Cabuyao River at Brgy. Caingin (Sitio Pulong Candy), Cabuyao,

Laguna

Public Bidding

LAGUNA II DISTRICT ENGINEERING OFFICELos Banos, Laguna

REVISED ANNUAL PROCUREMENT PLAN FOR FY 2014Reference

No. Contract Package (Description) Procurement Method Project Cost ABC (P '000) Bid Evaluation Award of Contract

Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

Region IV-A

Pre-Procurement Advertisement/ Pre-bid Submission & Post-QualificationConference Posting Conference Receipt of Bids Evaluation

PLAN (APP) 5,000.00 10/30/13- 11/06/13- 11/13/13 11/25/13 11/25/13 11/26/13- 11/29/13-

(PPMP) 10/31/13 11/12/13 11/28/13 12/02/13

ACTUAL 5,000.00 10/30/13- 11/04/13- 11/12/13 11/25/13 11/25/13 11/26/13- 1/16/14

(PPMP) 10/31/13 11/10/13 12/2/13

PLAN (APP) 17,640.00 10/30/13- 11/06/13- 11/13/13 11/25/13 11/25/13 11/26/13- 11/29/13-

(PPMP) 10/31/13 11/12/13 11/28/13 12/02/13

ACTUAL 17,640.00 10/30/13- 11/04/13- 11/12/13 11/25/13 11/25/13 11/26/13- 1/16/14

(PPMP) 10/31/13 11/10/13 12/2/13

PLAN (APP) 11,270.00 10/30/13- 11/06/13- 11/13/13 11/25/13 11/25/13 11/26/13- 11/29/13-

(PPMP) 10/31/13 11/12/13 11/28/13 12/02/13

ACTUAL 11,270.00 10/30/13- 11/04/13- 11/12/13 11/25/13 11/25/13 11/26/13- 1/16/14

(PPMP) 10/31/13 11/10/13 12/2/13

PLAN (APP) 17,640.00 11/05/13- 11/07/13- 11/14/13 11/26/13 11/26/13 11/27/13- 12/02/13-

(PPMP) 11/06/13 11/13/13 11/29/13 12/04/13

ACTUAL 17,640.00 11/05/13- 11/04/13- 11/12/13 11/25/13 11/25/13 11/26/13- 1/16/14

(PPMP) 11/06/13 11/10/13 12/2/13

PLAN (APP) 17,640.00 11/05/13- 11/07/13- 11/14/13 11/26/13 11/26/13 11/27/13- 12/02/13-

(PPMP) 11/06/13 11/13/13 11/29/13 12/04/13

ACTUAL 17,640.00 11/05/13- 11/04/13- 11/12/13 11/25/13 11/25/13 11/26/13- 1/16/14

(PPMP) 11/06/13 11/10/13 12/2/13

Prepared by: Recommended by: Approved by:

DPWH-INFR-03-072105

Chief, Plannning and Design Section OIC-Asst. District Engineer OIC-District Engineer

13DI0111Construction/Rehabilitation of Flood Control in

Laguna 2nd DEO/1st LD at Sta. Rosa River, Brgy. Aplaya, Sta. Rosa City

Public Bidding

JOVEL G. MENDOZA DANILO J. VILLA JR. JOEL F. LIMPENGCO

13DI0109Construction/Rehabilitation of Drainage/Slope Protection Manila South Road, San Juan River,

Calamba CityPublic Bidding

13DI0110Construction/Rehabilitation of Flood Control in

Laguna 2nd DEO/1st LD along Tagapo Waterways at Brgy. Sinalhan, Sta. Rosa City

Public Bidding

13DI0107Construction/Rehabilitation of Flood Control in

Laguna 2nd DEO/1st LD along San Isidro River at Brgy. San Vicente, San Pedro City

Public Bidding

13DI0108Construction/Rehabilitation of Flood Control in

Laguna 2nd DEO/1st LD Along Macabling River at Brgy. Aplaya, Sta. Rosa City

Public Bidding

LAGUNA II DISTRICT ENGINEERING OFFICELos Banos, Laguna

REVISED ANNUAL PROCUREMENT PLAN FOR FY 2014Reference

No. Contract Package (Description) Procurement Method Project Cost ABC (P '000) Bid Evaluation Award of Contract

Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

Region IV-A

Pre-Procurement Advertisement/ Pre-bid Submission & Post-QualificationConference Posting Conference Receipt of Bids Evaluation

PLAN (APP) 9,800.00 11/05/13- 11/07/13- 11/14/13 11/26/13 11/26/13 11/27/13- 12/02/13-

(PPMP) 11/06/13 11/13/13 11/29/13 12/04/13

ACTUAL 9,800.00 11/05/13- 11/04/13- 11/12/13 11/25/13 11/25/13 11/26/13- 1/16/14

(PPMP) 11/06/13 11/10/13 12/2/13

PLAN (APP) 17,640.00 11/05/13- 11/07/13- 11/14/13 11/26/13 11/26/13 11/27/13- 12/02/13-

(PPMP) 11/06/13 11/13/13 11/29/13 12/04/13

ACTUAL 17,640.00 11/05/13- 11/04/13- 11/12/13 11/25/13 11/25/13 11/26/13- 1/16/14

(PPMP) 11/06/13 11/10/13 12/2/13

PLAN (APP) 11,270.00 11/05/13- 11/07/13- 11/14/13 11/26/13 11/26/13 11/27/13- 12/02/13-

(PPMP) 11/06/13 11/13/13 11/29/13 12/04/13

ACTUAL 11,270.00 11/05/13- 11/04/13- 11/12/13 11/25/13 11/25/13 11/26/13- 1/16/14

(PPMP) 11/06/13 11/10/13 12/2/13

PLAN (APP) 19,010.76 11/05/13- 11/07/13- 11/14/13 11/26/13 11/26/13 11/27/13- 12/02/13-

(PPMP) 11/06/13 11/13/13 11/29/13 12/04/13

ACTUAL 19,010.76 11/05/13- 11/07/13- 11/14/13 11/26/13 11/26/13 11/26/13- 2/27/14

(PPMP) 11/06/13 11/12/13 12/2/14

PLAN (APP) 18,294.64 11/05/13- 11/07/13- 11/14/13 11/26/13 11/26/13 11/27/13- 12/02/13-

(PPMP) 11/06/13 11/13/14 11/29/13 12/04/13

ACTUAL 18,294.64 11/05/13- 11/04/13- 11/12/13 11/25/13 11/25/13 11/26/13- 1/16/14

(PPMP) 11/06/13 11/10/13 12/2/13

Prepared by: Recommended by: Approved by:

DPWH-INFR-03-072105

Chief, Plannning and Design Section OIC-Asst. District Engineer OIC-District Engineer

13DI0116

Widening/ Rehabilitation/ Improvement of Mt. Makiling Ecological Garden Road, Laguna 2nd LD,

K0061+000 -K0061+500 (with exception), Los Baños Section, including RROW Acquisition

Public Bidding

JOVEL G. MENDOZA DANILO J. VILLA JR. JOEL F. LIMPENGCO

13DI0114Construction/Rehabilitation of Flood Control in

Laguna 2nd DEO/1st LD along Sta. Rosa River at Brgy. Kanluran, Sta. Rosa City

Public Bidding

13DI0115

Widening of Calamba - Sta. Cruz-famy Junction Road, Laguna 2nd LD, (a.)K0063+460 -

K0064+500, (with exception),Los Baños Section including RROW Acquisition, (b.) K0066+319 -

K0067+000 (with exception),Bay Section Including RROW Acquisition

Public Bidding

13DI0112Construction/Rehabilitation of Flood Control in

Laguna 2nd DEO/1st LD along Macabling River at Brgy. Macabling( Sitio Daang NIA), Sta. Rosa City

Public Bidding

13DI0113Construction/Rehabilitation of Flood Control in

Laguna 2nd DEO/1st LD along Manila South Road At Brgy. Dita, Sta. Rosa City

Public Bidding

LAGUNA II DISTRICT ENGINEERING OFFICELos Banos, Laguna

REVISED ANNUAL PROCUREMENT PLAN FOR FY 2014Reference

No. Contract Package (Description) Procurement Method Project Cost ABC (P '000) Bid Evaluation Award of Contract

Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

Region IV-A

Pre-Procurement Advertisement/ Pre-bid Submission & Post-QualificationConference Posting Conference Receipt of Bids Evaluation

PLAN (APP) 25,788.57 11/05/13- 11/07/13- 11/14/13 11/26/13 11/26/13 11/27/13- 12/02/13-

(PPMP) 11/06/13 11/13/13 11/29/13 12/04/13

ACTUAL 25,788.57 11/05/13- 11/07/13- 11/14/13 11/26/13 11/26/13 11/26/13- 2/27/14

(PPMP) 11/06/13 11/12/13 12/2/14

PLAN (APP) 14,700.00 11/05/13- 11/07/13- 11/14/13 11/26/13 11/26/13 11/27/13- 12/02/13-

(PPMP) 11/06/13 11/13/13 11/29/13 12/04/13

ACTUAL 14,700.00 11/05/13- 11/04/13- 11/12/13 11/25/13 11/25/13 11/26/13- 1/16/14

(PPMP) 11/06/13 11/10/13 12/2/13

PLAN (APP) 31,173.55 11/06/13- 11/08/13- 11/15/13 11/27/13 11/27/13 11/28/13 12/03/13-

(PPMP) 11/07/13 11/14/13 12/02/13 12/05/13

ACTUAL 31,173.55 11/06/13- 11/08/13- 11/15/13 11/27/13 11/27/13 11/28/13 2/27/14

(PPMP) 11/07/13 11/14/13 12/02/13

PLAN (APP) 11,760.00 11/06/13- 11/08/13- 11/15/13 11/27/13 11/27/13 11/28/13 12/03/13-

(PPMP) 11/07/13 11/14/13 12/02/13 12/05/13

ACTUAL 11,760.00 11/06/13- 11/08/13- 11/15/13 11/27/13 11/27/13 11/28/13 1/16/14

(PPMP) 11/07/13 11/14/13 12/02/13

PLAN (APP) 17,640.00 11/06/13- 11/08/13- 11/15/13 11/27/13 11/27/13 11/28/13 12/03/13-

(PPMP) 11/07/13 11/14/13 12/02/13 12/05/13

ACTUAL 17,640.00 11/06/13- 11/08/13- 11/15/13 11/27/13 11/27/13 11/28/13 1/16/14

(PPMP) 11/07/13 11/14/13 12/02/13

Prepared by: Recommended by: Approved by:

DPWH-INFR-03-072105

Chief, Plannning and Design Section OIC-Asst. District Engineer OIC-District Engineer

13DI0121Construction/Rehabilitation of Flood Control in

Laguna 2nd DEO/1st LD along Aratan Waterways at Brgy. Pulong Sta. Cruz, Sta. Rosa City

Public Bidding

JOVEL G. MENDOZA DANILO J. VILLA JR. JOEL F. LIMPENGCO

13DI0119 Widening of Manila South Road, a) K0046 +340 -K0047+960, b) K0050+480 -K0051 +376, 2nd LD Public Bidding

13DI0120Construction/Rehabilitation of Flood Control in

Laguna 2nd DEO/1st LD Along Sta. Rosa River at Brgy. Ibaba, Sta. Rosa City

Public Bidding

13DI0117

Widening of Calamba-Sta. Cruz- Famy Junction Road, Lag. 2nd LD (a.) K0051+516 -K0051+964, Calamba City, (b.) K0053+700 -K0054+500(with

exception), Calamba Section, including RROW Acquisition

Public Bidding

13DI0104 Construction of Bridges,Macabling Bridge (K0038+408),Macabling- Sta. Rosa, Sta. Rosa City Public Bidding

LAGUNA II DISTRICT ENGINEERING OFFICELos Banos, Laguna

REVISED ANNUAL PROCUREMENT PLAN FOR FY 2014Reference

No. Contract Package (Description) Procurement Method Project Cost ABC (P '000) Bid Evaluation Award of Contract

Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

Region IV-A

Pre-Procurement Advertisement/ Pre-bid Submission & Post-QualificationConference Posting Conference Receipt of Bids Evaluation

PLAN (APP) 34,742.96 11/06/13- 11/08/13- 11/15/13 11/27/13 11/27/13 11/28/13 12/03/13-

(PPMP) 11/07/13 11/14/13 12/02/13 12/05/13

ACTUAL 34,742.96 11/06/13- 12/2/13- 12/9/13 12/26/14 12/26/14 12/23/13- 1/31/14

(PPMP) 11/07/13 12/8/13 1/24/14

PLAN (APP) 34,427.69 11/06/13- 11/08/13- 11/15/13 11/27/13 11/27/13 11/28/13 12/03/13-

(PPMP) 11/07/13 11/14/13 12/02/13 12/05/13

ACTUAL 34,427.69 11/06/13- 12/2/13- 12/9/13 12/26/14 12/26/14 12/23/13- 1/31/14

(PPMP) 11/07/13 12/8/13 1/24/14

PLAN (APP) 38,435.00 11/06/13- 11/08/13- 11/15/13 11/27/13 11/27/13 11/28/13 12/03/13-

(PPMP) 11/07/13 11/14/13 12/02/13 12/05/13

ACTUAL 38,435.00 11/06/13- 11/08/13- 11/15/13 11/27/13 11/27/13 11/28/13 2/27/14

(PPMP) 11/07/13 11/14/13 12/02/13

PLAN (APP) 38,776.57 11/06/13- 11/08/13- 11/15/13 11/27/13 11/27/13 11/28/13 12/03/13-

(PPMP) 11/07/13 11/14/13 12/02/13 12/05/13

ACTUAL 38,776.57 11/06/13- 12/2/13- 12/9/13 12/26/14 12/26/14 12/23/13- 1/31/14

(PPMP) 11/07/13 12/8/13 1/24/14

PLAN (APP) 49,000.00 11/06/13- 11/08/13- 11/15/13 11/27/13 11/27/13 11/28/13 12/03/13-

(PPMP) 11/07/13 11/14/13 12/02/13 12/05/13

ACTUAL 49,000.00 11/06/13- 12/2/13- 12/9/13 12/26/14 12/26/14 12/23/13- 1/31/14

(PPMP) 11/07/13 12/8/13 1/24/14

Prepared by: Recommended by: Approved by:

DPWH-INFR-03-072105

Chief, Plannning and Design Section OIC-Asst. District Engineer OIC-District Engineer

13DI0126Widening of Sta. Rosa - Ulat - Tagaytay Road,

K0045+500 - K0047+850 (with Exception), Including RROw Acquisition, Sta. Rosa City

Public Bidding

JOVEL G. MENDOZA DANILO J. VILLA JR. JOEL F. LIMPENGCO

13DI0124

Widening of Manila South Road, a) K0034+452 - K0034+852, Binan City (with exception), including

RROW Acquisition, Binan City, b) K0039+000-K0040+000 (with exception), Dila-Dita Section

including RROW Acquisition, Sta Rosa City

Public Bidding

13DI0125

Widening of Sta. Rosa - Ulat - Tagaytay Road, K0040+(-950)- K0041+000, Balibago Section (with Exception), Including RROW Acquisition, Sta. Rosa

City

Public Bidding

13DI0122 Construction(Opening) of Bucal-By Pass Road, Calamba City, Including drainage system Public Bidding

13DI0123

Widening of Mayapa- Canlubang-Cadre Road, Laguna 2nd LD, K0050+(-995)- K0051+864, Calamba - Mayapa Section, Including RROW

Acquisition, Calamba City

Public Bidding

LAGUNA II DISTRICT ENGINEERING OFFICELos Banos, Laguna

REVISED ANNUAL PROCUREMENT PLAN FOR FY 2014Reference

No. Contract Package (Description) Procurement Method Project Cost ABC (P '000) Bid Evaluation Award of Contract

Republic of the Philippines DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

Region IV-A

Page 1 of 6 pagesPre- Submission Post - Award

NO. Contract Package Procurement Procurement Advertisement/ Pre-Bid and Receipt Bid Qualification ofDescription Method Conference Posting Conference of Bids Evaluation Evaluation Contract

1 Cluster I for the Preventive Competitive PLAN(APP) 9,836,133.82 10/22/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-21/13 11/22-29/13 11/30-12/07/13Maintenance (MFO-1) of Calamba- Public BiddingSta. Cruz-Famy Jct. Road (PPMP) 10/22/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-21/13 11/22-29/13 11/30-12/07/13a. K0109 +-078 to K0109 + 000 ACTUAL 10/17/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-20/13 11/21-25/13 01/23/2014b. K0109 + 450 to K0109 + 989

(PPMP) 10/17/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-20/13 11/21-25/13 01/23/20142 Cluster II for the Preventive Competitive PLAN(APP) 29,067,227.91 10/22/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-21/13 11/22-29/13 11/30-12/07/13

Maintenance (MFO-1) of Paete-Famy Public BiddingPoblacion Road (PPMP) 10/22/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-21/13 11/22-29/13 11/30-12/07/13a. K0103 +-1472 to K0103 +-977 ACTUAL 10/17/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-20/13 11/21-25/13 01/23/2014b. K0110 + -088 to K0111 + 490c. K0112 + 000 to K0112 + 810 (PPMP) 10/17/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-20/13 11/21-25/13 01/23/2014

3 Preventive Maintenance (MFO-1) of Competitive PLAN(APP) 5,154,807.30 10/22/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-21/13 11/22-29/13 11/30-12/07/13Pila Poblacion Road, K0080 + -896 Public Biddingto K0080 + -714 (PPMP) 10/22/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-21/13 11/22-29/13 11/30-12/07/13

ACTUAL 10/17/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-20/13 11/21-25/13 01/23/2014

(PPMP) 10/17/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-20/13 11/21-25/13 01/23/20144 Preventive Maintenance (MFO-1) of Competitive PLAN(APP) 2,122,999.42 10/22/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-21/13 11/22-29/13 11/30-12/07/13

Sta. Cruz Poblacion Road, K0085 + Public Bidding -257 to K0085 + -131 (PPMP) 10/22/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-21/13 11/22-29/13 11/30-12/07/13

ACTUAL 10/17/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-20/13 11/21-25/13 01/23/2014

(PPMP) 10/17/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-20/13 11/21-25/13 01/23/2014Submitted by: Recommending Approval Approved:

MELANY F. MISTICAAdministrative Officer IV

Head, BAC Secretariat

(P)

THEODORO S. LLANTOS NESS S. VILLANUEVAAsst. District Engineer District Engineer

Republic of the PhilippinesDepartment of Public Works and Highways (DPWH)

Laguna I District Engineering OfficeSanta Cruz, Laguna

PROJECT COST/ABC

Republic of the PhilippinesDepartment of Public Works and Highways (DPWH)

Laguna I District Engineering OfficeSanta Cruz, Laguna

REVISED ANNUAL PROCUREMENT PLAN FOR FY 2014 FOR DISTRICT ENGINEERING OFFICE PROCURED PROJECTS

Page 2 of 6 pagesPre- Posting/ Submission Post - Award

NO. Contract Pakage Procurement Procurement Advertisement Pre-Bids and Receipt Bid Qualification ofDescription Method Conference Conference of Bids Evaluation Evaluation Contract

5 Preventive Maintenance (MFO-1) of Competitive PLAN(APP) 6,769,550.90 10/22/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-21/13 11/22-29/13 11/30-12/07/13Lumban-Caliraya Road, K0097 + 797 Public Biddingto K0098 + 360 (PPMP) 10/22/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-21/13 11/22-29/13 11/30-12/07/13

ACTUAL 10/17/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-20/13 11/21-25/13 01/23/2014

(PPMP) 10/17/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-20/13 11/21-25/13 01/23/20146 Construction/Improvement of Competitive PLAN(APP) 3,000,000.00 10/22/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-21/13 11/22-29/13 11/30-12/07/13

Drainage System along Pagsanjan- Public BiddingLucban Road, Pagsanjan, Laguna (PPMP) 10/22/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-21/13 11/22-29/13 11/30-12/07/134th LD ACTUAL 10/17/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-20/13 11/21-25/13 01/23/2014

(PPMP) 10/17/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-20/13 11/21-25/13 01/23/20147 Widening of Sta. Cruz-Poblacion Competitive PLAN(APP) 18,620,000.00 10/22/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-21/13 11/22-29/13 11/30-12/07/13

Road including Drainage/Outfall Public BiddingK0085 + 220 to K0090 + 480 (PPMP) 10/22/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-21/13 11/22-29/13 11/30-12/07/13(with exception), Laguna 4th LD ACTUAL 10/17/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-20/13 11/21-25/13 01/23/2014

(PPMP) 10/17/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-20/13 11/21-25/13 01/23/20148 Widening of Pila Bridge (K0080 + 810) Competitive PLAN(APP) 7,938,000.00 10/22/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-21/13 11/22-29/13 11/30-12/07/13

(B02465LZ) along Calamba-Sta. Public BiddingCruz- Famy Jct. Road, Pila Section, (PPMP) 10/22/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-21/13 11/22-29/13 11/30-12/07/13Pila, Laguna ACTUAL 10/17/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-20/13 11/21-25/13 01/23/2014

(PPMP) 10/17/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-20/13 11/21-25/13 01/23/2014Submitted by: Recommending Approval Approved:

MELANY F. MISTICAAdministrative Officer IV

Head, BAC Secretariat

Page 3 of 6 pagesPre- Posting/ Submission Post - Award

NO. Contract Pakage Procurement Procurement Advertisement Pre-Bids and Receipt Bid Qualification of

(P)

THEODORO S. LLANTOS NESS S. VILLANUEVAAsst. District Engineer District Engineer

Republic of the PhilippinesDepartment of Public Works and Highways (DPWH)

Laguna I District Engineering Office

REVISED ANNUAL PROCUREMENT PLAN FOR FY 2014 FOR DISTRICT ENGINEERING OFFICE PROCURED PROJECTS

PROJECT COST/ABC

PROJECT COST/ABC

REVISED ANNUAL PROCUREMENT PLAN FOR FY 2014 FOR DISTRICT ENGINEERING OFFICE PROCURED PROJECTS

Description Method Conference Conference of Bids Evaluation Evaluation Contract9 Paving of Shoulders (Seal Widening) Competitive PLAN(APP) 8,837,640.00 10/22/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-21/13 11/22-29/13 11/30-12/07/13

at Pagsanjan-Lucban Road (Sharp Public BiddingCurves), K0092 +-327 to K0114 + 510 (PPMP) 10/22/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-21/13 11/22-29/13 11/30-12/07/13(with exception) ACTUAL 10/17/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-20/13 11/21-25/13 01/23/2014

