FAIR – Facility for Antiproton and Ion Research
description
Transcript of FAIR – Facility for Antiproton and Ion Research
![Page 1: FAIR – Facility for Antiproton and Ion Research](https://reader034.fdocuments.us/reader034/viewer/2022051401/568148f3550346895db61184/html5/thumbnails/1.jpg)
FAIR – Facility for Antiproton and Ion Research
Austria China Finnland France Germany Greece India Italy Poland Slovenia Spain Sweden Romania Russia UK
Observers
Status of FAIR
FAIR 2nd Instit. Meeting, January 15/16th, 2008
H.H.Gutbrod Leader FAIR Joint Core Team
QuickTime™ and aTIFF (Uncompressed) decompressor
are needed to see this picture.
![Page 2: FAIR – Facility for Antiproton and Ion Research](https://reader034.fdocuments.us/reader034/viewer/2022051401/568148f3550346895db61184/html5/thumbnails/2.jpg)
Official start of the FAIR Project on November 7th, 2007 at Darmstadt .................................... ...........with about 1400 participants
![Page 3: FAIR – Facility for Antiproton and Ion Research](https://reader034.fdocuments.us/reader034/viewer/2022051401/568148f3550346895db61184/html5/thumbnails/3.jpg)
FAIR Start Event November 7th, 2007
![Page 4: FAIR – Facility for Antiproton and Ion Research](https://reader034.fdocuments.us/reader034/viewer/2022051401/568148f3550346895db61184/html5/thumbnails/4.jpg)
We have a project under way!
Who decided to participate and has not yet started to
work should start now!
Do not wait to get design drawings from somewhere!
You are the designer, producer, installer,commissioner!
JCT -later FAIR GmbH - is ‘just’ project management
QuickTime™ and aTIFF (Uncompressed) decompressor
are needed to see this picture.
![Page 5: FAIR – Facility for Antiproton and Ion Research](https://reader034.fdocuments.us/reader034/viewer/2022051401/568148f3550346895db61184/html5/thumbnails/5.jpg)
Status of Declarations from FAIR partner countriesRed= written declaration, black= no written declaration yet, green=high chance for add. contribution
Austria 0.5%
China 1.=% minimum
Finland 0.5% minimum
France 1% minimum
Greece ??
India 3% minimum
Italy 40 Mio € minimum (3.36%)
Poland 30 Mio € minimum (2.5%)
Romania 1%
Russia 5%, has now initiated steps for 10%
Slovenia 1%
Spain 2% minimum
Sweden 10 Mio € (0.84%)
UK 15 Mio € (1.25%), has proposed additional 45 Mio €
Sum 22,95% + 5% Russia + 3.79% UK = 31.74 % of FAIR _Project
Further candidates: Slovak Republic, The Netherlands, Hungary, Georgia,
![Page 6: FAIR – Facility for Antiproton and Ion Research](https://reader034.fdocuments.us/reader034/viewer/2022051401/568148f3550346895db61184/html5/thumbnails/6.jpg)
Expressions of Interest in providing in-kind contributions
for the construction of the Facility for Antiproton and Ion Research
Affiliation …………………………………………. Address ……………………………………………. Country ……………………………………………. Name/Function …………………………………………. …………………………………………. Short description of work package/contribution/PSP no. proposed to take over: Please sketch your expertise and/or refer to similar technical components: Is it planned to produce the components in your own workshops? … YES/NO Human resources/size of institute’s workshops ……………………………....… Is it planned to procure items together with external industry? YES/NO Planned industrial partners ………………………………………………........... Funding agency (name) ………………. is informed on this EoI YES/NO Funding agency has approved procurement of items of EoI YES/NO Funding agency has approved appropriate funding YES/NO
date, signature
Call for EoIs sent out October 10th, 2007
![Page 7: FAIR – Facility for Antiproton and Ion Research](https://reader034.fdocuments.us/reader034/viewer/2022051401/568148f3550346895db61184/html5/thumbnails/7.jpg)
QuickTime™ and a
TIFF (Uncompressed) decompressorare needed to see this picture.
Status of Response to Call for Expression of Interest (EoI)
![Page 8: FAIR – Facility for Antiproton and Ion Research](https://reader034.fdocuments.us/reader034/viewer/2022051401/568148f3550346895db61184/html5/thumbnails/8.jpg)
QuickTime™ and a
TIFF (Uncompressed) decompressorare needed to see this picture.
