Report Configuration

21
 Clockwork A/S Product Modelling 42451 Mass Customization - Application of Pr oduct Configuration 23-09-2011

Transcript of Report Configuration

8/3/2019 Report Configuration

http://slidepdf.com/reader/full/report-configuration 1/21

 

Clockwork A/S Product Modelling

42451 Mass Customization - Application of Product Configuration

23-09-2011

8/3/2019 Report Configuration

http://slidepdf.com/reader/full/report-configuration 2/21

1

Table of ContentsIntroduction ................................................................................................................................................. 2

Problem Definition ....................................................................................................................................... 2

Development of Specification Processes ...................................................................................................... 3

Step 1: Identifying and characterizing the most important specification processes .................... .............. . 3

Step 2: Analysis of requirements for the specification processes .............................................................. 6

Step 3: Designing the future specification process .................................................................................... 7

Scenario 1 ............................................................................................................................................ 7

Scenario 2 ............................................................................................................................................ 8

Scenario 3 ............................................................................................................................................ 9

Step 4: Evaluation and choice of solution ............................................................................................... 10

Step 5: Plan of action and organization of further work .......................................................................... 12

Product analysis ......................................................................................................................................... 13

Product Variant Master .......................................................................................................................... 13

Productions sequence ............................................................................................................................ 16

Object Oriented Analysis ............................................................................................................................ 17

Class diagram ......................................................................................................................................... 17

CRC card................................................................................................................................................. 18

Object Oriented Design .............................................................................................................................. 19

8/3/2019 Report Configuration

http://slidepdf.com/reader/full/report-configuration 3/21

2

IntroductionThe world today forces both big and small companies to think about optimization, reducing prices well still

maintaining a level of customization to accommodate potential customers. There are so many companies

today and thereby a lot of competition especially with the East, growing like it does, to threatening the life

of a company. Companies are therefore forced to think in new ways and ease their workflow and workprocesses in order to reduce time, and thereby money, to e.g. make an offer to a customer. A way to do

this, which is more and more used, is by creating a configuration system to maintain the standardized and

trivial work.

A configuration system is a way to ease the creation of e.g. an offer, by selecting different component by

different rules and possibilities. By using such a configuration system a company can retrieve and keep the

competitive edge since they are now faster and cheaper since both time and money are saved.

Problem DefinitionThis project will deal with a small clock company called Clockwork A/S with about 50 employees producing

and selling clock in the European market. The company is selling around 21000 clocks a year divided

between four different product families. The company has four main departments connected to the sales

and engineering tasks: Sales, Design, Production preparation and Logistics. The company has various

communication problems between these departments. In addition a lot of time is spent on unnecessary

paper work, paper work often contains errors and throughput time is fairly high. An extern consultant has

recommended that Clockwork A/S work in a more process-oriented manner to reduce these problems. She

advised the company to focus on one product family for example product family D. Figure 1 shows the

product family D:

Figure 1 - Product family D

The focus of this project will be on identifying and solve the problems that Clockwork A/S faces today by

analyzing differing methods and possibilities to change the way the company is working today.

8/3/2019 Report Configuration

http://slidepdf.com/reader/full/report-configuration 4/21

3

The goal of this project is to help Clockwork A/S to standardize about 80% of the product family D and it is

these 80% that will be in focus. By standardizing product family D the company hopes to reduce the time

spend on specifying an order.

Development of Specification ProcessesIn order to fully understand and investigate the Clockwork A/S specification process and hereafter give

suggestions to identify the problems and room for improvement systematically, different steps will be

followed in order to investigate possible changes in the specification process to be more a systematic

approach. The different steps to analyze and investigate this will be:

1.  Identifying and characterizing the most important specification processes

2.  Analysis of requirements for the specification processes

3.  Designing the future specification process

4.  Evaluation and choice of solution

5.  Plan of action and organization of further work

Step 1: Identifying and characterizing the most important specification

processes

The first step when developing a new specification process is to analyze the current processes and

specifications. Improvements cannot be made unless there is a clear understanding of what the current

situation is.

