Recent Antiproton Source Operations
Keith Gollwitzer
Antiproton Source Department
Accelerator Division
Fermilab
5 May 2008
![Page 2: Recent Antiproton Source Operations](https://reader031.fdocuments.us/reader031/viewer/2022020718/56813207550346895d985ae2/html5/thumbnails/2.jpg)
1/1/2008 2/1 3/1 4/1 5/1
10mm-3 2600V
Steel 1830V
10mm-2 2220V 2400V
Sta
ck R
ate
(mA
/hr)
Stack S
ize (mA
)
![Page 3: Recent Antiproton Source Operations](https://reader031.fdocuments.us/reader031/viewer/2022020718/56813207550346895d985ae2/html5/thumbnails/3.jpg)
1/1/2008 2/1 3/1 4/1 5/1
10mm-3 2600V
Steel 1830V
10mm-2 2220V 2400V
Record Accumulator Beam Current
313.58mAFebruary 21
Sta
ck R
ate
(mA
/hr)
Stack S
ize (mA
)
![Page 4: Recent Antiproton Source Operations](https://reader031.fdocuments.us/reader031/viewer/2022020718/56813207550346895d985ae2/html5/thumbnails/4.jpg)
1/1/2008 2/1 3/1 4/1 5/1
10mm-3 2600V
Steel 1830V
10mm-2 2220V 2400V
Progression of Stacked Antiprotons in 1 hour Record
Jan
8 2
4.69
mA
Jan
29
25.1
9mA
Mar
26
25.2
9mA
Ap
r 6
25.3
2mA
Ap
r 8
25.9
0mA
May
3 2
5.95
mA
May
5 2
6.09
mASta
ck R
ate
(mA
/hr)
Stack S
ize (mA
)
![Page 5: Recent Antiproton Source Operations](https://reader031.fdocuments.us/reader031/viewer/2022020718/56813207550346895d985ae2/html5/thumbnails/5.jpg)
10mm-5 Lens-transformer assembly is complete and ready for testing
10mm-3 Lens-transformer assembly has a new stripline and is the spare
Stripline failure early March
![Page 6: Recent Antiproton Source Operations](https://reader031.fdocuments.us/reader031/viewer/2022020718/56813207550346895d985ae2/html5/thumbnails/6.jpg)
![Page 7: Recent Antiproton Source Operations](https://reader031.fdocuments.us/reader031/viewer/2022020718/56813207550346895d985ae2/html5/thumbnails/7.jpg)
Studies and Tuning • Debuncher Momentum Cooling Systems
– Gain Ramps – determined no affect for 2.2sec cycle– Double Notch Filter
• Not achieving desired notch depth• Thinking about new notch filter equalizer
– Individual band equalizers - designed first; await chance to install• Accumulator Stacktail System
– Delta Kicker to compensate for transverse heating by system• Some quick gains seen• “Centering” of 2 kicker tanks achieved the same effect; need to do all 10• May still get benefit with new equalizers
• Accumulator Transverse Cooling Systems– Individual band equalizers – first should be ready soon
• AP2/Debuncher Optics– More circulating beam by moving Debuncher tunes
• Decreases Debuncher cooling effectiveness – reverted to design tunes– More beam into Debuncher with some AP2 optics changes - ongoing
• Mechanics of transfers out of Accumulator– Rapid transfers covered last All Experimenters’ Meeting
![Page 8: Recent Antiproton Source Operations](https://reader031.fdocuments.us/reader031/viewer/2022020718/56813207550346895d985ae2/html5/thumbnails/8.jpg)
![Page 9: Recent Antiproton Source Operations](https://reader031.fdocuments.us/reader031/viewer/2022020718/56813207550346895d985ae2/html5/thumbnails/9.jpg)
0 Stack size (mA) 80
0
Sta
ck r
ate
(mA
/hr)
2
4
3
2
Jan 1
May 4
![Page 10: Recent Antiproton Source Operations](https://reader031.fdocuments.us/reader031/viewer/2022020718/56813207550346895d985ae2/html5/thumbnails/10.jpg)
![Page 11: Recent Antiproton Source Operations](https://reader031.fdocuments.us/reader031/viewer/2022020718/56813207550346895d985ae2/html5/thumbnails/11.jpg)
Summary• The Antiproton Source is running well
• Outlook is promising
• Recent Records– 313.58mA in Accumulator– 26.09mA in 1 hour– 3065.6mA in 1 week (Mon-Mon 00:00)