EoIs still missing from
21 Expression of Interests received so far !
![Page 9: FAIR – Facility for Antiproton and Ion Research](https://reader034.fdocuments.us/reader034/viewer/2022051401/568148f3550346895db61184/html5/thumbnails/9.jpg)
WP 2.3
HEBT
![Page 10: FAIR – Facility for Antiproton and Ion Research](https://reader034.fdocuments.us/reader034/viewer/2022051401/568148f3550346895db61184/html5/thumbnails/10.jpg)
WP 2.4
Super FRS
![Page 11: FAIR – Facility for Antiproton and Ion Research](https://reader034.fdocuments.us/reader034/viewer/2022051401/568148f3550346895db61184/html5/thumbnails/11.jpg)
WP 2.5Collector Ring CR
![Page 12: FAIR – Facility for Antiproton and Ion Research](https://reader034.fdocuments.us/reader034/viewer/2022051401/568148f3550346895db61184/html5/thumbnails/12.jpg)
WP 2.6
NESR
![Page 13: FAIR – Facility for Antiproton and Ion Research](https://reader034.fdocuments.us/reader034/viewer/2022051401/568148f3550346895db61184/html5/thumbnails/13.jpg)
WP 2.7
Proton Linac
![Page 14: FAIR – Facility for Antiproton and Ion Research](https://reader034.fdocuments.us/reader034/viewer/2022051401/568148f3550346895db61184/html5/thumbnails/14.jpg)
WP 2.8
SIS 100
![Page 15: FAIR – Facility for Antiproton and Ion Research](https://reader034.fdocuments.us/reader034/viewer/2022051401/568148f3550346895db61184/html5/thumbnails/15.jpg)
WP 2.9
P-bar Target and Separator
![Page 16: FAIR – Facility for Antiproton and Ion Research](https://reader034.fdocuments.us/reader034/viewer/2022051401/568148f3550346895db61184/html5/thumbnails/16.jpg)
WP 2.12
SIS 300
![Page 17: FAIR – Facility for Antiproton and Ion Research](https://reader034.fdocuments.us/reader034/viewer/2022051401/568148f3550346895db61184/html5/thumbnails/17.jpg)
WP 2.13Electron Ringat NESR
![Page 18: FAIR – Facility for Antiproton and Ion Research](https://reader034.fdocuments.us/reader034/viewer/2022051401/568148f3550346895db61184/html5/thumbnails/18.jpg)
![Page 19: FAIR – Facility for Antiproton and Ion Research](https://reader034.fdocuments.us/reader034/viewer/2022051401/568148f3550346895db61184/html5/thumbnails/19.jpg)
Call for Expression of Interest to participate in the construction of FAIR is a
big success:
The FAIR accelerator complex will be built by the leading experts of the FAIR countries!
Something money cannot buy!
Missing EoIs from: France, Greece, Slowenia, UK– Missing MoU countries most urgently invited to follow up the call, since we
need to advance at the ISC meeting on February 18th, upon recommendations of IKAB on January 8th
– Certain overlap of interests require creation of accelerator consortia, e.g. p-Linac, NESR, Super-FRS etc..
– Next steps .....
Status of Response to Call for Expression of Interest (EoI)
![Page 20: FAIR – Facility for Antiproton and Ion Research](https://reader034.fdocuments.us/reader034/viewer/2022051401/568148f3550346895db61184/html5/thumbnails/20.jpg)
http://www.ihep.su/FAIR-meeting/index.shtml
![Page 21: FAIR – Facility for Antiproton and Ion Research](https://reader034.fdocuments.us/reader034/viewer/2022051401/568148f3550346895db61184/html5/thumbnails/21.jpg)
January 15th, 2008
09:00 – 09:15Welcome and short presentation of the host laboratory Nikolai Tyurin
09:15 – 09:30Rosatom and FAIR Russia Oleg Patarakin
09:30 – 10:00Accelerator complex of IHEP-Protvino Sergei Ivanov
10:00 – 10:30FAIR Russia Research Centre Boris Sharkov
10:30-11:00 COFFEE Break
11:00 – 11:20Status of FAIR Expression of Interests Hans Gutbrod
11:20– 11:40Report from the IKAB meeting Horst Wenninger
11:40 – 12:10Status report on FAIR accelerators, general planning Dieter Krämer
12:20 – 12:50Design and Engineering Issues; Standardization and Synergies Dieter Krämer
LUNCH break
![Page 22: FAIR – Facility for Antiproton and Ion Research](https://reader034.fdocuments.us/reader034/viewer/2022051401/568148f3550346895db61184/html5/thumbnails/22.jpg)
14:20 -17:10Start of discussions of work packages in detail, milestones, readiness etc., short presentations of representatives of the interested institutions (countries).
