www.normmakina.com.tr ANKARA/TURKEY 2015 NORM MAKİNA SAN. İNŞ. TİC.LTD.ŞTİ. REFERANCE LIST 2015 COMPLETED WORKS

Transcript of REFERANCE LIST 2015 COMPLETED WORKS°NA … · Revision works for the electrostatic precipitator of...

Page 1: REFERANCE LIST 2015 COMPLETED WORKS°NA … · Revision works for the electrostatic precipitator of the clinker cooler. 9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003 Denizli Cement

www.normmakina.com.tr

AN

KA

RA

/TU

RK

EY

20

15

NO

RM

MA

KİN

A S

AN

. İN

Ş. T

İC.L

TD

.ŞT

İ.

REFERANCE LIST

2015

COMPLETED WORKS

Page 2: REFERANCE LIST 2015 COMPLETED WORKS°NA … · Revision works for the electrostatic precipitator of the clinker cooler. 9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003 Denizli Cement

Sayfa 1 / 26

NORM MAKINA SAN. INS. TIC. LTD. STI.

GENERAL REFERENCE LIST

APRIL 2015

COMPLETED WORKS

1. YİBİTAŞ LAFARGE ORTA ANADOLU ÇİMENTO SAN. TİC. A.Ş. / 2002

Sivas Cement Plant

1.1. Revision of the electrostatic precipitator number I and II.

1.2. Fabrication and installation of the outlet pipe of the electrostatic

precipitator as well as the dismantling of the existing one.

1.3. Insulation works of the electrostatic precipitator.

2. VİCAT BAŞTAŞ BAŞKENT ÇİMENTO SAN. TİC. A.Ş. / 2002

Bastas Cement Plant

2.1. Clinker Cooler : Fabrication of the both fix and movable chassis

2.2. Fabrication of the fixation plate for crusher.

2.3. Lime Unit: Installation of the casette filter with the capacity of 5000 m3/h

as well as the piping works.

2.4. Packing Unit: Installation of the casette filter with the capacity of 1250

m3/h as well as the piping works.

2.5. Loesche Mill: Fabrication of the plates ( Hardox 400 )

2.6. Revision of the dust duct for cooling tower (Project, fabrication,

installation and dismantling of the existing one)

2.7. Lime quenching unit: Fabrication of the screw conveyor (Ø 500 mm)

3. VİCAT BAŞTAŞ BAŞKENT ÇİMENTO SAN. TİC. A.Ş. / 2003

Bastas Cement Plant

3.1. General revision works for clinker cooler.

3.2. Rotary Kiln Unit: reparation of the inlet seal

3.3. Rotary Kiln Unit: renovation of the outlet seal

Page 3: REFERANCE LIST 2015 COMPLETED WORKS°NA … · Revision works for the electrostatic precipitator of the clinker cooler. 9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003 Denizli Cement

Sayfa 2 / 26

4. OYAK ÜNYE ÇİMENTO SAN. TİC. A.Ş. / 2003

Unye Cement Plant

Fabrication and installation of the steel construction of the stock hall unit

5. SET ÇİMENTO SAN TİC A.Ş. / 2003

Trakya Cement Plant

General revision works for electrostatic precipitators for both clinker cooler

and raw mill.

6. BPB DOĞAN ALÇI FABRİKASI ( AYMAŞ A.Ş. ) / 2003

Hasanoglan Plaster Plant

Renovation work for the outlet seal ring of the rotary kiln number II.

7. IŞIKLAR ŞARAPÇILIK SAN. VE TİC. A.Ş. / 2003

Kalecik Plant

Fabrication and Installation works of the tanks for waste water treatment

facility.

8. BURSA ÇİMENTO FABRİKASI ( ÇİMTEK A.Ş. ) / 2003

Bursa Cement Plant

Revision works for the electrostatic precipitator of the clinker cooler.

9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003

Denizli Cement Plant

9.1. Fabrication, installation and insulation works for the hot gas line of the

cogeneration unit.

9.2. Revision works for the hoppers of the raw metarials and polyurethane

coating works (Electrostatic precipitator of the raw mill number 1 – 2 )

10. BPB DOĞAN ALÇI FABRİKASI / 2003

Hasanoglan Plaster Plant

Renovation of the outlet seal ring for the rotary kiln number I.

11. VİCAT – KONYA ÇİMENTO SAN. TİC A.Ş. / 2003

Konya Cement Plant

11.1. Fabrication of the buckets for the bucket elevator for the raw mill.

Page 4: REFERANCE LIST 2015 COMPLETED WORKS°NA … · Revision works for the electrostatic precipitator of the clinker cooler. 9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003 Denizli Cement

Sayfa 3 / 26

11.2. Fabrication of the kiln shell (Ø 4200x825 outlet side) for the rotary kiln

number II as well as the replacement of it.

12. YİBİTAŞ LAFARGE ORTA ANADOLU ÇİMENTO SAN. TİC.A. Ş. /2003

Corum Cement Plant

Revision of the kiln shell of the rotary kiln.

13. AŞKALE ÇİMENTO SAN. TİC. A.Ş. / 2003

Askale Cement Plant

13.1. Fabrication of the chair pad and support plates for the tyre of the rotary

kiln.

13.2. Fabrication of the caterpillar of the pan conveyor for the coal feeding

13.3. Fabrication of the bucket for the Loesche return elevator

14. OYAK – ELAZIĞ ALTINOVA ÇİM. SAN. TİC. A.Ş. ( DAL TEKNİK ) / 2003 - 2004

Elazıg Cement Plant

14.1. Erection of the rotary kiln ( KHD Ø 4,0x59 mt. )

14.2. Fabrication of the whole local equipments like cyclones, inlet chamber

dust ducts e.t.c. located on preheater tower and installation of them as well.

Weight of fabrication works: 650 ton

Weight of erection works: 1200 ton

15. NUH ÇİMENTO SAN. A.Ş. ( GÜLERMAK ) / 2004

Nuh Cement Plant

Erection of the rotary kiln number III. ( FLS Ø 5,5x66 mt )

Weight of erection works: 1100 ton

16. BPB GYPSUM ÜRETİM VE TİC. LTD. ŞTİ. / 2004

Hasanoglan Plaster Plant

Dust sealing works for the screw conveyors, belt conveyors, cyclones and

pipe lines for the perlite unit.

