Theme: Usage of calculation tools and BIMMay 2020
Report impression European Mechanical Installation Monitor – Q1 2020
2
IndexResearch background
Country installation profile
Turnover and order book development
Theme: Usage of calculation tools and BIM
Digitalisation and BIM usage on European level
United Kingdom
Germany
France
Poland
Belgium
The Netherlands
Appendix
3
Research topics
Fixed part:
Economic developments of the installation companies in Europe: order book and
turnover development
Specific topic:
Q1 2020 - Usage of calculation tools and BIMQ2 2020 - Prefab
Q3 2020 - DMU
Q4 2020 - Media Orientation & Consumption
Timeline
Methodology
Quantitative telephone interviews among professional HVAC installers & plumbers.
The fieldwork was carried out during the period of the COVID-19 pandemic situation and
serious lock down in most of the countries in the survey. Therefore, USP decided to
conduct fewer interviews in the 6 countries: The United Kingdom (125), Germany (125),
France (100), Poland (100), Belgium (75), and the Netherlands (75).
Research objective
Monitoring developments regarding main trends in the installation market on a regular basis, in order to facilitate the strategic decision making of our clients.
Report Q1
Report Q3
Report Q4
Aug ‘20May ‘20
Report Q2
RESEARCH
BACKGROUND
Nov ‘20 Feb ‘21
4
Methodology
From the next chapter onwards, the given results for each country are weighted
by company size. During the survey, companies of different sizes/ FTE (Full time
employees) categories were interviewed in order to find out if there are interesting
and remarkable differences between different-sized installation companies. Three
company size categories are formed:
• Small: 1-4 FTE
• Medium: 5-14 FTE
• Large: 15 FTE and more
METHODOLGY AND
STRUCTURE
Results
The results in this report on a total scale per country are weighted so that all three
FTE categories have an equal influence on the total country results. This is done
because larger companies have a larger impact on the installation sector in a
country, and we think it is important that big companies are also well represented
so that the results are not heavily influenced by many smaller companies.
Structure of the report
First of all, in order to create better insights and readability, the most-mentioned
answer(s) or most important findings are marked.
In chapter 2, insights will be given into the activities of the installation companies.
Chapter 3 will focus on the turnover and order books of the companies.
The theme of this quarter will be discussed in chapter 4.
Finally, in the appendix, additional information about the survey (questionnaire), a
detailed turnover/ order book overview and information about USP Marketing
Consultancy itself can be found.
5
This paragraph gives an overview of the positions of the
respondents and the size of the companies that were
interviewed for this survey. These results are unweighted, so
one can see the characteristics of the actual respondents/
companies that participated this quarter.
From the next chapter onwards, the given results for each
country are weighted by company size.
BACKGROUND
CHARACTERISTICS Company size(unweighted results)
1-4 FTE 5-14 FTE >15 FTE
The United Kingdom 20% 20% 20%
Germany 20% 20% 20%
France 20% 20% 20%
Poland 20% 20% 20%
Belgium 20% 20% 20%
The Netherlands 20% 20% 20%
The United Kingdom Owner / Director/ Manager 20% Project manager 20%
Germany Owner / Director/ Manager 20% Project manager 20%
France Owner / Director/ Manager 20% Project manager 20%
Poland Owner / Director/ Manager 20% Project manager 20%
Belgium Owner / Director/ Manager 20% Project manager 20%
The Netherlands Owner / Director/ Manager 20% Project manager 20%
Functions of the respondents – Top 2(unweighted results)
6
INDEXResearch background
Country installation profile
Turnover and order book development
Theme: Usage of calculation tools and BIM
Digitalisation and BIM usage on European level
United Kingdom
Germany
France
Poland
Belgium
The Netherlands
Appendix
7
TOTAL 1-4 FTE 5-14 FTE >15 FTE
Sample size 125 53 43 29
New build projects 20% 20% 20% 20%
Renovation 20% 20% 20% 20%