14:20 – 14:50 2.4, Super Fragmentseparator EoIs No. 1, 2, 11a, 13e, 13h, 13i, 14a, 15, 21VECC (IN), Profex (Ro), CIEMAT (ES), GSI, IMP (CN), Wroclaw UT (PL), Soltan Inst. (PL), (France) for the machine coordination: Markus Steck
14:50 – 15:10 2.5 CR (Collector Ring)EoIs No.5a, 8b, 13b, 13c, 13h, 13i, 14b, 15, 21Budker INP (RU), ITEP (RU), GSI, IMP (CN), Wroclaw UT (PL), Soltan Inst. (PL), for the machine coordination: Markus Steck
15:10 – 15:30 2.6 NESR (New Experimental Storage Ring)EoIs No. 5b, 11b ,13b ,13i, 21Budker INP (RU), CIEMAT (ES), GSI, Soltan Inst. (PL)
for the machine coordination: Markus Steck
15:30 – 15:50 2.10 RESR (Recuperated Experimental Storage Ring)EoIs No. 8b, 11c, 13b, 13c, 13h, 13i, 21ITEP (RU), CIEMAT (ES), GSI, Soltan Inst. (PL)
for the machine coordination: Markus Steck
COFFEE
![Page 23: FAIR – Facility for Antiproton and Ion Research](https://reader034.fdocuments.us/reader034/viewer/2022051401/568148f3550346895db61184/html5/thumbnails/23.jpg)
16:00 – 16:20 2.3 HEBT (High-Energy Beam Transfer Lines)
EoIs No. 13h, 13i, 18, 20, 21
GSI, ICSI (RO), Efremov (RU), Soltan Inst. (PL)
for the machine coordination: Peter Spiller
16:20 – 16:50 2.8 SIS 100 (Heavy-Ion Synchrotron 100 Tm)
EoIs No. 4, 7, 8a, 9, 12, 13b, 13f, 13g, 13h, 13i, 15, 18, 21
Finland, Cracow UT (PL), ITEP (RU), JINR, VNIINM (RU), GSI,
Wroclaw UT (PL), ICSI (RO), Soltan Inst. (PL)
for the machine coordination: Peter Spiller
16:50 – 17:15 2.12 SIS 300 (Heavy-Ion Synchrotron, 300 Tm)
EoIs No. 3, 4, 7, 8a, 12, 19, 21
IHEP (RU), Finland, Cracow UT (PL), ITEP (RU), VNIINM (RU), Italy,
Soltan Inst. (PL) for the machine coordination: Peter Spiller
17.15 – 19.00 Excursion to the IHEP accelerator complex and the workshops.
19.30 Dinner at the Scientists’ club
![Page 24: FAIR – Facility for Antiproton and Ion Research](https://reader034.fdocuments.us/reader034/viewer/2022051401/568148f3550346895db61184/html5/thumbnails/24.jpg)
January 16th, 2008
09:00 – 10:40Continuation of discussions of work packages in detail, milestones, readiness etc.
9:00 – 9:25 2.7 Proton Linear Accelerator EoIs No. 8c, 13a, 13b, 16ITEP (RU), GSI, Dept of Science and Technology (IN), (France)
for the machine coordination: Hartmut Eickhoff
9:25 – 9:55 2.9 Antiproton-Target, and 2.11, HESR (High-Energy Storage Ring)
for 2.9: EoIs No. 13h, 13i, 21for 2.11: EoIs No. 8b, 10, 17, 21ITEP (RU), Jülich (DE), Sweden, Soltan Inst. (PL)
for the machine coordination: Dieter Krämer
9:55 – 10:15 2.13 ER (Electron Ring)EoIs No. 5c, 21Budker INP (RU), Soltan Inst. (PL)
for the machine coordination: Markus Steck
10:15 – 10:50 Items not yet coveredDiscussion leader: Hans Gutbrod
10:50 – 11:10 COFFEE break
11:10 – 13:00Summary and focus on critical points, multiple interest for one work package, specs, way of collaborations, perhaps formation of collaborations, Technical Design Reports, next steps...
Discussion leader: Hans Gutbrod
13:00 LUNCH
14.30 End of the Meeting
![Page 25: FAIR – Facility for Antiproton and Ion Research](https://reader034.fdocuments.us/reader034/viewer/2022051401/568148f3550346895db61184/html5/thumbnails/25.jpg)
2nd FAIR institutes meeting
![Page 26: FAIR – Facility for Antiproton and Ion Research](https://reader034.fdocuments.us/reader034/viewer/2022051401/568148f3550346895db61184/html5/thumbnails/26.jpg)
Next Steps:• Detailing of EoIs in upcoming meeting and weeks, especially identification of persons in
charge, better specification of items, collaborations.......active collaboration with international FAIR partners strengthening the FAIR project and the FAIR JCT by detaching people to Darmstadt.
• Preparation of Technical Design Reports
• Setting up of Machine Advisory Committee
• Drafting of contracts where possible
---------------------------------
• ISC meeting 19th of February 2008
• Final Act by FAIR countries’ governments
• Creation of FAIR GmbH early Summer of 2008
• Staffing of managing director positions
• But above all that:
Continue or get started with the FAIR accelerator projects you want to work on!