The current specification processes related to the production of offers have been analyzed and depicted in

a flow diagram. Figure 2 show the sequence of events from the first time a customer inquires about a clockuntil production of the order begins. A flow diagram like the swimming lane diagram shown in figure 2 gives

a clear pitcher of who is involved in the processes, in what order they take place as well as highlighting if 

any time is wasted in avoidable interaction. This kind of diagram can be a good first tool to recognizing

what processes can be changed or eliminated to save both time and money. As value-adding and non-value

adding activities can often be clearly identified with a flow diagram.

Figure 2 shows that many different people and departments are involved in Clockwork´s A/S processes of 

taking orders and getting specifications ready before production ever starts. This means that responsibility

of the order changes hands frequently which increase the likelihood of mistakes being made. In general it is

presumed, when the amount of people handling an order increases the likelihood of errors increases.

Errors need to be limited as much as possible as they increase costs.

8/3/2019 Report Configuration

http://slidepdf.com/reader/full/report-configuration 5/21

4

8/3/2019 Report Configuration

http://slidepdf.com/reader/full/report-configuration 6/21

5

Figure 2 Flow diagram of current processes (THIS PITCHER WILL BE MADE MORE READABLEFOR FINAL REPORT)

As the current specification process is set up, both the Design- and Production departments take part in

making offers for small standard clocks. Ideally these departments should not take part in the process untilan order has been placed as that would decrease salary costs and time. Taking out the need for the Design-

and Production department to calculate offer could be achieved by setting up a configuration system. In

addition when looking at the whole process it is clear that time is often spent on coordinating collaboration

between many departments. This is both a waste of time and as before mentioned this increases the

likelihood of errors. The time spent on coordinating communication can be decreased with a configuration

system.

8/3/2019 Report Configuration

http://slidepdf.com/reader/full/report-configuration 7/21

6

Step 2: Analysis of requirements for the specification processes

Clockwork A/S has identified a few weaknesses in its current processes e.g. too much time spent on making

offers, a long delivery time and too many errors in offers. They have also identified a few goals for these

problems that need to be met so they can be competitive in their marketplace. This information has been

used to make a gap analysis, see table 1.

Gap analysis depicts the difference between the current performance and the target performance. It shows

the percentage of improvement that needs to be achieved to reduce the gap between the current

performance and the ultimate goal. The performance in the gap analysis has to be quantifiable, this is

necessary to keep track of if changes made to the process reduce the gap between current state and the

goal.

Table 1: Gap analysis

Current performance Goal Gap

Lead time for

producing offers

On average 7 days - large

variations in lead time(2-20 days)

Lead time for producing

offers max. 1 day afterorder

Reduction of about 86 %

Delivery time 3-4 weeks 1-2 weeks Reduction of 50-75%

Resource consumption

for producing offer and

lists of operations and

parts

5 hours 20-30 minutes Reduction of about 90 %

Quality of offers Less than 75% correct 99% correct Reduction of about 96 %

Quality of list of parts

and operations

80% correct 99% correct Reduction of about 95 %

The gap analysis shows five main areas that need improvement, they all relate to either time or quality. For

instance lead time for making an offer takes on average seven days but can take up to 20 days. Customers

are very unsatisfied with this service and they expect to receive an offer no later than the day after they

have made an enquiry. To reduce this gap Clockwork´s A/S needs to reduce this processing time by 85.7%.

In addition to these operational goals, there is another factor that is relevant in relation to the

development of Clockwork´s A/S specification processes, and that is accessibility of knowledge. Accessibility

of knowledge is hard to give an operational goal but should nevertheless be considered when developing a

specification process. This is of special concern for Clockwork A/S as in recent years a big turnover among

staff has resulted in a good deal of resources being used for training new employees. Turnovers can also

lead to loss of company knowledge.