(PPMP) 10/17/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-20/13 11/21-25/13 01/23/201410 Construction/Rehabilitation of Flood Competitive PLAN(APP) 11,760,000.00 10/22/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-21/13 11/22-29/13 11/30-12/07/13

Control in Laguna 1st DEO/4th LD Public Biddingat Pagsanjan River, Pinagsanjan, (PPMP) 10/22/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-21/13 11/22-29/13 11/30-12/07/13Pagsanjan, Laguna ACTUAL 10/17/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-20/13 11/21-25/13 01/23/2014

(PPMP) 10/17/2013 10/24-30/13 10/31/2013 11/15/2013 11/16-20/13 11/21-25/13 01/23/201411 Preventive Maintenance (MFO-1) o Competitive PLAN(APP) 16,345,273.81 11/7/2013 11/11-17/13 11/22/2013 12/5/2013 12/06-13/13 12/14-21/13 12/22-29/13

Liliw-Majayjay Road, K0103 + 368 to Public BiddingK0105 + 405 (PPMP) 11/7/2013 11/11-17/13 11/22/2013 12/5/2013 12/06-13/13 12/14-21/13 12/22-29/13

ACTUAL 11/4/2013 11/13-19/13 11/22/2013 12/5/2013 12/06-9/13 12/10-16/13 01/23/2014

(PPMP) 11/4/2013 11/11-17/13 11/22/2013 12/5/2013 12/06-13/13 12/14-21/13 01/23/201412 Const./Improvement of Drainage Competitive PLAN(APP) 34,300,000.00 11/15/2013 11/19-25/13 11/29/2013 12/12/2013 12/13-18/13 12/19-26/13 12/27/13-01/02/14

System along Calamba-Sta. Cruz- Public BiddingFamy Jct. Road, Laguna 4th LD (PPMP) 11/15/2013 11/19-25/13 11/29/2013 12/12/2013 12/13-18/13 12/19-26/13 12/27/13-01/02/14

(with exception), K0085 + 287 to ACTUAL 11/13/2013 11/19-25/13 11/29/2013 12/12/2013 12/13-16/13 12/17-18/13 01/23/2014K0109 + 660

(PPMP) 11/13/2013 11/19-25/13 11/29/2013 12/12/2013 12/13-16/13 12/17-18/13 01/23/2014

Submitted by: Recommending Approval Approved:

MELANY F. MISTICAAdministrative Officer IV

Head, BAC Secretariat

Page 4 of 6 pagesPre- Posting/ Submission Post - Award

NO. Contract Pakage Procurement Procurement Advertisement Pre-Bids and Receipt Bid Qualification ofDescription Method Conference Conference of Bids Evaluation Evaluation Contract

13 Const./Rehabilitation of Flood Control Competitive PLAN(APP) 48,866,104.83 11/15/2013 11/19-25/13 11/29/2013 12/12/2013 12/13-18/13 12/19-26/13 12/27/13-01/02/14

in Laguna 1st DEO/4th LD, Lumban Public BiddingRiver, Lumban, Laguna (PPMP) 11/15/2013 11/19-25/13 11/29/2013 12/12/2013 12/13-18/13 12/19-26/13 12/27/13-01/02/14

THEODORO S. LLANTOS NESS S. VILLANUEVAAsst. District Engineer District Engineer

Republic of the PhilippinesDepartment of Public Works and Highways (DPWH)

Laguna I District Engineering Office

REVISED ANNUAL PROCUREMENT PLAN FOR FY 2014 FOR DISTRICT ENGINEERING OFFICE PROCURED PROJECTS

PROJECT COST/ABC(P)

(P)

ACTUAL 11/13/2013 11/19-25/13 11/29/2013 12/12/2013 12/13-16/13 12/17-18/13 01/23/2014

(PPMP) 11/13/2013 11/19-25/13 11/29/2013 12/12/2013 12/13-16/13 12/17-18/13 01/23/201414 Construction/Rehabilitation of Water Competitive PLAN(APP) 500,000.00 3/24/2014 3/28-04/3/13 04/10/2014 04/23/2014 4/24-29/2014 4/30-5/7/2014 5/8-15/2014

Supply/Septage and Sewerage/Rain Public BiddingWater Collectors (RWCS), San (PPMP) 3/24/2014 3/28-04/3/13 04/10/2014 04/23/2014 4/24-29/2014 4/30-5/7/2014 5/8-15/2014Miguel E/S, Mabitac, Laguna ACTUAL - 4/1-7/2014 04/11/2014 04/23/2014 4/24-28/2014 4/29-30/2014 5/6-8/2014

(PPMP) - 4/1-7/2014 4/11/2014 04/23/2014 4/24-28/2014 4/29-30/2014 5/6-8/201415 Const. of one (1) Storey, one (1) cl Competitive PLAN(APP) 1,130,905.83 6/9/2014 6/13-19/2014 6/20/2014 7/4/2014 7/5-10/2014 7/11-18/2014 7/19-26/2014

School Building, Inao-Awan E/S, Public BiddingCavinti, Laguna (PPMP) 6/9/2014 6/13-19/2014 6/20/2014 7/4/2014 7/5-10/2014 7/11-18/2014 7/19-26/2014

ACTUAL 6/9/2014 6/13-19/2014 6/20/2014 7/4/2014

(PPMP) 6/9/2014 6/13-19/2014 6/20/2014 7/4/201416 Cluster I- Const. of one (1) Storey, Competitive PLAN(APP) 2,212,311.66 6/9/2014 6/13-19/2014 6/20/2014 7/4/2014 7/5-10/2014 7/11-18/2014 7/19-26/2014

one (1) cl School Building Public Biddinga. Labuin E/S, Pila, Laguna (PPMP) 6/9/2014 6/13-19/2014 6/20/2014 7/4/2014 7/5-10/2014 7/11-18/2014 7/19-26/2014b. San Miguel E/S, Pila, Laguna ACTUAL 6/9/2014 6/13-19/2014 6/20/2014 7/4/2014

(PPMP) 6/9/2014 6/13-19/2014 6/20/2014 7/4/2014

Submitted by: Recommending Approval Approved:

MELANY F. MISTICAAdministrative Officer IV

Head, BAC Secretariat

Page 5 of 6 pagesPre- Posting/ Submission Post - Award

NO. Contract Pakage Procurement Procurement . Pre-Bids and Receipt Bid Qualification ofDescription Method Conference Conference of Bids Evaluation Evaluation Contract

17 Cluster I- Const. of Multi Purpose Competitive PLAN(APP) 7,490,000.00 6/22/2014 6/26-7/2/2014 7/4/2014 7/18/2014 7/19-24/2014 7/25-8/1/2014 8/2-9/2014Building: Public Biddinga. Poblacion I, Sta. Cruz, Laguna (PPMP) 6/22/2014 6/26-7/2/2014 7/4/2014 7/18/2014 7/19-24/2014 7/25-8/1/2014 8/2-9/2014b. Brgy. Pagsawitan, Sta. Cruz, Laguna ACTUAL 6/16/2014 6/26-7/2/2014 7/4/2014

(PPMP) 6/16/2014 6/26-7/2/2014 7/4/201418 Const. of Multi Purpose Building, Competitive PLAN(APP) 3,000,000.00 6/22/2014 6/26-7/2/2014 7/4/2014 7/18/2014 7/19-24/2014 7/25-8/1/2014 8/2-9/2014

Asst. District Engineer District Engineer

Republic of the PhilippinesDepartment of Public Works and Highways (DPWH)

Laguna I District Engineering Office

REVISED ANNUAL PROCUREMENT PLAN FOR FY 2014 FOR DISTRICT ENGINEERING OFFICE PROCURED PROJECTS

PROJECT COST/ABC(P)

THEODORO S. LLANTOS NESS S. VILLANUEVA

Brgy. Matalatala, Mabitac, Laguna Public Bidding(PPMP) 6/22/2014 6/26-7/2/2014 7/4/2014 7/18/2014 7/19-24/2014 7/25-8/1/2014 8/2-9/2014

ACTUAL 6/16/2014 6/26-7/2/2014 7/4/2014

(PPMP) 6/16/2014 6/26-7/2/2014 7/4/201419 Const. of Multi Purpose Building, Competitive PLAN(APP) 2,100,000.00 6/22/2014 6/26-7/2/2014 7/4/2014 7/18/2014 7/19-24/2014 7/25-8/1/2014 8/2-9/2014

Brgy. Bulajo, Cavinti, Laguna Public Bidding(PPMP) 6/22/2014 6/26-7/2/2014 7/4/2014 7/18/2014 7/19-24/2014 7/25-8/1/2014 8/2-9/2014

ACTUAL 6/16/2014 6/26-7/2/2014 7/4/2014

(PPMP) 6/16/2014 6/26-7/2/2014 7/4/201420 Const. of Multi Purpose Building, Competitive PLAN(APP) 2,100,000.00 6/22/2014 6/26-7/2/2014 7/4/2014 7/18/2014 7/19-24/2014 7/25-8/1/2014 8/2-9/2014

Brgy. Ibabang Butnong, Magdalena, Public BiddingLaguna (PPMP) 6/22/2014 6/26-7/2/2014 7/4/2014 7/18/2014 7/19-24/2014 7/25-8/1/2014 8/2-9/2014

ACTUAL 6/16/2014 6/26-7/2/2014 7/4/2014

(PPMP) 6/16/2014 6/26-7/2/2014 7/4/2014

Submitted by: Recommending Approval Approved:

MELANY F. MISTICAAdministrative Officer IV

Head, BAC Secretariat

Page 6 of 6 pagesPre- Posting/ Submission Post - Award

NO. Contract Pakage Procurement Procurement Advertisement Pre-Bids and Receipt Bid Qualification ofDescription Method Conference Conference of Bids Evaluation Evaluation Contract

21 Const. of Multi Purpose Building, Competitive PLAN(APP) 2,100,000.00 6/22/2014 6/26-7/2/2014 7/4/2014 7/18/2014 7/19-24/2014 7/25-8/1/2014 8/2-9/2014Brgy. Pook, Pila, Laguna Public Bidding

(PPMP) 6/22/2014 6/26-7/2/2014 7/4/2014 7/18/2014 7/19-24/2014 7/25-8/1/2014 8/2-9/2014ACTUAL 6/16/2014 6/26-7/2/2014 7/4/2014

(PPMP) 6/16/2014 6/26-7/2/2014 7/4/201422 Const. of Multi Purpose Building, Competitive PLAN(APP) 5,390,000.00 6/22/2014 6/26-7/2/2014 7/4/2014 7/18/2014 7/19-24/2014 7/25-8/1/2014 8/2-9/2014

Brgy. Lewin, Lumban, Laguna Public Bidding(PPMP) 6/22/2014 6/26-7/2/2014 7/4/2014 7/18/2014 7/19-24/2014 7/25-8/1/2014 8/2-9/2014

ACTUAL 6/16/2014 6/26-7/2/2014 7/4/2014

Republic of the PhilippinesDepartment of Public Works and Highways (DPWH)

Laguna I District Engineering Office

REVISED ANNUAL PROCUREMENT PLAN FOR FY 2014 FOR DISTRICT ENGINEERING OFFICE PROCURED PROJECTS

PROJECT COST/ABC(P)

Asst. District Engineer District EngineerTHEODORO S. LLANTOS NESS S. VILLANUEVA

(PPMP) 6/16/2014 6/26-7/2/2014 7/4/201423 Const. of Multi Purpose Building, Competitive PLAN(APP) 2,100,000.00 6/22/2014 6/26-7/2/2014 7/4/2014 7/18/2014 7/19-24/2014 7/25-8/1/2014 8/2-9/2014

Brgy. San Miguel, Majayjay, Laguna Public Bidding(PPMP) 6/22/2014 6/26-7/2/2014 7/4/2014 7/18/2014 7/19-24/2014 7/25-8/1/2014 8/2-9/2014

ACTUAL 6/16/2014 6/26-7/2/2014 7/4/2014

(PPMP) 6/16/2014 6/26-7/2/2014 7/4/201424 Network Development-Off-Carriageway Competitive PLAN(APP) 52,822,090.82 6/23/2014 6/26-7/2/2014 7/7/2014 7/18/2014 7/21-25/2014 7/28-8/1/2014 8/4-7/2014

Improvement (paving of shoulders, Public Biddingloading and unloading bays, etc) (PPMP) 6/23/2014 6/26-7/2/2014 7/7/2014 7/18/2014 7/21-25/2014 7/28-8/1/2014 8/4-7/2014Rizal Bdry.-Famy-Quezon Road, ACTUAL 6/16/2014 6/26-7/2/2014 7/4/2014K0068 + 390 to K0122 + 160(with exception) (PPMP) 6/16/2014 6/26-7/2/2014 7/4/2014

Submitted by: Recommending Approval Approved:

MELANY F. MISTICAAdministrative Officer IV

Head, BAC Secretariat

THEODORO S. LLANTOS NESS S. VILLANUEVAAsst. District Engineer District Engineer

Pre- Post

Procurement Qualification

Conference Evaluation

PLAN

14-DK-0001 Cluster I - Construction of Multi-Purpose Building By Contract (APP) 2,000,000.00

at Paaralang Elem. Ng Lucban (PEL-2) E/S (PPMP)

Barangay Ayuti, Lucban, Quezon ACTUAL

(PMP) 1,919,293.54 3/7/2014 03/10-17/2014 5/29/2014 3/14/2014 5/30-06/03-2014 6/04-18/2014 7/26/2014

PLAN

14-DK-0002 Cluster II - Rehabilitation og Multi-Putpose Building By Contract (APP) 2,000,000.00

at Luis Palad National High School (NHS) Barangay (PPMP)

Ipilan, Tayabs, Quezon ACTUAL

(PMP) 1,899,992.00 3/7/2014 03/10-17/2014 5/29/2014 3/14/2014 5/30-06/03-2014 6/04-18/2014 7/26/2014

PLAN

Construction of Multi-Purpose Building at Barangay (APP) 2,000,000.00

Bantigue, Pagbilao, Quezon (PPMP)

ACTUAL

(PMP) 1,899,211.09 3/7/2014 03/10-17/2014 5/29/2014 3/14/2014 5/30-06/03-2014 6/04-18/2014 7/26/2014

PLAN

14-DK-0003 Cluster III - Construction of Multi-Purpose Building By Contract (APP) 2,000,000.00

at Barangay Sabang, Pollilo, Quezon (PPMP)

ACTUAL

(PMP) 1,919,364.17 3/7/2014 03/10-17/2014 5/29/2014 3/14/2014 5/30-06/03-2014 6/04-18/2014 7/26/2014

PLAN

14-DK-0004 CLUSTER IV-Construction of Multi-Purpose Bldg. By Contract (APP) 2,000,000.00

at Barangay Bantilan, Infanta, Quezon (PPMP)

ACTUAL

(PMP) 1,919,680.71 3/7/2014 03/10-17/2014 5/29/2014 3/14/2014 5/30-06/03-2014 6/04-18/2014 7/26/2014

PLAN

Construction of Multi-Purpose Building at Paaralang (APP) 2,000,000.00

Sekundarya ng Heneral Nakar, Barangay Anoling (PPMP)

Gen. Nakar, Quezon ACTUAL

(PMP) 1,919,432.32 3/7/2014 03/10-17/2014 5/29/2014 3/14/2014 5/30-06/03-2014 6/04-18/2014 7/26/2014

Republic of the Philippines

Department of Public Works and Highways

Regional Office No. IV-A

EDSA, Quezon City

ANNUAL PROCUREMENT PLAN FOR PROJECTS TO BE PROCURED IN OFFICES WITHIN REGION IV-A

FOR FY 2014 (BELOW 50M)

No. Contract Package (Description)Procurement

Method

Allocation Amount/Posting/

AdvertisementBidding Date

Pre-Bid

ConferenceBid Evaluation

Award of

ContractContract (ABC)

Approved Budget for the

Pre- Post

Procurement Qualification

Conference Evaluation

PLAN

14-DK-0005 Reblocking along Tayabas-Mainit-Mauban Road By Contract (APP) 500,000.00

Tayabas, Quezon (PPMP)

K0140+800-K0143+200, with exception ACTUAL

(PMP) 495,090.73 5/12/2014 05/15-22/2014 6/5/2014 5/23/2014 06/06-10/2014 06/11-19/2014 6/24/2014

PLAN

14-DK-0006 Repair/Maintenance of Lined Canal along Tayabas- By Contract (APP) 500,000.00

Mainit-Mauban Road, Tayabas, Quezon (PPMP)

K0151+500-K0151+800, with exception ACTUAL

(PMP) 494,775.05 5/12/2014 05/15-22/2014 6/5/2014 5/23/2014 6/06-10-2014 06/11-19/2014 6/24/2014

PLAN

14-DK-0007 Construction and Maintenance of Bridges/ By Contract (APP) 44,705,600.00

Rehabilitation/Reconstruction/Replacement/Retro- (PPMP)

fitting of Existing Permanent Bridges of Capalong ACTUAL

Bridge along Famy-Real-Infanta-Dinahican Port Rd. (PMP) 42,018,705.93 5/12/2014 05/05-12/2014 5/29/2014 5/16/2014 5/30-06/03/2014 6/04-7/03-2014 7/9/2014

PLAN

14-DK-0008 Repair/Maintenance of Pavement Markings along By Contract (APP) 500,000.00

Marikina-Infanta Road (PPMP)

K0123+237-K0129+847, with exception ACTUAL

(PMP) 496,306.24 5/5/2014 05/07-13/2014 5/29/2014 5/16/2014 05/30-06/02/2014 06/03-09/2014 6/13/2014

PLAN

14-DK-0009 Repair/Maintenance of Pavement Markings along By Contract (APP) 500,000.00

Famy-Real-Infanta Road (PPMP)

K0095+250-K0148+109, with exception ACTUAL

(PMP) 494,314.53 5/5/2014 05/07-13/2014 5/29/2014 5/16/2014 05/30-06/02/2014 06/03-09/2014 6/13/2014

PLAN

14-DK-0010 Repair/Maintenance of Pavement Markings along By Contract (APP) 500,000.00

Lucban-Sampaloc-Mauban Road (PPMP)

K0128+678-K0157+1000, with exception ACTUAL

(PMP) 496,257.87 5/5/2014 05/07-13/2014 5/29/2014 5/16/2014 05/30-06/02/2014 06/03-09/2014 6/13/2014

No. Contract Package (Description)Procurement

Method

Allocation Amount/Posting/

Advertisement

Bidding

Date

Pre-Bid

ConferenceBid Evaluation

Award of

ContractApproved Budget for the

Contract (ABC)

FOR FY 2014 (BELOW 50M)

Republic of the Philippines

Department of Public Works and Highways

Regional Office No. IV-A

EDSA, Quezon City

ANNUAL PROCUREMENT PLAN FOR PROJECTS TO BE PROCURED IN OFFICES WITHIN REGION IV-A

Pre- Post

Procurement Qualification

Conference Evaluation

PLAN

14-DK-0011 Installation of Road Signs along National Roads By Contract (APP) 500,000.00

and Bridges within Quezon I, DEO, Lucban, Quezon (PPMP)

ACTUAL

(PMP) 494,811.02 5/5/2014 05/07-13/2014 5/29/2014 5/16/2014 5/30-6/2/2014 6/3-9/2014 6/13/2014

PLAN

14-DK-0012 Repair/Maintenance of Kilometer Posts Right of Way By Contract (APP) 500,000.00

Markers DEO, Lucban, Quezon (PPMP)

ACTUAL

(PMP) 494,447.98 5/5/2014 05/07-13/2014 5/29/2014 5/16/2014 5/30-6/02/2014 6/3-9/2014 6/13/2014

PLAN

14-DK-0013 CLUSTER I-Construction of Multi-Purpose Building By Contract (APP) 2,000,000.00

at Barangay Busdak Sitio Katakian Patnanungan, (PPMP)

Quezon ACTUAL

(PMP) 1,902,134.17 5/5/2014 05/07-13/2014 5/29/2014 5/16/2014 5/30-6/3/2014 6/4-18/2014 7/26/2014

PLAN

Construction of Multi-Purpose Building at Barangay By Contract (APP) 1,500,000.00

Apad, Jomalig, Quezon (PPMP)

ACTUAL

(PMP) 1,425,125.21 5/5/2014 05/07-13/2014 5/29/2014 5/16/2014 5/30-6/3/2014 6/4-18/2014 7/26/2014

PLAN

14-DK-0014 CLUSTER II-Construction of Classroom at Real (APP) 1,500,000.00

Central Elem. School (CES) Barangay Poblcaion I, (PPMP)

Real, Quezon ACTUAL

(PMP) 1,425,506.40 5/5/2014 05/07-13/2014 5/29/2014 5/16/2014 5/30-6/3/2014 6/4-18/2014 7/26/2014

PLAN

Construction of Multi-Purpose Building at Cagbalete By Contract (APP) 2,000,000.00

I-Elementary School, Barangay Cagbalete I, Mauban (PPMP)

Quezon ACTUAL

(PMP) 1,902,324.55 5/5/2014 05/07-13/2014 5/29/2014 5/16/2014 5/30-6/3/2014 6/4-18/2014 7/26/2014

Bidding

Date

Pre-Bid

ConferenceBid Evaluation

Award of

ContractApproved Budget for the

Contract (ABC)

No. Contract Package (Description)Procurement

Method

Allocation Amount/Posting/

Advertisement

ANNUAL PROCUREMENT PLAN FOR PROJECTS TO BE PROCURED IN OFFICES WITHIN REGION IV-A

FOR FY 2014 (BELOW 50M)

Republic of the Philippines

Department of Public Works and Highways

Regional Office No. IV-A

EDSA, Quezon City

Pre- Post

Procurement Qualification

Conference Evaluation

PLAN

14-DK-0015 Construction of Multi-Purpose Building at Burdeos By Contract (APP) 1,500,000.00

Central School (Poblacion) Burdeos, Quezon (PPMP)

ACTUAL

(PMP) 1,424,836.92 5/5/2014 05/07-13/2014 5/29/2014 5/16/2014 5/30-6/3/2014 6/4-18/2014 7/26/2014

PLAN

14-DK-0016 Repair/Maintenance of Slope Protection along By Contract (APP) 500,000.00

Lucban-Sampaloc-Mauban Road (PPMP)