17. ADO ÇİMENTO SAN. TİC. A.Ş. / 2004-2005

Kızılkaya Cement Plant

I. Clinker Production Line

17.1. Maintenance and erection of the rotary kiln together with it’s all

equipments ( Polysius Ø 4,2x60 mt. )

Page 5: REFERANCE LIST 2015 COMPLETED WORKS°NA … · Revision works for the electrostatic precipitator of the clinker cooler. 9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003 Denizli Cement

Sayfa 4 / 26

17.2. Installation of the coal mill unit and fabrication of the local equipments

(PFEIFFER )

17.3. Installation of the Clinker cooler unit and fabrication of the local

equipments ( IKN )

Weight of the local fabrication works: 650 ton

Weight of the erection works: 1350 ton

18. BETONSAN – BETON VE ÇİMENTO SAN. A.Ş. / 2005

Lalahan Cement Grinding Facility.

Alignment works for the gear box and bearings of the Cement mill

19. VİCAT – KONYA ÇİMENTO SAN. A.Ş. / 2005

Konya Cement Plant

Both Fabrication and installation works for the raw metarial feeding line of the

Raw mill.

Weight of the local fabrication works: 350 ton

Weight of the erection works: 600 ton

20. DENİZLİ ÇİMENTO SAN.TİC. A.Ş. / 2005

Denizli Cement Plant

20.1. Revision of the ESP number II( Changing of the discharge electrodes,

maintenace of the hammers e.t.c.)

20.2. Replacement of the light kiln shell, heavy kiln shell with tyre, rollers and

adjustment of the gear and drive unit for the rotary kiln number II.

21. ÇİMENTAŞ KARS ÇİMENTO SAN. TİC. A.Ş. / 2005

Kars Cement Plant

General revision works for clinker cooler, crusher, raw and coal mill e.t.c.

22. ÇİMSA ÇİMENTO SAN. TİC. A.Ş. / 2005

Kayseri Cement Plant

Erection of the Rotary Kiln ( FLS Ø 3,6x55 mt. )

23. İZAYDAŞ İZMİT ATIK VE ARTIKLARI DEĞERLENDİRME A.Ş. / 2005

Revision of the rotary kiln. ( Ø 4,2x12 mt. )

Page 6: REFERANCE LIST 2015 COMPLETED WORKS°NA … · Revision works for the electrostatic precipitator of the clinker cooler. 9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003 Denizli Cement

Sayfa 5 / 26

24. ADO ÇİMENTO SAN. A.Ş. / 2005

Antalya Cement Grinding Facility

Replacement of gears for the gearbox of the cement.

25. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. ( TİMSAN A.Ş. ) / 2005-2006

Denizli Cement Plant

Fabrication of the local equipments for the clinker stock hall with the capacity

of 90.000 ton and installation of them.

26. SANKO – ÇİMKO ÇİMENTO VE BETON SAN. TİC. A.Ş. / 2005 - 2006

Adıyaman Cement Plant

Erection and fabrication works of the cement mill unit.( UDCM / Ø 3,8x13 )

Weight of the local fabrication worksi: 1050 ton

Weight of the Installation works: 1500 ton

27. VİCAT BAŞTAŞ BAŞKENT ÇİMENTO SAN. TİC. A.Ş. / 2006

Bastas Cement Plant

27.1. Maintenance works for the clinker cooler

27.2. Maintenance works for the stacker and reclaimer

28. TÜRKERLER İNŞ. TURİZM MADENCİLİK TİC. SAN. A.Ş. / 2006

Ladik Cement Plant

Fabrication of the inlet gas duct of the electrostatic precipitator as weel as the

expansion joint.

29. AS ÇİMENTO SAN. TİC. A.Ş. / 2006

Kızılkaya Cement Plant - LM 56.3+3.

Fabrication and installation works for Loesche cement mill unit ( 210 ton/h

Weight of the local fabrication worksi: 440 ton

Weight of the Installation works: 1228 ton

30. YİBİTAŞ LAFARGE ORTA ANADOLU ÇİMENTO SAN.TİC.A.Ş. /2007

Corum Cement Plant

Fabrication and installation works for the modification works of the clinker

cooler.

Weight of the local fabrication works : 35 ton

Weight of the erection works : 90 ton

Page 7: REFERANCE LIST 2015 COMPLETED WORKS°NA … · Revision works for the electrostatic precipitator of the clinker cooler. 9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003 Denizli Cement

Sayfa 6 / 26

31. OYAK – MARDİN ÇİMENTO SAN. TİC. A.Ş. (DAL TEKNİK)/ 2007

Mardin Cement Plant

31.1. Erection of the Rotary Kiln Unit ( HUMBOLDT Ø 4,33x65 mt. )

31.2.Fabrication of the cyclones located on preheater tower ( OMAG )

Weight of the local fabrication works: 550 ton

Weight of the erection works: 900 ton

32. OYAK BOLU ÇİMENTO SAN. A.Ş. / 2007

Saraykoy Grinding Facility.

Replacement of the trunnion for cement mill

33. VİCAT KONYA ÇİMENTO SAN. A.Ş. / 2007

Konya Cement Plant

Fabrication and replacement of the beams for the raw mill(Loesche LM 45-4 )

34. VİCAT – KONYA ÇİMENTO SAN. A.Ş. ( 2006 – 2007 )

Konya Cement Plant

Installation of the cement mill unit (FCB – Horomill 2 Ø 3800 )

Weight of the local fabrication works: 1200 ton

Weight of the erection works: 2100 ton

35. SANKO – ÇİMKO ÇİMENTO FABRİKASI ( EKON – PROKON ). / 2007

Kahramanmaras Cement Plant

35.1. Installation of the rotary kiln unit.( Polysius Ø 5,6x87 mt )

35.2. Installation of the raw mill. (Polysius RM 51 / 26 ) ( 3 units )

35.3. Installation of the coal mill unit (Polysius RMK 25 / 12) ( 2 Units )

35.4. Installation of the other equipments Fans / Elevators

Weight of the erection works : 5500 ton

36. AS ÇİMENTO SAN. TİC. A.Ş. / 2007

Kızılkaya Cement Plant

Replacement of the kiln shell for rotary kiln number I (PolysiusØ 4,0 x60 mt.)