As can be seen in table 1 the difference between the current performance and the goal performance is

quite significant. This table clearly shows that radical changes have to be made if Clockwork A/S is to

achieve its goal of becoming more competitive. A configuration system could be a radical solution to

decreasing these vast gaps.

8/3/2019 Report Configuration

http://slidepdf.com/reader/full/report-configuration 8/21

7

Step 3: Designing the future specification process

The future specification process for Clockwork A/S has to meet the demands of step 2 as well as consider

the problems that arose when examining the flow diagram in step 1. There are many different ways to

improve the specification processes that meet some or all of the requirements of step 1 and 2. To sort out

the best solution for the specification processes three scenarios were made with aim of picking the most

efficient and profitable solution. Here below are the three scenarios as well as a flow diagram of each

scenario.

Scenario 1

Salesperson with configuration system

This scenario has a configuration system to help the salesperson to give the correct information about the

products that the company have. The configuration system is on the salespersons computer and can

therefore only be accessed by a salesperson from the company. The configuration system is like a catalogue

on the computer. The normal procedure of the order, production and shipping could be as followed:

The CustomerThe customer contacts the sales department of the company requesting that he want to buy some clocks.

The sales department then arranges a meeting with the customer to help identify what kind of clock and in

what style the customer want. The salesperson and the customer meet and start creating the clock desired

by the customer.

The salesperson

The salesperson talks to the customer to identify the needs. The salesperson then checks the configuration

system to find out if the request from the customer is a standard clock. If this is the case then the

salesperson discuss with the customer to select the right clock by constantly consulting the configuration

system. The salesperson makes an offer to the customer based on the quantity and model of the clocks

using the configuration system. If the customer accepts the offer then the salesperson sends the

specifications to the Production preparation team.

Production preparation

The production team then creates the bill of material and the operational card thereby estimating a total

production time and delivering time for the finished products. They contact the salesperson to give this

information to the customer. Then the order is handed over to the production department.

Figure 3: Flow diagram of scenario 1 (Pitcher will be clearer in final report)

8/3/2019 Report Configuration

http://slidepdf.com/reader/full/report-configuration 9/21

8

Scenario 2

Web based order service with configuration system.

This scenario is a web based configuration system. This means that the company has a webpage where the

customer can make an order of the desired clocks. Furthermore is it possible for the customer to design its

own clock from the configuration system. The normal procedure of the order, production and shipping

could be as followed:

The customer

The customer logs on to the webpage of the company to find a user interface that allows the customer to

design its own clock by going through different steps to choose the different desired parts according to the

underlying configuration system. The configuration system makes sure that no unfeasible combinations of 

parts are made by the customer, thereby avoiding that a customer creates a nonstandard clock. As soon

as the customer has designed a clock and chosen the required quantity, he can see the price of the order.

This enables the customer to make the decision of whether or not he wants to proceed and confirm the

order. The customer immediately receives an order confirmation by e-mail which also includes an estimate

of when he can expect the arrival of the order.

Production preparation

As soon as a customer has confirmed an order the production team gets a notification that a new order has

arrived. The configuration system creates all the required paperwork (bill of material, list of operations,

CAD drawing etc.) that the production needs in order to process the order. The configuration system also

automatically checks if enough parts are on stock and if not notifying the production that new orders have

to be made. If no further parts are needed than what is on stock, the production can begin the order as

soon as production capacity is free. When the order is done it can be handed over to the logistics

department ready to ship to the customer.