K0135+350-K0135+400, with exception ACTUAL

(PMP) 494,325.99 5/12/2014 05/15-22,2014 06/05/201 5/23/2014 6/6-10/2014 6/11-19/2014 6//24/2014

PLAN

14-DK-0017 Repair/Maintenance of Abutment Protection By Contract (APP) 100,000.00

(Camatian Bridge) Lucban, Quezon (PPMP)

ACTUAL

(PMP) 94,732.49 5/12/2014 05/15-22,2014 06/05/201 5/23/2014 6/6-10/2014 6/11-19/2014 6//24/2014

PLAN

14-DK-0018 Reblocking along Mauban-Tignoan Road By Contract (APP) 500,000.00

K0162+794-K0163+380, with exception (PPMP)

ACTUAL

(PMP) 494,870.23 5/12/2014 05/15-22,2014 06/05/201 5/23/2014 6/6-10/2014 6/11-19/2014 6//24/2014

PLAN

14-DK-0019 Repair/Maintenance of Slope Protection along (APP) 500,000.00

Tayabas-Mainit-Mauban Road, Mauban, Quezon (PPMP)

ACTUAL

(PMP) 495,079.67 5/12/2014 05/15-22,2014 06/05/201 5/23/2014 6/6-10/2014 6/11-19/2014 6//24/2014

PLAN

14-DK-0020 Repair/Maintenance of Lined Canal along Lucban- By Contract (APP) 500,000.00

Sampaloc-Mauban Road (PPMP)

K0147+100-K0147+30, with exception ACTUAL

(PMP) 494,847.34 5/12/2014 05/15-22,2014 06/05/201 5/23/2014 6/6-10/2014 6/11-19/2014 6//24/2014

FOR FY 2014 (BELOW 50M)

No. Contract Package (Description)Procurement

Method

Allocation Amount/Posting/

Advertisement

Bidding

Date

Pre-Bid

ConferenceBid Evaluation

Award of

ContractApproved Budget for the

Contract (ABC)

Republic of the Philippines

Department of Public Works and Highways

Regional Office No. IV-A

EDSA, Quezon City

ANNUAL PROCUREMENT PLAN FOR PROJECTS TO BE PROCURED IN OFFICES WITHIN REGION IV-A

Pre- Post

Procurement Qualification

Conference Evaluation

PLAN

14-DK-0021 Repair/Maintenance of Lined Canal along Famy-Real By Contract (APP) 500,000.00

Infanta Road, Infanta, Quezon (PPMP)

K0135+450-K0135+750, with exception ACTUAL

(PMP) 494,896.61 5/12/2014 05/15-22,2014 06/05/201 5/23/2014 6/6-10/2014 6/11-19/2014 6/24/2014

PLAN

14-DK-0022 Repair/Maintenance of Asphalt Pavement along By Contract (APP) 500,000.00

Famy-Real-Infanta Road, Real, Quezon (PPMP)

K0099+957-K0108+000, with exception ACTUAL

(PMP) 494,736.55 5/12/2014 05/15-22,2014 06/05/201 5/23/2014 6/6-10/2014 6/11-19/2014 6/24/2014

PLAN

14-DK-0023 Repair/Maintenance of Asphalt Pavement along By Contract (APP) 500,000.00

Famy-Real-Infanta Road, Real, Quezon (PPMP)

K0110+500-K0114+000, with exception ACTUAL

(PMP) 494,736.55 5/12/2014 05/15-22,2014 06/05/201 5/23/2014 6/6-10/2014 6/11-19/2014 6/24/2014

PLAN

14-DK-0024 Construction/Rehabilitation of Flood Mitigation By Contract (APP) 9,553,500.00

Facilities along major River Basins (PPMP)

Consruction of Flood Control along Agos River ACTUAL

(PMP) 6/2/2014 06/04-11/2014 6/26/2014 6/13/2014

PLAN

14-DK-0025 Construction of Barangay Health Station at (APP) 990,000.00

Barangay Casuguran, Jomalig, Quezon (PPMP)

ACTUAL

(PMP) 6/24/2014 06/27-07/04/2014 7/30/2014 7/17/2014

PLAN

14-DK-0026 Construction of Barangay Health Station at By Contract (APP) 990,000.00

Barangay Rizal, Burdeos, Quezon (PPMP)

ACTUAL

(PMP) 6/24/2014 06/27-07/04/2014 7/30/2014 7/17/2014

FOR FY 2014 (BELOW 50M)

No. Contract Package (Description)Procurement

Method

Allocation Amount/Posting/

Advertisement

Bidding

Date

Pre-Bid

ConferenceBid Evaluation

Award of

ContractApproved Budget for the

Contract (ABC)

Republic of the Philippines

Department of Public Works and Highways

Regional Office No. IV-A

EDSA, Quezon City

ANNUAL PROCUREMENT PLAN FOR PROJECTS TO BE PROCURED IN OFFICES WITHIN REGION IV-A

Pre- Post

Procurement Qualification

Conference Evaluation

PLAN

14-DK-0027 Construction of Barangay Health Station at BarangayBy Contract (APP) 990,000.00

Taluong, Pollilo, Quezon (PPMP)

ACTUAL

(PMP) 06/16-25/201406/27-07/04/2014 7/30/2014 7/17/2014

PLAN

14-DK-0028 By Contract (APP)

(PPMP)

ACTUAL

(PMP)

PLAN

14-DK-0029 By Contract (APP)

(PPMP)

ACTUAL

(PMP)

PLAN

14-DK-0030 By Contract (APP)

(PPMP)

ACTUAL

(PMP)

PLAN

14-DK-0031 (APP)

(PPMP)

ACTUAL

(PMP)

PLAN

14-DK-0032 By Contract (APP)

(PPMP)

ACTUAL

(PMP)

FOR FY 2014 (BELOW 50M)

No. Contract Package (Description)Procurement

Method

Allocation Amount/Posting/

Advertisement

Bidding

Date

Pre-Bid

ConferenceBid Evaluation

Award of

ContractApproved Budget for the

Contract (ABC)

Republic of the Philippines

Department of Public Works and Highways

Regional Office No. IV-A

EDSA, Quezon City

ANNUAL PROCUREMENT PLAN FOR PROJECTS TO BE PROCURED IN OFFICES WITHIN REGION IV-A

Page 1 of 9

Reference No. CONTRACT PACKAGE DESCRIPTION Procurement Pre-Procurement Advertisement/ Pre-Bid Submission Bid Evaluation Post Qualification

Method Conference Posting Conference & Receipt of Evaluation Award of Contract

Bids

13DM0058 Rehab./Reconst./Upgrading of Damaged CompetitivePave National Road along Padre Burgos- Bidding PLAN (APP) 11,453,728.51 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 11/18/2013Pototanin Junction Road, KO187+000 -

KO188+260, Unisan, Quezon (PPMP) 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 11/18/2013ACTUAL 11,453,289.87 6/11-18/2014 6/19/2014 7/1/2014 7/2/2014 7/3/2014 7/4/2014

(PPMP) 6/11-18/2014 6/19/2014 7/1/2014 7/2/2014 7/3/2014 7/4/201413DM0059 Road Upgrading (Gravel to Paved) along Competitive PLAN (APP) 5,697,297.95 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 11/18/2013

Gumaca-Pitogo-Mulanay-San Narciso BiddingRoad, KO276+187.50 - KO276+307.50, (PPMP) 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 11/18/2013KO286+021 -KO286+035, KO286+121 - ACTUAL 5,697,297.95 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 6/16/2014KO286+181, San Narciso, Quezon

(PPMP) 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 6/16/201413DM0060 Replacement of Matuig Bridge along Competitive PLAN (APP) 15,655,398.67 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 11/18/2013

Mulanay-San Francisco Road, BiddingKO293+349, Mulanay, Quezon' (PPMP) 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 11/18/2013

Competitive ACTUAL 15,655,398.67 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 1/3/2014Bidding

(PPMP) 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 1/3/2014

PREPARED BY: RECOMMENDING APPROVAL: APPROVED:

MICHAEL P. ROSARIAEngineer III

Procurement Engineer

Page 2 of 9

Regional Office No. IV-AOFFICE OF THE DISTRICT ENGINEER

Quezon III Engineering DistrictCatanauan, Quezon

ANNUAL PROCUREMENT PLAN FY 2014 FOR DISTRICT PROCURED PROJECTS

Republic of the PhilippinesDepartment of Public Works and Highways

ANNUAL PROCUREMENT PLAN FY 2014 FOR DISTRICT PROCURED PROJECTS

Project Cost/ABC

(P)

MARCELITO G. FERRER ROSAURO R. GUERRERO

Republic of the PhilippinesDepartment of Public Works and Highways

Regional Office No. IV-AOFFICE OF THE DISTRICT ENGINEER

Quezon III Engineering DistrictCatanauan, Quezon

Assistant District Engineer District Engineer

Reference No. CONTRACT PACKAGE DESCRIPTION Procurement Pre-Procurement Advertisement/ Pre-Bid Submission Bid Evaluation Post Qualification

Method Conference Posting Conference & Receipt of Evaluation Award of Contract

Bids

13DM0061 Repair of Macalelon Bridge along CompetitiveGumaca-Pitogo-Mulanay-San Narciso Bidding PLAN (APP) 999,125.11 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 11/18/2013Road, KO226+792, Macalelon, Quezon

(PPMP) 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 11/18/2013ACTUAL 999,125.11 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 1/3/2014

(PPMP) 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 1/3/201413DM0062 Repair of Mayubok Bridge along Competitive PLAN (APP) 999,125.11 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 11/18/2013

Gumaca-Pitogo-Mulanay-San Narciso BiddingRoad, KO216+316, Pitogo, quezon (PPMP) 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 11/18/2013

ACTUAL 999,125.11 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 1/3/2014

(PPMP) 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 1/3/201413DM0063 Construction of Lined Canal along Competitive PLAN (APP) 797,224.49 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 11/18/2013

Gumaca-Pitogo-Mulanay-San Narciso BiddingRoad, KO235+850 - KO236+004 (L/S) (PPMP) 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 11/18/2013General Luna, Quezon ACTUAL 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 3/28/2014

797,224.49

(PPMP) 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 3/28/2014

PREPARED BY: RECOMMENDING APPROVAL: APPROVED:

MICHAEL P. ROSARIAEngineer III

Procurement Engineer

Page 3 of 9

Reference No. CONTRACT PACKAGE DESCRIPTION Procurement Pre-Procurement Advertisement/ Pre-Bid Submission Bid Evaluation Post Qualification

Method Conference Posting Conference & Receipt of Evaluation Award of Contract

Bids

13DM0064 Construction of Lined Canal along Competitive PLAN (APP) 1,297,489.79 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 11/18/2013Gumaca-Pitogo-Mulanay-San Narciso BiddingRoad, KO262+907 - KO263+170 (L/S) (PPMP) 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 11/18/2013

Quezon III Engineering DistrictCatanauan, Quezon

ANNUAL PROCUREMENT PLAN FY 2014 FOR DISTRICT PROCURED PROJECTS

Project Cost/ABC

(P)

Republic of the PhilippinesDepartment of Public Works and Highways

Regional Office No. IV-AOFFICE OF THE DISTRICT ENGINEER

Project Cost/ABC

(P)

MARCELITO G. FERRER ROSAURO R. GUERREROAssistant District Engineer District Engineer

Catanauan, Quezon ACTUAL 1,297,489.79 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 3/28/2014

(PPMP) 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 3/28/201413DM0065 Construction of Lined Canal along Competitive PLAN (APP) 1,695,867.18 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 11/18/2013

Gumaca-Pitogo-Mulanay-San Narciso BiddingRoad, KO287+971 - KO288+113 (R/S) and (PPMP) 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 11/18/2013KO287+929 - KO288+079 (L/S) ACTUAL 1,695,867.18 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 3/28/2014Mulanay, Quezon

(PPMP) 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 3/28/201413DM0066 Construction of Lined Canal along Competitive PLAN (APP) 6,858,296.71 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 11/18/2013

Gumaca-Pitogo-Mulanay-San Narciso BiddingRoad, KO261+586 - KO261+936 (R/S) (PPMP) 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 11/18/2013Mulanay, Quezon ACTUAL 6,858,296.71 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 3/28/2014

(PPMP) 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 3/28/2014

PREPARED BY: RECOMMENDING APPROVAL: APPROVED:

MICHAEL P. ROSARIAEngineer III

Procurement Engineer

Page 4 of 9

Reference No. CONTRACT PACKAGE DESCRIPTION Procurement Pre-Procurement Advertisement/ Pre-Bid Submission Bid Evaluation Post Qualification

Method Conference Posting Conference & Receipt of Evaluation Award of Contract

Bids

13DM0067 Construction of Lined Canal along Competitive PLAN (APP) 797,224.49 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 11/18/2013

Padre Burgos-Pototanin Junction Road BiddingKO203+250 - KO203+404 (L/S) (PPMP) 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 11/18/2013

Pitogo, Quezon ACTUAL 797,224.49 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 3/28/2014

(PPMP) 10/14-24/2013 10/25-11/1/2013 10/31/2013 11/14/2013 11/15/2013 11/15/2013 3/28/2014

13DM0076 Road Upgrading along Buenavista- Competitive PLAN (APP) 41,148,865.29 10/29-11/7/2013 11/7-14/2013 11/15/2013 11/27/2013 11/28/2013 11/29/2013 12/2/2013

Abuyon Road, KO250+676 -KO252+000, BiddingKO252+000 - KO252+390, Net Length = (PPMP) 10/29-11/7/2013 11/7-14/2013 11/15/2013 11/27/2013 11/28/2013 11/29/2013 12/2/2013

1.714 kms. 280 mm. Thick, SO2043LZ, ACTUAL 41,148,865.29 10/29-11/7/2013 11/7-14/2013 11/15/2013 11/27/2013 11/28/2013 11/29/2013 4/15/2014

Buenavista, Quezon

Quezon III Engineering DistrictCatanauan, Quezon

ANNUAL PROCUREMENT PLAN FY 2014 FOR DISTRICT PROCURED PROJECTS

Project Cost/ABC

(P)

Republic of the PhilippinesDepartment of Public Works and Highways

Regional Office No. IV-AOFFICE OF THE DISTRICT ENGINEER

MARCELITO G. FERRER ROSAURO R. GUERREROAssistant District Engineer District Engineer

(PPMP) 10/29-11/2013 11/7-14/2013 11/15/2013 11/27/2013 11/28/2013 11/29/2013 4/15/2014

13DM0077 Road Upgrading along Catanauan- Competitive PLAN (APP) 38,541,376.24 10/29-11/7/2013 11/7-14/2013 11/15/2013 11/27/2013 11/28/2013 11/29/2013 12/2/2013

Buenavista Road, KO254+116 - KO255+ Bidding335, KO255+868 - KO255+958, KO255+958- (PPMP) 10/29-11/7/2013 11/7-14/2013 11/15/2013 11/27/2013 11/28/2013 11/29/2013 12/2/2013

LO256+008, Net length = 1.359 kms. 280 ACTUAL 38,541,376.24 10/29-11/7/2013 11/7-14/2013 11/15/2013 11/27/2013 11/28/2013 11/29/2013 4/15/2014

mm. Thick, SO4235LZ,

Catanauan, Quezon (PPMP) 10/29-11/7/2013 11/7-14/2013 11/15/2013 11/27/2013 11/28/2013 11/29/2013 4/15/2014

PREPARED BY: RECOMMENDING APPROVAL: APPROVED:

MICHAEL P. ROSARIAEngineer III

Procurement Engineer

Page 5 of 9

Reference No. CONTRACT PACKAGE DESCRIPTION Procurement Pre-Procurement Advertisement/ Pre-Bid Submission Bid Evaluation Post Qualification

Method Conference Posting Conference & Receipt of Evaluation Award of Contract

Bids

13DM0078 Road Upgrading along MSR, Jct., Lopez- Competitive PLAN (APP) 39,443,751.62 10/29-11/7/2013 11/7-14/2013 11/15/2013 11/27/2013 11/28/2013 11/29/2013 12/2/2013

Catanauan Road, KO237+005 - KO237+ Bidding835, KO238+099 - KO238+899, Net Length= (PPMP) 10/29-11/7/2013 11/7-14/2013 11/15/2013 11/27/2013 11/28/2013 11/29/2013 12/2/2013

1.63 kms. 230mm. Thick, SO4249LZ, ACTUAL 39,443,751.62 10/29-11/7/2013 11/7-14/2013 11/15/2013 11/27/2013 11/28/2013 11/29/2013 1/13/2014

General Luna, Quezon

(PPMP) 10/29-11/7/2013 11/7-14/2013 11/15/2013 11/27/2013 11/28/2013 11/29/2013 1/13/2014

13DM0079 Road Upgrading along Talaba-Summit- Competitive PLAN (APP) 39,443,751.62 10/29-11/7/2013 11/7-14/2013 11/15/2013 11/27/2013 11/28/2013 11/29/2013 12/2/2013

Panaon Road, KO188+500 - KO190+000, BiddingNet length = 1.50 kms. 280 mm thick, (PPMP) 10/29-11/7/2013 11/7-14/2013 11/15/2013 11/27/2013 11/28/2013 11/29/2013 12/2/2013

SO2042LZ, Unisan, Quezon ACTUAL 39,443,751.62 10/29-11/7/2013 11/7-14/2013 11/15/2013 11/27/2013 11/28/2013 11/29/2013 1/13/2014

(PPMP) 10/29-11/2013 11/7-14/2013 11/15/2013 11/27/2013 11/28/2013 11/29/2013 1/13/2014

13DM0089 Road Upgrading along San Francisco- Competitive PLAN (APP) 37,906,815.79 11/25-12/4/2013 12/2-10/2013 12/10/2013 12/23/2013 12/24/2013 12/26/2013 12/27/2013

San Andres-San Narciso Road, KO313+ Bidding217 - KO314+446 (Casay Section)), Net (PPMP) 11/25-12/4/2013 12/2-10/2013 12/10/2013 12/23/2013 12/24/2013 12/26/2013 12/27/2013

Length = 1.30 kms. 230 mm. Thick, ACTUAL 37,906,815.79 11/25-12/4/2013 12/2-10/2013 12/10/2013 12/23/2013 12/24/2013 12/26/2013 6/16/2014

SO4252LZ, San Francisco, Quezon

(PPMP) 11/25-12/4/2013 12/2-10/2013 12/10/2013 12/23/2013 12/24/2013 12/26/2013 6/16/2014

Quezon III Engineering DistrictCatanauan, Quezon

ANNUAL PROCUREMENT PLAN FY 2014 FOR DISTRICT PROCURED PROJECTS

Project Cost/ABC

(P)

Republic of the PhilippinesDepartment of Public Works and Highways

Regional Office No. IV-AOFFICE OF THE DISTRICT ENGINEER

MARCELITO G. FERRER ROSAURO R. GUERREROAssistant District Engineer District Engineer

PREPARED BY: RECOMMENDING APPROVAL: APPROVED:

MICHAEL P. ROSARIAEngineer III

Procurement Engineer

Page 6 of 9

Reference No. CONTRACT PACKAGE DESCRIPTION Procurement Pre-Procurement Advertisement/ Pre-Bid Submission Bid Evaluation Post Qualification

Method Conference Posting Conference & Receipt of Evaluation Award of Contract

Bids

13DM0090 Road Upgrading along along San Fran- Competitive PLAN (APP) 43,533,901.33 11/25-12/4/2013 12/2-10/2013 12/10/2013 12/23/2013 12/24/2013 12/26/2013 12/27/2013

cisco-San Andres-San Narciso Road, BiddingKO396+049 - KO397+620 (Talisay Section), (PPMP) 11/25-12/4/2013 12/2-10/2013 12/10/2013 12/23/2013 12/24/2013 12/26/2013 12/27/2013

Net length = 1.571 kms. 230mm. Thick, ACTUAL 43,533,901.23 11/25-12/4/2013 12/2-10/2013 12/10/2013 12/23/2013 12/24/2013 12/26/2013 6/16/2014

SO4253LZ, San Narciso, Quezon

(PPMP) 11/25-12/4/2013 12/2-10/2013 12/10/2013 12/23/2013 12/24/2013 12/26/2013 6/16/2014

13DM0091 Construction/Improvement of Access Competitive PLAN (APP) 29,306,222.31 11/25-12/4/2013 12/2-10/2013 12/10/2013 12/23/2013 12/24/2013 12/26/2013 12/27/2013

Road leading to Catanauan Cove and BiddingBeaches = 1.5 kms. 230 mm. Thick, (PPMP) 11/25-12/4/2013 12/2-10/2013 12/10/2013 12/23/2013 12/24/2013 12/26/2013 12/27/2013

Catanauan, Quezon ACTUAL 29,306,222.31 11/25-12/4/2013 12/2-10/2013 12/10/2013 12/23/2013 12/24/2013 12/26/2013 3/20/2014

(PPMP) 11/25-12/4/2013 12/2-10/2013 12/10/2013 12/23/2013 12/24/2013 12/26/2013 3/20/2014

14DM0003 Construction (Rehabilitation) of Competitive PLAN (APP) 3,499,838.37 2/11-20/2014 2/21-28/2014 3/5/2014 3/17/2014 3/18/2014 3/19/2014 3/20/2014

Multi-Purpose Building (1-B) at BiddingAgdangan Central School, Agdangan, (PPMP) 2/11-20/2014 2/21-28/2014 3/5/2014 3/17/2014 3/18/2014 3/19/2014 3/20/2014

Quezon ACTUAL 3,499,838.37 2/11-20/2014 2/21-28/2014 3/5/2014 3/17/2014 3/18/2014 3/19/2014 3/20/2014

(PPMP) 3/3-11/2014 3/12-19/2014 3/20/2014 4/1/2014 4/2/2014 4/3/2014 3/20/2014

PREPARED BY: RECOMMENDING APPROVAL: APPROVED:

MICHAEL P. ROSARIAEngineer III

Procurement Engineer

MARCELITO G. FERRER ROSAURO R. GUERREROAssistant District Engineer District Engineer

Quezon III Engineering DistrictCatanauan, Quezon

ANNUAL PROCUREMENT PLAN FY 2014 FOR DISTRICT PROCURED PROJECTS

Project Cost/ABC

(P)

Republic of the PhilippinesDepartment of Public Works and Highways

Regional Office No. IV-AOFFICE OF THE DISTRICT ENGINEER

MARCELITO G. FERRER ROSAURO R. GUERREROAssistant District Engineer District Engineer

