REGIONS OF Tibati · 100 Climate Solutions Project Campaign 2016 100 Climate Solutions Project...

2
100 Climate Solutions Project Campaign ~ 2016 Renewable Energies REGIONS OF CLIMATE ACTION Summary Mandating Authority : Expected project CAPEX : Main stakeholders Social and environmental impact Location and population Project Type : Photovoltaic solar power plant in Tibati Raising the socio-economic conditions of the inhabitants of the city of Tibati and sur- rounding towns The project involves the implementation of a photovoltaic solar plant with a production capacity of 30 MW and a storage capacity of 5 MW Tibati Council 80’753’000 € CRES S.A (Cameroon Renewable Energy Systems), Tibati Council; S2 Services Sarl; Exicel; Rural Electrification Agency (Fonds d’Electrification Rurale) Tibati city, Djerem Depart- ment, Adamawa Region, Cameroon. 26 683 inh. Solar

Transcript of REGIONS OF Tibati · 100 Climate Solutions Project Campaign 2016 100 Climate Solutions Project...

Page 1: REGIONS OF Tibati · 100 Climate Solutions Project Campaign 2016 100 Climate Solutions Project Campaign 2016 Renewable Energies REGIONS OF CLIMATE ACTION Summary Qerhexmrk Eyxlsvmx\b

100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016

Renewable Energies

REGIONS OFCLIMATE ACTION

Summary

Mandating Authority :

Expected project CAPEX :

Main stakeholders

Social and environmental impact

Location and population

Project Type :

Photovoltaic solar power plant in Tibati

Raising the socio-economic conditions of the inhabitants of the city of Tibati and sur-rounding towns

The project involves the implementation of a photovoltaic solar plant with a production capacity of 30 MW and a storage capacity of 5 MW

Tibati Council

80’753’000 €

CRES S.A (Cameroon Renewable Energy Systems), Tibati Council; S2 Services Sarl; Exicel; Rural Electrification Agency (Fonds d’Electrification Rurale)

Tibati city, Djerem Depart-ment, Adamawa Region, Cameroon.26 683 inh.

Solar

Page 2: REGIONS OF Tibati · 100 Climate Solutions Project Campaign 2016 100 Climate Solutions Project Campaign 2016 Renewable Energies REGIONS OF CLIMATE ACTION Summary Qerhexmrk Eyxlsvmx\b

100 Climate Solutions Project Campaign ~ 2016100 Climate Solutions Project Campaign ~ 2016

Project maturity ( IFC / World Bank Categories )

STAGE 1 : Concept Development, Site identification

Site identified :

Site access :

Technology :

Expected installed capacity :

Energy resource data

Expected type of contract :

Adequate road Rail access Port facilities

Comments

Building permits signed :

Grid Connection :

Land concession signed :

STAGE 4 : Permitting / Financing / Contracts

Operation and Maintenance Contractor :

STAGE 5 : Engineering / Construction / Commercial Operation

Engineering, Procurement and Construction Contractor :

Power Purchase Agreement

Off-Taker :

Tenor : Price of electricity :

Identified sources of fundings

Environmental impact study

STAGE 2 : Pre-Feasibility Studies

Pre-feasibility study :

STAGE 3 : Feasibility Studies

Feasibility study :

✓ ✓

STAGE 1 : Concept Development, Site identification

STAGE 2 : Pre-Feasibility Studies

STAGE 3 : Feasibility Studies

STAGE 4 : Permit t ing / Financing / Contracts

STAGE 5 : Engineering/Construction/Commercial Operation

Yes but not complete

A final design (sort of business plan) was submitted and presented to the Ministry of Energy. The document is being improved to reflect the instructions, comments, and suggestions of the Ministry.

Photovoltaic Panels

Yes

No, but the site offered by the Lamido and the town hall is defined and localized

No

CRES SA; BG Ingénieurs Conseils SA; S2 Services Sarl; Exicel

CRES SA; S2 Services Sarl; Exicel

No

No

The connection will be done once the project has started; a study was made for this and must be completed and followed by SONATREL

Ongoing discussions with the Department of Energy, but the buyer will SONATREL newly created.

To be defined To be defined

Fonds d’Electrification Rurale; other to be defined

30 MW

PVgyst

Engineering Procurement Construction / BOT, BOOT, etc.

Yes