RBSP MCR EFW- 1 JHUAPL, Jan 30,31 2007
RBSP-EFW
Radiation Belt Storm ProbeElectric Field and Waves Instrument
(EFW)
PI: Prof. John Wygant, [email protected], (612) 626-8921
PM: Dave Curtis, [email protected], 510-642-5998
RBSP MCR EFW- 2 JHUAPL, Jan 30,31 2007
RBSP-EFW Org Chart
C o Is
F in a n c ia lK a te H a rps
S ch ed u lerD a n ie le M ie lh an
Q A / P a rtsR o n Ja ckson
A X B : Ro b D u ckS P B : G reg D a ltonD yn a m ics : D a ve P a n kow
L e ad M EP a u l T u rin
A n a lo g : H ila ry R ich a rdsD ig ita l: M ich a e l Lu d lamF S W : P e te r H a rveyL V P C/H V P C : P e te r B e rg
L ea d E EP e te r H a rvey
S e n so rsJo h n B o nn e ll
L e a d E E : Jim W e s tfa ll
L A S P /D S PB o b E rg un
O p e ra tio nsT im Q u inn
P M / S ysED a v id C u rtis
P IJo h n W yg a nt
U M N
RBSP MCR EFW- 3 JHUAPL, Jan 30,31 2007
RBSP-EFW
• UMN will subcontract to UCB and LASP to develop the EFW instrument
• No other significant subcontracts are required. All hardware built and tested in house.
Major Subcontracts
RBSP MCR EFW- 4 JHUAPL, Jan 30,31 2007
RBSP-EFW
Instrument Science Requirements
RBSP MCR EFW- 5 JHUAPL, Jan 30,31 2007
RBSP-EFW
Science Objective: Measure electric fields associated with a variety of mechanisms causing particle energization, scattering and transport in the inner magnetosphere.
These mechanisms include:• Energization by the large-scale convection E-field.• Energization by substorm injection fronts propagating in from the
tail.• Radial diffusion of energetic particles mediated by ULF MHD
waves.• Transport and energization by intense magnetosonic waves
generated by interplanetary shock impacts upon the magnetosphere.
• Coherent and Stochastic acceleration and scattering of particles by small-scale, large-amplitude plasma structures, turbulence and waves (EM and ES ion cyclotron waves, kinetic Alfven waves, solitary waves, electron phase space holes, zero freq. turbulence)
Science and Measurement Objectives (1)
RBSP MCR EFW- 6 JHUAPL, Jan 30,31 2007
RBSP-EFW
RBSP Electric Field Waves • Four spin plane booms (2 x 40 m and 2x 50 m)• Spherical sensors and preamplifiers near outboard tip of
flexible cable boom (500 kHz response)• Flexible boom cable ~7-8 thin wires carrying power/bias
commanding out to sensor electronics and signals back to SC.
• Outer braid of cable is a conductor tied to SC chassis through large resistor (100 k ohms to 1 M ohms).
• Two spin axis stacer booms (2x6 m) with outboard sensors• Sensors are current biased by instrument command to be
within ~ 1 volt of ambient plasma potential. (except sensors at ends of E-field booms)
• Main electronic box (filtering, sampling, A-D conversion, commanding, tm formatting, burst memory, spectra, IDPU etc.
• Telemetered electric field quantities include:• SC- sensor potential (V1s, V2s, V3s, V4s, V5s, V6s)
• Difference between opposing sensors (V12, V34, V56)• Electrostatic cleanliness spec designed to keep variations of
potential across spacecraft surfaces smaller than 1 Volt.
