R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía...

38
Fundación Ciudad de la Energía (CIUDEN) CIUDEN CIUDEN ´ ´ s CCS large scale s CCS large scale R&D Activities R&D Activities Monica Lupion 4 th APP OFWG Oxyfuel Capacity Building Course Tokyo Institute of Technology, Tokyo, Japan – September 2 nd 3 rd , 2012

Transcript of R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía...

Page 1: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

Fundación Ciudad de la Energía (CIUDEN)

CIUDENCIUDEN´́s CCS large scales CCS large scale R&D ActivitiesR&D Activities

Monica Lupion4th

APP OFWG Oxyfuel Capacity Building Course 

Tokyo Institute of Technology, Tokyo, Japan –

September 2nd‐

3rd

, 2012

Page 2: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

24th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

ContentContent

• Fundacion Ciudad de la Energia (CIUDEN)• CCS large pilot scale facilities: es.CO2

Centre

• OXYCFB300 Compostilla Project

• Concluding remarks

Page 3: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

34th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

An initiative of the Spanish AdministrationAn initiative of the Spanish Administration

CIUDEN 

was 

created 

by 

the 

Spanish 

Government 

in 

2006 

as

R&D  institution fully conceived for collaborative research in CCS and CCTs.

An initiative to strength to social, industrial and technological base in  Spain and by extension in Europe.

Page 4: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

44th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

CIUDENCIUDEN’’s Attributess Attributes

Page 5: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

54th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

CIUDEN’s  tecchnological R&D by 

creating a Centre for Advanced 

Technologies on Clean Coal

A worldwide reference point 

for clean coal use activities

Eco‐innovation to prevent 

millions of tonnes of CO2

being released into 

atmosphere

Clean Coal 

Technologies

Actions to support regional 

development 

Develop and use environmental 

recovery techniques in degraded 

lands due to mining activityRestoration of the rubble 

heaps, in parthnership with the 

main local actors: authorities 

and civil societyCreating new  “green”

jobs, for 

the local area, and developing 

greening skills also

Energy and 

Environmental 

Applications 

CIUDEN’s  regional projects

Reuse of industrial 

installations for exhibition, 

tourist and social purposes

Conservation of the energy 

heritage, scientific  

research and dissemination

National Museum of 

Energy

Universities, R&D Centers, 

Companies (specially from national 

energy sector)

Universities, R&D Centers, 

Companies (specially from national 

energy sector)

In colaboration with the main stakeholders: Companies, City and Regional 

Councils, Local Governments

CIUDEN CIUDEN ‘‘s Programmess Programmes

Page 6: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

64th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

THROUGHTHROUGH

Our overarching objectiveOur overarching objective

Page 7: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

74th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

ContentContent

• Fundacion Ciudad de la Energia (CIUDEN)• CCS large pilot scale facilities: es.CO2

Centre

• OXYCFB300 Compostilla Project

• Concluding remarks

Page 8: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

84th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

es.COes.CO 22

Centre Centre ‐‐

Basic dataBasic data

Page 9: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

94th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

Fuels: anthracites, bit & subbit coals, pet coke, sustainable biomassFuels: anthracites, bit & subbit coals, pet coke, sustainable biomass

