Report to SNPWG

Transcript of Report to SNPWG. S-100 Still awaiting the portrayal component It is getting closer – model is...

Page 1: Report to SNPWG. S-100 Still awaiting the portrayal component It is getting closer – model is complete Agreed to incorporate a product specification template.

Report to SNPWG

Page 2: Report to SNPWG. S-100 Still awaiting the portrayal component It is getting closer – model is complete Agreed to incorporate a product specification template.

S-100Still awaiting the portrayal component

It is getting closer – model is completeAgreed to incorporate a product specification

template into S-100 for useTSMAD26 will discuss numerous proposals to

enhance better interoperability between products

Still working on a GML profile

Page 3: Report to SNPWG. S-100 Still awaiting the portrayal component It is getting closer – model is complete Agreed to incorporate a product specification template.

S-101Most of S-101 is nearing completion

Still waiting for S-100 portrayalDCEG will be stabilized this week

This is the foundation for the S-101 feature catalogue

Established an S-101 Risk Register to monitor progress of each of the S-101 components

Created a draft test strategy and test plan for the S-100/101 test beds

Completed the S-101 impact study

Page 4: Report to SNPWG. S-100 Still awaiting the portrayal component It is getting closer – model is complete Agreed to incorporate a product specification template.

Member StatesApprove S-101

UpdateS-57 to S-101

Convertor

FinalizeS-101

User Review and Input

OEMs Implement S-100 based ECDISECDIS

On-Shore Trials

Converted S-57 or Full S-101 ENC Data Available

S-101 Test Bed Developmentand Iterative Testing

ECDIS Sea Trials

OEMs Develop S-100 ECDIS

HSSC Approves

S-101

S-101 Draft Version

IEC 61174 PAS made available

Draft S-58 & S-64 for S-101 Available

Complete Portrayal Section of S-100 Finalize Portrayal Section of S-101

Finalize Draft of S-101 for Testbed

Update S-57 to S-101 Convertor and Make Sample S-101 Data

Available for Review

Sample S-101Data madeAvailable

RetireS-57 and S-52

Contract to CreatePortrayal Catalogue Builder

Final S-101 Stakeholder

Review

Manually Build Portrayal Cataloguefor Testbed

OEMs

TSMAD

HOs

Stakeholders

DIPWG

Responsible Party S-101 Development and S-100 Testbed Timeline

Draft S-58 & S-64 for S-

101

Release S-101 for Operational Use

S-101 Test Bed Development and Iterative Testing

Draft S-58 and S-64 for S-101

User Review and Input

APR MAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR

2013 2014

2014 2015 2016 2017 201920182013 …

Portrayal is the major dependency

Page 5: Report to SNPWG. S-100 Still awaiting the portrayal component It is getting closer – model is complete Agreed to incorporate a product specification template.

Upcoming TSMAD activitiesWorking to finalize S-58 and S-64 for HSSC6Continue to work with DIPWG on S-101

portrayal