Maintenance, planned or not planned/
ad-hoc works20% 20% 20% 20%
TOTAL 1-4 FTE 5-14 FTE >15 FTE
Sample size 125 53 43 29
Residential 20% 20% 20% 20%
Non-residential 20% 20% 20% 20%
Industrial 20% 20% 20% 20%
Infrastructural 20% 20% 20% 20%
Core HVAC activities
SUMMARY | THE UNITED KINGDOM | GERMANY | FRANCE | POLAND | BELGIUM | THE NETHERLANDS
Other activities
TOTAL 1-4 FTE 5-14 FTE >15 FTE
Sample size 125 53 43 29
Total 3.0 3.0 3.0 3.0
Core HVAC activities 2.0 2.0 2.0 2.0
Other installation activities 1.0 1.0 1.0 1.0
Number of activities
Average turnover of the companies for 2019
Turnover distribution for 2019
90%
80%
70%
60%
50%
Heating installations
Hot & cold water installation
Installation of sanitary ware
Ventilation
Air conditioning and cooling
40%
30%
20%
Electrical installation
Home automation installation
Solar cell, solar collectors
8
IndexResearch background
Country installation profile
Turnover and order book development
Theme: Usage of calculation tools and BIM
Digitalisation and BIM usage on European level
United Kingdom
Germany
France
Poland
Belgium
The Netherlands
Appendix
9
INTRODUCTION | SUMMARY | UNITED KINGDOM | GERMANY | FRANCE | POLAND | BELGIUM | THE NETHERLANDS
Order book portfolioHow big is your current order book portfolio? So, for how many months will you be able to keep your current staff working?
3
4
5
6
7
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1
2017 2018 2019 2020
ORDER BOOK (MONTHS)
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula
eget dolor. Aenean massa.
10
INTRODUCTION | SUMMARY | UNITED KINGDOM | GERMANY | FRANCE | POLAND | BELGIUM | THE NETHERLANDS
Turnover outlookIf you compare your turnover of Q1-20 to the same quarter last year, how did your turnover develop?
20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20%
-70%
-50%
-30%
-10%
10%
30%
50%
70%
Q1-19 Q1-20 Q1-19 Q1-20 Q1-19 Q1-20 Q1-19 Q1-20 Q1-19 Q1-20 Q1-19 Q1-20
TURNOVER BALANCE
(% INCREASE minus % DECREASE)
TURNOVER BALANCE
(% INCREASE minus % DECREASE)
The United Kingdom Germany France Poland Belgium The Netherlands
PO
SIT
IVE
N
EG
AT
IVE
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula
eget dolor. Aenean massa.
11
The majority of installation companies expect lower turnover in 2020 due to the
COVID-19 pandemic. Polish installers foresee the biggest loss in turnover
90%
76%
96%
83%87%
78%
The United Kingdom Germany France Poland Belgium The Netherlands
36% 26% 26% 45% 32% 26%
Installation companies, expecting decreasing turnover in 2020 due to COVID-19Do you expect that Corona virus will impact your turnover this year? (% of companies expecting decrease)
Avg. turnover decrease
INTRODUCTION | SUMMARY | UNITED KINGDOM | GERMANY | FRANCE | POLAND | BELGIUM | THE NETHERLANDS
12
Turnover outlookIf you compare your turnover of Q1-20 to Q1-19, how did your turnover develop?
What are your expectations for the development in Q2-20?
Order book portfolioHow big is your current order book portfolio?
PO
SIT
IVE
N
EG
AT
IVE
COMPARISON SAME QUARTER LAST YEAR
TURNOVER BALANCE (% INCREASE minus % DECREASE) ORDER BOOK (MONTHS)
INTRODUCTION | SUMMARY | THE UNITED KINGDOM | GERMANY | FRANCE | POLAND | BELGIUM | THE NETHERLANDS
EU | THE UNITED KINGDOM
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula
eget dolor. Aenean massa.
40% 40% 40% 40% 40% 40% 40% 40%
-20%
-40%
-80%
-40%
0%
40%
80%
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Exp.Q2
2018 2019 2020
4,0
6,0
3
4
5
6
7
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1
2018 2019 2020
13
IndexResearch background
Country installation profile
Turnover and order book development
Theme: Usage of calculation tools and BIM
Digitalisation and BIM usage on European level
United Kingdom
Germany
France
Poland
Belgium
The Netherlands
Appendix
14
INTRODUCTION | EUROPEAN OVERVIEW
• Every quarter, besides the regular chapters about installation characteristics and turnover and order books, a theme will be discussed. The theme of the European
Mechanical Installation Monitor Q1 2020 is ‘Calculation Tools & Building Information Modelling (BIM)’. The same topic was also covered in 2015 and 2018.