Page 8: REFERANCE LIST 2015 COMPLETED WORKS°NA … · Revision works for the electrostatic precipitator of the clinker cooler. 9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003 Denizli Cement

Sayfa 7 / 26

37. VİCAT BAŞTAŞ BAŞKENT ÇİMENTO SAN. TİC. A.Ş. / 2007

Bastas Cement Plant

Replacement of the seperator of the raw mill named Loesche LM 45-4 and

some revision works.

38. ÇİMSA ÇİMENTO SAN. TİC. A.Ş. / 2007 - 2008

Eskisehir Cement Plant

38.1. Erection of the rotary kiln unit (FLS Ø 3,6x55 mt )

38.2. Erection of the Clinker cooler unit ( FLS )

38.3. Erection of the electrostatic presipitator fort he Clinker cooler ( FLS )

38.4. Erection of the clinker transport lines.

Total weight of the erection works: 1600 ton

39. AS ÇİMENTO SAN. VE TİC. A.Ş. / 2007 - 2008

Kızılkaya Cement Plant

Clinker production line number II

39.1. Erection of the raw mill unit and local fabrication works ( PFEIFFER

AG / MPS 5300 )

39.2. Erection of the coal mill unit and local fabrication works ( PFEIFFER AG

/ MPS 3070 )

39.3. Erection of the rotary kiln unit. (CITIC Ø 5,6x87 mt. )

39.4. Erection of the clinker cooler unit ( IKN )

Weight of the local fabrication works : 2100 ton

Weight of the erection works : 5050 ton

40. VİCAT – KONYA ÇİMENTO SAN. A.Ş. / 2008

Konya Cement Plant

Replacement work of the casing of the cement mill number I ( FCB – Horomill

1 Ø 3800mm )

41. AS ÇİMENTO SAN. TİC. A.Ş./ 2008

Kızılkaya Cement Plant.

Erection of the Clinker silo with the capacity of 30000 ton and local

fabrication works

Weight of the local fabrication works: 1200 ton

Weight of the erection works: 2200 ton

Page 9: REFERANCE LIST 2015 COMPLETED WORKS°NA … · Revision works for the electrostatic precipitator of the clinker cooler. 9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003 Denizli Cement

Sayfa 8 / 26

42. KİPAŞ KAHRAMANMARAŞ ÇİMENTO SAN. TİC. A.Ş.(SARHAN)/ 2008

Kahramanmaras Cement Plant

Clinker production line number 1.

42.1. Erection of the rotary kiln unit. ( KHD Ø 4,6x54 mt. )

42.2. Erection of the clinker cooler unit and transport line. (KHD – Pyrofloor )

42.3. Erection of the raw mill. ( PFEIFFER AG / MPS 4500 )

Total weight of the erection works : 2400 ton

43. ÇİMSA ÇİMENTO SAN. TİC. A.Ş. / 2008

Eskisehir Cement Plant

43.1. Local fabrication ,dismantling and installation works for the

modernization of the coal transportation system of the clinker production line.

43.2. Replacement of the impeller of the ID fan.

43.3. Replacement of the impeller of the fan for the electrostatic presipitator

of the raw mill.

44. SET ÇİMENTO SAN. TİC.A. Ş / 2008

Balıkesir Cement Plant

Replacement of the heavy kiln shell with tyre and rollers.

(HUMBOLDT - Ø 3.6 x 54 mt.)

45. LAFARGE VAN ÇİMENTO A.Ş./ 2008

Van Cement Plant

Fabrication of the light and heavy kiln shell ( Ø 3,6 x 11 mt. )

46. SET ÇİMENTO SAN. TİC.A. Ş / 2008

Ankara Cement Plant

Replacement of the kiln shell for the rotary kiln number 3 and some revision

works ( FCB- Ø 4,4 x 64 mt. )

Fabrication of the cyclone for the hot gas line of the coal mill and installation.

47. CİMPOR ÇORUM ÇİMENTO SAN. TİC. A.Ş. /2008

Corum Cement Plant

Replacement of the casing of the mill number III ( KHD / Ø 2,2 x 13 mt )

Page 10: REFERANCE LIST 2015 COMPLETED WORKS°NA … · Revision works for the electrostatic precipitator of the clinker cooler. 9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003 Denizli Cement

Sayfa 9 / 26

48. NUH ÇİMENTO SAN. A.Ş. (ANDRİTZ) / 2008-2009

Nuh Cement Plant

Solid waste disposal facility (sludge drying)

Both fabrication and installation of some equipments.

49. AS ÇİMENTO SAN. TİC. A.Ş./ 2008-2009

Kızılkaya Cement Plant

Erection of the raw mill unit. ( Hefei – HRM / 3700 E )

Total weight of the erection works: 350 ton.

50. VİCAT BAŞTAŞ BAŞKENT ÇİMENTO SAN. TİC. A.Ş. / 2008-2009

Bastas Cement Plant

Solid waste burnning and stocking facility

Weight of the local fabrication works: 168 ton

Weight of the erection works: 225 ton

51. ETİ ALUMİNYUM A.Ş / 2009

Seydisehir Aluminium Facilities

Revision of the rotary kiln number II (Rus / Ø 3,6 x 75 mt. )

Fabrication of the chair pad for the tyre

52. BETA MAKİNA / 2009

Ankara gendarmes sewing workshops

Erection of the steel construction - 265 ton

53. CİMPOR YOZGAT ÇİMENTO SAN. TİC. A.Ş. /2009

Yozgat Cement Plant

Replacement of the casing and impeller of the fan for raw mill.