Page 7 of 9

Reference No. CONTRACT PACKAGE DESCRIPTION Procurement Pre-Procurement Advertisement/ Pre-Bid Submission Bid Evaluation Post Qualification

Method Conference Posting Conference & Receipt of Evaluation Award of Contract

Bids

14DM0004 Construction of Two(2)-One (1) Storey, Competitive PLAN (APP) 3,999,905.57 2/11-20/2014 2/21-28/2014 3/5/2014 3/17/2014 3/18/2014 3/19/2014 3/20/2014

Three (3) CL School Building at BiddingAgdangan Central School, Agdangan, (PPMP) 2/11-20/2014 2/21-28/2014 3/5/2014 3/17/2014 3/18/2014 3/19/2014 3/20/2014

Quezon ACTUAL 3,999,905.57 2/11-20/2014 2/21-28/2014 3/5/2014 3/17/2014 3/18/2014 3/19/2014 3/20/2014

(PPMP) 2/11-20/2014 2/21-28/2014 3/5/2014 3/17/2014 3/18/2014 3/19/2014 3/20/2014

14DM0005 Construction of Local Road, San Vicente- Competitive PLAN (APP) 2,999,374.80 2/11-20/2014 2/21-28/2014 3/5/2014 3/17/2014 3/18/2014 3/19/2014 3/20/2014

White Cliff Barangay Road, San Narciso, BiddingQuezon (PPMP) 2/11-20/2014 2/21-28/2014 3/5/2014 3/17/2014 3/18/2014 3/19/2014 3/20/2014

ACTUAL 2,999,374.80 2/11-20/2014 2/21-28/2014 3/5/2014 3/17/2014 3/18/2014 3/19/2014 3/20/2014

(PPMP) 2/11-20/2014 2/21-28/2014 3/5/2014 3/17/2014 3/18/2014 3/19/2014 3/20/2014

14DM0006 Construction of Local Road, Villa Reyes Competitive PLAN (APP) 1,999,134.78 2/11-20/2014 2/21-28/2014 3/5/2014 3/17/2014 3/18/2014 3/19/2014 3/20/2014

San Narciso, quezon Bidding(PPMP) 2/11-20/2014 2/21-28/2014 3/5/2014 3/17/2014 3/18/2014 3/19/2014 3/20/2014

ACTUAL 1,999,134.78 2/11-20/2014 2/21-28/2014 3/5/2014 3/17/2014 3/18/2014 3/19/2014 3/20/2014

(PPMP) 2/11-20/2014 2/21-28/2014 3/5/2014 3/17/2014 3/18/2014 3/19/2014 3/20/2014

PREPARED BY: RECOMMENDING APPROVAL: APPROVED:

MICHAEL P. ROSARIAEngineer III

Procurement Engineer

Page 8 of 9

Regional Office No. IV-AOFFICE OF THE DISTRICT ENGINEER

Quezon III Engineering DistrictCatanauan, Quezon

ANNUAL PROCUREMENT PLAN FY 2014 FOR DISTRICT PROCURED PROJECTS

Assistant District Engineer District Engineer

Republic of the PhilippinesDepartment of Public Works and Highways

ANNUAL PROCUREMENT PLAN FY 2014 FOR DISTRICT PROCURED PROJECTS

Project Cost/ABC

(P)

MARCELITO G. FERRER ROSAURO R. GUERRERO

Republic of the PhilippinesDepartment of Public Works and Highways

Regional Office No. IV-AOFFICE OF THE DISTRICT ENGINEER

Quezon III Engineering DistrictCatanauan, Quezon

Reference No. CONTRACT PACKAGE DESCRIPTION Procurement Pre-Procurement Advertisement/ Pre-Bid Submission Bid Evaluation Post Qualification

Method Conference Posting Conference & Receipt of Evaluation Award of Contract

Bids

14DM0007 Construction of Level II Water Supply Competitive PLAN (APP) 5,999,232.78 2/11-20/2014 2/21-28/2014 3/5/2014 3/17/2014 3/18/2014 3/19/2014 3/20/2014

System with Water Filtration System, BiddingPoblacion, San Francisco, Quezon (PPMP) 2/11-20/2014 2/21-28/2014 3/5/2014 3/17/2014 3/18/2014 3/19/2014 3/20/2014

Quezon ACTUAL 5,999,821.78 2/11-20/2014 2/21-28/2014 3/5/2014 3/17/2014 3/18/2014 3/19/2014 3/20/2014

(PPMP) 2/11-20/2014 2/21-28/2014 3/5/2014 3/17/2014 3/18/2014 3/19/2014 3/20/2014

14DM0008 Construction of Level II Water Supply Competitive PLAN (APP) 2,999,374.80 2/11-20/2014 2/21-28/2014 3/5/2014 3/17/2014 3/18/2014 3/19/2014 3/20/2014

System with Water Filtration System, BiddingPoblacion, San Francisco, Quezon (PPMP) 2/11-20/2014 2/21-28/2014 3/5/2014 3/17/2014 3/18/2014 3/19/2014 3/20/2014

Quezon ACTUAL 2,999,374.80 2/11-20/2014 2/21-28/2014 3/5/2014 3/17/2014 3/18/2014 3/19/2014 3/20/2014

(PPMP) 2/11-20/2014 2/21-28/2014 3/5/2014 3/17/2014 3/18/2014 3/19/2014 3/20/2014

14DM0009 Road Upgrading (Concrete Paving) along Competitive PLAN (APP) 92,029,497.84 3/3-11/2014 3/12-19/2014 3/20/2014 4/1/2014 4/2/2014 4/3/2014 4/4/2014

Mulanay-San Francisco Road, KO289+ Bidding102 - KO289+469, KO290+989 -KO292+426 (PPMP) 3/3-11/2014 3/12-19/2014 3/20/2014 4/1/2014 4/2/2014 4/3/2014 4/4/2014

and KO289+082 - KO299+882, Net Length= ACTUAL 82,029,497.84 3/3-11/2014 3/12-19/2014 3/20/2014 4/1/2014 4/2/2014 4/3/2014 6/23/2014

3584 L.M.

(PPMP) 3/3-11/2014 3/12-19/2014 3/20/2014 4/1/2014 4/2/2014 4/3/2014 6/23/2014

PREPARED BY: RECOMMENDING APPROVAL: APPROVED:

MICHAEL P. ROSARIAEngineer III

Procurement Engineer

Page 9 of 9

Reference No. CONTRACT PACKAGE DESCRIPTION Procurement Pre-Procurement Advertisement/ Pre-Bid Submission Bid Evaluation Post Qualification

Method Conference Posting Conference & Receipt of Evaluation Award of Contract

Bids

14DM0010 Road Upgrading (Concrete Paving) along Competitive PLAN (APP) 54,362,383.32 3/3-11/2014 3/12-19/2014 3/20/2014 4/1/2014 4/2/2014 4/3/2014 4/4/2014

MSR Jct. Lopez-Buenavista Road, BiddingKO241+651 - KO243+927, Net Length = (PPMP) 3/3-11/2014 3/12-19/2014 3/20/2014 4/1/2014 4/2/2014 4/3/2014 4/4/2014

Quezon III Engineering DistrictCatanauan, Quezon

ANNUAL PROCUREMENT PLAN FY 2014 FOR DISTRICT PROCURED PROJECTS

Project Cost/ABC

(P)

Republic of the PhilippinesDepartment of Public Works and Highways

Regional Office No. IV-AOFFICE OF THE DISTRICT ENGINEER

Project Cost/ABC

(P)

MARCELITO G. FERRER ROSAURO R. GUERREROAssistant District Engineer District Engineer

2276 L.M. (SO4254LZ), Quezon III ACTUAL 54,382,383.32 3/3-11/2014 3/12-19/2014 3/20/2014 4/1/2014 4/2/2014 4/3/2014 6/23/2014

(PPMP) 3/3-11/2014 3/12-19/2014 3/20/2014 4/1/2014 4/2/2014 4/3/2014 6/23/2014

14DM0011 Construction of Rain Water Collector Competitive PLAN (APP) 249,959.09 3/19-26/2014 3/27/2014 4/8/2014 4/10/201 4/11/201 4/14/2014

(RWCS), San Isidro Ilaya ES (Pidac), BiddingGeneral Luna, Quezon (PPMP) 3/19-26/2014 3/27/2014 4/8/2014 4/10/201 4/11/201 4/14/2014

ACTUAL 249,959.09 3/19-26/2014 3/27/2014 4/8/2014 4/10/201 4/11/201 4/14/2014

(PPMP) 3/19-26/2014 3/27/2014 4/8/2014 4/10/201 4/11/201 4/14/2014

14DM0012 Construction of Rain Water Collector Competitive PLAN (APP) 249,990.81 3/19-26/2014 3/27/2014 4/8/2014 4/10/201 4/11/201 4/14/2014

(RWCS), Caigdal National High School, BiddingUnisan, Quezon (PPMP) 3/19-26/2014 3/27/2014 4/8/2014 4/10/201 4/11/201 4/14/2014

ACTUAL 249,990.81 3/19-26/2014 3/27/2014 4/8/2014 4/10/201 4/11/201 4/14/2014

(PPMP) 3/19-26/2014 3/27/2014 4/8/2014 4/10/201 4/11/201 4/14/2014

PREPARED BY: RECOMMENDING APPROVAL: APPROVED:

MICHAEL P. ROSARIAEngineer III

Procurement Engineer

MARCELITO G. FERRER ROSAURO R. GUERREROAssistant District Engineer District Engineer

PROJECT COST Pre- Submission Post

Contract Package Description Procurement ABC Procurement Posting/ Pre-Bid and Receipt Bid Qualification Award of

Method Conference Advertisement Conference of Bids Evaluation Evaluation Contract

14-DL-0001

Construction of Rain Water Collector(RCWS), Competetive 500,000.00 June 14-20, 2014 June 23, 2014 July 04, 2014 July 04, 2014 July 07-11, 2014 July 15, 2014

Alabat, Quezon, Nabangka National High School, 499,988.78

Guinayangan Central Elementary School,

Guinayangan, Quezon, Capuluan Central Elementary

School, Alabat-Guinayangan, Quezon

14-DL-0002

Local Infrastructure Program Competetive 5,000,000.00 June 14-20, 2014 June 23, 2014 July 04, 2014 July 04, 2014 July 07-11, 2014 July 15, 2014

Rehabilitation of Brgy. Road-Dancalan, 4,949,841.79

Guinayangan, Quezon

14-DL-0003

Local Infrastructure Program Competetive 5,000,000.00 June 14-20, 2014 June 23, 2014 July 04, 2014 July 04, 2014 July 07-11, 2014 July 15, 2014

Rehabilitation of Local Road-Camohaguin-Biga- 4,949,717.77

San Diego-Villa Tanada-Cawayan Road, Gumaca

14-DL-0004

Local Infrastructure Program Competetive 5,000,000.00 June 14-20, 2014 June 23, 2014 July 04, 2014 July 04, 2014 July 07-11, 2014 July 15, 2014

Rehabilitation of Local Road-Jongo-San Isidro- 4,949,561.38

San Pedro-Ilayang Ilog-Binahian-Cogon Road, Lopez

14-DL-0005

Local Infrastructure Program Competetive 5,000,000.00 June 14-20, 2014 June 23, 2014 July 04, 2014 July 04, 2014 July 07-11, 2014 July 15, 2014

Rehabilitation of Local Road-Kapaluhan-Tabansak- 4,949,358.14

Vinas-Tiniguiban-Villa San Isidro Road, Calauag

14-DL-0006

As of July 14, 2014

ANNUAL PROCUREMENT PLAN FOR DISTRICT PROCURED PROJECTS

Republic of the Philippines

Department of Public Works and Highways (DPWH)Regional Office No. IV-A

Quezon IV District Engineering OfficeBarangay Isabang, Lucena City

Local Infrastructure Program Competetive 5,000,000.00 June 14-20, 2014 June 23, 2014 July 04, 2014 July 04, 2014 July 07-11, 2014 July 15, 2014

Rehabilitation of Local Road-Mabini-Sta. Maria Road, 4,949,137.61

Guinayangan, Quezon

14-DL-0007

Local Infrastructure Program Competetive 4,500,000.00 June 14-20, 2014 June 23, 2014 July 04, 2014 July 04, 2014 July 07-11, 2014 July 15, 2014

Rehabilitation of Local Road-San Andres Labak- 4,454,895.05

San Andres Bundok-Montes Balaon-Montes

Callagan Road, Atimonan

14-DL-0008

Network Development - Off Carriageway Improvement

(paving of shoulders, loading and unloading bays etc.), Competetive 15,000,000.00 June 24, 2014 June 27, 2014 July 08, 2014 July 17, 2014 July 17, 2014 July 18, 2014 July 23-24, 2014

Jct. MSR Old Zigzag Road, (Intermittent Sections), 14,975,477.99 to

Pagbilao Section, Quezon 1st Legislative District, July 03, 2014

Pagbilao, Quezon, KO 153+(-472) - KO 154+600

14-DL-0009

Construction of Classrooms in Areas Experiencing Competetive 1,217,329.12 July 05-11, 2014 July 14, 2014 July 24, 2014 July 24-25, 2014 July 28, 2014 July 30-31, 2014

Acute Classroom Shortage under the CY 2014 Basic 1,217,169.11

Educational Facilities Fund (BATCH 1)

a. 1 STY 1 CL., Sto. Angel National High School,

Calauag, Quezon

14-DL-0010

Construction of Classrooms in Areas Experiencing Competetive 2,020,417.57 July 05-11, 2014 July 14, 2014 July 24, 2014 July 24-25, 2014 July 28, 2014 July 30-31, 2014

Acute Classroom Shortage under the CY 2014 Basic 2,020,252.17

Educational Facilities Fund (BATCH 1)

a. 1 STY 2 CL., Dungawan Central ES,

Guinayangan, Quezon

14-DL-0011

Construction of Classrooms in Areas Experiencing

Acute Classroom Shortage under the CY 2014 Basic Competetive 2,020,417.57 July 05-11, 2014 July 14, 2014 July 24, 2014 July 24-25, 2014 July 28, 2014 July 30-31, 2014

Educational Facilities Fund (BATCH 1) 2,000,309.50

a. 1 STY 2 CL., Sta. Cruz ES,

Guinayangan, Quezon

14-DL-0012

Construction of Classrooms in Areas Experiencing Competetive 1,092,239.12 July 05-11, 2014 July 14, 2014 July 24, 2014 July 24-25, 2014 July 28, 2014 July 30-31, 2014

Acute Classroom Shortage under the CY 2014 Basic 1,092,121.60

Educational Facilities Fund (BATCH 1)

a. 1 STY 1 CL., Villa Padua ES, Gumaca, Quezon

14-DL-0013

Construction of Classrooms in Areas Experiencing Competetive 1,092,239.12 July 05-11, 2014 July 14, 2014 July 24, 2014 July 24-25, 2014 July 28, 2014 July 30-31, 2014

Acute Classroom Shortage under the CY 2014 Basic 1,092,121.60

Educational Facilities Fund (BATCH 1)

a. 1 STY 1 CL., Progreso ES, Gumaca, Quezon

14-DL-0014

Construction of Classrooms in Areas Experiencing Competetive 4,020,835.14 July 05-11, 2014 July 14, 2014 July 24, 2014 July 24-25, 2014 July 28, 2014 July 30-31, 2014

Acute Classroom Shortage under the CY 2014 Basic 4,020,538.15

Educational Facilities Fund (BATCH 1)

a. 2 Units 1 STY 2 CL., Mabamban ES,

Lopez, Quezon

14-DL-0015

Construction of Classrooms in Areas Experiencing Competetive 1,092,329.12 July 05-11, 2014 July 14, 2014 July 24, 2014 July 24-25, 2014 July 28, 2014 July 30-31, 2014

Acute Classroom Shortage under the CY 2014 Basic 1,092,121.60

Educational Facilities Fund (BATCH 1)

a. 1 STY 1 CL., Tan-Ag ES, Lopez, Quezon

14-DL-0016

Construction of Classrooms in Areas Experiencing Competetive 2,245,417.57 July 05-11, 2014 July 14, 2014 July 24, 2014 July 24-25, 2014 July 28, 2014 July 30-31, 2014

Acute Classroom Shortage under the CY 2014 Basic 2,245,327.11

Educational Facilities Fund (BATCH 1)

a. 1 STY 2 CL., Perez NHS, Perez, Quezon

14-DL-0017

Construction of Classrooms in Areas Experiencing Competetive 1,117,329.12 July 05-11, 2014 July 14, 2014 July 24, 2014 July 24-25, 2014 July 28, 2014 July 30-31, 2014

Acute Classroom Shortage under the CY 2014 Basic 1,117,147.87

Educational Facilities Fund (BATCH 1)

a. 1 STY 1 CL., Bagong Silang NHS,

Tagkawayan, Quezon

14-DL-0018

Construction of Classrooms in Areas Experiencing Competetive 1,092,329.12 July 05-11, 2014 July 14, 2014 July 24, 2014 July 24-25, 2014 July 28, 2014 July 30-31, 2014

Acute Classroom Shortage under the CY 2014 Basic 1,092,121.60

Educational Facilities Fund (BATCH 1)

a. 1 STY 1 CL., San Isidro NHS, Tagkawayan,

Tagkawayan, Quezon

14-DL-0019

Construction of Classrooms in Areas Experiencing Competetive 1,092,329.12 July 05-11, 2014 July 14, 2014 July 24, 2014 July 24-25, 2014 July 28, 2014 July 30-31, 2014

Acute Classroom Shortage under the CY 2014 Basic 1,092,121.60

Educational Facilities Fund (BATCH 1)

a. 1 STY 1 CL., Mansilay NHS,

Tagkawayan, Quezon

14-DL-0020

Asset Preservation of National Roads - Preventive Competetive 20,000,000.00 July 03, 2014 July 08-14, 2014 July 16, 2014 July 28, 2014 July 28-29, 2014 July 30, 2014 Aug. 06-07, 2014

Maintenance Based on Pavement Management System/ 19,607,280.18

Highway Development Management -4 (HDM-(4),

(Intermittent Sections) Gumaca-Pitogo-Mulanay-San

Narciso RD, KO202+200 - KO206+537,

Gumaca, Quezon

14-DL-0021

Repair/Rehabilitation of DPWH Quezon IV District Competetive 650,000.00 July 15-21, 2014 Aug. 05, 2014 Aug. 05, 2014 Aug. 06, 2014 Aug. 13, 2014

Engineering Office, Lucena City 649,768.28

14-DL-0022

Repair/Rehabilitation of Other Public Biddings PNP Competetive 650,000.00 July 15-21, 2014 Aug. 05, 2014 Aug. 05, 2014 Aug. 06, 2014 Aug. 13, 2014

Office Building, Municipal Police Station, 649,634.17

Gumaca, Quezon

14-DL-0023

Construction/Rehabilitation of Flood Control and Competetive 19,000,000.00 July 14, 2014 July 17-23, 2014 July 30, 2014 Aug. 07, 2014 Aug. 07, 2014 Aug. 08, 2014 Aug. 18, 2014

Drainage Structure along MSR Jct. Lopez-Catanauan 18,626,252.13

Road, KO225+500 - KO228+820, Lopez, Quezon

(w/exceptions), Lopez, Quezon

14-DL-0024

Installation/Application/Construction of Road Safety Competetive 11,200,000.00 July 14, 2014 July 17-23, 2014 July 30, 2014 Aug. 07, 2014 Aug. 07, 2014 Aug. 08, 2014 Aug. 18, 2014

Devices, Daang Maharlika, Atimonan, Quezon 11,088,156.63

(505868LZ) KO152+000 to KO162+000 With Exceptions

Atimonan, Quezon

Prepared by: Checked by:

KATHERINE MAE E. DE LOS REYESEngineer II

HEAD - BAC Secretariat Chairman, Bids and Awards Committee

Submitted by:

GENER J. ABERGAS RODY A. ANGULOAssistant District Engineer OIC - District Engineer

Republic of the Philippines Department of Public Works and Highways

( Regional Office No. IV-A ) Quezon II District Engineering Office

REVISED ANNUAL PROCUREMENT PLAN FOR PROJECTS TO BE PROCURED IN OFFICES WITHIN REGION IV-AFOR FY 2014

No. Pre- Pre-Bid Submission Post- Award of Approved Budget for the Procurement Conference & Receipt of Bid Evaluation Qualification Contract

Conference Bids EvaluationPLAN(APP) P 999,995.77 Feb. 14, 2014 Feb. 18-March 7, 20Feb. 25, 2014 March 11, 2014 March 12-13, 2014 March 14& 17, 2014 March 18-19, 2014

14DJ001 Repair/Maintenance of DILG - PNP (PPMP) P 999,995.77 Feb. 14, 2014 Feb. 18-March 7, 20Feb. 25, 2014 March 11, 2014 March 12-13, 2014 March 14& 17, 2014 March 18-19, 2014Building at Lucena City

ACTUAL (PPMP) - Feb. 14, 2014 Feb. 18-March 7, 20Feb. 25, 2014 March 11, 2014 March 12-13, 2014 March 14& 17, 2014 March 18-19, 2014PLAN

Const. of One (1) Storey Three (3) (APP) P 2,839,200.00 Feb. 14, 2014 Feb. 18-March 7, 20Feb. 25, 2014 March 11, 2014 March 12-13, 2014 March 14& 17, 2014 March 18-19, 201414DJ002 Classroom Academic School Building (PPMP) P 2,839,200.00 Feb. 14, 2014 Feb. 18-March 7, 20Feb. 25, 2014 March 11, 2014 March 12-13, 2014 March 14& 17, 2014 March 18-19, 2014

(with Five (5) Seater Toilet) at ACTUAL Candelaria,Quezon (PPMP) - Feb. 14, 2014 Feb. 18-March 7, 20Feb. 25, 2014 March 11, 2014 March 12-13, 2014 March 14& 17, 2014 March 18-19, 2014

PLANRepair/Maintenance of Iyam Bridge (APP) P 499,998.16 Feb. 14, 2014 Feb. 18-March 7, 20Feb. 25, 2014 March 11, 2014 March 12-13, 2014 March 14& 17, 2014 March 18-19, 2014

14DJ003 B02976LZ along MSR-Old Route, Lucena (PPMP) P 499,998.16 Feb. 14, 2014 Feb. 18-March 7, 20Feb. 25, 2014 March 11, 2014 March 12-13, 2014 March 14& 17, 2014 March 18-19, 2014City KO130+614 Bid out but not