• Nowadays, many installation systems have become more and more complex. Different types of installation systems are often connected with each other and
installers need to have knowledge about a broad range of installation systems. Besides that, on large scale building projects, installers need to work with several
other parties who are involved in the building process. This makes clear communication and close cooperation essential. To support the work of the installers,
manufacturers of installation systems try to develop different calculation tools. Building Information Modelling (BIM) is a concept which plays an important role in
today’s (especially large and complex) building projects. This chapter will give insights in the knowledge and usage of these calculation tools and BIM by the
installers in the different countries.
• The European overview presents the combined results of all BIM users in the 6 countries. This summarised overview about BIM users is needed, as the
penetration of BIM is still very limited and the number of measurements per country is very low.
• In the country chapters more detailed information can be found about:
• different types of calculations that are requested by clients and done by installers;
• the usage of calculation software and tools;
• the familiarity with and (potential) usage of BIM;
• the attitude towards BIM.
15
INTRODUCTION | DIGITALISATION: EUROPEAN OVERVIEW
Digital data exchange with different parties – Top 5Which of the following stakeholders do you digitally exchange data with?
Way of data exchangeHow often do you exchange data with external stakeholders via the following ways?
Paper E-mail Cloud-
storage
Digital
software
platforms
The United Kingdom 20% 20% 20% 20%
Germany 20% 20% 20% 20%
France 20% 20% 20% 20%
Poland 20% 20% 20% 20%
Belgium 20% 20% 20% 20%
The Netherlands 20% 20% 20% 20%
% always + regularly
Low level of
digitalisation
High level of
digitalisation
Always | Regularly | Sometimes | Not
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
% always +
regularly
20%
20%
20%
20%
20%
Building owners /end users
Contractors
Internal colleagues/ other
architects and designers
Manufacturers
Wholesalers
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula
eget dolor. Aenean massa.
16
20%
30%
40%
10%
20%
30%
40%
50%
60%
0%
50%
100%
2015 2018 2020 2021 2023 2025
INTRODUCTION | BIM USERS: EUROPEAN OVERVIEW
BIM awareness
BIM users
Average BIM awareness and usage development
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula
eget dolor. Aenean massa.
Expected percentage
of BIM users
17
The Netherlands
Low usage
High usage
Poland
Germany
United Kingdom
France
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula
eget dolor. Aenean massa.
Total awareness with BIM
Installers using BIM in their projects
BIM penetration among HVAC installers & plumbers in Europe
20%
20%
20%
20%
20%
20%
c
20%
20%
20%
20%
Belgium20%
20%
INTRODUCTION | BIM USERS: EUROPEAN OVERVIEW
18
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula
eget dolor. Aenean massa.
Up to 4 fte 5-14 fte ≥15 fte
BIM awareness 20%
BIM users 20% 20% 20%
20% 20%
BIM awareness and usage by company size
Company size (in full-time employees)
INTRODUCTION | BIM USERS: EUROPEAN OVERVIEW
19
20% 20% 20%20% 20% 20%
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo
ligula eget dolor. Aenean massa.
Average turnover for 2019 by new build and renovationHow would you distribute your total turnover from the beginning of 2019 until now over the following types of projects?
New build projects RenovationMaintenance, planned
or not planned Residential Non-residential Industrial Infrastructural
Average turnover for 2019 by residential and non-residential projectsHow would you distribute your total turnover from the beginning of 2019 until now over the following types of projects?
INTRODUCTION | BIM USERS: EUROPEAN OVERVIEW
BIM users | Non-users
20% 20% 20% 20%20% 20% 20% 20%
BIM users | Non-users
20
20% 20% 20% 20%20% 20% 20%
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo
ligula eget dolor. Aenean massa.
Number of projects done with BIMUntil now how many projects in BIM have you worked on?
1-5 projects 6-10 projects 11 and more
projects1 year 2 years 3-5 years 6 and more
years
Number of years with experience with BIMWhen did your company start to work with BIM?
INTRODUCTION | BIM USERS: EUROPEAN OVERVIEW
21
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula
eget dolor. Aenean massa.