54. CİMPOR SİVAS ÇİMENTO SAN. TİC. A.Ş. /2009

Sivas Cement Plant

1.Fabrication of the structure holding the burner pipe of the rotary kiln and

replacement of the burner pipe.

2. Replacement of the trunnion of the raw mill.

Page 11: REFERANCE LIST 2015 COMPLETED WORKS°NA … · Revision works for the electrostatic precipitator of the clinker cooler. 9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003 Denizli Cement

Sayfa 10 / 26

55. SURİYE TARTOUS ÇİMENTO FABRİKASI / 2009

Replacement of the heavy kiln shell with tyre and rollers and adjustment of

the gear. ( Ø 4,6 * 69 mt )

56. AS ÇİMENTO SAN. VE TİC. A.Ş. / 2009

Kızılkaya Cement Plant

Revision works for clinker silo.

Revision works for Rotary kiln line 1

Installation of the packing unit.

Revision of the elevator for tras dryer.

Fabrication of the screw conveyors under the filter. ( 60 ton/h – 5 units )

Fabrication of the chair pad for the tyre of the rotary kiln.

Fabrication of the driver and carrier shafts for crusher.

Erection of the Mass machine cement cooler unit

57. VİCAT BAŞTAŞ BAŞKENT ÇİM. SAN. VE TİC. A.Ş. / 2009

Bastas Cement Plant

Fabrication of the beams for Loesche mill

Fabrication of the discahrge chute

Fabrication rotary valve for waste burnning facility.

Replacement of the valves at the waste burnning facility

Fabrication of the upper pulley of the elevator for the cement mills number 1

and 2.

58. OYAK BOLU ÇİMENTO SAN. A.Ş. / 2009

Ankara Grinding Facility.

Fabrication of the bucket for packing unit. (400mm-500mm-630mm)

59. SET ÇİMENTO SAN. VE TİC. A.Ş. / 2009

Balıkesir Cement Plant

General revision work for the clinker cooler. ( IKN ) Fabrication and erection

works.

Modification works for the bag filter with the capacity of 15.000 m2/h

Insulation works for the hot gas pipe.

Page 12: REFERANCE LIST 2015 COMPLETED WORKS°NA … · Revision works for the electrostatic precipitator of the clinker cooler. 9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003 Denizli Cement

Sayfa 11 / 26

60. ÇİMKO ÇİMENTO VE BETON SAN. A.Ş. / 2009

Kahramanmaras Cement Plant

Fabrication works for the pan conveyor number L11.01.01 and L11.01.02

Measuring works for rotary kiln

Revision of the inlet seal for the rotary kiln.

Revision of the electrostatic presipitator for klinker cooler.

Fabrication of the expansion joint for cooling tower. ( Ø3020*1260 )

Execution of the cement transport line( Project, fabrication ,installation )

Execution of the elevator for the cement transportation and it’s tower ( 200

t/h, 28 mt – Project ,fabrication ,installation)

Fabrication of the outlet kiln shell of the rotary kiln ( Ø5500*1450mm )

Replacement of the burner pipe.

Fabrication of the air-slide ( 630 mm )

Replacement of the rotor for crusher.

Replacement of the sleeve of the raw mill

61. CİMPOR ÇORUM ÇİMENTO SAN. TİC. A.Ş. /2009

Corum Cement Plant

Replacement of the cement ball mill shell (3,8*13mt)

Fabrication and installation of the base frame of the gearbox and motor of the

Raw mill. ( KHD / Ø 2,2 x 13 mt. )

Cold Measuring the alignment of the Rotary Kiln

Replacement of the chair pad under the tyre of the rotary kiln.

62. VİCAT – KONYA ÇİMENTO SAN. A.Ş. / 2009-2010

Konya Cement Plant

Fabrication and replacement of the outlet kiln shell of the rotary kiln number II

( Ø 4200x825 mm. )

63. AŞKALE ÇİMENTO SAN. TİC. A.Ş. /2009

Trabzon Cement Plant

Fabrication of the beam under the rail for the overhead crane in the stockhall.

Fabrication of the pulley of the cooling ventilator

Fabrication of the seperation valve for air-slide ( 300mm. 2 units)

Fabrication of the casing and buckets of the Aumund elevator (5 units )

Fabrication of the ventilator pulley of the elevator number 3

Page 13: REFERANCE LIST 2015 COMPLETED WORKS°NA … · Revision works for the electrostatic precipitator of the clinker cooler. 9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003 Denizli Cement

Sayfa 12 / 26

64. SET ÇİMENTO SAN. TİC.A. Ş /2009-2010

Pınarhisar Cement Plant

Extension of the lenght of the precalcination for the rotary kiln number II.

( Project-Fabrication-Erection )

65. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2010

Denizli Cement Plant

Modification works for the cyclone DF1 SO4

Fabrication and installation works for the hot gas duct between cogeneration

and raw mill number 3

66. AS ÇİMENTO SAN. TİC. A.Ş. / 2010

Kızılkaya Cement Plant

Replacement of the outlet trunnion of the cement mill number II and

adjustment of the drive unit.

Installation of the rotary scale for the packing unit number IV

Fabrication and installation works of the steel silo and transport lines

( 1500 ton )

Fabrication and installation works of the steel silo and transport lines

( 1000 ton )

Revision of the gearbox of the raw mill number MPS 5300

Revision of the rotary kiln number 2 and replacement of the burner pipe of

the rotary kiln

67. AŞKALE ÇİMENTO SAN. TİC. A.Ş. / 2010

Askale Cement Plant.

Fabrication of the casing of the crusher of the trass

Fabrication of the weighing hopper of raw mill.

Fabrication of the casing of the crusher for the rotary kiln number II.

68. SANKO – ÇİMKO ÇİMENTO FABRİKASI / 2010

Kahramanmaras Cement Plant

Fabrication of the outlet kiln shell of the rotary kiln ( Ø 5.6 x 1.45 mt. )

Fabrication of the slide gate valve ( DN 800 )

Fabrication of the retaining ring for rotary kiln

Fabrication of the protector for switch

Revision works for the clinker production line.