Pulverized

Coal

20 MWth

Pulverized

Coal

20 MWth

Circulating

Fluidized Bed 

30 MWth

Circulating

Fluidized Bed 

30 MWth

DeNOX

Dedust

DeSOX

DeNOX

Dedust

DeSOX

CO2 

purification and compression CO2 

purification and compression 

Biomass Gasifier 3 MWthBiomass Gasifier 3 MWth+

OxycombustionOxycombustion

es.COes.CO 22

Centre Centre ‐‐

Basic dataBasic data

Page 10: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

104th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

FUEL PREPARATION

BIOMASS 

GASIFIER

PC BOILER

20 MWth

CFB BOILER

30 MWthTECHNICAL BUILDINGS 

AND CONTROL ROOM

FLUEGAS 

CLEANING

FLUEGAS 

RECIRCULATION AND 

MIXING

CO2 

PURIFICATION 

CO2 

TRANSPORT RIG

es.COes.CO 22

CentreCentre

Page 11: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

114th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

FUELPREPARATION

SYSTEM

DeNOX

15-30 MWthCFB

BOILER GAS

CLEANINGSYSTEM

COMPRESSIONAND

SEPARATION UNIT

MIX ANDPREHEATING

SYSTEM

20 MWthPC

BOILER

PREHEATINGTRAIN

AIR

FGR1

O2

STORAGEAND

VAPORISATION

O2PREHEATING

FGR2

HIGHEFFICIENCYDeSOXMIXERS

BAG FILTER

STACK

BAG FILTER

CO2

EXPANDER

CPU

FGR2

 REC

IRCU

LATION

FGR1

 REC

IRCU

LATION

FROM BIOMASSPREPARATION

BIOMASSBIN

GASTREATMENT

BIOMASSGASIFIER

CYCLON

ENGINE

TORCH

PCSILO

es.COes.CO 22

CentreCentre

Page 12: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

124th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

Raw coal hopper 42 m3

Coal crusher 15 t/h

Crushed  coal silos 2 x 120 m3

Bag filter 47,000 m3/h

Ball mill 5 t/h

PC silo 80 m3

Bucket elevator 15 t/h

Dossifiers 4.1‐1.2 t/h

Fuel Preparation SystemFuel Preparation System

Page 13: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

134th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

COALCRUSHER

15 t/h

CO2INERTIZED BALL

MILL 5 t/h

CLASSIFIER

BAGFILTER

PCSILO

CRUSHEDCOAL SILOS2 x 120 m3

CFBSILO

COALUNLOAD

TO CFB FEEDER

RAWCOAL

HOPPER

COALSAMPLER

BAGFILTER

BUCKETELEVATOR

DOSSIFIERS

TO CFB

PARTIAL RECIRCULATION

TO PCBOILER

TO PC

HOT GASES

CO2INERTIZED

CO2INERTIZED

BAG FILTER

Fuel Preparation SystemFuel Preparation System

Page 14: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

144th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

Size (m) 24 x 7.6 x 4.5 

Burners4 horizontal burners2 vertical burners

Biomass feeding system

Mwth HHV Max oxy mode 20

O2

(kg/h) 6,600

FGR (kg/h) 17,900

Flue gas flow (kg/h) 26,400

Coal flow rate (kg/h) 3,350

Steam (t/h) 25

P(bar) / T (°C) 30 / 420

PC BoilerPC Boiler

Page 15: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

154th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

PC BoilerPC Boiler

Page 16: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

164th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

Fuel

Fuel

Fuel

Fuel

Dedust+ SCR

From CFB

CB1To CFB

To CFBCB2CB3

Economizer

Convective Area

RadiantArea

PC BoilerPC Boiler

Page 17: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

174th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

Furnace Dimensions

(m) 20x2.9x1.7

MWth

maxoxycombustion 30

O2 

consumption (kg/h) 8,775

Flue gas recycle (kg/h) 25,532

Flue gas (kg/h) 28,800

Coal consumption (kg/h) 5,469

Limestone feed (kg/h) 720

Steam (t/h) 47.5

P(bar) / T (°C) 30 / 250

CFB BoilerCFB Boiler

Page 18: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

184th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

CFB BoilerCFB Boiler

Page 19: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

194th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

Uni

t Cap

acity

(MW

e)

0

100

200

300

400

500

600

1970 1975 1980 1985 1990 1995 2000 2005 2010

Start-Up Year

2015

Pilot Plant Oriental Chem

Lagisza

JEA

Turow 1

VaskiluodonNova ScotiaTri-State

General Motors

AIR-FIRED

CIUDEN TDP

Compostilla

OXY-FIRED

Pilot Plant

Adapted from S Santos, IEAGHG. 2010

Evolution of CFB Unit CapacitiesEvolution of CFB Unit Capacities

Page 20: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

204th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

FLY ASHSILO

FLY ASHFEEDING SYSTEM

LIMESTONESILO

LIMESTONEFEEDING SYSTEM

SAND SILO

SAND FEEDINGSYSTEM

FUEL SILO

FUEL FEEDING SYSTEM

NATURALGAS

START‐UP 

BURNER SKID

BOILER FEED 

WATER

FLUE GAS

BOTTOM ASH

FLY ASHSYSTEM

PRIMARYOXIDANT

PRIMARYOXIDANT FAN

OXYGEN

SECUNDARYOXIDANT

SECUNDARYOXIDANT FAN

MIXER

FLY ASH

 REC

IRCU

LATION

LIMESTO

NE

SAND

FUEL FEED

AMMONIA

MIXER

MIXER

CB1

CB2

LOOPSEAL

INTREX

CROSSOVER

C

O

N

V

E

C

T

I

O

N

C

A

G

E

CFB Boiler CFB Boiler ‐‐

DiagramDiagram

Page 21: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

214th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

Technology Bubbling 

fluidised bed

MWth

max 3

Oxidant  Air

Biomass flow rate (t/d) 15

P(barg)  0.3

T (°C) 800

Efficiency (cold gas basis)

98%(75%)

Footprint ( m2) 90

GasifierGasifier

Page 22: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

224th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

Block diagram of the CO2

Transport 

Experimental Facility3D simulation of CIUDEN´s 

Facility

Transportation Test FacilityTransportation Test Facility

Page 23: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

234th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

Test Activities on OxyCFB CombustionTest Activities on OxyCFB Combustion

• First fire on coal in 3Q/2011• First operation and commissioning on oxyfuel

combustion 4Q/2011• First experimental test runs 1Q/2012• First tests on integrated operation with CPU

start in 3Q/2012 • The CFB pilot is fully booked for testing during

2012-2013

Page 24: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

244th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

• Local anthracite – Cupo del Bierzo, 34% ash, 1% sulfur

• Petcoke• Bituminous coal• Local lignite

– high ash and sulfur

• Biomass co-firing

Fuel testedFuel tested

Page 25: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

254th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

Transition (airTransition (air‐‐oxyoxy‐‐air) Flexiair) Flexi‐‐Burn Operation Burn Operation  Smooth Transition