ACTUAL yet awarded due to(PPMP) - Feb. 14, 2014 Feb. 18-March 7, 20Feb. 25, 2014 March 11, 2014 March 12-13, 2014 March 14& 17, 2014 uncertainty of fund

Prepared by : Recommending Approval: Approved by:

NIMFA M. DERADA RENATO C. ALCALA NESTOR I. CLEOFAS Head, BAC Secretariat Assistant District Engineer

Republic of the Philippines Department of Public Works and Highways

( Regional Office No. IV-A ) Quezon II District Engineering Office

(Description) MethodContract (ABC)

Contract Package Procurement

District Engineer

Competitive

Competitive

Competitive

AdvertisementPosting/

REVISED ANNUAL PROCUREMENT PLAN FOR PROJECTS TO BE PROCURED IN OFFICES WITHIN REGION IV-AFOR FY 2014

No. Pre- Pre-Bid Submission Post- Award of Approved Budget for the Procurement Conference & Receipt of Bid Evaluation Qualification Contract

Conference Bids EvaluationPLAN(APP) P 1,000,038.41 Feb. 14, 2014 Feb. 18-March 7, 20Feb. 25, 2014 March 11, 2014 March 12-13, 2014 March 14& 17, 2014 March 18-19, 2014

14DJ004 Repair/Maintenance of Various (PPMP) P 1,000,038.41 Feb. 14, 2014 Feb. 18-March 7, 20Feb. 25, 2014 March 11, 2014 March 12-13, 2014 March 14& 17, 2014 March 18-19, 2014National Roads, Tiaong,Quezon to bid out but notLucena City ACTUAL yet awarded due to

(PPMP) - Feb. 14, 2014 Feb. 18-March 7, 20Feb. 25, 2014 March 11, 2014 March 12-13, 2014 March 14& 17, 2014 uncertainty of fundPLAN

Repair/Rehab./Improvement (Asphalt (APP) P 9,900,007.45 Feb. 14, 2014 Feb. 18-March 7, 20Feb. 25, 2014 March 11, 2014 March 12-13, 2014 March 14& 17, 2014 March 18-19, 201414DJ005 Overlay) of Quezon-Batangas Road, (PPMP) P 9,900,007.45 Feb. 14, 2014 Feb. 18-March 7, 20Feb. 25, 2014 March 11, 2014 March 12-13, 2014 March 14& 17, 2014 March 18-19, 2014

Tiaong,Quezon KO095+475-KO098+000 ACTUAL No Fund(w/exception) (PPMP) - Feb. 14, 2014 Feb. 18-March 7, 20Feb. 25, 2014 March 11, 2014 March 12-13, 2014 March 14& 17, 2014 Releasea)Const. of MP Building Brgy. Hall at PLANTumbaga 1- Sariaya,Quezon b)Const. of (APP) P 12,249,983.16 March 12, 2014 March 13-April 1, 20March 20, 2014 April 1, 2014 April 2-3, 2014 April 4&7, 2014 April 8&10, 2014

14DJ006 MP Building at Brgy.Lutucan 1, Sariaya,Que. (PPMP) P 12,249,983.16 March 12, 2014 March 13-April 1, 20March 20, 2014 April 1, 2014 April 2-3, 2014 April 4&7, 2014 April 8&10, 2014CLUSTER 1 c)Const. of MP Building at Brgy. Bogon,

Sariaya,Quezon d)Const. of MP Building at ACTUAL Brgy. Antipolo, Sariaya,Quezon (PPMP) - March 12, 2014 March 13-April 1, 20March 20, 2014 April 1, 2014 April 2-3, 2014 April 4&7, 2014 April 8&10, 2014

Prepared by : Recommending Approval: Approved by:

NIMFA M. DERADA RENATO C. ALCALA NESTOR I. CLEOFAS Head, BAC Secretariat Assistant District Engineer

Republic of the Philippines Department of Public Works and Highways

( Regional Office No. IV-A ) Quezon II District Engineering Office

REVISED ANNUAL PROCUREMENT PLAN FOR PROJECTS TO BE PROCURED IN OFFICES WITHIN REGION IV-AFOR FY 2014

Competitive

AdvertisementContract (ABC)

Competitive

Contract Package(Description)

Competitive

Procurement Posting/Method

District Engineer

No. SubmissionApproved Budget for the & Receipt of Bid Evaluation

BidsPLAN(APP) P 1,999,999.40 March 12, 2014 March 13-April 1, 2014 March 20, 2014 April 1, 2014 April 2-3, 2014

14DJ007 Const. of Road at Brgy. Pili, Sariaya, (PPMP) P 1,999,999.40 March 12, 2014 March 13-April 1, 2014 March 20, 2014 April 1, 2014 April 2-3, 2014Quezon

ACTUAL (PPMP) - March 12, 2014 March 13-April 1, 2014 March 20, 2014 April 1, 2014 April 2-3, 2014PLAN

Const. of Bridge at Brgy. San Isidro, (APP) P 2,249,999.98 March 12, 2014 March 13-April 1, 2014 March 20, 2014 April 1, 2014 April 2-3, 201414DJ008 Sitio Bacong, Candelaria,Quezon (PPMP) P 2,249,999.98 March 12, 2014 March 13-April 1, 2014 March 20, 2014 April 1, 2014 April 2-3, 2014

ACTUAL (PPMP) - March 12, 2014 March 13-April 1, 2014 March 20, 2014 April 1, 2014 April 2-3, 2014PLAN

Const. of Water Supply System at Brgy. (APP) P 1,999,999.76 March 12, 2014 March 13-April 1, 2014 March 20, 2014 April 1, 2014 April 2-3, 201414DJ009 Concepcion Banahaw, Sariaya,Quezon (PPMP) P 1,999,999.76 March 12, 2014 March 13-April 1, 2014 March 20, 2014 April 1, 2014 April 2-3, 2014

ACTUAL (PPMP) - March 12, 2014 March 13-April 1, 2014 March 20, 2014 April 1, 2014 April 2-3, 2014

Prepared by : Recommending Approval: Approved by:

NIMFA M. DERADA RENATO C. ALCALA NESTOR I. CLEOFAS Head, BAC Secretariat Assistant District Engineer

Republic of the Philippines Department of Public Works and Highways

( Regional Office No. IV-A ) Quezon II District Engineering Office

REVISED ANNUAL PROCUREMENT PLAN FOR PROJECTS TO BE PROCURED IN OFFICES WITHIN REGION IV-AFOR FY 2014

No. SubmissionApproved Budget for the & Receipt of Bid Evaluation

BidsPLAN

Completion/Const. of 3-Storey Main (APP) P 9,771,538.47 March 12, 2014 March 13-April 1, 2014 March 20, 2014 April 1, 2014 April 2-3, 201414DJ010 Building (Storage Area for Records, (PPMP) P 9,771,538.47 March 12, 2014 March 13-April 1, 2014 March 20, 2014 April 1, 2014 April 2-3, 2014

Autoclavin Area, DOTS Facility,PhilhealthRoom, other 8-5 offices), Candelaria, ACTUAL

Contract (ABC) Conference

Contract Package Procurement Pre- Posting/ Pre-Bid

Advertisement ConferenceContract (ABC) Conference

District Engineer

Contract Package Procurement Pre- Posting/ Pre-Bid

Competitive

Competitive

Competitive

(Description) Method Procurement Advertisement Conference

Competitive

(Description) Method Procurement

Quezon (PPMP) - March 12, 2014 March 13-April 1, 2014 March 20, 2014 April 1, 2014 April 2-3, 2014PLAN

Construction of E.R. and O.R. at Camp (APP) P 5,819,998.69 April 15, 2014 April 16-May 22, 2014 April 23, 2014 May 6, 2014 May 7-8, 201414DJ011 Nakar Station Hospital, Lucena City (PPMP) P 5,819,998.69 April 15, 2014 April 16-May 22, 2014 April 23, 2014 May 6, 2014 May 7-8, 2014

ACTUAL (PPMP) - April 15, 2014 April 16-May 22, 2014 April 23, 2014 May 6, 2014 May 7-8, 2014PLAN

Const. of One-Storey,Two Classroom (APP) P 1,970,417.52 June 19, 2014 June 23-29, 2014 July 1, 2014 July 15, 2014 July 16-17, 201414DJ012 School Building at LCNHS-Ransohan (PPMP) P 1,970,417.52 June 19, 2014 June 23-29, 2014 July 1, 2014 July 15, 2014 July 16-17, 2014

Extension, Lucena CityACTUAL (PPMP) - June 19, 2014 June 23-29, 2014 July 1, 2014 July 15, 2014 July 16-17, 2014

Prepared by : Recommending Approval: Approved by:

NIMFA M. DERADA RENATO C. ALCALA NESTOR I. CLEOFAS Head, BAC Secretariat Assistant District Engineer

Republic of the Philippines Department of Public Works and Highways

( Regional Office No. IV-A ) Quezon II District Engineering Office

REVISED ANNUAL PROCUREMENT PLAN FOR PROJECTS TO BE PROCURED IN OFFICES WITHIN REGION IV-AFOR FY 2014

No. SubmissionApproved Budget for the & Receipt of Bid Evaluation

BidsPLAN

Const. of One-Storey, Two Classroom (APP) P 1,970,417.52 June 19, 2014 June 23-29, 2014 July 1, 2014 July 15, 2014 July 16-17, 201414DJ013 School Building at Masalukot 3 E/S, (PPMP) P 1,970,417.52 June 19, 2014 June 23-29, 2014 July 1, 2014 July 15, 2014 July 16-17, 2014

Candelaria,QuezonACTUAL (PPMP) - June 19, 2014 June 23-29, 2014 July 1, 2014 July 15, 2014 July 16-17, 2014PLAN

Const. of One-Storey,Two Classroom (APP) P 1,970,417.52 June 24, 2014 June 26-July 2, 2014 July 4, 2014 July 17, 2014 July 18&21, 201414DJ014 School Building at Matipunso E/S, (PPMP) P 1,970,417.52 June 24, 2014 June 26-July 2, 2014 July 4, 2014 July 17, 2014 July 18&21, 2014

San Antonio, ACTUAL (PPMP) - June 24, 2014 June 26-July 2, 2014 July 4, 2014 July 17, 2014 July 18&21, 2014PLAN

Const. of One-Storey,Two Classroom (APP) P 1,970,417.52 June 24, 2014 June 26-July 2, 2014 July 4, 2014 July 17, 2014 July 18&21, 201414DJ015 School Building at Callejon NHS, (PPMP) P 1,970,417.52 June 24, 2014 June 26-July 2, 2014 July 4, 2014 July 17, 2014 July 18&21, 2014

Competitive

Competitive

(Description) Method Procurement Advertisement ConferenceContract (ABC) Conference

District Engineer

Contract Package Procurement Pre- Posting/ Pre-Bid

Competitive

Competitive

Competitive

San Antonio,QuezonACTUAL (PPMP) - June 24, 2014 June 26-July 2, 2014 July 4, 2014 July 17, 2014 July 18&21, 2014

Prepared by : Recommending Approval: Approved by:

NIMFA M. DERADA RENATO C. ALCALA NESTOR I. CLEOFAS Head, BAC Secretariat Assistant District Engineer

Republic of the Philippines Department of Public Works and Highways

( Regional Office No. IV-A ) Quezon II District Engineering Office

REVISED ANNUAL PROCUREMENT PLAN FOR PROJECTS TO BE PROCURED IN OFFICES WITHIN REGION IV-AFOR FY 2014

No. SubmissionApproved Budget for the & Receipt of Bid Evaluation

BidsPLAN

Const. of One-Storey, Two Classroom (APP) P 1,970,417.52 June 24, 2014 June 26-July 2, 2014 July 4, 2014 July 17, 2014 July 18&21, 201414DJ016 School Building at Magsaysay E/S, (PPMP) P 1,970,417.52 June 24, 2014 June 26-July 2, 2014 July 4, 2014 July 17, 2014 July 18&21, 2014

San Antonio,QuezonACTUAL (PPMP) - June 24, 2014 June 26-July 2, 2014 July 4, 2014 July 17, 2014 July 18&21, 2014PLAN(APP)

(PPMP)ACTUAL (PPMP)PLAN(APP)

(PPMP)

ACTUAL (PPMP)

Prepared by : Recommending Approval: Approved by:

NIMFA M. DERADA RENATO C. ALCALA NESTOR I. CLEOFAS

District Engineer

Contract Package Procurement Pre- Posting/ Pre-Bid

Competitive

Competitive

-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x-x Competitive

(Description) Method Procurement Advertisement ConferenceContract (ABC) Conference

Head, BAC Secretariat Assistant Disitrict Engineer District Engineer

Post- Award of Qualification Contract

Evaluation

pril 4&7, 201ril 8&10, 2014pril 4&7, 201ril 8&10, 2014

bid out but not yetawarded due to the

pril 4&7, 201 r declustering of Project I.D

pril 4&7, 201ril 8&10, 2014pril 4&7, 201ril 8&10, 2014

pril 4&7, 201ril 8&10, 2014

pril 4&7, 201ril 8&10, 2014pril 4&7, 201ril 8&10, 2014

pril 4&7, 201ril 8&10, 2014

S

Post- Award of Qualification Contract

Evaluation

pril 4&7, 201ril 8&10, 2014pril 4&7, 201ril 8&10, 2014

Bid outbut no Fund

pril 4&7, 201Release yet

ay 9 & 12,20ay 13-14, 2014ay 9 & 12,20ay 13-14, 2014

Bid out but Noay 9 & 12,20nd Release yet

y 18 & 21, 20ly 22-23, 2014y 18 & 21, 20ly 22-23, 2014

Bid out buty 18 & 21, 20t yet awarded

S

Post- Award of Qualification Contract

Evaluation

y 18 & 21, 20ly 22-23, 2014y 18 & 21, 20ly 22-23, 2014

Bid out buty 18 & 21, 20t yet awarded

ly 22-23, 20ly 24-25, 2014ly 22-23, 20ly 24-25, 2014

ly 22-23, 20For Bidding

ly 22-23, 20ly 24-25, 2014ly 22-23, 20ly 24-25, 2014

ly 22-23, 20For Bidding

S

Post- Award of Qualification Contract

Evaluation

ly 22-23, 20ly 24-25, 2014ly 22-23, 20ly 24-25, 2014

ly 22-23, 20For Bidding

S

28,126,000.00 11/14/13 11/19-25/13 11/28/13 12/10/13 12/10-13/13 12/16-20/13 12/23/13

28,126,000.00 11/14/13 11/19-25/13 11/28/13 12/10/13 12/10-13/13 12/16-20/13 12/23/13

50,508,000.00 11/05/13 11/8-14/13 11/19/13 12/02/13 12/03-6/13 12/9-13/13 12/16/13

50,508,000.00 11/05/13 11/8-14/13 11/19/13 12/02/13 12/03-6/13 12/9-13/13 12/16/13

48,740,220.00 12/13/13 12/16-22/13 12/27/13 1/9/14 1/10-13/2014 1/14-15/2014 1/17/14

45,568,231.82 12/13/13 12/16-22/13 12/27/13 1/9/14 1/10-13/2014 1/14-15/2014 3/26/14

93,000,000.00 09/17/13 9/20-26/13 10/01/13 10/15/13 10/16-22/13 10/23-28/13 10/29/13

93,000,000.00 09/17/13 9/20-26/13 10/01/13 10/15/13 10/16-22/13 10/23-28/13 10/29/13

88,625,340.36 01/09/14 9/9-15/14 01/16/14 01/28/14 1/29-30/2014 1/31-2/3/2014 02/05/14

82,424,313.37 01/09/14 9/9-15/14 01/16/14 01/28/14 1/29-30/2014 1/31-2/3/2014awaiting for approval of

modification

Approved:

MARISSA G. AGUZAREngineer III

Head, BAC Secretariat

REFERENCE NO.

CONTRACT PACKAGE (DESCRIPTION)PROCUREMENT

METHODPROJECT COST/ABC

(P)

Republic of the PhilippinesDepartment of Public Works and Highways

Regional Office No. IV-AEDSA, Quezon City

REVISED ANNUAL PROCUREMENT PLAN FOR FY 2014 FOR REGIONAL PROCURED PROJECTS

PRE-BID CONFERENCE

SUBMISSION & RECEIPT OF

BIDS

BID EVALUATION

POST-QUALIFICATION

EVALUATION

AWARD OF CONTRACT

PRE-PROCUREMENT

CONFERENCE

ADVERTISEMENT/ POSTING

1/2-7/2014 1/8/2014 05/23/14

(PPMP)

13D0-0012

Asphalt Overlay of SUMULONG HIGHWAY, ANTIPOLO CITY, Rizal Prov., Section 1 Sta. 22+220.00 - Sta. 23+200.00 Section 2 Sta. 24+700.00- Sta 25+880.00 Section 3 Sta. 26+000.00-Sta. 26+210.00 Section 4 Sta. 26 +383.00-Sta 26+443.00, Section 5 Sta 27+410.00 - Sta. 27+510.00 (w/ exception) Net Length = 2520.00 L.M.

Public Bidding

PLAN (APP)

(PPMP)

ACTUAL

ACTUAL

25,735,279.28 12/02/13 12/3-10/13 12/13/13 12/27/13

13D0-0011

Asphalt Overlay of TAGAYTAY-MANILA ROAD via SILANG ROAD (Brgy. BUHO to ROTONDA), CAVITE 2nd DEO, Tagaytay City, Cavite Province, Section 1 K0053+940-K0055+180; Section 2 K0055+790-K0056+146.05, Net length=1,292.50 L.M.

Public Bidding

PLAN (APP)

(PPMP)

Submitted by: Recommending Approval:

SAMSON L. HEBRA HUILLIO B. BELLEZA, MNSA, CESO III Aassistant Regional Director Regional Director

(PPMP)

14D0-0001

Improvement/Widening of TAGAYTAY CITY to BATANGAS CITY Via TUY ROAD; Section 1 K0061+281.50 - K0062+077.05 w/ equation Section 2 K0067+698.00 - K0071+520.00; Net Length = 4,636.60 L.M. Tagaytay City, Cavite Province

Public Bidding

PLAN (APP)

(PPMP)

ACTUAL

(PPMP)

57,000,000.00 09/17/13 9/20-26/13 10/01/13 10/15/13 10/16-22/13 10/23-28/13 10/29/13

57,000,000.00 09/17/13 9/20-26/13 10/01/13 10/15/13 10/16-22/13 10/23-28/13 10/29/13

42,209,297.47 01/09/14 9/9-15/14 01/16/14 01/28/14 1/29-30/2014 1/31-2/3/2014 02/05/14

39,454,679.88 01/09/14 9/9-15/14 01/16/14 01/28/14 1/29-30/2014 1/31-2/3/2014 4/28/14

52,219,000.00 11/05/13 11/8-14/13 11/19/13 12/02/13 12/03-6/13 12/9-13/13 12/16/13

52,219,000.00 11/05/13 11/8-14/13 11/19/13 12/02/13 12/03-6/13 12/9-13/13 12/16/13

44,282,852.51 01/21/14 1/24-30/2014 2/4/2014 2/17/2014 2/18-19/2014 2/20-21/2014 2/24/2014

41,174,050.52 01/21/14 1/24-30/2014 2/4/2014 2/17/2014 2/18-25/2014 2/26/2014 3/26/14

74,171,000.00 11/05/13 11/8-14/13 11/19/13 12/02/13 12/03-6/13 12/9-13/13 12/16/13

74,171,000.00 11/05/13 11/8-14/13 11/19/13 12/02/13 12/03-6/13 12/9-13/13 12/16/13

72,316,725.00 01/21/14 1/24-30/2014 2/4/2014 2/17/2014 2/18-19/2014 2/20-21/2014 2/24/2014

67,243,193.24 01/21/14 1/24-30/2014 2/4/2014 2/17/2014 2/18-25/2014 2/26/2014 3/26/14

65,915,000.00 11/05/13 11/8-14/13 11/19/13 12/02/13 12/03-6/13 12/9-13/13 12/16/13

65,915,000.00 11/05/13 11/8-14/13 11/19/13 12/02/13 12/03-6/13 12/9-13/13 12/16/13

61,116,952.00 01/21/14 1/24-30/2014 2/4/2014 2/17/2014 2/18-19/2014 2/20-21/2014 2/24/2014

56,804,564.66 01/21/14 1/24-30/2014 2/4/2014 2/17/2014 2/18-25/2014 2/26/2014 3/26/.14

Approved:

MARISSA G. AGUZAREngineer III

Head, BAC Secretariat

PRE-BID CONFERENCE

SUBMISSION & RECEIPT OF

BIDS

BID EVALUATION

POST-QUALIFICATION

EVALUATION

AWARD OF CONTRACT

14D0-0002

Widening of DASMARIÑAS-TRECE MARTIRES CITY-NAIC (GOVERNOR'S DRIVE leading to TERNATE-NASUGBU ROAD, Cavite II K0054+622.30-K0056+920.00 (with exception); Net Length = 2,281.60 L.M.

Public Bidding

PLAN (APP)

(PPMP)

REFERENCE NO.

CONTRACT PACKAGE (DESCRIPTION)PROCUREMENT

METHODPROJECT COST/ABC

(P)

PRE-PROCUREMENT

CONFERENCE

ADVERTISEMENT/ POSTING

14D0-0004

Asphalt Overlay of MARIKINA-INFANTA ROAD, ANTIPOLO CITY, Section 1 K0019+(-130)- K0020+145: L=1,875 l.m. (K0018+980 - K0020+855). Section 2 K0023+178 - K0023+298; L = 120 l.m., Section 3 K0023+422- K0024+278; L=856 l.m., Section 4 K0024+538 - K0024+811; L=273 l.m.. Net Length = 3,124 L.M.

Public Bidding

PLAN (APP)

(PPMP)

ACTUAL

(PPMP)

ACTUAL

(PPMP)

14D0-0003

Asphalt Overlay of CAINTA-KAYTICKLING-ANTIPOLO-TERESA-MORONG ROAD, ANTIPOLO CITY, Rizal Section 1 K0020+320 - K0021+000; L=680 l.m., Section2 K0021+229 - K0023+057; L= 1,828. l.m., Net Length = 2,508 l.m.