Page 14: REFERANCE LIST 2015 COMPLETED WORKS°NA … · Revision works for the electrostatic precipitator of the clinker cooler. 9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003 Denizli Cement

Sayfa 13 / 26

Belt conveyor ( 200T/h - 3 unit )(project, fabrication, installation)

Fabrication of the seperation valve for air slide ( 315 mm. )

Fabrication of the valves for the feeding pipes in preheater tower.

Fabrication of the sealing and extension parts of the tertiary air duct.

Replacement of the louvres of the seperators for the cement mills number I.II.

III.

Execution of the overhead cranes and bridges ( 20 Ton, 2Ton, 1Ton )

( Project , fabrication, installation )

Various steel and platform works (55 Ton)

Various steel and platform works (36 Ton)

Fabrication of the casing of the air slide ( 315 mm. )

Cement transportation line and bridges for the air slides

69. OYAK – MARDİN ÇİMENTO SAN. TİC. A.Ş. / 2010

Mardin Cement Plant

Revision of the rotary kiln number I and replacment of the kiln shell and tyre

Revision of the elektrostatic presipitator for raw mill, replacement of the

collecting and discharge electrodes.

General revision works for preheater tower

Fabrication of the chair pad for rotary kilns number I.and II.

Fabrication of the base frame for the ventilator of the gas of chimney.

70. VİCAT – KONYA ÇİMENTO SAN. A.Ş. / 2010

Konya Cement Plant

Revision of the electrostatic precipitator for raw mill. ( Redecam).

Fabrication of the casing of the gear box for the overhead crane.

71. ÇİMSA ÇİMENTO SAN. TİC. A.Ş. / 2010

Mersin Cement Plant

Adjustment of the drive unit and gear of the rotary ( FLS - Ø 5.5 x 87 mt. )

72. SET ÇİMENTO SAN. TİC.A. Ş / 2010

Ambarlı Cement Grinding and packing Facility

Revision of the cement mills number I. and II.

Page 15: REFERANCE LIST 2015 COMPLETED WORKS°NA … · Revision works for the electrostatic precipitator of the clinker cooler. 9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003 Denizli Cement

Sayfa 14 / 26

73. SET ÇİMENTO SAN. TİC.A. Ş / 2010

Pınarhisar Cement Plant

Revision of the rotary kiln number II. ( Replacement of the heavy kiln shell

together with tyre )

Revision of the IHI raw mill and replacement of the rotor of the seperator 2.

Manufacturing and installation of Cement Mill body outlet side (Ø 3,8*11 mt)

Replacement of the outlet bearing of the cement mill number 2

SET ÇİMENTO SAN. TİC.A. Ş / 2010

Ankara Cement Plant

Fabrication and installation of the hot gas pipe of the clinker cooler for the

rotary kiln number 3

74. CİMPOR ÇORUM ÇİMENTO SAN. TİC. A.Ş. / 2010

Corum Cement Plant

Revision of the rotary kiln

75. CİMPOR YOZGAT ÇİMENTO SAN. TİC. A.Ş. / 2010

Yozgat Cement Plant

General modification works for clinker cooler unit ( Fabrication and

installation of the both fix and movable frames e.t.c.)

76. OYAK BOLU ÇİMENTO SAN. TİC. A.Ş. / 2010

Eregli Cement Grinding Facility – Loesche LM 53. 3+3

Local fabrication and installation works for the grinding

Weight of the local fabrication works: 400 ton

Weight of the installation works. : 1350 ton

77. VİCAT-KONYA ÇİMENTO SAN.A.Ş. – 2010

Konya Cement Plant

Fabrication and installation works for the clinker transporatation system

Weight of the local fabrication works: 142 ton

Weight of the installation works: 215 ton

Page 16: REFERANCE LIST 2015 COMPLETED WORKS°NA … · Revision works for the electrostatic precipitator of the clinker cooler. 9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003 Denizli Cement

Sayfa 15 / 26

78. RENAİSSANCE CONSTRUKSİON / RUSYA. 2010 / 2011 – ( NORM-CCM )

Verhnebakansky Cement Plant -6200 Tpd.

6200 Tpd. Fabrication and Installation Works For The Complete Cement

Production Line

Raw mill feeding

Erection of the electrostatic presipitator for raw mill

Installation of the equipments located on the preheater tower

Installation of the rotary kiln unit

Installation of the clinker cooler unit and electrostatic presipitator

Fabrication of the cyclones and gas ducts ( 2250 ton )

79. SET ÇİMENTO SAN. TİC.A. Ş / 2010

Ankara Cement Plant

Revision of the rotary kiln number II ( Ø 4.2*60 )

Replacement of the heavy kiln shell together with tyre

80. OYAK – MARDİN ÇİMENTO SAN. TİC. A.Ş. / 2010

Mardin Cement Plant

Fabrication of the chair pad and support plates for tyre.

81. ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. / 2010-2011

Eskisehir Cement Plant

Extension of the calcination in facility I.

Fabrication works: 425 ton

Installation works: 380 ton

Dismounting works: 106 ton

82. VİCAT-KONYA ÇİMENTO SAN.A.Ş. / 2010-2011

Konya Cement Plant

Both fabrication and installation of the beams for Loesche raw mill

83. SANKO – ÇİMKO ÇİMENTO FABRİKASI / 2010-2011

Kahramanmaras Cement Plant

Fabrication of the guillotine valve with actuator

(2440*2440mm) - 3 units

(1700*1200mm) - 4 units

(P200 *300mm )- 4 units

Page 17: REFERANCE LIST 2015 COMPLETED WORKS°NA … · Revision works for the electrostatic precipitator of the clinker cooler. 9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003 Denizli Cement

Sayfa 16 / 26

84. ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. / 2010-2011

Mersin Cement Plant

Replacement of the kiln shell on which Girth Gear is located ( FLS Ø

5.2*6mt. )

85. VİCAT-KONYA ÇİMENTO SAN.A.Ş. / 2010-2011

Konya Cement Plant.

