Relationship of NNPWG to SNPWG SNWPG14 / Monaco 13th-17th Feb 2012.

13
Relationship of NNPWG to SNPWG SNWPG14 / Monaco 13th-17th Feb 2012

Transcript of Relationship of NNPWG to SNPWG SNWPG14 / Monaco 13th-17th Feb 2012.

Page 1: Relationship of NNPWG to SNPWG SNWPG14 / Monaco 13th-17th Feb 2012.

Relationship of NNPWG to SNPWG

SNWPG14 / Monaco 13th-17th Feb 2012

Page 2: Relationship of NNPWG to SNPWG SNWPG14 / Monaco 13th-17th Feb 2012.

www.fta.fi• <Toimialue>13th-17th Feb 2012 J. Nyholm 2

Authothority

International Hydrographic Organization

Page 3: Relationship of NNPWG to SNPWG SNWPG14 / Monaco 13th-17th Feb 2012.

www.fta.fi• <Toimialue>

Authothority

13th-17th Feb 2012 J. Nyholm 3

International Hydrographic Organization

Page 4: Relationship of NNPWG to SNPWG SNWPG14 / Monaco 13th-17th Feb 2012.

www.fta.fi• <Toimialue>

Nordic Nautical Publication Work Group (NNPWG)Establishment

13th-17th Feb 2012 J. Nyholm 6

16th BSHC Conference Agenda item ENorrköping, Sweden Explanatory Note19-21 September 2011 Denmark

The establishment of a Nordic Nautical Publication WG

Introduction

This explanatory note includes a presentation of status and initiatives related topublications in the Nordic Hydrographic Commission and an invitation for the Balticmember states to participate in the forthcoming work in a newly established NordicNautical Publication WG (NNPWG).. . . . . . The Working Group should:• Primarily focus on issues related to printed nautical publications (NP1) and tocorresponding digital copies (NP2).• If deemed appropriate and time permits also focus on NP3 and the co-operationwith SNPWG. In order to discuss which of NP information should be included inthe ECDIS and to agree on standards from a regional perspective.. . . . . .

Link to this document

Page 5: Relationship of NNPWG to SNPWG SNWPG14 / Monaco 13th-17th Feb 2012.

www.fta.fi• <Toimialue>

Highlights of ToRs

13th-17th Feb 2012 J. Nyholm 7

SNWPG NNWPG

To develop guidelines for the preparation of nautical publications, in a digital format compatible with ECDIS. The WG should: (i) Investigate the data format specifications, content and display requirements of digital nautical publications intended for use in ECDIS. (ii) Draft guidance document(s) and/or revised technical resolutions, as appropriate. (iii) Liaise with relevant IHO Technical WG’s to ensure, technical feasibility and compatibility of any developed proposals. ata format specifications, content and display requirements of digital nautical publications intended for use in ECDIS.

Link to Tor

The Nordic Hydrographic Commission (NHC) recognizes the need to manage and distribute information/data for improved and future Nautical Publications or the equivalent in various formats.

The Nordic Nautical Publications WG shall:a) Support the work of the IHO SNPWG.b) Investigate relevant use cases regarding use of nautical publication (NP) information.c) Suggest ways to present and distribute various NP products.d) Create guidelines for an HO to efficiently manage NP data supporting a multitude of NP products.

Link to Tor

Page 6: Relationship of NNPWG to SNPWG SNWPG14 / Monaco 13th-17th Feb 2012.

www.fta.fi• <Toimialue>

Rostock-meeting 13th-14th Dec 2011(participants from NSHC, BSHC & ARHC)

13th-17th Feb 2012 J. Nyholm 8

WorkshopThe future of nautical publications

Tuesday and Wednesday December 13th and 14th

BSH - Rostock - Germany

Page 7: Relationship of NNPWG to SNPWG SNWPG14 / Monaco 13th-17th Feb 2012.

www.fta.fi• <Toimialue>

Agenda

13th-17th Feb 2012 J. Nyholm 9

Day one: December 13, 2011 Theme Time Subject Responsible

Welcome 0900 - 1000 Welcome Host/Chair

Approval of the agenda Chair

Logistical information Host

Presentation of participants All

The goals and objectives of the workshop Chair

ToR for NNPWG Chair

Break 1000 - 1015

Status 1015 - 1200 MS’ presentation of relevant initiatives and future challenges related to nautical publications All

Highlights from questionnaire KMS

Break 1200 - 1300

Presentations 1300 - 1320 The work in SNPWG BSH

1320 - 1350 Creating a data model BSH

1350 - 1410 Experience from the BLAST project BSH/KMS

Break 1410 - 1430

Presentations 1430 - 1450 Nautical publications from a mariner’s perspective ?