Public Bidding

PLAN (APP)

(PPMP)

ACTUAL

(PPMP)

Submitted by: Recommending Approval:

SAMSON L. HEBRA HUILLIO B. BELLEZA, MNSA, CESO III Aassistant Regional Director Regional Director

14D0-0005

Asphalt Overlay of MARIKINA-VICTORIA VALLEY-ANTIPOLO ROAD, ANTIPOLO CITY , RIZAL 1 a. K0017+000+K0017+880 b. K0018+877+K0020+000 c. K0021+000+K0021+210

Public Bidding

PLAN (APP)

(PPMP)

ACTUAL

(PPMP)

79,446,000.00 11/14/13 11/19-25/13 11/28/13 12/10/13 12/10-13/13 12/16-20/13 12/23/13

79,446,000.00 11/14/13 11/19-25/13 11/28/13 12/10/13 12/10-13/13 12/16-20/13 12/23/13

76,665,390.00 01/21/14 1/24-30/2014 2/4/2014 2/17/2014 2/18-19/2014 2/20-21/2014 2/24/2014

70,408,261.69 01/21/14 1/24-30/2014 2/4/2014 2/17/2014 2/18-25/2014 2/26/2014 requested for release of fund

56,000,000.00 09/17/13 9/20-26/13 10/01/13 10/15/13 10/16-22/13 10/23-28/13 10/29/13

56,000,000.00 09/17/13 9/20-26/13 10/01/13 10/15/13 10/16-22/13 10/23-28/13 10/29/13

54,600,000.00 02/06/14 2/14-21/2014 2/24/2014 3/10/2014 3/11-13/2014 3/14-17/2014 3/19/2014

50,732,463.70 02/06/14 2/14-21/2014 2/24/2014 3/10/2014 3/11-13/2014 3/14-17/2014 03/17/14

69,850,000.00 10/03/13 10/08-14/13 10/17/13 10/29/13 10/30-11/5/13 11/06-12/13 11/13/13

69,850,000.00 10/03/13 10/08-14/13 10/17/13 10/29/13 10/30-11/5/13 11/06-12/13 11/13/13

68,103,750.00 422/2014 04/25-05/05/14 05/06/14 5/19/14 05/20-21/14 05/22-23/14 05/27/14

64,009,155.41 04/22/14 04/25-05/05/14 05/06/14 5/19/14 05/20-21/14 05/22-23/14 5/28/14

Approved:

MARISSA G. AGUZAREngineer III

Head, BAC Secretariat

PRE-BID CONFERENCE

SUBMISSION & RECEIPT OF

BIDS

BID EVALUATION

POST-QUALIFICATION

EVALUATION

AWARD OF CONTRACT

14D0-0006

Construction of Roads and Related Infrastructure Facilities for 2015 APEC SUMMIT-TAGAYTAY-LAGUNA Via CALAMBA ROAD (STA. ROSA-ULAT INTERMITTENT SECTION to HIGHLANDS), Cavite II, Section 1 K0058+(-20)-K0058+696; L=678.80 l.m., Section 2 K0058+696-K0063+560; L=4,864l.m. Net Length = 5,542.80 l.m.

Public Bidding

PLAN (APP)

(PPMP)

REFERENCE NO.

CONTRACT PACKAGE (DESCRIPTION)PROCUREMENT

METHODPROJECT COST/ABC

(P)

PRE-PROCUREMENT

CONFERENCE

ADVERTISEMENT/ POSTING

ACTUAL

(PPMP)

14D0-0007

Widening of NOVELETA - NAIC-TAGAYTAY ROAD Leading to Nasugbu Road, Cavite II, Naic, Cavite Province K0043+(-460)- K0046+000.00 (Intermittent) Net Length= 2,240.00 l.m.)

Public Bidding

PLAN (APP)

(PPMP)

ACTUAL

(PPMP)

Submitted by: Recommending Approval:

SAMSON L. HEBRA HUILLIO B. BELLEZA, MNSA, CESO III Aassistant Regional Director Regional Director

14D0-0008

NETWORK DEVELOPMENT, WIDENING OF NATIONAL ROADS, WIDENING OF CALAMBA-STA. CRUZ-FAMY JUNCTION ROAD, LAGUNA 4TH L.D. Section 1 K0106+502.00-K0109+497.80 w/ exception, L = 2,925.80 L.M.; Section 2 K0112+200.70 - K0112+665.00 w/ exception, L = 404.30 L.M. NET LENGTH = 3,330.10 L.M. LAGUNA PROVINCE

Public Bidding

PLAN (APP)

(PPMP)

ACTUAL

(PPMP)

60,167,000.00 08/20/13 08/22-28/13 09/03/13 09/17/13 9/18-24/13 9/25-30/13 10/01/13

60,167,000.00 08/20/13 08/22-28/13 09/03/13 09/17/13 9/18-24/13 9/25-30/13 10/01/13

49,191,682.87 02/27/14 2/28-3/07/2014 03/07/14 03/20/14 3/21-24/2014 3/26/2014 3/27/2014

45,994,136.32 02/27/14 2/28-3/07/2014 03/07/14 03/20/14 3/21-24/2014 3/26/2014 3/26/14

72,629,000.00 10/03/13 10/08-14/13 10/17/13 10/29/13 10/30-11/5/13 11/06-12/13 11/13/13

72,629,000.00 10/03/13 10/08-14/13 10/17/13 10/29/13 10/30-11/5/13 11/06-12/13 11/13/13

70,813,275.00 03/13/14 03/15-21/14 3/25/14 04/07/14 04/08-10/14 04/11-16/14 04/21/14

68,516,992.33 03/13/14 03/15-21/14 3/25/14 04/07/14 04/08-10/14 04/11-16/14 5/26/14

63,000,000.00 11/14/13 11/19-25/13 11/28/13 12/10/13 12/10-13/13 12/16-20/13 12/23/13

63,000,000.00 11/14/13 11/19-25/13 11/28/13 12/10/13 12/10-13/13 12/16-20/13 12/23/13

39,734,577.75 03/25/14 03/26-04/01/14 4/2/14 4/15/14 04/16-17/14 04/21-22/14 4/23/14

37,299,822.69 03/25/14 03/26-04/01/14 4/2/14 4/15/14 04/16-17/14 04/21-22/14 4/28/14

61,200,000.00 11/14/13 11/19-25/13 11/28/13 12/10/13 12/10-13/13 12/16-20/13 12/23/13

61,200,000.00 11/14/13 11/19-25/13 11/28/13 12/10/13 12/10-13/13 12/16-20/13 12/23/13

29,459,362.32 03/25/14 03/26-04/01/14 4/2/14 4/15/14 04/16-17/14 04/21-22/14 4/23/14

27,642,277.05 03/25/14 03/26-04/01/14 4/2/14 4/15/14 04/16-17/14 04/21-22/14 4/28/14

62,000,000.00 11/14/13 11/19-25/13 11/28/13 12/10/13 12/10-13/13 12/16-20/13 12/23/13

62,000,000.00 11/14/13 11/19-25/13 11/28/13 12/10/13 12/10-13/13 12/16-20/13 12/23/13

29,799,003.44 04/07/14 04/09-15/14 04/16/14 04/28/14 04/29-30/14 05/02-05/14 05/06/14

28,239,559.69 04/07/14 04/09-15/14 04/16/14 04/28/14 04/29-30/14 05/02-05/14 5/2/14

Approved:

MARISSA G. AGUZAREngineer III

Head, BAC Secretariat

PRE-BID CONFERENCE

SUBMISSION & RECEIPT OF

BIDS

BID EVALUATION

POST-QUALIFICATION

EVALUATION

AWARD OF CONTRACT

14D0-0009

ASPHALT OVERLAY OF DAANG MAHARLIKA CALAMBA, LAGUNA II, LAGUNA PROVINCE Section I Sta. 53+533.00 to Sta. 53+1223 Section 2: Sta. 54+000.00 to Sta. 54+970.00 Section 3: Sta. 55+400.00 to Sta. 55+610.00 Net Length = 1,870.00 L.M.

Public Bidding

PLAN (APP)

(PPMP)

REFERENCE NO.

CONTRACT PACKAGE (DESCRIPTION)PROCUREMENT

METHODPROJECT COST/ABC

(P)

PRE-PROCUREMENT

CONFERENCE

ADVERTISEMENT/ POSTING

ACTUAL

(PPMP)

14D0-0010

Road Upgrading of MAUBAN-TIGNOAN ROAD (Gravel to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standard (HDM-4 Project Analysis), QUEZON PROVINCE K0116+717.00 - K0119+182.00 Net Length = 2,420.00 l.m.

Public Bidding

PLAN (APP)

(PPMP)

ACTUAL

(PPMP)

14D0-0012

CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS/WIDENING OF PERMANENT BRIDGES DARANGAN BRIDGE, Binangonan along Manila East Rd. Net Length = 34.00 l.m.

Public Bidding

PLAN (APP)

(PPMP)

ACTUAL

(PPMP)

14D0-0011

CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS/ WIDENING OF PERMANENT BRIDGES BILIBIRAN BRIDGE, Binangonan along Manila East Rd., R1LD Net Length = 35.00 l.m.

Public Bidding

PLAN (APP)

(PPMP)

ACTUAL

(PPMP)

Submitted by: Recommending Approval:

SAMSON L. HEBRA HUILLIO B. BELLEZA, MNSA, CESO III Aassistant Regional Director Regional Director

14D0-0013

CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS/WIDENING OF PERMANENT BRIDGES ANGONO BRIDGE, along Angono Diversion Road, Net Length = 48.80 l.m.

Public Bidding

PLAN (APP)

(PPMP)

ACTUAL

(PPMP)

52,000,000.00 11/14/13 11/19-25/13 11/28/13 12/10/13 12/10-13/13 12/16-20/13 12/23/13

52,000,000.00 11/14/13 11/19-25/13 11/28/13 12/10/13 12/10-13/13 12/16-20/13 12/23/13

41,860,693.28 04/07/14 04/09-15/14 04/16/14 04/28/14 04/29-30/14 05/02-05/14 05/06/14

38,930,444.00 04/07/14 04/09-15/14 04/16/14 04/28/14 04/29-30/14 05/02-05/14 05/19/14

155,442,000.00 08/20/13 08/22-28/13 09/03/13 09/17/13 9/18-24/13 9/25-30/13 10/01/13

155,442,000.00 08/20/13 08/22-28/13 09/03/13 09/17/13 9/18-24/13 9/25-30/13 10/01/13

96,581,392.64 04/07/14 04/12-18/14 04/21/14 05/05/14 05/06-07/14 05/08-12/14 05/13/14

89,723,867.76 04/07/14 04/12-18/14 04/21/14 05/05/14 05/06-07/14 05/08-12/14 5/26/14

100,000,000.00 08/20/13 08/22-28/13 09/03/13 09/17/13 9/18-24/13 9/25-30/13 10/01/13

100,000,000.00 08/20/13 08/22-28/13 09/03/13 09/17/13 9/18-24/13 9/25-30/13 10/01/13

95,565,610.61 4/7/14 04/12-18/14 4/21/14 5/5/14 05/6-7/14 05/8-12/14 5/16/14

89,791,222.92 4/7/14 04/12-18/14 4/21/14 5/5/14 05/6-7/14 05/8-12/14 5/19/14

143,500,000.00 11/14/13 11/19-25/13 11/28/13 12/10/13 12/10-13/13 12/16-20/13 12/23/13

143,500,000.00 11/14/13 11/19-25/13 11/28/13 12/10/13 12/10-13/13 12/16-20/13 12/23/13

96,548,511.29 4/22/14 04/23-30/14 5/6/14 5/20/14 05/21-22/14 05/23-26/14 5/28/14

90,599,683.61 4/22/14 04/23-30/14 5/6/14 5/20/14 05/21-22/14 05/23-26/14REQUESTED FOR

RELEASE OF FUND

Approved:

MARISSA G. AGUZAREngineer III

Head, BAC Secretariat

PRE-BID CONFERENCE

SUBMISSION & RECEIPT OF

BIDS

BID EVALUATION

POST-QUALIFICATION

EVALUATION

AWARD OF CONTRACT

14D0-0014

CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS/WIDENING OF PERMANENT BRIDGES NAIC DIVERSION BRIDGE, along Naic Diversion Road, C7LD Net Length = 47.17 l.m.

Public Bidding

PLAN (APP)

(PPMP)

REFERENCE NO.

CONTRACT PACKAGE (DESCRIPTION)PROCUREMENT

METHODPROJECT COST/ABC

(P)

PRE-PROCUREMENT

CONFERENCE

ADVERTISEMENT/ POSTING

14D0-0016

FLOOD CONTROL AND DRAINAGE PROJECTS CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND CONSTRUCTION OF REVETMENT INCLUDING ROADWAY ALONG ZAPOTE RIVER BACOOR CITY, CAVITE PROVINCE

Public Bidding

PLAN (APP)

(PPMP)

ACTUAL

(PPMP)

ACTUAL

(PPMP)

14D0-0015

ASSET PRESERVATTION OF NATIONAL ROIADS PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT -4 (HDM-4)(INTERMITTENT SECTIONS) CAVITE-BATANGAS ROAD, Cavite 5th LD, Cavite Province Net Length = 5,230.00 l.m. K0039+(-186) - K0039+986, L=1,170.00 l.m. K0047+146 - K0050+593, L = 3,420.00 l.m. K0051+068 - K0051+708, L = 640.00 l.m.

Public Bidding

PLAN (APP)

(PPMP)

ACTUAL

(PPMP)

Submitted by: Recommending Approval:

SAMSON L. HEBRA HUILLIO B. BELLEZA, MNSA, CESO III Aassistant Regional Director Regional Director

14D0-0017

CONSTRUCTION/REPAIR/REHAB./ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS ROADS AND RELATED INFRASTRUCTURE FACILITIES FOR 2015 APEC SUMMIT - REGION IV-A- LAGUNA 2ND DISTRICT Road Improvement, STA ROSA-ULAT-TAGAYTAY ROAD (Intercahnage to Brgy.Pasong Langka, Silang), Laguna II, Net Length 3,613.40 lm

Public Bidding

PLAN (APP)

(PPMP)

ACTUAL

(PPMP)

122,500,000.00 11/14/13 11/19-25/13 11/28/13 12/10/13 12/10-13/13 12/16-20/13 12/23/13

122,500,000.00 11/14/13 11/19-25/13 11/28/13 12/10/13 12/10-13/13 12/16-20/13 12/23/13

60,965,120.96 05/23/14 5/24-06/30/14 05/30/14 06/11/14 06/12-13/14 06/14-16/14 06/16/14

58,793,536.85 05/23/14 5/24-06/30/14 05/30/14 06/11/14 06/12-13/14 06/14-16/14UNDER

EVALUATION

97,500,000.00 05/23/14 5/24-06/30/14 05/30/14 06/11/14 06/12-13/14 06/14-16/14 06/16/14

97,500,000.00 05/23/14 5/24-06/30/14 05/30/14 06/11/14 06/12-13/14 06/14-16/14 06/16/14

97,500,000.00 05/23/14 5/24-06/30/14 05/30/14 06/11/14 06/12-13/14 06/14-16/14 06/16/14

90,638,124.60 05/23/14 5/24-06/30/14 05/30/14 06/11/14 06/12-13/14 06/14-16/14UNDER

EVALUATION

127,500,000.00 10/22/13 10/25-31/13 11/07/13 11/19/13 11/20-22/13 11/25-29/13 12/02/13

127,500,000.00 10/22/13 10/25-31/13 11/07/13 11/19/13 11/20-22/13 11/25-29/13 12/02/13

97,500,000.00 6/19/14 6/20-26/2014 6/27/14 7/9/14 7/10-11/14 7/14/14 7/15/14

78,188,195.72 6/19/14 6/20-26/2014 6/27/14 7/9/14UNDER

EVALUATION

Approved:

MARISSA G. AGUZAREngineer III

Head, BAC Secretariat

PRE-BID CONFERENCE

SUBMISSION & RECEIPT OF

BIDS

BID EVALUATION

POST-QUALIFICATION

EVALUATION

AWARD OF CONTRACT

14D0-0020

Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations-To Declared Tourism Destinations QUEZON ECO - TOURISM ROAD (LUCENA CITY-BATANGAS COASTAL ROAD) PHASE III, CONSTRUCTION OF ISABANG BRIDGE & APPROACHES (K0143+105), QUEZON

Public Bidding

PLAN (APP)

(PPMP)

REFERENCE NO.

CONTRACT PACKAGE (DESCRIPTION)PROCUREMENT

METHODPROJECT COST/ABC

(P)

PRE-PROCUREMENT

CONFERENCE

ADVERTISEMENT/ POSTING

ACTUAL

(PPMP)

14D0-0021

Road Upgrading (gravel to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standard (HDM-4 Project Analysis) (Intermittent Section), Secondary Road SAN FRANCISCO-SAN ANDRES-SAN NARCISO RD K0351+(-661)-K0353+168 & K0353+952 - K0355+319 NET LENGTH = 4,000.00 l.m.

PLAN (APP)

(PPMP)

ACTUAL

(PPMP)

Submitted by: Recommending Approval:

SAMSON L. HEBRA HUILLIO B. BELLEZA, MNSA, CESO III Aassistant Regional Director Regional Director

14D0-0022

Daang Maharlika (LZ), Quezon IV a. K0177+000-K0179+000 b. K0181+767-K0182+500 c. K0191+486-K0191+1000 d. K0236+600-K0238+000 e. K0245+1000-K0246+724 REALIGNED TO: Rehabilitation / Reconstruction of QUIRINO - HIGHWAY K0267 + 671.00 –K0278 + 593.50 (with exception) Net Length = 4,398.50 L.M. Tagkawayan Quezon Province

Public Bidding

PLAN (APP)

(PPMP)

ACTUAL

(PPMP)

100,000,000.00 10/03/13 10/08-14/13 10/17/13 10/29/13 10/30-11/5/13 11/06-12/13 11/13/13

100,000,000.00 10/03/13 10/08-14/13 10/17/13 10/29/13 10/30-11/5/13 11/06-12/13 11/13/13

97,500,000.00 6/19/14 6/20-26/2014 6/27/14 7/9/14 7/10-11/14 7/14/14 7/15/14

86,872,498.40 6/19/14 6/20-26/2014 6/27/14 7/9/14UNDER

EVALUATION

175,457,000.00 10/22/13 10/25-31/13 11/07/13 11/19/13 11/20-22/13 11/25-29/13 12/02/13

175,457,000.00 10/22/13 10/25-31/13 11/07/13 11/19/13 11/20-22/13 11/25-29/13 12/02/13

162,868,035.78 6/19/14 6/20-26/2014 6/27/14 7/9/14 7/10-11/14 7/14/14 7/15/14

149,629,225.20 6/19/14 6/20-26/2014 6/27/14 7/9/14UNDER

EVALUATION

95,338,000.00 11/14/13 11/19-25/13 11/28/13 12/10/13 12/10-13/13 12/16-20/13 12/23/13

95,338,000.00 11/14/13 11/19-25/13 11/28/13 12/10/13 12/10-13/13 12/16-20/13 12/23/13

85,454,550.00 7/2/14 7/4-11/14 7/11/14 7/23/14 7/24-25/14 7/28-29/14 8/1/14

Approved:

MARISSA G. AGUZAREngineer III

Head, BAC Secretariat

PRE-BID CONFERENCE

SUBMISSION & RECEIPT OF

BIDS

BID EVALUATION

POST-QUALIFICATION

EVALUATION

AWARD OF CONTRACT

14D0-0023

Widening of Batangas Port Diversion Road, Bolbok Section, Batangas 2nd LD REALIGNED TO: Widening of MANILA –BATANGAS ROAD, 2nd LD, including Drainage System K0096 + (-120.00) –K0098 + 980.000 (with exception) Net Length = 2,920.00 L.M. San Jose, Batangas Province

Public Bidding

PLAN (APP)

(PPMP)

REFERENCE NO.

CONTRACT PACKAGE (DESCRIPTION)PROCUREMENT

METHODPROJECT COST/ABC

(P)

PRE-PROCUREMENT

CONFERENCE

ADVERTISEMENT/ POSTING

ACTUAL

(PPMP)

14D0-0024

Rehabilitaion / Reconstruction / Upgrading of Damaged Paved National Roads, FAMY–REAL-INFANTA-DINAHICAN PORT ROAD including Drainage Based on Pavement Management System/ Highway Development and Management -4 (HDM-4) (Intermittent Section) Section I –K0111 + 338.30-K0113 + 661.16, L =2,240.58 lm. (with exception) Section II –K0122 + 990.00-K0123 + 919.15, L =863.80 lm. (with exception) Section III –K0133 + 806.00-K0137 + 338.70, L =3,455.50 lm. (with exception) Total Net Length = 6,559.88 L.M.

Public Bidding

PLAN (APP)

(PPMP)

ACTUAL

(PPMP)

Submitted by: Recommending Approval:

SAMSON L. HEBRA HUILLIO B. BELLEZA, MNSA, CESO III Aassistant Regional Director Regional Director

14D0-0025

Network Development-Construction of By-Pass Diversion Roads, Construction of Junction Batasan-San Mateo-Rodriguez, By-Pass Link Road, Phase II, including Bridges and ROW, Rizal 2nd LD, K0021+2349.00-K0021+3300.00 (with exception), Net Length = 951.00 l.m.

Public Bidding

PLAN (APP)

(PPMP)

ACTUAL

(PPMP)

74,920,000.00 08/20/13 08/22-28/13 09/03/13 09/17/13 9/18-24/13 9/25-30/13 10/01/13

74,920,000.00 08/20/13 08/22-28/13 09/03/13 09/17/13 9/18-24/13 9/25-30/13 10/01/13

200,000,000.00 11/14/13 11/19-25/13 11/28/13 12/10/13 12/10-13/13 12/16-20/13 12/23/13

200,000,000.00 11/14/13 11/19-25/13 11/28/13 12/10/13 12/10-13/13 12/16-20/13 12/23/13

68,000,000.00 11/14/13 11/19-25/13 11/28/13 12/10/13 12/10-13/13 12/16-20/13 12/23/13

68,000,000.00 11/14/13 11/19-25/13 11/28/13 12/10/13 12/10-13/13 12/16-20/13 12/23/13

194,546,000.00 11/14/13 11/19-25/13 11/28/13 12/10/13 12/10-13/13 12/16-20/13 12/23/13

194,546,000.00 11/14/13 11/19-25/13 11/28/13 12/10/13 12/10-13/13 12/16-20/13 12/23/13

53,900,000.00 10/03/13 10/08-14/13 10/17/13 10/29/13 10/30-11/5/13 11/06-12/13 11/13/13

53,900,000.00 10/03/13 10/08-14/13 10/17/13 10/29/13 10/30-11/5/13 11/06-12/13 11/13/13

Approved:

MARISSA G. AGUZAREngineer III

Head, BAC Secretariat

PRE-BID CONFERENCE

SUBMISSION & RECEIPT OF

BIDS

BID EVALUATION

POST-QUALIFICATION

EVALUATION

AWARD OF CONTRACT

Asphalt Overlay of Calamba-Tagaytay Road, Laguna II, a) K0051+000-K0051+610; b) K0053+00-K0053+424; c) K0054+170-K0054+744; d) K0055+765-K0056+448; e) K0059+000-K0063+000

Public Bidding

PLAN (APP)

(PPMP)

REFERENCE NO.