Fabrication and replacement of the heavy kiln shell together with tyre and

also fabrication and installation of the inlet and outlet section of the rotary kiln

number I (KHD – 4.2mt. )

86. ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. / 2010-2011

Eskisehir Cement Plant

Replacement of the heavy kiln shell inlet and outlet side together with

tyre. ( MİAG - Ø 3.6mt)

87. OYAK BOLU ÇİMENTO SAN. TİC. A.Ş. / 2011

Eregli Cemnet Grinding Facility.

Execution of the cement silo with the capacity of 550 ton (2 units)

88. CİMPOR ANKARA ÇİMENTO SAN. TİC. A.Ş. / 2011

Ankara Hasanoglan Cement Plant

Replacement of the burner pipe of the rotary kiln.

89. CİMPOR YOZGAT ÇİMENTO SAN. TİC. A.Ş. / 2011

Yozgat Cement Plant

Replacement of the burner pipe of the rotary kiln

90. AŞKALE ÇİMENTO SAN. TİC. A.Ş. / 2011

Askale Cement Plant

Revision of the raw mill.

Revision of the rotary kiln and preheater tower.

Replacement of the beams and maintenace works for the clinker stock

hall.

Page 18: REFERANCE LIST 2015 COMPLETED WORKS°NA … · Revision works for the electrostatic precipitator of the clinker cooler. 9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003 Denizli Cement

Sayfa 17 / 26

91. SANKO – ÇİMKO ÇİMENTO FABRİKASI / 2011

Kahramanmaras Cement Plant

Dismounting ,maintenance and installation of the gear box of the raw mii

number 3.

Replacement of the fans for clinker cooler.

Replacement of the gear of the main drive of the rotary kiln

92. VİCAT-KONYA ÇİMENTO SAN.A.Ş. / 2011

Konya Cement Plant

Execution of the 150 m3 coal silo (Project, Fabrication and installation)

Weight of the fabrication works: 125 ton

Weight of the installation works: 140 ton

Weight of the dismounting works: 10 ton

93. ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. / 2011

Eskisehir Cement Plant

Installation of the HOT DISK REACTOR for the facility number 2 and

fabrication of some equipment for this Project.

Weight of the fabrication works : 115... ton

Weight of the installation works : 360... ton

Weight of the dismounting works : 120… ton

94. ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. / 2011

Nigde Cement Plant

Revision of the rotary kiln. ( KHD - Ø 3.8*54mt.)

95. OYAK BOLU ÇİMENTO SAN. TİC. A.Ş. / 2012

Bolu Cement Plant

Revision of the rotary kiln ( Ø 4.6*64mt- KHD )

Replacement of the both tertiary air duct and kiln hood

Replacement of the outlet part of the rotary kiln, outlet side tyre and

rollers.

Adjustment of the girth gear

Maintenance of the cyclones in the preheater tower

Dismounting of the cyclones number O1 and V1 and installation of the

new ones.

Page 19: REFERANCE LIST 2015 COMPLETED WORKS°NA … · Revision works for the electrostatic precipitator of the clinker cooler. 9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003 Denizli Cement

Sayfa 18 / 26

97. BEUMER MaschienenfabrikGMBH.- 2012

Fabrication of the various kind of elevator casing-160 ton

98. CİMPOR SİVAS ÇİMENTO SAN. TİC. A.Ş. / 2012

Sivas Cement Plant

Replacement of the burner pipe of the rotary kiln

99. RENAİSSANCE CONSTRÜKSİYON / RUSYA. 2012 / 2013 – ( NORM-CCM )

Sebryakov Cement Plant - Mihailovka.

Fabrication and installation of the clinker production line (4000 Tpd. )

Site Fabrication

Fabrication of the cyclones and ducts – 1250 ton

Workshop Fabrication

Fabrication of the some equipments in our workshop located on Ankara-

TURKEY ( Light kiln sections of the rotary kiln ,stacker-reclaimer,Apron conveyor,belt

conveyors ) - 600 ton

Erection

Erection of the raw mill unit.

Erection of the equipments in preheater tower

Erection of the rotary kiln unit

Erection of the clinker cooler unit and electrostatic precipitator for clinker

cooler.

Erection of the electrostatic precipitator for raw mill.

100. RENAİSSANCE CONSTRÜKSİYON / RUSYA. 2012 / 2013 – ( NORM-CCM )

Novocement Cement Plant-Novorosisky.

Installation of the some units for clinker production line ( 4000 Tpd. )

Total weight of the installation : 3000 ton.

101. KİPAŞ KAHRAMANMARAŞ ÇİMENTO SAN. TİC. A.Ş./ 2012/2013/2014

Kahramanmaras Cement Plant

Fabrication and installation works for the clinker production line

number II .

Fabrication of the steel structure : 6 500 ton

Fabrication of the technological equipments : 4 000 ton

(Casing of the filters ,some parts for the clinker cooler ,cyclones ,

Page 20: REFERANCE LIST 2015 COMPLETED WORKS°NA … · Revision works for the electrostatic precipitator of the clinker cooler. 9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003 Denizli Cement

Sayfa 19 / 26

. hoppers, gas ducts ,chimney e.t.c. )

Fabrication of the mechanical Equipments : 1 500 ton

(Casing of the coal, cement and raw mills ,seperators ,base frame of

the rollers for the rotary kiln ,base frame of the roller press and their accessories ,valves

,expansion joints ,air slides and e.t.c.)