Figure 4: Flow diagram of Scenario 2

8/3/2019 Report Configuration

http://slidepdf.com/reader/full/report-configuration 10/21

8/3/2019 Report Configuration

http://slidepdf.com/reader/full/report-configuration 11/21

10

Table 6 shows a large configuration system that includes offer making, planning, production, purchasing,

assembly, delivery etc. The configuration system that Clockwork plans, only relates to offer making and a

few specifications that are needed before production starts e.g. parts list and list of operations. The thin

black lines in table 6 indicate the framework which is included in the configuration system of scenario two

and three. (REMBER TO ASK LARS ABOUT TABLE 2)

Table 2: Content of the configuration system

Property models Product structure

model

Models of the product´s meeting with li fe cycle

systems

Internal

and

external

properti

es

Functional

properties

Solution

principl

es

Part model Factory

model

Process

model

Assembly

model

Transport

model

Generic

level

Rules for

calculati

ng price

and .

Rules for

calculating

battery

consumption and the

clock´s

mechanical

life span

Rules of 

selection

and

dimensioning of the

clock´s

component

s

Rules for

calculating

time

consumption

Rules for

describing

the

individualproductio

n

processes

Rules for

selecting

assembly

equipment and

calculating

assembly

time

Rules for

selecting

form of 

transportand

calculatin

g

transport

price

Instance

level

Table of 

price for

parts to

be used,

wage

costs and

overhea

d costs

Functional

description

of the

mechanism

used

List of 

parts,

drawings of 

parts, CRC-

cards

List of 

operations,

production

layout,

description

of 

production

equipmentetc.

Process

descriptio

n,

descriptio

n of tools,

etc.

Assembly

instruction

s, list of 

assembly

equipmen

t,

assembly

time etc.

List of 

transport

options,

transport

price,

descriptio

n of 

packagingtransport

document

s, etc.

Step 4: Evaluation and choice of solution

To be able to assess which of the scenarios stated above is most suitable for Clockwork A/S, an evaluation

was conducted. To ensure that the needs of the company have been met in most efficient way each

scenario has been evaluated against the gap analysis and compared to one another.

It is estimated that all the scenarios meets all the goals stated in the gap analysis. However scenario one

and three takes a bit more resources in demand concerning production of offers and lists of operations etc.

compared to scenario two. At the same time entails scenario two a flawless configuration system to meet

the goals concerning quality of offers, lists of parts and operations because there is no third part involved

to check the order before it is confirmed. This can affect both offer lead time and delivery time for the

desired product. But if the size of the configuration system required at Clockwork A/S is taken in to

consideration a flawless system should not be impossible to obtain.

8/3/2019 Report Configuration

http://slidepdf.com/reader/full/report-configuration 12/21

11

Scenario one is an improvement of the old process   if you look at the number of steps in the process. This

will decrease the time for producing offers as well as delivery time for the product. At the same time both

the salesperson and production team has a chance to check the order for errors before the productions

starts, this will ensure a low error rate and high quality of both offers and productions plans. Even though

this is an improvement from the old system the salesperson and production team will have to spend a lot of 

time using the system and communicate with one another, which is cost both time and money.

In scenario one the configuration system is only used by the salesperson and production team which means

that the user interface of the system does not have to be advanced. The employees can be trained in how

to use the program and the company does not have to consider how the interface reflects the company to

the customers, which will save a lot of money. But consideration has to be taken to the additional cost for

training the employees and the time the salespersons and production team spend using the system,

compared to if the customers would use the system themselves. A more advanced system, which means

more costly user interference, can pay off in the long run.

Scenario two makes the customer do all the work and at the same time gives the customer the freedom to

place the order whenever he/she has time. This process model will reduce the man-hours put in by the

employees and shorten the lead time of producing an order as well as delivery time of the product. To

make this process work optimally the configuration system has to be flawless to en sure a high quality of 

the orders and production plans produced by the system. But as stated above the size of the configuration

system needed makes this possible.

The fact that the customer uses the system on its own makes great demands on the user interface of the

system. To ensure that the customer can understand the system immediately and reduce the number of 

people calling the sale support a lot of time and money needs to be spent on the development of suitable

interface. It is also necessary that the interface reflects the right image to the costumer as well as stops the

customer gaining too much information from the company and its products. The investment in this kind of 

system must be compared to the reduced cost for personnel and possible increased sales.