CONTRACT PACKAGE (DESCRIPTION)PROCUREMENT

METHODPROJECT COST/ABC

(P)

PRE-PROCUREMENT

CONFERENCE

ADVERTISEMENT/ POSTING

ACTUAL

(PPMP)

Road Opening of Lobo-Malabrigo-Laiya-San Juan Road (Lobo-Malabrigo-Laiya Section), Lobo, Batangas II

Public Bidding

PLAN (APP)

(PPMP)

ACTUAL

(PPMP)

Construction of Jct. Batasan -San Mateo-Rodriguez By-pass Link Road, K0021+3849-K0021+10749, Phase III and IV including Bridges and ROW, Rizal 2nd LD, Rizal II: For Implementation of Central Office

Public Bidding

PLAN (APP)

(PPMP)

ACTUAL

(PPMP)

Opening/Concreting of Eco-Tourism Coastal Road (Section III) including ROW Acquisition, K0140+062-K0143+343.5

Public Bidding

PLAN (APP)

(PPMP)

ACTUAL

(PPMP)

Submitted by: Recommending Approval:

SAMSON L. HEBRA HUILLIO B. BELLEZA, MNSA, CESO III Aassistant Regional Director Regional Director

Paving of shoulder (seal widening) of Rizal Boundary- Famy-Quezon Road, K0068+390-K0122+160 (w/exception), Laguna 4th LD, Laguna I Procurement & Implementation to be undertaken by Laguna I DEO

Public Bidding

PLAN (APP)

(PPMP)

ACTUAL

(PPMP)

60,626,000.00 10/03/13 10/08-14/13 10/17/13 10/29/13 10/30-11/5/13 11/06-12/13 11/13/13

60,626,000.00 10/03/13 10/08-14/13 10/17/13 10/29/13 10/30-11/5/13 11/06-12/13 11/13/13

56,650,000.00 10/22/13 10/25-31/13 11/07/13 11/19/13 11/20-22/13 11/25-29/13 12/02/13

56,650,000.00 10/22/13 10/25-31/13 11/07/13 11/19/13 11/20-22/13 11/25-29/13 12/02/13

96,821,000.00 10/22/13 10/25-31/13 11/07/13 11/19/13 11/20-22/13 11/25-29/13 12/02/13

96,821,000.00 10/22/13 10/25-31/13 11/07/13 11/19/13 11/20-22/13 11/25-29/13 12/02/13

62,490,000.00 10/22/13 10/25-31/13 11/07/13 11/19/13 11/20-22/13 11/25-29/13 12/02/13

62,490,000.00 10/22/13 10/25-31/13 11/07/13 11/19/13 11/20-22/13 11/25-29/13 12/02/13

Approved:

MARISSA G. AGUZAREngineer III

Head, BAC Secretariat

PRE-BID CONFERENCE

SUBMISSION & RECEIPT OF

BIDS

BID EVALUATION

POST-QUALIFICATION

EVALUATION

AWARD OF CONTRACT

Asphalt Overlay of Daang Maharlika (LZ), Quezon II : Procurement & Implementation to be undertaken by Quezon II DEO

Public Bidding

PLAN (APP)

(PPMP)

REFERENCE NO.

CONTRACT PACKAGE (DESCRIPTION)PROCUREMENT

METHODPROJECT COST/ABC

(P)

PRE-PROCUREMENT

CONFERENCE

ADVERTISEMENT/ POSTING

Mulanay-San Francisco Road a. K0289+102-K0289+469 b. K0290+989-K0292+426 c. K0298+082-K0299+882 Procurement & Implementation to be undertaken by Quezon III DE O

Public Bidding

PLAN (APP)

(PPMP)

ACTUAL

(PPMP)

ACTUAL

(PPMP)

MSR-Jct. Lopez-Buenavista Rd., Quezon III, a) K0241+651-K0243+927 Procurement & Implementation to be undertaken by Quezon III DEO

Public Bidding

PLAN (APP)

(PPMP)

ACTUAL

(PPMP)

HUILLIO B. BELLEZA, MNSA, CESO III Aassistant Regional Director Regional Director

Bauan-Mabini Road a. K0172+438-K0172+648 b. K0175+000-K0176+000 c. K0176+203-K0177+201 d. K0158+000-K0158+265 e. K0166+000-K0167+002 f. K0174+000-K0174+950 g. K0172+227-K0172+287 Procurement & Implementation to be undertaken by Batangas II DEO

Public Bidding

PLAN (APP)

(PPMP)

ACTUAL

(PPMP)

Submitted by: Recommending Approval:

SAMSON L. HEBRA

Project Cost/ Pre- Posting/ Pre-Bid Submission Post AwardNo. Contract Package Description Procurement ABC Procurement Advertisement Conference and Receipt Bid Qualification/ of

Method Conference of Bids Evaluation Evaluation Contract14DN0001 Widening of San Juan Bridge along Manila Competitive 8,000,000.00/ Jan. 17, 2014 Jan. 23-29, 2014 Jan. 29, 2014 Feb. 11, 2014 Feb. 12-13, 2014 Feb. 14-20, 2014 Feb. 21-26, 2014

East Road, Binangonan, Rizal Public 7,760,000.00 Bidding

14DN0002 Widening of Angono Bridge along Manila -do- 31,200,000.00 Jan. 17, 2014 Jan. 23-29, 2014 Jan. 29, 2014 Feb. 11, 2014 Feb. 12-13, 2014 Feb. 14-20, 2014 Feb. 21-26, 2014 East Road, Angono, Rizal 18,750,554.51

14DN0003 Widening of Bangiad Bridge 1 along Manila -do- 8,000,000.00/ Jan. 17, 2014 Jan. 24-30, 2014 Jan. 30, 2014 Feb. 13, 2014 Feb. 14-17, 2014 Feb. 18-24, 2014 Feb. 26-28, 2014 East Road, Taytay, Rizal 7,760,000.00

14DN0004 Widening of Bangiad Bridge 2 along Manila -do- 8,000,000.00/ Jan. 17, 2014 Jan. 24-30, 2014 Jan. 30, 2014 Feb. 13, 2014 Feb. 14-17, 2014 Feb. 18-24, 2014 Feb. 26-28, 2014 East Road, Taytay, Rizal 7,760,000.00

14DN0005 Widening of Marikina-Infanta Road, Inarawan -do- 25,000,000.00/ Feb. 13, 2014 Feb. 19-25, 2014 Feb. 26, 2014 March 11, 2014 March 12-14, 2014 March 17-21, 2014 March 27, 2014 Section, k0024+590-k0025+790, 2nd Legislative 24,192,043.89 District, Antipolo City

14DN0006 Widening of Cabrera-Antipolo Road, -do- 25,000,000.00/ Feb. 13, 2014 Feb. 19-25, 2014 Feb. 26, 2014 March 11, 2014 March 12-14, 2014 March 17-21, 2014 March 27, 2014 k0030+240-k0030+1030, 2nd Legislatve 24,249,391.28 District, Antipolo Citity

Submitted by: Recommended by: Approved by:

NAPOLEON T. ABRIL GREGORIO E. MASIDDO JR. ROGELIO S. CRESPOChairman, TWG Committee BAC - Chairman District Engineer

Republic of the PhilippinesDepartment of Public Works and Highways

DPWH-Rizal First District Engineering OfficeBinangonan, Rizal

ANNUAL PROCUREMENT PLAN FOR CENTRALLY PROCURED PROJECTS

Project Cost/ Pre- Posting/ Pre-Bid Submission Post AwardNo. Contract Package Description Procurement ABC Procurement Advertisement Conference and Receipt Bid Qualification/ of

Method Conference of Bids Evaluation Evaluation Contract14DN0007 Preventive Maintenance (Asphalt Overlay) along Competitive 11,975,000.00/ March 01, 2014 March 07, 2014 March 14, 2014 March 27, 2014 March 28, 2014 April 01-04, 2014 April 07-10, 2014

Manila east Road, Chainage 0000 - Chainage 0642 Public 11,656,851.72 to to k0018+(-948) - k0018+(-856) with exception Bidding March 13, 2014 March 31, 2014 Cainta, Rizal

14DN0008 Construction of Water Sanitation Facilities, -do- 603,000.00/ May 07, 2014 May 15-21, 2014 May 21, 2014 June 03, 2014 June 04-06, 2014 June 09-13, 2014 June 19, 2014 Don Jose M. Ynares Sr. MNHS, Binangonan, 602,998.91 Rizal 1 unit 3 seater (1B-1G-1PWD) detached and 2 units of 1 seater attached to clrm with handwashing facilities and septic vault, Binangonan, Rizal

14DN0009 Construction of Water and Sanitation Facilities -do- 1,078,000.00/ May 07, 2014 May 15-21, 2014 May 21, 2014 June 03, 2014 June 04-06, 2014 June 09-13, 2014 June 19, 2014 at Vicente Madrigal NHS Binangonan III, Rizal 1,077,239.94 (2 units of 3 seaters (1B-1G-1 PWD) with handwashing facilities and septic vault and 2 units of 2 seater toilet (1B -1G/PWD), Binangonan, Rizal

14DN0010 Construction of Water and Sanitation Facilities: -do- 775,000.00/ May 07, 2014 May 15-21, 2014 May 21, 2014 June 03, 2014 June 04-06, 2014 June 09-13, 2014 June 19, 2014 1. Casimiro A. Ynares Sr. MNHS, Taytay, Rizal 775,000.00 3 seater toilet (1B-1G-1 PWD) with handwashing facilities and septic vault 2. Sitio Mata ES, Binangonan, Rizal - 2 seater 1B-1G-/PWD with handwashing facilities and septic vault 3. Kinaboogan Barrio School, Binangonan,

Republic of the PhilippinesDepartment of Public Works and Highways

DPWH-Rizal First District Engineering OfficeBinangonan, Rizal

ANNUAL PROCUREMENT PLAN FOR CENTRALLY PROCURED PROJECTS

Rizal - 2 seater (1B-1G/PWD) with hand- washing facilities and septic vault, Taytay and Binangonan, Rizal

14DN0011 Water Supply System - Brgy. Tatala, -do- 2,000,000.00/ May 14, 2014 May 22-28, 2014 May 28, 2014 June 10, 2014' June 13-17, 2014 June 18-24, 2014 June 30, 2014 Binanagonan, Rizal 1,979,914.40

District, Antipolo City14DN0012 Construction of Water System Level 2 - Brgy. -do- 2,300,000.00/ May 14, 2014 May 22-28, 2014 May 28, 2014 June 10, 2014' June 13-17, 2014 June 18-24, 2014 June 30, 2014

Janosa Janosa National High School, Binangonan, 2,276,877.63 Rizal

14DN0013 Construction of Water System Level 2 - Brgy. -do- 2,400,000.00/ May 14, 2014 May 22-28, 2014 May 28, 2014 June 10, 2014' June 13-17, 2014 June 18-24, 2014 June 30, 2014 Tatala, Binangonan, Rizal 2,375,865.11

Submitted by: Recommended by: Approved by:

NAPOLEON T. ABRIL GREGORIO E. MASIDDO JR. ROGELIO S. CRESPOChairman, TWG Committee BAC - Chairman District Engineer

Project Cost/ Pre- Posting/ Pre-Bid Submission Post AwardNo. Contract Package Description Procurement ABC Procurement Advertisement Conference and Receipt Bid Qualification/ of

Method Conference of Bids Evaluation Evaluation Contract14DN0014 Construction of Road - Dugay St., Brgy. Competitive 2,000,000.00/ May 22, 2014 May 30, 2014 June 06, 2014 June 19, 2014 June 20-23, 2014 June 24-27, 2014 July 03, 2014

Mahabang Parang, Binangonan, Rizal Public 1,980,000.00 toBidding June 05, 2014

14DN0015 Constructiopn of Road, Leoncia Ojeda St. & -do- 2,000,000.00/ May 22, 2014 May 30, 2014 June 06, 2014 June 19, 2014 June 20-23, 2014 June 24-27, 2014 July 03, 2014 Cattleya St., Brgy. Mambog, Binangonan, Rizal 1,980,000.00 to

June 05, 201414DN0016 Rehabilitation of Road, MIlagros Subdivision, -do- 5,000,000.00/ May 22, 2014 May 30, 2014 June 16, 2014 June 19, 2014 June 20-23, 2014 June 24-27, 2014 June 30, 2014

Brgy. Dalig, Antipolo City 4,950,000.00 to toJune 05, 2014 July 02, 2014

14DN0017 Rehabilitation of Road, Gloria Heights, Brgy. -do- 5,000,000.00/ May 22, 2014 May 30, 2014 June 16, 2014 June 19, 2014 June 20-23, 2014 June 24-27, 2014 June 30, 2014 Dalig, Antipolo City 4,950,000.00 to to

June 05, 2014 July 02, 201414DN0018 Rehabilitation of Road, Joyous Heights, Brgy. -do- 5,000,000.00/ May 22, 2014 May 30, 2014 June 16, 2014 June 19, 2014 June 20-23, 2014 June 24-27, 2014 June 30, 2014

Republic of the PhilippinesDepartment of Public Works and Highways

DPWH-Rizal First District Engineering OfficeBinangonan, Rizal

ANNUAL PROCUREMENT PLAN FOR CENTRALLY PROCURED PROJECTS

San Jose, Antipolo City 4,950,000.00 to toJune 05, 2014 July 02, 2014

14DN0019 Repair/Rehabilitatio/Improvement (Additional) -do- 9,360,000.00/ May 29, 2014 June 05-11, 2014 June 11, 2014 June 24, 2014 June 24-26, 2014 June 25-26, 2014 July 04-08, 2014 Pavement width with Drainage Improvement) 9,266,400.00 of Manila East Road, k0022+(-166.70- k0022+186.30), Taytay, Rizal

14DN0020 Repair/Rehabilitation/Improvement (Additional -do- 11,340,000.00/ May 29, 2014 June 05-11, 2014 June 11, 2014 June 24, 2014 June 24-26, 2014 June 25-26, 2014 July 04-08, 2014 Pavement width) along Marikina-Infanta Road, 11,226,600.00 k0036+960-k0037+448 (with exception) Brgy. San Jose, Antipolo City

14DN0021 Rehabilitation of Road, Peace Village, Brgy. -do- 5,000,000.00/ May 29, 2014 June 05-11, 2014 June 11, 2014 June 24, 2014 June 24-26, 2014 June 25-26, 2014 July 04-08, 2014 San Luis, Antipolo City 4,950,000.00

14DN0022 Rehabilitation of Road, Spring Valley Penafrancia, -do- 5,000,000.00/ May 29, 2014 June 05-11, 2014 June 11, 2014 June 24, 2014 June 24-26, 2014 June 25-26, 2014 July 04-08, 2014 Brgy. San Luis, Antipolo City 4,950,000.00

14DN0023 Widening/Rehabilitation Improvement of Antipolo- -do- 5,620,000.00/ May 29, 2014 June 06-12, 2014 June 13, 2014 June 26, 2014 June 27-30, 2014 July 01-07, 2014 July 08-10, 2014 Hinulugang Taktak Road, k0029+938.20- 5,451,400.00 k0030+216, Antipolo City

14DN0024 Improvement (Paving of Shoulder with Drainage) -do- 4,533,,000.00/ May 29, 2014 June 06-12, 2014 June 13, 2014 June 26, 2014 June 27-30, 2014 July 01-07, 2014 July 08-10, 2014 System) of Sumulong Highway, k0027+886- 4,533,000.00 k0028+233, Antipolo City

14DN0025 Rehab. Of Road, Brgy. Beverly Hills, 1st -do- 3,000,,000.00/ May 29, 2014 June 06-12, 2014 June 13, 2014 June 26, 2014 June 27-30, 2014 July 01-07, 2014 July 08-10, 2014 Legislative District, Antipolo City 2,790,000.00

Submitted by: Recommended by: Approved by:

NAPOLEON T. ABRIL GREGORIO E. MASIDDO JR. ROGELIO S. CRESPOChairman, TWG Committee BAC - Chairman District Engineer

Project Cost/ Pre- Posting/ Pre-Bid Submission Post AwardNo. Contract Package Description Procurement ABC Procurement Advertisement Conference and Receipt Bid Qualification/ of

Method Conference of Bids Evaluation Evaluation Contract14DN0026 Repair/Rehab./Improvement of Drainage System Competitive 9,330,000.00/ June 04, 2014 June 10-16, 2014 June 17, 2014 July 01, 2014 July 02-03, 2014 July 04-08, 2014 July 09-11, 2014

along Marikina-Infanta Road Cogeo Gate 2, Public 9,236,700.00

DPWH-Rizal First District Engineering Office

Republic of the PhilippinesDepartment of Public Works and Highways

Binangonan, Rizal

ANNUAL PROCUREMENT PLAN FOR CENTRALLY PROCURED PROJECTS

km23+200-km24+000 (with exception), Antipolo Bidding14DN0027 Construction of Rainwater Collector System -do- 500,000.00/ June 04, 2014 June 10-16, 2014 June 17, 2014 July 01, 2014 July 02-03, 2014 July 04-08, 2014 July 09-11, 2014

(RWCS) Facilities, Rizal 1st District Engineering 500,000.00 Office A. Antipolo NHS 166,666.67 B. San Isidro NHS 166,666.67 C. Bagong Nayon I E/S 166,666.66

14DN0028 Rehabilitation of Road NHA Ave., Brgy. Dela Paz, -do- 5,000,000.00/ June 09, 2014 June 19-24, 2014 June 25, 2014 July 08, 2014 July 09-11, 2014 July 14-18, 2014 July 21-23, 2014 Antipolo City 4,950,000.00

14DN0008 Construction of Water Sanitation Facilities, -do- 603,000.00/ June 18, 2014 June 26, 2014 July 02, 2014 July 15, 2014 July 16-17, 2014 July 18-22, 2014 July 23-25, 2014(Re-Bid) Don Jose M. Ynares Sr. MNHS, Binangonan, 602,998.91 to

Rizal 1 unit 3 seater (1B-1G-1PWD) detached July 02, 2014 and 2 units of 1 seater attached to clrm with handwashing facilities and septic vault, Binangonan, Rizal

14DN0009 Construction of Water and Sanitation Facilities -do- 1,078,000.00/ June 18, 2014 June 26, 2014 July 02, 2014 July 15, 2014 July 16-17, 2014 July 18-22, 2014 July 23-25, 2014(Re-Bid) at Vicente Madrigal NHS Binangonan III, Rizal 1,077,239.94 to

(2 units of 3 seaters (1B-1G-1 PWD) with July 02, 2014 handwashing facilities and septic vault and 2 units of 2 seater toilet (1B -1G/PWD), Binangonan, Rizal

14DN0010 Construction of Water and Sanitation Facilities: -do- 775,000.00/ June 18, 2014 June 26, 2014 July 02, 2014 July 15, 2014 July 16-17, 2014 July 18-22, 2014 July 23-25, 2014(Re-Bid) 1. Casimiro A. Ynares Sr. MNHS, Taytay, Rizal 775,000.00 to

3 seater toilet (1B-1G-1 PWD) with July 02, 2014 handwashing facilities and septic vault 2. Sitio Mata ES, Binangonan, Rizal - 2 seater 1B-1G-/PWD with handwashing facilities and septic vault 3. Kinaboogan Barrio School, Binangonan, Rizal - 2 seater (1B-1G/PWD) with hand- washing facilities and septic vault, Taytay and Binangonan, Rizal

Submitted by: Recommended by: Approved by:

NAPOLEON T. ABRIL GREGORIO E. MASIDDO JR. ROGELIO S. CRESPOChairman, TWG Committee BAC - Chairman District Engineer

.

