Fundación Ciudad de la Energía (CIUDEN)...Ponferrada, 9 th – 13th September 2013 Fundación...
Transcript of Fundación Ciudad de la Energía (CIUDEN)...Ponferrada, 9 th – 13th September 2013 Fundación...
CIUDEN Ponferrada, 9th – 13th September 2013
Fundación Ciudad de la Energía CIUDEN
Ponferrada 9th to 13th September 2013
Organised by: Hosted by:
CIUDEN s CO2 Transport Rig R. Diego, I. Llavona, M. Gómez, T. Coca, B. Navarrete, P. Otero (CIUDEN) J. Moreno (Isolux Corsán)
CIUDEN Ponferrada, 9th – 13th September 2013 CIUDEN Ponferrada, 9th – 13th September 2013
CIUDEN s Technology Development Centre for CO2 Capture and Transport
CIUDEN es.CO2 Centre
COMPOSTILLA II Power Station
ENDESA
CIUDEN Ponferrada, 9th – 13th September 2013 CIUDEN Ponferrada, 9th – 13th September 2013
es.CO2 - aerial view
FUEL PREPARATION
BIOMASS GASIFIER
PC BOILER 20 MWth
CFB BOILER 30 MWth TECHNICAL BUILDINGS
AND CONTROL ROOM
FLUEGAS CLEANING
FLUEGAS RECIRCULATION AND
MIXING
CO2 PURIFICATION
CO2 TRANSPORT RIG
CIUDEN Ponferrada, 9th – 13th September 2013 CIUDEN Ponferrada, 9th – 13th September 2013
Transport test rig - CO2 sources (commercial and captured)
Compression and
purification unit (CPU)
CO 2
Commercial CO2 storage
CIUDEN Ponferrada, 9th – 13th September 2013 CIUDEN Ponferrada, 9th – 13th September 2013
CO2 from CPU
Pure CO2
Pres
sure
ves
sel
Pum
p
Heat
exchangers
Tube coils (3.000 m)
P: 80-110 bar
T: 10-31 ºC
Transport test rig
CIUDEN Ponferrada, 9th – 13th September 2013 CIUDEN Ponferrada, 9th – 13th September 2013
Transport test rig - Tube coil description
TOP VIEW
TUBE COIL INLET
4.5 m
FRONT VIEW
9 m
2 m TUBE COIL INLET
TUBE COIL OUTLET
0.4 m
CIUDEN Ponferrada, 9th – 13th September 2013 CIUDEN Ponferrada, 9th – 13th September 2013
CO2 from CPU
Pure CO2
Pres
sure
ves
sel
Pum
p
Heat
exchangers
Tube coils (3.000 m)
Pressure drops Corrosion
Instrumentation testing
Available Elastomer testing
Contaminant
dosing MIR-FT
Chromatograph
De-pressurization
P: 80-110 bar
T: 10-31 ºC
Transport test rig
Experimental areas
Spectrometry UV-vis
CIUDEN Ponferrada, 9th – 13th September 2013 CIUDEN Ponferrada, 9th – 13th September 2013
Transported CO2 composition – Dosing capabilities
SOURCE: ECOFYS STUDY
New components
from CO2 capture
processes
CIUDEN Ponferrada, 9th – 13th September 2013 CIUDEN Ponferrada, 9th – 13th September 2013
Transport test rig - Design parameters
Operating P (barg) 80 - 110
Operating T (ºC) 10 - 31
Pipeline size (inch) 2 Total pipeline length
(m) 3,000
Recirculation Pump (m3/h)
15
High Pressure Vessel (m3)
4.5
Pressure Drop (bar) 30
Building (m3) 23x18x8.5
Pipe material CS (2 SS tube
coils)
CIUDEN Ponferrada, 9th – 13th September 2013 CIUDEN Ponferrada, 9th – 13th September 2013
Transport test rig - Experimental areas
• Pressure drops • Instrumentation testing • De-pressurization • Corrosion and material testing • Leaks • Available one
The tests can be carried out with different CO2 qualities and at different P & T
CIUDEN Ponferrada, 9th – 13th September 2013 CIUDEN Ponferrada, 9th – 13th September 2013
Transport test rig pictures (I)
CIUDEN Ponferrada, 9th – 13th September 2013 CIUDEN Ponferrada, 9th – 13th September 2013
Transport test rig pictures (II)
CIUDEN Ponferrada, 9th – 13th September 2013 CIUDEN Ponferrada, 9th – 13th September 2013
Transport test rig pictures (III)
CIUDEN Ponferrada, 9th – 13th September 2013 CIUDEN Ponferrada, 9th – 13th September 2013
Property Gas Supercritical Liquid
Density (g/cm3) ≈0,001 0,2 – 1,0 0,6 – 1,6
Diffusivity (cm2/s) 0,1 0,001 0,00001
Viscosity (g/(cm s) 0,0001 0,001 0,01
CO2 properties– Phase diagram
CIUDEN Ponferrada, 9th – 13th September 2013 CIUDEN Ponferrada, 9th – 13th September 2013
CO2 pipeline composition
CO2 composition
Source of CO2
Pre-treatment
Process
HES Toxicity
Operation Compression
De-pressurization Training
Flow assurance Phase diagram
Density Compressibility
Hydrates
Pipeline Integrity
Material Selection Corrosion
Economic Evaluation
CIUDEN´S CO2 transport test rig
+ Partner (funding, collaboration
agreement)
Theoretical studies
Basic research
Applied research
CIUDEN Ponferrada, 9th – 13th September 2013 CIUDEN Ponferrada, 9th – 13th September 2013
Experimentation capabilities in Transport TDP (WP2): Impurities (composition), corrosion - material testing, different P&T, pressure drops,
instrumentation testing and de-pressurization
EEPR – OXY-CFB-300 Compostilla (III)
Test/ Week W1 W2 W3
1 T1
2 S1 S2
TEST MATRIX SUMMARY - CO2 TRANSPORT TDP
Parametric tests have consited of different tests with real CO2 from the CPU at different P and T values. On a second stage, the fluid has been dopped with different contaminants.
Operation Range
P: 60 to 100 bar
T : 12 to 27 ºC
Fluid: dense phase
These tests have run for one week and the results obtained will give us the information and the know how on the operation of the unit and the capabilities of the instalation. Commercial CO2 has been used, with differente
P and T values.
Characterization Tests
Parametric Tests
Dec. 2012
CIUDEN Ponferrada, 9th – 13th September 2013 CIUDEN Ponferrada, 9th – 13th September 2013
Operational SCADA of the Transport test rig
CIUDEN Ponferrada, 9th – 13th September 2013 CIUDEN Ponferrada, 9th – 13th September 2013
Transport test rig - Tests
CIUDEN Ponferrada, 9th – 13th September 2013 CIUDEN Ponferrada, 9th – 13th September 2013
Transport test rig - Tests
CIUDEN Ponferrada, 9th – 13th September 2013
The work presented is co-financed under the OXY CFB 300 COMPOSTILLA Project
(EEPR)
CIUDEN Ponferrada, 9th – 13th September 2013 CIUDEN Ponferrada, 9th – 13th September 2013
THANK YOU VERY MUCH FOR YOUR ATTENTION
For further information, please contact
Ruth Diego, [email protected]