Another benefit gained from using a system of this kind is that it can easily keep track of stock and facilitate

the purchasing group of the company. This will contribute to a more efficient purchasing as well as the

warehousing of parts in the company, which in turn will increase profit and contribute to a more efficient

organization.

The third scenario is an improvement of scenario one concerning lead time for offers and delivery time for

products. The salesperson sends the order to strait to production without consulting someone from the

production team, which saves time and money. Just as in scenario one the salesperson interacts with the

configuration system so there is no need for an advanced user interface. The company only has to take

notice to the cost for education of the employees in the sales department and integration of the system in

the production process. Even though the cost for personnel most likely would decrease when using this

kind of system this process necessitates that the customer have the time to contact a salesperson at the

company and that the salesperson have the time to service the customer, which naturally limits the room

for the company to grow.

8/3/2019 Report Configuration

http://slidepdf.com/reader/full/report-configuration 13/21

12

All these scenarios put pressure on the implementation process of the configuration system. A change like

this can make the employees feel replaceable and unwanted, a scenario which must be prevented. It is

most important that the employees feel involved in the process and that they understand the new work

routine, regardless of which of the scenarios is to be implemented.

The company must also be aware that it might take some time before the goals in the gap analysis are

fulfilled. Especially in the second scenario it might take some time to reach out to the customers and to get

them used to the new way of placing an order. But with a good interface and well planned advertising

campaign the time to reach the goal time and sales numbers can be considerably decreased.

Considering all the advantages and disadvantages stated above the second scenario is probably the most

profitable in the long run. Even though there is a large initial cost, the system will pay of due to reduced

cost for personnel and more accurate orders and production plans. To ensure that the configuration system

is flawless regarding errors in offers and assembly plans for the product the implementation can be done in

two faces. First a trial period where the salesperson makes the order in the system so he at the same time

can check for errors and lacks in the system and the production team can make sure that the system

interacts with the production process as planned. When the configuration system works satisfactory an

online version can be launched for the customers to use.

Step 5: Plan of action and organization of further work 

The last step in planning a future specification process is to work out a plan of action for the development

of scenario 2. A plan of action describes what activities are needed to implement scenario 2 and in what

order they are to be implemented, from analyzing and modeling the product range to definition of work

processes in the further specification process. The action plan for Clockwork A/S can be seen in table 3. The

table shows the activities for scenario 2, which employees are to perform the individual activities, the

expected time consumption and the start and finishing times.

Table 3: Plan of action of scenario 2

Activity Resource people Person

responsible

Expected time

consumption

Start End

Analysis and modelling

of product range

Preformed by project

leader (form design

department), consultant

and one sales staff member

3 man weeks 1.1 7.1

Programming of 

configuration system

Preformed by programmer

with input from project

leader and consultant

3 man weeks 7.1 28.1

Training of the system´s

users in the configuration

system

Programmer and project

leader will train sales staff 

1 man week 28.1 30.1

Face 1 of 

implementation: Test of 

configuration system

Programmer and project

leader, together with all

members of sales staff 

4 man week 1.2 1.3

Face 2 of 

implementation: Launch

internet site

Preformed by programmer 1 man day 1.3 1.3

8/3/2019 Report Configuration

http://slidepdf.com/reader/full/report-configuration 14/21

13

Definition of work

processes in the future

specification process

Project leader and

consultant

2 man weeks 26.2 3.3

Table 3 shows that the main participants in the action plan are an external consultant, an externalprogrammer, the sales staff and the project manager. The project manager will be an in-house employee

for the Design department.

Table 3 shows that Clockwork A/S could start their first face of implementation after one month, with the

sales staff working with the configuration system to resolve any problem that might come up. In two

months time the configuration system should be ready to launch on the internet.