1450 - 1510 Nautical publications from an HO perspective KMS

Teamwork 1510 - 1650 Group work (details to follow) on nautical publications: Past and present: paper (NP1) and digital (NP2) Future: integrated in the map (NP3)

All

Evaluation 1650 - 1700 Evaluation and preparations for the second day Chair

Day two: December 14, 2011 Theme Time Subject Responsible

Presentations 0900 - 1015 Welcome Host/Chair

Creating a new vision for nautical publications Chair

Presentation of group work from first day All

Break 1015 - 1030

Status and how to proceed

1015 - 1200 Summing up the challenges for the future KMS

Discussion on how to proceed All

Conclusions Chair

Closing 1200 Closing of the workshop Host/Chair

Page 8: Relationship of NNPWG to SNPWG SNWPG14 / Monaco 13th-17th Feb 2012.

www.fta.fi• <Toimialue>

The goals and objectives of the workshop

13th-17th Feb 2012 J. Nyholm 10

Learn to know your colleagues better

Exchange knowledge and insights

Create a framework for future cooperation regarding nautical publications

Investigate the possibility of closer cooperation

Sharpen our awareness of the development of publications, including the possibility of joint exchange of practical and/or operational solutions

Create a framework for discussing priorities

Agree on a way to proceed

Page 9: Relationship of NNPWG to SNPWG SNWPG14 / Monaco 13th-17th Feb 2012.

www.fta.fi• <Toimialue>

The goals and objectives of the workshop

13th-17th Feb 2012 J. Nyholm 11

After this workshop:

Gained insight into the status of other countries’ nautical publications

Gathered information about the current situation and discussed how to proceed

Established a forum for exchanging and sharing knowledge and technical solutions

Agreed on how to proceed

Page 10: Relationship of NNPWG to SNPWG SNWPG14 / Monaco 13th-17th Feb 2012.

www.fta.fi• <Toimialue>

Nordic Nautical Publications WG

13th-17th Feb 2012 J. Nyholm 12

At the NHC conference in 2010, the need for establishing a Nordic NauticalPublication Working Group as a formal working group was discussed.

One important issue was to clarify if the SNPWG would solve our challenges concerning publications in the future and thus make a regional WG redundant.

It was stated that:

• the aim of SNPWG is to develop guidelines for the preparation of nautical publications, in a digital format compatible with ECDIS.

• SNPWG will not provide guidelines for nautical publications in paper/printed version, nor the future content of nautical publications. • A coordinated Nordic effort with regards to nautical publications does therefore not conflict or overlap with the scope of SNPWG.

Page 11: Relationship of NNPWG to SNPWG SNWPG14 / Monaco 13th-17th Feb 2012.

www.fta.fi• <Toimialue>

Extact from ToR for NNPWG

13th-17th Feb 2012 J. Nyholm 13

The Working Group should:

• Primarily focus on issues related to printed nautical publications (NP1) and to corresponding digital copies (NP2).• If deemed appropriate and time permits also focus on NP3 and the co-operation with SNPWG. In order to discuss which of NP information should be included in the ECDIS and to agree on

• To forward its findings and recommendations for NP1s and NP2s which may have importance to the SNPWG for further evaluation

Page 12: Relationship of NNPWG to SNPWG SNWPG14 / Monaco 13th-17th Feb 2012.

www.fta.fi• <Toimialue>

Workshop Summary and Results

13th-17th Feb 2012 J. Nyholm 14

Page 13: Relationship of NNPWG to SNPWG SNWPG14 / Monaco 13th-17th Feb 2012.

www.fta.fi• <Toimialue>

Straight and open discussion

13th-17th Feb 2012 J. Nyholm 15

NNPWG SNPWG