Application areas of BIMFor which application areas do you use BIM?
20%
20%
20%
20%
20%
20%
20%
Electrical conduit systems
Hot and cold water systems
Rainwater systems
Soil and waste water systems
Surface heating and cooling systems
Ventilation systems
Other
Share of the turnover BIM users get from BIM projects
20%
INTRODUCTION | BIM USERS: EUROPEAN OVERVIEW
22
Manufacturers websites
MEPcontent
RevitCity
Other
Don't know
Availability of BIM software in the companyWhat BIM software/ platform do you use?
Platform to find / download BIM filesWhich platform are you using to find/download your BIM files?
20%
20%
20%
20%
20%
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula
eget dolor. Aenean massa.
20% 20%works with works with
BIM users who have their own BIM software
20%
INTRODUCTION | BIM USERS: EUROPEAN OVERVIEW
23
20% 20% 20%
How often BIM model needs to be adjusted as the BIM model is not matching with construction site situation
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula
eget dolor. Aenean massa.
Role of the installation companies in BIM projectsWhat was/is (normally) the role of your company in the projects you have done in BIM?
20%
20%
20%
20%
Engineer and install the
installations/ systems
Only engineer the systems, no
installation works
Only install the systems which
another company has designed
in BIM
Don't know
Frequency of starting installation works when BIM model is still incomplete
INTRODUCTION | BIM USERS: EUROPEAN OVERVIEW
20% 20% 20% 20% 20%
Always Most of the
time
Sometimes Rarely Never
Always Most of the time Never
24
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula
eget dolor. Aenean massa.
Most relevant features of BIM for the BIM users – Top 5Which of the following features of BIM do you think are most relevant for a company like yours?
20%
20%
20%
20%
20%
Collision detection between the
imported MEP system elements and
the architectural project elements
Determining quantities of materials,
equipment and man hours
Exchange of structured product
information via a Common Data
Environment
Generate/ Work with 2D drawings of
the installation system coming from the
3D model
To make 3D visualisation and
animation of the installation systems
INTRODUCTION | BIM USERS: EUROPEAN OVERVIEW
BIM users with requests from clients for working in BIM or BIM as a requirement for winning a projectHave you already received any requests from investors / clients for working in BIM or has it been a requirement for winning a project?
20%
20%
20%
20%
20%
No, we have never received request/
requirements for using BIM
Yes, we have received, but the
demand for BIM is still low
Yes, we have received and the
demand for BIM is growing
It has been a requirement for winning a
project
Don't know
25
Greatest advantages of BIM – Top 5What do you consider to be the greatest advantages of BIM?
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula
eget dolor. Aenean massa.
20%
20%
20%
20%
20%
Disadvantages of BIM – Top 5What do you consider to be the greatest limitations or pain points of BIM?
Better planning
Integrated work of different
parties
Lower failure costs
Quicker lead time of projects
Reduced calculation time
20%
20%
20%
20%
20%
Difficult to understand, not clear
what BIM is
Requires financial investment
Requires training/ gaining
knowledge
The full potential of BIM is not
clear to us
Too complex
INTRODUCTION | BIM USERS: EUROPEAN OVERVIEW
26
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula
eget dolor. Aenean massa.
Expectations towards manufactures in relation to BIMWhat do you expect from the manufactures in relation to BIM?
20%
20%
20%
20%
20%
20%
20%
20%
To be able to engineer in BIM
To make their BIM product information
available in open source libraries
To provide 3D BIM object information
for their assortment
To provide BIM information in IFC
format
To provide technical product
information/ specifications for BIM
Nothing
Other
Don't know
INTRODUCTION | BIM USERS: EUROPEAN OVERVIEW
BIM users who will stop working with a supplier that is not BIM ready.
20%
27
IndexResearch background
Country installation profile
Turnover and order book development
Theme: Usage of calculation tools and BIM
Digitalisation and BIM usage on European level
United Kingdom
Germany
France
Poland
Belgium
The Netherlands
Appendix
28
Calculation apps of a software
provider
Calculation apps of product
manufacturers
Calculation online tools of a software
provider
Calculation online tools of product
manufacturers
Calculation software
MEP design software
None
Other
Don't know
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula
eget dolor. Aenean massa.