Product analysisTo obtain an overview of the product range in product family D at Clockwork A/S a product variant master

(PVM) has been drawn up, see figure 6 below. This was conducted by using the program Product ModelManager.

Product Variant Master

8/3/2019 Report Configuration

http://slidepdf.com/reader/full/report-configuration 15/21

14

Figure 6: Product Variant Master for family D

8/3/2019 Report Configuration

http://slidepdf.com/reader/full/report-configuration 16/21

15

The aim of a product variant master is to create an overview of the product range at the company. The

overview is used to simplify the evaluation of the product range in aspects such as variation in the product

range, if the product range is sufficient to the target market etc. It is also used to detect new combination

possibilities and identify unnecessary variations in the product range. There are different ways to approach

the structuring of a product variant master depending on what the goal is and for whom the product

variant master is made. In general there are three different approaches:

The customers view

The engineers view

The production view

In this case the salespersons place the most central role in the company and see the product from both the

customers and the engineers point of view. With that in mind the product variant master is constructed

after how the salesperson works when he/she selects the parts that are to be included in a specific

customized clock.

To be create a product variant master for the product the first step is to identify the part-of modules orparts of the product, i.e. the parts or modules that appears in all the products in the product family that is

been analyzed. In the product family analyzed in this assignment the following seven parts have been

identified:

Mount

Foot

Dial

Pivot

Mechanism

Hands

Plastic Film

All the different variation (also called kind-of) of the pars are then specified and can be inserted in a

generic structure in to the product variant master. When making the generic structure all the important

connection between the different parts and their variation is stated and rules of how different parts and

modules can be combined is described. An example of the generic structure of the clocks pivot is presented

in the figure 7 below.

Figure 7: Generic structure of the pivot 

8/3/2019 Report Configuration

http://slidepdf.com/reader/full/report-configuration 17/21

16

So in this case the product variant master describes which parts in the product family D can be combined

and all the variations of the different parts.

Productions sequence

To be able to analyze the production of the clocks in product family D a master for the production sequence

has been drawn up. A graphic overview of the sequence is presented in figure 8. The overview of the

production sequence is divided into the different processes conducted during the production of clocks. The

production process has been divided into two major processes; the making of the mount and the making of 

the foot. These processes have then been divided into three different groups connect to the three different

types of mounts/feet. The time in minutes for each operation is stated below the name of the operation.

Figure 8: Production sequence

8/3/2019 Report Configuration

http://slidepdf.com/reader/full/report-configuration 18/21

17

Object Oriented AnalysisObject oriented analysis (OOA) is a way of visualizing the different steps a product has to go through in

order to be finished. The OOA can help structuring a complex system, because it gives a good overview of 

the processes and parts. Another good reason to use the OOA is that it makes it easier to see which

components and processes are dependent on which thereby making it easier to distribute the different taskbetween the departments. This helps reducing the total finishing time since more departments can work on

the same time instead of waiting for each other for no reason when the system is not clear to all

departments. The system can be visualized in different ways: the class diagram and with the use of Class,

Responsibly and Collaboration (CRC) card.

Class diagram

The class diagram is based on the results from the analysis made in the previous chapters, of the product

families. This class diagram is way of expand this information and create a more object oriented view of the

system focusing on development of the new configuration system software.

First the system is being visualized in the class diagram illustration the different classes and their

relationship with each other in figure 9. Second a CRC card is made for each of the different classes and

those can be seen in appendix A.

The class diagram is more or less the same as what has been created in the PVM, but the class diagram is

more visualized and therefore they serve different purposes. The PVM is more for the engineers while the

class diagram is more for the programmers. On each of the classes there will be some number telling how

many of this kind of child class is used to make one of the parent class.