12
3
5
6
4
SC Rotation
SUN
RBSP MCR EFW- 7 JHUAPL, Jan 30,31 2007
RBSP-EFW
Mechanisms associated with energetic particle acceleration and transport (Mauk/APL)
RBSP MCR EFW- 8 JHUAPL, Jan 30,31 2007
RBSP-EFW
The shock induced magnetosonic wave created a 5 order of magnitude increase in 13 MeV electronfluxes in <100 seconds resulting in a new radiation belt that lasted two years
The large scale electric field produced a ~70 kV potential drop between L=2 & L-4and injected ring current plasma. dDst/dt= - 40 nT/hr
MHD waves: an important mechanism for radially diffusing and energizing particles.
CRRES measurements of the E-field during a pass through the the inner magnetosphere March 1991 Major Geomagnetic Storm
E-Fields in the Active Radiation Belt
RBSP MCR EFW- 9 JHUAPL, Jan 30,31 2007
RBSP-EFW
Injection Front: prompt energization of ~ 1 MeV electrons near R=4.28 Local midnightTop panelsEy gse, Bz gseDrift Echo signature in energetic particlesIntense 100 mV/m(ptp) electric field turbulence in Ey and Ez gse (0.2 to 10 Hz)
RBSP MCR EFW- 10 JHUAPL, Jan 30,31 2007
RBSP-EFW Science and Measurement Objectives (2)
EFW Science quantities: Energization/Transport Mechanism
Mechanisms for Acceleration/ Transport of Energetic Particles
Range E-Field Amplitude (or density)
Range of Wave Magnetic Field
Duration Telemetry Mode Measurement quantity
1) Interplanetary shock impact
1mV/m to 300 mV/m
Use fluxgate 1s to 5 minutes Main Ey, Ez, Ex*
2) Injection Events 1- 50 mV/m Use fluxgate 30s to 10 minutes Main Ey, Ez,, Ex*
3) Convection Electric field
0.1 mV/m to 15 mV/m
Use fluxgate 5 minutes to 10 hours
Main Ey, Ez, Ex
4) MHD wave driven radial diffusion
1- 40 mV/m Use fluxgate 10 s to 10 minutes
Main Ex, Ey,, Ez.*
5) Whistler Energization
0.1 -30 mV/m
1 pT to 1 nT 100 Hz to 12 kHz
Main E-Spectra, B-Spectra Burst 1 (waveform)
6) Ion cyclotron waves/ small scale structures
1-400 mV/m 10 pT to 20 nT 0.1 Hz to 1 kHz Ey,Ez, Ex*, E-Spectra, B-Spectra Burst 2, Burst 3
7) Cold Plasmasphere Density
0.1 - 1600 cm-3 0.1 - ~100 cm-3
0.2 s to 5 hours Main TM SC potential SFR(upper hybrid)
Baseline Measurement Requirements
0.1- 300 mV/m 0.1 - ~100 cm-3
1 pT to 5 nT 10 hours to 12 KHz
Main, Burst 1, Burst 2
Red typface indicates overlap with Iowa, Red overlap with underline indicates deleted portion of instrument or capability as of tentative selection.
RBSP MCR EFW- 11 JHUAPL, Jan 30,31 2007
RBSP-EFW
Key Measurement Quantities:• Spin plane component of E at DC-12 Hz (0.05 mV/m
accuracy).• Spin axis component of E at DC-12 Hz (~3 mV/m accuracy).• E- and B-field spectra for nearly-parallel and nearly-
perpendicular to B components between 1 Hz and 12 kHz at 6-s cadence.
• Spacecraft potential estimate covering cold plasma densities of 0.1 to ~100 cm-3 at 1-s cadence.
• Burst recordings of high-frequency E- and B-field waveforms, as well as individual sensor potentials for interferometric analyses.
Science and Measurement Objectives (3)
RBSP MCR EFW- 12 JHUAPL, Jan 30,31 2007
RBSP-EFW
Instrument Concept
RBSP MCR EFW- 13 JHUAPL, Jan 30,31 2007
RBSP-EFW Boom Accommodation
Schematic Diagram of EFW
RBSP MCR EFW- 14 JHUAPL, Jan 30,31 2007
RBSP-EFW Spin Plane Boom (SPB)
RBSP-EFW: SPB Packaging Concept (THEMIS)
Example of SPB, Cable, Preamp, Fine Wire and Sphere (THEMIS Flight Model)
• Mass: 2.2 kg/unit (4 total).• Envelope: 9.9”H x 4.6”W x 8.6”D.• Deployed Length: 80/100 m tip-to-tip.