Project Cost/ Pre- Posting/ Pre-Bid Submission Post AwardNo. Contract Package Description Procurement ABC Procurement Advertisement Conference and Receipt Bid Qualification/ of

Method Conference of Bids Evaluation Evaluation Contract14DN0013 Construction of Water System Level 2 - Brgy. Competitive 2,400,000.00/ June 18, 2014 June 26, 2014 July 02, 2014 July 15, 2014 July 16-17, 2014 July 18-22, 2014 July 23-25, 2014(Re-Bid) Tatala, Binangonan, Rizal Public 2,375,865.11 to

Bidding July 02, 201414DN0029 Rehabilitation of Road, Olalia Road, Brgy. Sta. -do- 8,000,000.00/ June 18, 2014 June 26, 2014 July 02, 2014 July 15, 2014 July 16-17, 2014 July 18-22, 2014 July 23-25, 2014

Cruz, 1st District, Antipolo City 7,920,000.00 toJuly 02, 2014

14DN0030 Construction of Road, Brgy. Muntingdilaw, -do- 4,000,000.00/ July 01, 2014 July 10-16, 2014 July 16, 2014 July 29, 2014 July 31, 2014 Aug. 04-08, 2014 Aug. 11-13, 2014 Antipolo City 4,000,000.00 to

Aug. 01, 201414DN0031 Widening/Improvement/Raising with Drainage -do- 10,000,000.00/ July 01, 2014 July 10-16, 2014 July 16, 2014 July 29, 2014 July 31, 2014 Aug. 04-08, 2014 Aug. 11-13, 2014

System along Imelda Avenue, k0020+340- 9,700,000.00 to k0020+640, Cainta, Rizal Aug. 01, 2014

14DN0032 Rehab. of Road, Sitio San Lorenzo Ruiz, Brgy. -do- 4,500,000.00/ July 01, 2014 July 10-16, 2014 July 16, 2014 July 29, 2014 July 31, 2014 Aug. 04-08, 2014 Aug. 11-13, 2014 San Roque, Antipolo City 4,000,000.00 to

Aug. 01, 201414DN0033 Rehabilitation of School Buildings, Two (2) -do- 5,950,000.00/ July 01, 2014 July 10-16, 2014 July 16, 2014 July 29, 2014 July 31, 2014 Aug. 04-08, 2014 Aug. 11-13, 2014

Buildings: Rodrif=guez I, Two (2) Storey Bldg., 5,950,000.00 to 10 Room and Rodriguez II, Three (3) Storey Aug. 01, 2014 21 Room Bldg-Taytay Elem. School, Brgy. Dolores, Taytay, Rizal

Submitted by: Recommended by: Approved by:

NAPOLEON T. ABRIL GREGORIO E. MASIDDO JR. ROGELIO S. CRESPOChairman, TWG Committee BAC - Chairman District Engineer

ANNUAL PROCUREMENT PLAN FOR CENTRALLY PROCURED PROJECTS

Republic of the PhilippinesDepartment of Public Works and Highways

DPWH-Rizal First District Engineering OfficeBinangonan, Rizal

Reference No. Contract Package (Description)Procurement

MethodPre-Procurement

ConferenceAdvertisement/

PostingPre-Bid

ConferenceSubmission &

Receipt of BidsBid Evaluation

10/18/2013 10/25/2013 10/31/2013 11/14/2013 11/15/201310/18/2013 10/31/2013 10/31/2013 11/14/2013 11/18/201310/18/2013 10/25/2013 10/31/2013 11/14/2013 11/15/201310/18/2013 11/1/2013 10/31/2013 11/14/2013 11/18/201310/31/2013 11/8/2013 11/15/2013 11/28/2013 11/29/201310/31/2013 11/14/2013 11/15/2013 11/28/2013 11/18/201310/31/2013 10/25/2013 10/31/2013 11/14/2013 11/15/201310/31/2013 11/1/2013 10/31/2013 11/14/2013 11/18/201310/18/2013 10/25/2013 10/31/2013 11/14/2013 11/15/201310/18/2013 10/31/2013 10/31/2013 11/14/2013 11/18/201310/18/2013 10/25/2013 11/4/2013 11/15/2013 11/18/201310/18/2013 11/1/2013 11/4/2013 11/15/2013 11/19/201310/18/2013 10/25/2013 10/31/2013 11/14/2013 11/15/201310/18/2013 10/31/2013 10/31/2013 11/14/2013 11/18/201310/18/2013 10/25/2013 11/4/2013 11/15/2013 11/18/201310/18/2013 11/1/2013 11/4/2013 11/15/2013 11/19/201310/31/2013 11/8/2013 11/15/2013 11/28/2013 11/29/201310/31/2013 11/14/2013 11/15/2013 11/28/2013 11/18/201310/31/2013 10/25/2013 11/4/2013 11/15/2013 11/18/201310/31/2013 11/1/2013 11/4/2013 11/15/2013 11/19/2013

Reference No. Contract Package (Description)Procurement

MethodPre-Procurement

ConferenceAdvertisement/

PostingPre-Bid

ConferenceSubmission &

Receipt of BidsBid Evaluation

10/31/2013 11/8/2013 11/15/2013 11/28/2013 11/29/201310/31/2013 11/14/2013 11/15/2013 11/28/2013 12/2/201310/31/2013 12/3/2013 12/12/2013 12/23/2013 12/26/201310/31/2013 12/10/2013 12/12/2013 12/23/2013 12/27/201310/31/2013 11/8/2013 11/15/2013 11/28/2013 11/29/201310/31/2013 11/14/2013 11/15/2013 11/28/2013 12/2/201310/31/2013 12/3/2013 12/12/2013 12/23/2013 12/26/201310/31/2013 12/10/2013 12/12/2013 12/23/2013 12/27/201310/31/2013 11/8/2013 11/15/2013 11/28/2013 11/29/201310/31/2013 11/14/2013 11/15/2013 11/28/2013 12/2/201310/31/2013 12/3/2013 12/12/2013 12/23/2013 12/26/201310/31/2013 12/10/2013 12/12/2013 12/23/2013 12/27/2013

13 DO 0215Widening of Permanent Bridge at Ampid

Bridge along San Mateo-Rodriguez Road, San Mateo, Rizal

Public Bidding

PLAN (APP) (PPMP)

P 43,424,293.85

ACTUAL (PPMP)

P 43,424,256.97

13 DO 0214Widening of Cainta-Kaytikling-Antipolo-

Teresa-Morong Road K0039+000 - K0040+000, Morong, Rizal

Public Bidding

PLAN (APP) (PPMP)

P 24,124,616.88

ACTUAL (PPMP)

P 24,124,554.59

Project Cost/ABC (P)

13 DO 0213Widening of Cainta-Kaytikling-Antipolo-

Teresa-Morong Road K0037+(-22) - K0038+000, Morong, Rizal

Public Bidding

PLAN (APP) (PPMP)

P 24,124,518.28

ACTUAL (PPMP)

P 24,124,980.99

13 DO 0172Riprapping (Slope Protection) at Tanay River,

along Sagbat-Pililla Diversion Road, Tanay, Rizal

Public Bidding

PLAN (APP) (PPMP)

P 19,267,586.81

ACTUAL (PPMP)

P 19,267,586.81

13 DO 0171Widening of Manila East Road K0046+108.79

- K0046+426.64Public Bidding

PLAN (APP) (PPMP)

P 9,649,290.66

ACTUAL (PPMP)

P 9,649,290.66

13 DO 0169Widening of Cainta-Kaytikling-Antipolo-Teresa-Morong Road (Chainage 0-083),

Morong, RizalPublic Bidding

PLAN (APP) (PPMP)

P 2,488,894.43

ACTUAL (PPMP)

P 2,488,894.43

13 DO 0167Riprapping (Slope Protection) at San Mateo

River along IBP - San Mateo Road, San Mateo, Rizal

Public Bidding

PLAN (APP) (PPMP)

P 19,299,934.39

ACTUAL (PPMP)

P 19,299,934.39

13 DO 0166Riprapping (Slope Protection) at Teresa River

along Cainta-Kaytikling-Antipolo-Teresa-Morong Road, Teresa, Rizal

Public Bidding

PLAN (APP) (PPMP)

P 9,649,036.84

ACTUAL (PPMP)

P 9,649,036.84

Republic of the PhilippinesDepartment of Public Works and Highways

Rizal II District Engineering Office#16 Westbank Road, Manggahan Floodway, Rosario, Pasig

REVISED ANNUAL PROCUREMENT PLAN FOR FY 2014 DISTRICT PROCURED PROJECTProject Cost/ABC

(P)

10/18/2013 10/25/2013 10/31/2013 11/14/2013 11/15/201310/18/2013 10/31/2013 10/31/2013 11/14/2013 11/18/201310/18/2013 12/3/2013 12/12/2013 6/26/2014 6/27/201410/18/2013 12/10/2013 12/12/2013 6/26/2014 6/28/201410/18/2013 10/25/2013 10/31/2013 11/14/2013 11/15/201310/18/2013 10/31/2013 10/31/2013 11/14/2013 11/18/201310/18/2013 12/3/2013 12/12/2013 12/23/2013 12/26/201310/18/2013 12/10/2013 12/12/2013 12/23/2013 12/26/201310/31/2013 11/8/2013 11/15/2013 11/29/2013 12/2/201310/31/2013 11/14/2013 11/15/2013 11/29/2013 12/3/201310/31/2013 12/3/2013 12/12/2013 4/16/2014 4/17/201410/31/2013 12/10/2013 12/12/2013 4/16/2014 4/21/2014

Reference No. Contract Package (Description)Procurement

MethodPre-Procurement

ConferenceAdvertisement/

PostingPre-Bid

ConferenceSubmission &

Receipt of BidsBid Evaluation

10/31/2013 11/8/2013 11/15/2013 11/29/2013 12/2/201310/31/2013 11/14/2013 11/15/2013 11/29/2013 12/3/201310/31/2013 12/3/2014 12/12/2013 4/16/2014 4/17/201410/31/2013 12/10/2013 12/12/2013 4/16/2014 4/21/201410/31/2013 11/8/2013 11/15/2013 11/28/2013 11/29/201310/31/2013 11/14/2013 11/15/2013 11/28/2013 12/2/201310/31/2013 12/17/2013 12/23/2013 3/19/2014 3/20/201410/31/2013 12/24/2013 12/23/2013 3/19/2014 3/25/2014

4/7/2014 4/15/2014 4/24/2014 5/6/2014 5/7/20144/7/2014 4/21/2014 4/24/2014 5/6/2014 5/8/20144/7/2014 4/16/2014 4/24/2014 5/6/2014 5/7/20144/7/2014 4/23/2014 4/24/2014 5/6/2014 5/8/20144/7/2014 4/15/2014 4/24/2014 5/6/2014 5/7/20144/7/2014 4/21/2014 4/24/2014 5/6/2014 5/8/20144/7/2014 4/16/2014 4/24/2014 5/6/2014 5/7/20144/7/2014 4/23/2014 4/24/2014 5/6/2014 5/8/2014

4/21/2014 4/29/2014 5/8/2014 5/20/2014 5/21/20144/21/2014 5/6/2014 5/8/2014 5/20/2014 5/22/20144/21/2014 4/29/2014 5/8/2014 5/20/2014 5/21/20144/21/2014 5/6/2014 5/8/2014 5/20/2014 5/22/20144/21/2014 4/29/2014 5/8/2014 5/20/2014 5/21/20144/21/2014 5/6/2014 5/8/2014 5/20/2014 5/22/20144/21/2014 4/29/2014 5/8/2014 5/20/2014 5/21/20144/21/2014 5/6/2014 5/8/2014 5/20/2014 5/22/2014

Reference No. Contract Package (Description)Procurement

MethodPre-Procurement

ConferenceAdvertisement/

PostingPre-Bid

ConferenceSubmission &

Receipt of BidsBid Evaluation

Project Cost/ABC (P)

14 DO 0007

Rehabilitation of Road at Brgy. Pinugay, Rehabilitation of Road at Brgy. Sto. Niño, Rehabilitation of Road at Brgy. Tandang

Kutyo, Baras, San Mateo and Tanay, Rizal

Public Bidding

PLAN (APP) (PPMP)

P 6,998,831.11

ACTUAL (PPMP)

P 6,998,831.11

14 DO 0006

Rehabilitation of Road at San Guillermo, Rehabilitation of Road at Brgy. May-Iba,

Rehabilitation of Road at Palay-Palay, Morong, Teresa and Jalajala, Rizal

Public Bidding

PLAN (APP) (PPMP)

P 5,999,389.31

ACTUAL (PPMP)

P 5,999,389.31

14 DO 0004Rehabilitation of Multi-Purpose Building at

Geronimo, Rodriguez, RizalPublic Bidding

PLAN (APP) (PPMP)

P 1,999,575.60

ACTUAL (PPMP)

P 1,999,575.60

14 DO 0003Rehabilitation of Multi-Purpose Building -

Guitnangbayan I, San Mateo, RizalPublic Bidding

PLAN (APP) (PPMP)

P 1,999,631.40

ACTUAL (PPMP)

P 1,999,631.40

13 DO 0226Widening of Tanay-Sampaloc Road

K0058+116 - K0061+000, Tanay, RizalPublic Bidding

PLAN (APP) (PPMP)

P 28,949,780.25

ACTUAL (PPMP)

P 28,949,780.25

Project Cost/ABC (P)

13 DO 0219

Construction of Retaining Wall (Slope Protection) at San Mateo River along San

Mateo-Rodriguez Road (Phase II), San Mateo, Rizal

Public Bidding

PLAN (APP) (PPMP)

P 43,231,035.00

ACTUAL (PPMP)

P 43,230,969.31

13 DO 0218

Construction of Retaining Wall (Slope Protection) at San Mateo River along San

Mateo-Rodriguez Road (Phase I), San Mateo, Rizal

Public Bidding

PLAN (APP) (PPMP)

P 48,250,000.00

ACTUAL (PPMP)

P 48,249,737.85

13 DO 0217Widening of Permanent Bridge Bulak Bridge

along Cainta-Kaytikling-Antipolo-Teresa-Morong Road, Teresa, Rizal

Public Bidding

PLAN (APP) (PPMP)

P 5,306,639.50

ACTUAL (PPMP)

5,306,639.50

13 DO 0216

Construction of Drainage System along Manila East Road

K0044+900-K0045+500, K0055+000-K0058+000

Public Bidding

PLAN (APP) (PPMP)

P 38,599,105.59

ACTUAL (PPMP)

P 38,383,105.95

4/29/2014 5/6/2014 5/15/2014 5/27/2014 5/28/20144/29/2014 5/13/2014 5/15/2014 5/27/2014 5/29/20144/29/2014 5/6/2014 5/15/2014 5/27/2014 5/28/20144/29/2014 5/13/2014 5/15/2014 5/27/2014 5/29/20145/19/2014 5/26/2014 6/4/2014 6/17/2014 6/18/20145/19/2014 6/2/2014 6/4/2014 6/17/2014 6/19/20145/19/2014 5/27/2014 6/5/2014 6/17/2014 6/18/20145/19/2014 6/3/2014 6/5/2014 6/17/2014 6/20/20145/19/2014 5/26/2014 6/4/2014 6/17/2014 6/18/20145/19/2014 6/2/2014 6/4/2014 6/17/2014 6/19/20145/19/2014 5/27/2014 6/5/2014 7/8/2014 7/9/20145/19/2014 5/27/2014 6/5/2014 7/8/2014 7/10/20145/19/2014 5/26/2014 6/4/2014 6/17/2014 6/18/20145/19/2014 6/2/2014 6/4/2014 6/17/2014 6/19/20145/19/2014 5/27/2014 6/5/2014 6/17/2014 6/18/20145/19/2014 5/27/2014 6/5/2014 6/17/2014 6/20/20146/23/2014 6/30/2014 7/11/2014 7/22/2014 7/23/20146/23/2014 7/7/2014 7/11/2014 7/22/2014 7/24/20146/23/2014 6/30/2014 7/11/2014 7/22/2014 7/23/20146/23/2014 7/7/2014 7/11/2014 7/22/2014 -6/23/2014 6/30/2014 7/11/2014 7/22/2014 7/23/20146/23/2014 7/7/2014 7/11/2014 7/22/2014 7/24/20146/23/2014 6/30/2014 7/11/2014 7/22/2014 7/23/20146/23/2014 7/7/2014 7/11/2014 7/22/2014 -

Reference No. Contract Package (Description)Procurement

MethodPre-Procurement

ConferenceAdvertisement/

PostingPre-Bid

ConferenceSubmission &

Receipt of BidsBid Evaluation

6/23/2014 6/30/2014 7/11/2014 7/22/2014 7/23/20146/23/2014 7/7/2014 7/11/2014 7/22/2014 7/24/20146/23/2014 6/30/2014 7/11/2014 7/22/2014 7/23/20146/23/2014 7/7/2014 7/11/2014 7/22/2014 -6/23/2014 6/30/2014 7/11/2014 7/22/2014 7/23/20146/23/2014 7/7/2014 7/11/2014 7/22/2014 7/24/20146/23/2014 6/30/2014 7/11/2014 7/22/2014 -6/23/2014 7/7/2014 7/11/2014 - -6/23/2014 6/30/2014 7/11/2014 7/22/2014 7/23/20146/23/2014 7/7/2014 7/11/2014 7/22/2014 7/24/20146/23/2014 6/30/2014 7/11/2014 7/22/2014 -6/23/2014 7/7/2014 7/11/2014 - -7/2/2014 7/11/2014 7/17/2014 7/31/2014 8/1/2014

Construction of One (1) Storey Two (2)

PLAN (APP) P 2 170 358 24

14 DO 0016Construction of One (1) Storey One (1) Classroom School Building at Mamuyao

Elementary School, Tanay, RizalPublic Bidding

PLAN (APP) (PPMP)

P 1,282,121.00

ACTUAL (PPMP)

P 1,282,121.00

14 DO 0015Construction of One (1) Storey One (1)

Classroom School Building at Laiban Elementary School, Tanay, Rizal

Public Bidding

PLAN (APP) (PPMP)

P 1,282,121.00

ACTUAL (PPMP)

P 1,282,121.00

Project Cost/ABC (P)

14 DO 0014

Construction of One (1) Storey One (1) Classroom School Building at Macaingalan

High School, Rodriguez, Rizal

Public Bidding

PLAN (APP) (PPMP)

P 1,257,211.24

ACTUAL (PPMP)

P 1,257,211.24

14 DO 0013

Construction of One (1) Storey One (1) Classroom School Building at San Isidro Elementary School - Balagbag Annex,

Rodriguez, Rizal

Public Bidding

PLAN (APP) (PPMP)

P 1,182,324.40

ACTUAL (PPMP)

P 1,182,324.40

14 DO 0012

Construction of One (1) Storey One (1) Classroom School Building at San Rafael Elementary School - Catmon Elementary

School, Rodriguez, Rizal

Public Bidding

PLAN (APP) (PPMP)

P 1,182,324.40

ACTUAL (PPMP)

P 1,182,324.40

14 DO 0011

Construction of Three (3) Units Rainwater Collection System (RWCS) at Silangan E/S,

Silangan National HS & Sto. Niño E/S, San Mateo, Rizal

Public Bidding

PLAN (APP) (PPMP)

P 499,114.10

ACTUAL (PPMP)

P 499,114.10

14 DO 0010Rehabilitation of Multi-Purpose Building-

Ampid I, San Mateo, RizalPublic Bidding

PLAN (APP) (PPMP)

P 2,699,263.90

ACTUAL (PPMP)

P 2,699,263.90

14 DO 0009Rehabilitation of Multi-Purpose Building-

Balite Rodriguez, RizalPublic Bidding

PLAN (APP) (PPMP)

P 1,999,593.99

ACTUAL (PPMP)

P 1,999,593.99

14 DO 0008Rehabilitation of Multi-Purpose Building-San

Roque, Cardona, RizalPublic Bidding

PLAN (APP) (PPMP)

P 2,799,892.29

ACTUAL (PPMP)

P 2,799,892.29

7/2/2014 7/18/2014 7/17/2014 7/31/2014 8/2/20147/1/2014 7/11/2014 7/17/2014 - -7/1/2014 7/18/2014 7/17/2014 - -

7/14/2014 7/24/2014 7/31/2014 8/13/2014 8/14/20147/14/2014 7/31/2014 7/31/2014 8/13/2014 8/15/20147/14/2014 7/24/2014 - - -7/14/2014 7/31/2014 - - -

Submitted by: Approved:Recommending Approval:

ERICKSON A. MICOR FRANCISCO F. CRUZ E Head, BAC Secretariat OIC-Assistant District Engineer

14 DO 0018Repair/Rehabilitation/Improvement of

Rodriguez-San Jose Road (K0029+(-158) to K0030+300) with exceptions Rodriguez, Rizal

Public Bidding

PLAN (APP) (PPMP)

P 9,364,474.19

ACTUAL (PPMP)

P 9,364,474.19

14 DO 0017Construction of One (1) Storey Two (2)

Classroom School Building at Patiis Elementary School, San Mateo, Rizal

Public Bidding

(PPMP)

P 2,170,358.24

ACTUAL (PPMP)

P 2,170,358.24

Post Qualification Evaluation

Award of Contract

11/19/2013 11/22/201311/20/2013 11/22/201311/19/2013 2/3/201411/22/2013 2/3/201411/19/2013 12/4/201312/2/2013 12/4/2013

11/19/2013 1/29/201411/22/2013 1/29/201411/19/2013 11/22/201311/20/2013 11/22/201311/20/2013 2/3/201411/22/2013 2/3/201411/19/2013 11/22/201311/20/2013 11/22/201311/20/2013 2/3/201411/22/2013 2/3/201411/19/2013 12/4/201312/2/2013 12/4/2013

11/20/2013 2/3/201411/22/2013 2/3/2014

Post Qualification Evaluation

Award of Contract

12/3/2013 12/6/201312/4/2013 12/6/2013

12/27/2013 2/3/20141/2/2014 2/3/2014

12/3/2013 12/6/201312/4/2013 12/6/2013

12/27/2013 2/3/20141/2/2014 2/3/2014

12/3/2013 12/6/201312/4/2013 12/6/2013

12/27/2013 1/29/20141/21/2013 1/29/2014

11/19/2013 12/6/201311/20/2013 12/6/20136/29/2014 7/7/20146/30/2014 7/7/2014

11/19/2013 11/22/201311/20/2013 11/22/201312/27/2013 2/3/2014

1/2/2014 2/3/201412/4/2013 12/9/201312/5/2013 12/9/20134/22/2014 4/30/20144/28/2014 4/30/2014

Post Qualification Evaluation

Award of Contract

12/4/2013 12/9/201312/5/2013 12/9/20134/22/2014 5/2/20144/28/2014 5/2/201412/3/2013 12/6/201312/4/2013 12/6/20133/26/2014 4/28/20144/23/2014 4/28/20145/9/2014 5/16/2014

5/14/2014 5/16/20145/9/2014 5/13/2014

5/12/2014 5/13/20145/9/2014 5/16/2014

5/14/2014 5/16/20145/9/2014 5/13/2014

5/12/2014 5/13/20145/23/2014 5/30/20145/28/2014 5/30/20145/23/2014 5/27/20145/26/2014 5/27/20145/23/2014 5/30/20145/28/2014 5/30/20145/23/2014 5/27/20145/26/2014 5/27/2014

Post Qualification Evaluation

Award of Contract

5/30/2014 6/6/20146/4/2014 6/6/2014

5/30/2014 6/3/20146/2/2014 6/3/2014

6/20/2014 6/27/20146/25/2014 6/27/20146/23/2014 6/25/20146/24/2014 6/25/20146/20/2014 6/27/20146/25/2014 6/27/20147/11/2014 7/15/20147/14/2014 7/15/20146/20/2014 6/27/20146/25/2014 6/27/20146/23/2014 6/25/20146/24/2014 6/25/20147/25/2014 8/1/20147/29/2014 8/1/2014

- -- -

7/25/2014 8/1/20147/29/2014 8/1/2014

- -- -

Post Qualification Evaluation

Award of Contract

7/25/2014 8/1/20147/29/2014 8/1/2014

- -- -

7/25/2014 8/1/20147/29/2014 8/1/2014

- -- -

7/25/2014 8/1/20147/29/2014 8/1/2014

- -- -

8/3/2014 8/14/2014

8/7/2014 8/14/2014- -- -

8/18/2014 8/26/20148/22/2014 8/26/2014

- -- -

EDGARDO P. PERALTADistrict Engineer