WVONG SHIRE COUNCIL,

REPORT ON RECENT SCOURING OF TUMBI CREEK

MARCH 1992

vvrONG SHIRE building a better tomorrow!

• TUMBI CREEK - INDEX

• Page No.

1 Overa 11 Locality Map

• 2 Site 1 & 2

3 Si te 3 & 4

• 4 Site 5

5 Site 6A & B

• 6 Sites 1 - 68 Detail Map

Al Appendix A - Estimates Tumbi Creek Restoration

• . '

• - 1 -

Overall Locality Map

- 2 -

Site 1 - Photo 1

Scour 8 metres long, 2. 5 metres high and 2 metres deep. Undercutting root system of trees .

Site 2 - Photo 2

Viewing creek downstream. Extensive scouring on both banks .

.. •

- 3 -

Site 3 - Photo 3

Photo indicating fallen tree reaching from bank to bank, restricting water flow.

Site 4 - Photo 4

Small scour 3 metres long, 2 metres high and 1.5 metres deep, between 2 trees.

• - 4 -

• Site 5 - Photo 5

Large scour 6 metres long, 2 metres high and 2 metres deep.

r

- 5 -

Site 6 - Photo 6A & B

Tree undercut, across bank restricting flow, causing flow to scour beind root base.

• Q -«:

0 ~

• CJ 2; 0

>... ~ •

&

• 6.

APPENDIX A. •

• - Al -

APPENDIX "A" .. TUMBI CREEK RESTORATION

ESTIMATES

WORK ESTIMATED PRIORITY SITE REQUIRED ITEM COST

\ • 1 Construction of gabion wall 10m @ $l335/m $l3350 Medium (2m high) on mattress base. Fill behind and restoration. $ 2000

• 2 Construction of gabion wall 40m @ $2310/m $92400 Medium (1.5m high) on mattress base to both banks. Fill behind and restoration. $ 8000

• 3 Removal of tree from bank. $4000 Medium

4 Minor restoration. $2000 Medium

• 5 Construction of gabion wall 10m @ $1155/m $11550 Medium (1.5m high) on mattress base. Fill behind and restoration. $ 4000

• 6 Removal of large tree and restoration. $BOOO

ASSUMED ALL CROWN LAND - TOTAL COST $145300