20%
20%
20%
20%
20%
20%
20%
20%
20%
Base: n=xx, asked to all
Usage of calculation software and tools What software or calculation tools does your company use when designing/ installing products and systems?
Calculation on the energy / fuel savings
HVAC (length of pipes, heat loss, building heat
loss, fresh air in room, etc.)
Pumps (pump efficiency, pressure etc)
Water flow for water heating (optimum water flow,
volume of water flow, pipes total dimension, etc.)
None
20%
20%
20%
20%
20%
Most made calculations on the job site by installers – Top 5Based on your experience, what type of calculations does an installer need to make most often when working on the job site?
Base: n=xx, asked to all
THE UNITED KINGDOM | USAGE OF CALCULATION SOFTWARE AND TOOLS | FAMILIARITY WITH AND USAGE OF BIM | BIM IN PRACTICE | ATTITUDE TOWARDS BIM
29
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula
eget dolor. Aenean massa.
Base: n=xx, asked to all
Requested calculations/ information by clients Which calculations / information is requested most often by your clients when deciding on the product or system to be installed?
I do NOT use smart phone apps
on the job site
Calculations on CO2 emissions
Calculations on gas
For installation instructions
To consult technical information
and documents, product
documentation
20%
20%
20%
20%
20%
Usage of smart phone apps on the job site – Top 5Do you / your installers use smart phone apps on the job site and if yes what for?
Base: n=xx, asked to all
Calculation on the energy / fuel savings
Calculations on CO2 emissions
Calculations on costs savings
Calculations on the payback period of a
certain installation/ product
Heat loss calculations
Sizings calculation on boilers
Time estimation for providing calculation
or information
None
Other
Don't know/no opinion
THE UNITED KINGDOM | USAGE OF CALCULATION SOFTWARE AND TOOLS | FAMILIARITY WITH AND USAGE OF BIM | BIM IN PRACTICE | ATTITUDE TOWARDS BIM
30
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo
ligula eget dolor. Aenean massa.
Base: n=xx, asked to all
Way of data exchangeHow often do you exchange data with external stakeholders via the following ways?
Parties with which digital data is being exchangedWhich of the stakeholders do you digitally exchange data with?
% always +
regularly
Architects
Building owners /end users
Contractors
Governmental institutions
Internal colleagues/ other
architects and designers
Investor/ developer
Manufacturers
Mechanical/electrical
engineers
Wholesalers
THE UNITED KINGDOM | USAGE OF CALCULATION SOFTWARE AND TOOLS | FAMILIARITY WITH AND USAGE OF BIM | BIM IN PRACTICE | ATTITUDE TOWARDS BIM
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
Cloud-storage
Digital software platforms
On paper
Always | Regularly | Sometimes | Never
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
% always +
regularly
20%
20%
20%
20%
20%
20%
20%
20%
20%
Base: n=xx, asked to all
Always | Regularly | Sometimes | Never
31
20% 20% 20% 20% 20% 20%
40% 40% 40%
0%
50%
100%
2015 2018 2020 2021 2023 2025
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula
eget dolor. Aenean massa.
THE UNITED KINGDOM | USAGE OF CALCULATION SOFTWARE AND TOOLS | FAMILIARITY WITH AND USAGE OF BIM | BIM IN PRACTICE | ATTITUDE TOWARDS BIM
BIM awareness and usage
Expected percentage
of BIM users
Installers in the UK think that it will
take for BIM 20 years to be widely
used by installation companies.Base: n=xx, if at least heard of BIM
BIM awareness
BIM users
32
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo
ligula eget dolor. Aenean massa.
1-4 FTE
5-14 FTE
15 and more FTE
33%
33%
33%
33%
33%
33%
33%
33%
33%
2020
2018
2015
BIM user BIM-aware, non-user BIM unaware
THE UNITED KINGDOM | USAGE OF CALCULATION SOFTWARE AND TOOLS | FAMILIARITY WITH AND USAGE OF BIM | BIM IN PRACTICE | ATTITUDE TOWARDS BIM
Are you familiar with the term BIM and do you use it?
33%
33%
33%
33%
33%
33%
33%
33%
BIM user BIM-aware, non-user BIM unaware
Results 2020 split by company size
Base: n=xx, asked to allBase: n=xx, asked to all
33
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula
eget dolor. Aenean massa.