Total weight of the installation works : 15 000 ton

Insulation works : 20 000 m2

Cladding works : 35 000 m2

General installation works for air, water and lubrication

102. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2012

Denizli Cement Plant

Cladding works for the roof of the cement silo

Weight of the fabrication works : 46 ton

Weight of the installation works : 46 ton

Weight of the dismounting works : 5 ton

Cladding of the roof : 600m²

103. ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. / 2012

Eskisehir Cement Plant

Fabrication and installation works for the transport line of the raw metarial

Weight of the fabrication works : 220 ton

Weight of the installation works : 235 ton

Weight of the dismounting works : 120 ton

Insulation works : 132 m2

Cladding Works : 1350 m2

104. ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. 2012 / 2013

Mersin Cement Plant

Installation of the HAC (Cement facility with Calcium aluminate )

Weight of the fabrication works : 485 ton

Weight of the installation works : 570 ton

Weight of the dismounting works : 120 ton

Insulation works : 295 m2

Cladding Works : 4 500 m2

Page 21: REFERANCE LIST 2015 COMPLETED WORKS°NA … · Revision works for the electrostatic precipitator of the clinker cooler. 9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003 Denizli Cement

Sayfa 20 / 26

105. VİCAT BAŞTAŞ BAŞKENT ÇİM. SAN. VE TİC. A.Ş. / 2013

Bastas Cement Plant

Installation and fabrication works for the Roller Press Unit labelled BK -2

Weight of the fabrication of the technological equipments : 161 ton

Weight of the fabrication of the steel construction : 877 ton

Weight of the fabrication of the mechanical equipments : 45 ton

Weight of the installation of the both technological and process equipments

: 1230 ton

Installation of the steel construction : 877 ton

Cladding works : 7600 m²

Insulation works : 3180 m²

106. ÖZBEKİSTAN DZHİZAK ÇİMENTO FABRİKASI.(DAL TEKNİK) / 2013

Fabrication of the paddle box for cement mill

Fabrication of the temporary support for rotary kiln

Fabrication of the support for the fan lines of the burner pipe

107. OYAK ÜNYE ÇİMENTO SAN. TİC. A.Ş. / 2014

Unye Cement Plant

Fabrication of the dryer shell and gas line equipments for the ATY system and

maintenance , installation ,commisionning works ( Ø3.0*25mt )

108. VİCAT – KONYA ÇİMENTO SAN. A.Ş. / 2014

Konya Cement Plant

Converting the chair pads to sliding system. ( Ø4.2mt )

109. YURT ÇİMENTO SAN A.Ş./ 2014 Mus Cement Plant

Replacement of the kiln shell (Ø 4.15 x 1.0 mt)

110. ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. / 2014

Kayseri Cement Plant

Dismounting and installation works for ID fan

Page 22: REFERANCE LIST 2015 COMPLETED WORKS°NA … · Revision works for the electrostatic precipitator of the clinker cooler. 9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003 Denizli Cement

Sayfa 21 / 26

111. LAFARGE EREĞLİ ÇİMENTO SAN VE TİC A.Ş./ 2013 / 2014

Eregli Cement Grinding Facility

Replacement of the shell of the cement mill and the girth gear- pinion

112. ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. / 2014

Kayseri Cement Plant

Installation and fabrication works for the transport line of the clinker with

trass

113. DENİZLİ ÇİMENTO SAN. A.Ş./ 2012 – 2013 Denizli Cement Plant Fabrication and replacement of the kiln shell for the rotary kiln number 1 (Ø 4.6*7.5 mt / Ø 4.6*2.6mt) 114. OYAK – MARDİN ÇİMENTO SAN. TİC. A.Ş. / 2013

Mardin Cement Plant

Fabrication and replacement of the outlet kiln shell ( Ø 4.6*1.6mt) 115. NUH ÇİMENTO SANAYİ A.Ş. / 2013 Preperation of the heavy kiln shell together with tyre for the rotary kiln number 3 on the ground as a spare part. FLS (Ø 5.5*2.8 mt. and Tyre) 116. OYAK – MARDİN ÇİMENTO SAN. TİC. A.Ş. / 2013

Mardin Cement Plant

Fabrication and replacement of the kiln shell for the rotary kiln number 1. (Ø 4.6*2.6mt) 117. CİMPOR YOZGAT ÇİMENTO SAN. TİC. A.Ş. / 2013

Yozgat Cement Plant

Fabrication of the two way valve for the inlet of the raw mill

118. DENİZLİ ÇİMENTO SAN. A.Ş./ 2014 Denizli Cement Plant Fabrication and replacement of the kiln shell for the rotary kiln number 1. (Ø 4.6*6.3 mt )

Page 23: REFERANCE LIST 2015 COMPLETED WORKS°NA … · Revision works for the electrostatic precipitator of the clinker cooler. 9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003 Denizli Cement

Sayfa 22 / 26

119. TRAÇİM ÇİMENTO SANAYİ VE TİCARET A.Ş . 2013/2014

Fabrication, installation and commisionning works of the roller press unit for

the cement mill number 1

Project : SINOMA-CHINA

Model : TRD 140/140

Capacity : 500/650 ton

120. SANÇİM ÇİMENTO SANAYİ VE TİCARET A.Ş. / 2014 Bilecik Cement Plant

Fabrication of the kiln shell ( Ø 4.6*1.0mt)

121. SANKO – ÇİMKO ÇİMENTO FABRİKASI / 2014

Kahramanmaras Cement Plant

Replacement of the outlet kiln shell (Ø 5.5 x 1.45 mt)

122. ÇİMSA ÇİMENTO SAN. TİC. A.Ş. / 2014

Eskisehir Cement Plant

Replacement of the kiln shell (Ø 3.6 x 18 mt)

Firma: FLS Ø 3,6x55 mt

Fabrication and installation of the tertiary air duct 123. ÇİMSA ÇİMENTO SAN. TİC. A.Ş. / 2014

Eskisehir Cement Plant

Modernization of the pipes of the ID fan for the facility number 1.