There are different kinds of classes that can be present I a system, at it is therefore important to distinguish

between them in order for the programmer to do the job fast, efficient and correct. The different classes

that can be used are:

1.  Generalization describes the structure where classes inherits the different properties from each

other

2.  Aggregation describes the structure where child classes are used to complete parent classes

3.  Association describes the structure where classes are associated with each other but without

inheriting anything or is being used in the parent class.

In the class diagram below of product family D is the aggregation structure being used, showing the

different parts inheriting the properties and which, and how many, are used to complete the clock.

8/3/2019 Report Configuration

http://slidepdf.com/reader/full/report-configuration 19/21

18

Figure 9: Class diagram of product family D

CRC card

The class diagram is an overview of the classes and their relationships, but it does not tell anything about

the different classes e.g. attributes, this is where the CRC card can be helpful. One CRC card is made foreach of the classes and it describes everything that is relevant for the specified class. An example of a CRC

card of the dial is presented in figure 10 and the rest of the CRC cards can be seen in appendix A.

Class name Date Author

Dial 22/09/11 Group 2

Responsibilities:

Describes the different dial possibilities the customers can choose from. It also describes the different

properties and rules of the dial.

Aggregation Generalization

Superparts: Mount Module Superclass:

Subparts: Type 1, Type 2 Subclass:

Sketch:

Knows/Does Collaboration

Knows:

Width(75;95)

RoundedCorners(Yes;No)

Does:

Dial.Width < Mount.Width

If Mount = 3 Then Type3.RoundedCorners =

Dial.RoundedCorners

Mount

Mount

Figure 10: CRC Card for dial

8/3/2019 Report Configuration

http://slidepdf.com/reader/full/report-configuration 20/21

19

The CRC cards describe the properties of relevant item. The different kinds of properties that are used in

the CRC cards are described below:

y  Attributes the Knows, also known as the attributes, describes different properties that describe

all objects in the class. Attributes are used as guideline for the programmers when the system has

to be build

y  Methods the Does, also known as the methods, describes how the different objects and classes

interact and are connected with each other. Methods describes in which way the programmer

should get the different classes to work together.

Object Oriented DesignThe purpose of object-oriented design is to use a set of objects that have specifications from the Object

Oriented Analysis and then, using these specifications, piece the objects together to form a larger object as

a whole. These specifications must also take into account any restrictions that may be involved with the

different objects.

A user/customer usually has some preferences or desired specifications for any product. In the case of 

Clockwork A/S, when working with scenario 1 and 2, the user interface involves interaction on a computer,

from either the customer or salesperson. The user/customer is then always connected to the system, and

would get a constant update of any restraints based on specifications, comments or remarks from the

manufacturer, and an updated price based on choices made for the specifications.

The user/customer is also constantly updated on the appearance of the product. This would be done as the

specifications are made. Every time an input into the system is made, an image of the final product is

updated, giving the user/customer a feel of seeing the finished product come to life.

The experience would however be different depending on whether the customer is doing the process fromhome/office, or if it were a salesperson at the store. However, the process in which this is done would be

the same.

In Scenario 1, where the salesperson is present, he would see much more information about the different

parts that are included, and the general layout of his program would be different.

When it comes to scenario 2, where the customer is going through the process from home or at the office,

they would see a very simple and flowing design of the process. This would be done through Clockworks

A/Ss website, and it would be created so as to make sure the customer does not get confused or sees

information that is not relevant to them (part numbers, etc).

Scenario 3 involves most of the same steps in scenario 1, except the customer is not on location.

While the customer may have certain requirements to the product, they cannot always be filled due to

restrictions on the objects that are involved. They will specify these requirements to the

system/salesperson, and, if there are no restraints, the system will create a model for the customer.

8/3/2019 Report Configuration

http://slidepdf.com/reader/full/report-configuration 21/21

20

The following diagrams depict the first two steps of the process, seen from a customers view, and if dial

type 1 is chosen:

Figure 11: The first step of the user interface for selecting a clock

Figure 12: The second step of the user interface for selecting a clock