Received requests or requirement for using BIM Have you already received any requests from investors / clients for working in BIM or has it been a requirement for winning a project?
No, we have never received request/
requirements for using BIM
Yes, we have received, but the demand for BIM
is still low
It has been a requirement for winning a project
Don't know
20%
20%
20%
20%
THE UNITED KINGDOM | USAGE OF CALCULATION SOFTWARE AND TOOLS | FAMILIARITY WITH AND USAGE OF BIM | BIM IN PRACTICE | ATTITUDE TOWARDS BIM
Base: n=xx, if at least heard of BIM
Most relevant features of BIM Which of the following features of BIM do you think are most relevant for a company like yours?
Collision detection between the imported MEP
system elements and the architectural project
elements
Determining quantities of materials, equipment and
man hours
Exchange of structured product information via a
Common Data Environment
Extra analysis and simulation capabilities for fire
safety
Extra analysis and simulation capabilities for
sustainability
Generate/ Work with 2D drawings of the installation
system coming from the 3D model
To make 3D visualisation and animation of the
installation systems
20%
20%
20%
20%
20%
20%
20%
20%
Base: n=xx, asked to all
34
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo
ligula eget dolor. Aenean massa.
Base: n=xx, if at least heard of BIM
Perceived advantages of BIM What do you consider to be the greatest advantages of BIM?
Perceived disadvantages of BIM What do you consider to be the greatest limitations or pain points of BIM?
Base: n=xx, if at least heard of BIM
Better planning
Design and detailed plans are
made more quickly
Error free installation
High exchangeability of data/
information
Integrated work of different
parties
Lower failure costs
Quicker lead time of projects
Reduced calculation time
None
Other
Don't know
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
20%
Difficult to understand, not clear
what BIM is
Requires financial investment
Requires training/ gaining
knowledge
Too complex
None/ nothing
Other
Don't know
20%
20%
20%
20%
20%
20%
20%
THE UNITED KINGDOM | USAGE OF CALCULATION SOFTWARE AND TOOLS | FAMILIARITY WITH AND USAGE OF BIM | BIM IN PRACTICE | ATTITUDE TOWARDS BIM
35
33%
33%
12%
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula
eget dolor. Aenean massa.
Expectations towards manufactures in relation to BIM What do you expect from the manufactures in relation to BIM?
Stop working with suppliers if not BIM-readyCould you imagine to stop working with certain suppliers, that are not BIM-ready?
To make their BIM product information
available in open source libraries
To provide 3D BIM object information
for their assortment
To provide BIM information in IFC
format
To provide technical product
information/ specifications for BIM
Nothing
Other
Don't know
20%
20%
20%
20%
20%
20%
20%
THE UNITED KINGDOM | USAGE OF CALCULATION SOFTWARE AND TOOLS | FAMILIARITY WITH AND USAGE OF BIM | BIM IN PRACTICE | ATTITUDE TOWARDS BIM
Yes
No
Maybe
Base: n=xx, if at least heard of BIM Base: n=xx, if at least heard of BIM
36
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula
eget dolor. Aenean massa.
Base: n=xx, if at least heard of BIM
Statements regarding BIM What do you expect from the manufactures in relation to BIM?