124 . ÇİMSA ÇİMENTO SAN. TİC. A.Ş. / 2014

Eskisehir Cement Plant

Civil and mechanical works of the kiln feeding system for the facility

number 1

125. ÜST YAPI MADENCİLİK A.Ş. / 2014 Kav-Cim Kavak Cement Plant Fabrication and installation works of the stacker and reclaimer system for the coal stock hall

Page 24: REFERANCE LIST 2015 COMPLETED WORKS°NA … · Revision works for the electrostatic precipitator of the clinker cooler. 9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003 Denizli Cement

Sayfa 23 / 26

Fabrication and installation works of the stacker and reclaimer system for the raw metarial stock hall Fabrication and installation works of the stacker and reclaimer system for the additive stock hall 126. ÜST YAPI MADENCİLİK A.Ş. / 2014 Kav-Cim Kavak Cement Plant Fabrication and installation of the kiln shells. ( Ø 4.65*59mt) 127. TOROS TARIM A.Ş. /2014 Samsun Plant Fabrication and replacement of the tyres, kiln shells under the tyre and pulley of the dryer for the NPK unit NPK ( Ø 3.6*1.3mt+Ring) / ( Ø 3.6*1.8mt+Ring)

128. ÇİNKOM ÇİNKO KURŞUN METAL VE MADENCİLİK SAN.TİC.A.Ş. /2014

Kayseri Plant Fabrication of the kiln shell fort he teksif rotary kiln ( Ø 2.6*14.85mt) 129. OYAK – MARDİN ÇİMENTO SAN. TİC. A.Ş. / 2014

Mardin Cement Plant

Fabrication of the outlet kiln Shell fort he rotary kiln number II ( Ø 4.35*1.6mt)

130. VİCAT BAŞTAŞ BAŞKENT ÇİM. SAN. VE TİC. A.Ş. / 2014

Bastas Cement Plant

Replacement of the chair pads for the rotary kiln number II

Replacement of the cyclones

Replacement of the pipes located on the preheater tower ( +120 m. from

the ground level.)

Fixation and installation of the screw conveyor inside the hopper for the

wasting system

Fabrication of the steel and technological equipments related to this job

and insulation works for this project.

Page 25: REFERANCE LIST 2015 COMPLETED WORKS°NA … · Revision works for the electrostatic precipitator of the clinker cooler. 9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003 Denizli Cement

Sayfa 24 / 26

131. SANKO – ÇİMKO ÇİMENTO FABRİKASI / 2014

Kahramanmaras Cement Plant

Replacement of the outlet kiln shell ( Ø 5.6*1.45mt)

Replacement of the inlet sealing of the rotary kiln.

Modification of the expansion joint at the tertiary air duct.

Installation of the weighing machine for clinker and modification of the

feeding station.

Modification of the system fans for the coal mill.

Replacement of the movable louvres of the coal mills.

132. VİCAT BAŞTAŞ BAŞKENT ÇİM. SAN. VE TİC. A.Ş. / 2014

Baştaş Çimento Fabrikası

Fabrication and installation of the hopper for the roller press unit BK-2

133. NUH ÇİMENTO SANAYİ A.Ş. / 2015

Installation of the heavy kiln shell section of the rotary kiln number 3 together with the tyre FLS (Ø 5.5*2.8 mt )

134. NUH ÇİMENTO SANAYİ A.Ş. / 2015

Revision of the inlet chamber of the electrostatic precipitator for clinker cooler for the clinker production line number 3

135. SANKO – ÇİMKO ÇİMENTO FABRİKASI / 2015

Kahramanmaras Cement Plant

Fabrication of the outlet kiln shell section ( Ø 5.6*1.6mt)

136. ÇİMSA ÇİMENTO SAN.VE TİC.A.Ş. / 2015

Kayseri Cement Plant

Fabrication and installation works for the dust coal

137. VOTORANTİM ÇİMENTO SAN. TİC. A.Ş. / 2015

Samsun Cement Grinding facility.

Revision of the concrete support for the main drive unit of the cement mill

and replacement of the gear.

Page 26: REFERANCE LIST 2015 COMPLETED WORKS°NA … · Revision works for the electrostatic precipitator of the clinker cooler. 9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003 Denizli Cement

Sayfa 25 / 26

138. TÜRKMEX ÇİNKO OKSİT VE ÇİNKO SÜLFAT FABRİKASI A.Ş./ 2015

Izmir Aliaga Facility.

Fabrication and installation of the dryer shell ( Ø 3.0*18.288mt)

139. OYKA KAĞIT AMBALAJ SANAYİ VE TİCARET A.Ş./ 2015

Caycuma Plant

Fabrication of the Trommel used for peeling of the trunks for making paper( Ø

4.0*18.0mt)

140. ORMAKSAN HİDROLİK VE MAKİNE SAN VE TİC LTD. ŞTİ / 2015

Equatorial Guinea.

Fabrication of the BSD Equipments for one of the FLS Project. ( Rotary kiln

sections, casing of the raw mill, casing of the seperator e.t.c.)

Weight of the fabrication works : 678 Ton.

141. ERMADEN ERDEMİR MADENCİLİK SAN. VE TİC. A.Ş./ 2015

Divrigi Facility

Replacement of the part on the shell of the ball mill (Ø4400*7020mm)

Page 27: REFERANCE LIST 2015 COMPLETED WORKS°NA … · Revision works for the electrostatic precipitator of the clinker cooler. 9. DENİZLİ ÇİMENTO SAN. TİC. A.Ş. / 2003 Denizli Cement

Sayfa 26 / 26

NORM MAKINA SAN. INS. TIC. LTD. STI.

MARCH 2015

ONGOING PROJECTS

1. BATIÇİM BATI ANADOLU ÇİMENTO SAN. A.Ş./ SARTA LTD. ŞTİ./2015

Soke Cement Plant

Fabrication and installation works for the roller press unit

Weight of the fabrication works: 452 Ton.

Weight of the installation works:600 Ton.

2. BATIÇİM BATI ANADOLU ÇİMENTO SAN. A.Ş./ SARTA LTD. ŞTİ./2015

Soke Cement Plant

Fabrication and installation works of the fly ash silo (2750 m³ )

Weight of the fabrication works :234 Ton.

Weight of the installation works : 250 Ton.

3. ÜST YAPI MADENCİLİK A.Ş. / 2015

Kav-Cim Kavak Cement Plant Fabrication and installation works for the local equipments of the raw mill

( Ø5,2*13mt-Polysius)

Fabrication and installation of the electrostatic precipitator for the raw mill

and clinker cooler and cooling tower as well.

4. ÇİMSA ÇİMENTO SAN. TİC. A.Ş. / 2015

Eskisehir Cement Plant

Civil and mechanical works for the dedusting system of the wagon loading

system for the facility number II.

5. VİTKOVİCE GEARWORKS A.Ş. / 2014

Erection of Bridge Scraper Machine – MBSK 600