Page 26: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

264th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

Transition (airTransition (air‐‐oxyoxy‐‐air) Flexiair) Flexi‐‐Burn Operation Burn Operation  Confirmed Reduction of NOx

Page 27: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

274th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

ContentContent

• Fundacion Ciudad de la Energia (CIUDEN)• CCS large pilot scale facilities: es.CO2

Centre

• OXYCFB300 Compostilla Project

• Concluding remarks

Page 28: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

284th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

FLEXIBURN CFBFlexible high‐efficiency 

CFB combustion technology

OXYCFB300Demo 300Mw CCS oxy‐

CFB power station 

RELCOMOxy‐PC firing

MACPLUSAdvanced materials 

for oxy‐capture 

ECCSEL PPIEuropean distributed and 

integrated research 

infrastructure

BRISKBiomass gasification

R&DIALOGUESocial perception of CCS

O2GEN2nd 

generation 

oxy‐fuel 

power station

IMPACTSCO2

quality for 

transport and storage

OnOn‐‐going R&D Capture and Transport going R&D Capture and Transport  ProgrammeProgramme

Page 29: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

4th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

THE COMPOSTILLA DEMO PROJECT

The origin of the EEPR is the global 

€200 billion European Economic 

Recovery Plan presented by the 

Commission on November 2008. 

Investment in energy projects was 

considered an important tool to 

support the economic recovery

In July 2009,

the European Council 

and the European Parliament 

adopted the Commission proposal 

for the EEPR. 12 CCS projects 

applied for assistance under the 

EEPR

In December 2009,

the EC granted 

financial assistance to six (6) 

projects

These projects will receive overall 

funding  of €1 billion

under the 

EEPR

BelchatowPost

180 M€

Jaënschwalde

Oxy‐PC180 M€

Rotterdam 2

Post180 M€

COMPOSTILLAOxy‐CFB

180 M€

Hatfield

Pre180 M€

Porto Tolle

Post100 M€

COMPOSTILLA:  THE SPANISH EEPR PROJECT

Page 30: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

4th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012 30

BASIC DATA

THE COMPOSTILLA DEMO PROJECT

Page 31: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

4th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

Oxy Mode

Gross power (MWe) 323

Boiler efficiency (%,  LHV) 94.3

CO2

emission (g/kWh‐net) 97

CO2

capture ratio (%) 91

CO2 

captured in the first 5 years of operation (Mt) ~ 5

THE COMPOSTILLA DEMO PROJECT

BASIC DATA

Page 32: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

4th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

OxyCFB APPROACH: FACILITIES 

VTT  100 kW

CANMET 1 MW 

2008 2010 2011 2012 20152009

CIUDEN 30 MW 

Compostilla 300 MWe 

Lagisza 460 MWe (AirCFB)

THE COMPOSTILLA DEMO PROJECT

Page 33: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

4th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

Pilot scale 

Technology 

Development

Demo scale 

Validation of 

CCS Technology

2009‐2012 Phase I Technology development 

Final Investment Decision

• Reduce economic and technical risks• Enhance experience and technical support

TWO‐PHASES APPROACH

THE COMPOSTILLA DEMO PROJECT

Page 34: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

4th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

www.compostillaproject.eu

MORE INFO

THE COMPOSTILLA DEMO PROJECT

Page 35: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

354th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

ContentContent

• Fundacion Ciudad de la Energia (CIUDEN)• CCS large pilot scale facilities: es.CO2

Centre

• OXYCFB300 Compostilla Project

• Concluding remarks

Page 36: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

364th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

CIUDEN’s R&D Experimental facilities:

• Simulation of a wide variety of operational modes and fuels• Maximum efficiency in view of schedule and budget• Small as possible but large enough to be scalable

Strenghts:

• Full integrated process• Flexibility and high experimental capabilities:

• Several burners to investigate flame interaction• PC-CFB comparison (20 + 30 MWth

)• Wide range of fuels: anthracites, bit, sub-bit, pet coke, biomass

• Public R&D institution open for collaboration

Concluding remarksConcluding remarks

Page 37: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

374th APP OFWG Oxyfuel Capacity Building CourseTokyo Institute of Technology, Tokyo, Japan – September 2nd‐ 3rd , 2012

Thank youThank youMonica Lupion

External Affairs Director Fundacion Ciudad de la Energia CIUDEN

[email protected]

Page 38: R&D Activities - University of Newcastle · 2014-03-13 · Fundación Ciudad de la Energía (CIUDEN) CIUDEN´s CCS large scale R&D Activities Monica Lupion 4. th. APP OFWG Oxyfuel

Oxidant Preparation Diagram

deSOx

Coal

O2

Air

to

CFB

CB1

CB2

CB3

IDF

FGR2

FGR1

90‐215ºC

30% max

300‐330ºC

40% max

300‐330ºC

70% max

CombustionFlue

Gases