20%
20%
20%
-20%
-20%
-20%
-20%
% AGREE minus % DISAGREE
More disagree More agree
BIM is relevant for all manufacturers of HVAC and plumbing products
regardless of their size
BIM is relevant only for installation companies working on big projects
BIM will lead to major changes in the way the different parties
collaborate in a construction project
Installers do not need to work in BIM, as they just have to install the
HVAC systems according to the drawings
There is an increasing need of BIM data from HVAC and plumbing
manufacturers
There is an increasing need of information from manufactures about
BIM as a planning method
We have enough knowledge about BIM and our role in BIM
THE UNITED KINGDOM | USAGE OF CALCULATION SOFTWARE AND TOOLS | FAMILIARITY WITH AND USAGE OF BIM | BIM IN PRACTICE | ATTITUDE TOWARDS BIM
37
IndexResearch background
Country installation profile
Turnover and order book development
Theme: Usage of calculation tools and BIM
Digitalisation and BIM usage on European level
United Kingdom
Germany
France
Poland
Belgium
The Netherlands
Appendix
3838
About USP
USP Marketing Consultancy
Total
70
Head office Subsidiary
Rotterdam Düsseldorf
Consultants
Research Analysts
Project managers
Market specialist installation, construction, home improvement and real estate
Dedicated and multi-client research
Active in the market for over 25 years
230+ dedicated market research projects annually
Revenue distribution
turnover coming from international projects
70%
turnover coming from dedicated market
research, 10% from multi client
90%
turnover coming from B2B, 30% B2C
70%
focus groups in-depth interviews
78 1,162
B2B CATI interviews
B2C online interviews
58,653 56,750
Research in
34countries annually
39
What we do
Examples Dedicated market research
• Tailor made
• Driven by your information needs
• Advice & consultancy based on facts and over 25 years of experience in the industry
• Worldwide coverage
• B2B, B2C, qualitative and quantitive research or a combination of both
• Within our market specialism, all types of researches can be conducted
• Targeting the right audience, with the right questions at the right time.
Segmentation Customerjourney
Branding Concept/product research
Customersatisfaction
Trends Distributionresearch
Marketexploration
Pricing Marketsize
39
40
We are active globally
Countries which we continuously research
Other countries which have been researched in past 2 years
40
4141
Principals of USP
DIY ConstructionInstallation
4242
Our multi-client research monitorsEuropean
Architectural
Barometer
European
Contractor
Monitor
European
Mechanical
Installation
Monitor
European
Electrical
Installation
Monitor
European
Painter Insight
Monitor
European
Home Improvement
Monitor
Target group Architects Building contractors HVAC installers Electrical installers Professional painters Consumers
Methodology
Annual sample size 5,800 interviews 2,050 interviews 3,200 interviews 3,800 interviews 2,300 interviews 26,400 interviews
Country scope • Germany
• United Kingdom
• France
• Netherlands
• Belgium
• Poland
• Spain
• Italy
• Germany
• United Kingdom
• France
• Netherlands
• Belgium
• Poland
• Spain
• Italy
• Germany
• United Kingdom
• France
• Netherlands
• Belgium
• Poland
• Germany
• United Kingdom
• France
• Netherlands
• Belgium
• Poland
• Spain
• Germany
• United Kingdom
• France
• Netherlands
• Belgium
• Poland
• Spain
• Italy
• Denmark
• Sweden
• Germany
• United Kingdom
• France
• Netherlands
• Belgium
• Poland
• Spain
• Italy
• Denmark
• Sweden
• Austria
Way of reporting Quarterly Bi-annually Quarterly Quarterly Annually Quarterly
2020 Theme topics • Q1: Media orientation &
consumption
• Q2: Shifts in building
methods
• Q3: City of the future
• Q4: Circularity &
sustainability
• H1: Circularity &
sustainability
• H2: Decision-making
• Q1: BIM & calculation
tools
• Q2: Prefab
• Q3: DMU
• Q4: Media orientation &
consumption
• Q1: Electrification
• Q2: Services in
installation sector
• Q3: Certification &
circularity
• Q4: Pricing
• Trend tracking
• Sustainability
• Labour shortage
• Online buying
• Future expectations
• Innovation needs
• Q1: Orientation & smart
homes
• Q2: Purchase channels
• Q3: Branding (A vs.
Private)
• Q4: DIFM vs. DIY
43
Max Euwelaan 51
3062 MA Rotterdam
+31-10-2066900
Call center +31-10-8002700
© , USP Marketing Consultancy B.V.
The information in this publication is strictly confidential and all relevant
copyrights, database rights and other (intellectual) property rights are
explicitly reserved. No part of this publication may be reproduced and/or
published without the prior written permission of USP Marketing
Consultancy B.V.
Ralitsa Ruseva
Consultant
+31 6 8321 1709
Hanane Bouazzaoui
Senior Research Analyst
+31 010 800 2707
Feel free to contact us for more information
44
© 19 May 2020, USP Marketing Consultancy B.V.
The information in this publication is strictly confidential and all relevant copyrights, database rights and other (intellectual)
property rights are explicitly reserved. No part of this publication may be reproduced and/or published without the prior
written permission of USP Marketing Consultancy B.V.