• 47 m cable + 3 m fine wire in each SPB.•Deploy Rate: 0.5-1.0 cm/s.•Cable Mass Rate: ~3 g/m.•Fine Wire Mass Rate: < 1 g/m.•Preamp Mass: 48 g (up to 150 g w/up-shield and cable driver).•Sphere/Keyreel Mass: 100 g.•Deployed spin MOI: 600 or 360 kg-m2/boom (100-g preamp); 1920 kg-m2 total.•Power: 2.6 W/unit (typ., deploy motor only).• Actuators: Doors are spring-loaded, SMA or FrangiBolt-released; Cable deploy is motor-driven; no pyros required for actuation.
RBSP MCR EFW- 15 JHUAPL, Jan 30,31 2007
RBSP-EFW Axial Boom (AXB)
Examples of AXB, Tube, and Preamp/Whip (THEMIS Flight Models):
• Mass: 4 kg total (2 booms + tube).• Footprint: 41H x 5 to 6 OD inches.• Deployed Length:
• 12m tip-to-tip.• 1-m whip sensor stacer.• Power: 35 W max for 1-2 s, per boom (deploy only).• Actuators: deploy is spring-driven, Frangibolt-released; no pyros required for deploy.
RBSP MCR EFW- 16 JHUAPL, Jan 30,31 2007
RBSP-EFW Instrument Data Processing Unit (IDPU)
•Mass: 4.7 kg.•Dimensions: 9.75H x 4.7W x 7.95D inches (add 2-inch keepout for connectors to depth).•Power: 7.5 W (primary side, CBE).•Elements and Function:
•Chassis – provides structural integrity and radiation shielding (7-mm Al equiv.).•Backplane – signal and power distribution.•Low-Voltage Power Supply (LVPS) and Power Controller Board (PCB) – power conversion, regulation, and switching.• Data Processing Unit (DPU) and Memory (SSR) – instrument control; data storage, routing, and compression.•Boom Electronics Board (BEB) – sensor and bias surface control.•Digital Signal Processing Board (DSP) – analog signal conditioning, ADC, digital waveform filtering, on-board spectral product calculation.•UIowa (EMFISIS) Interface Board (UII) – buffering of E-field signals to EMFISIS; buffering of B-field signals from EMFISIS; burst coordination signals; etc. (may be part of DSP or BEB).
RBSP MCR EFW- 17 JHUAPL, Jan 30,31 2007
RBSP-EFW Digital Signal Processor (DSP)
• The DSP board provides analog conditioning of the signals from the E- and B-field sensors on RBSP, analog-to-digital conversion of those signals at 16-bit resolution, digital waveform filtering, and on-board FFT-based spectral product computations (auto- and cross-spectra).
•All analog signals (V1-V6, E12, E34, E56 (both DC- and AC-coupled) and SCM1-3) are sampled at a constant 32-ksamp/s rate through the analog mulitplexer and switch system, and the three 256-ksamp/s ADCs.
•The 3 ADCs can be reconfigured so as to maintain sampling at lower base rates if one or two fail during the mission.
•Independent Survey and Burst digital filter chains provide anti-aliased and down-sampled waveform data at power-of-two intervals from 32 ksamp/s to 1 samp/s.
•Broadband power-of-two Filter Bank channels are derived directly from the digital filter chain outputs for use in on-board triggering or Survey science output.
•DC B-field data (EMFISIS fluxgate) used to rotate AC E- and B-Field into field-aligned coordinate system for input to on-board FFT-based spectral processing.
•On-Board FFT-based spectral processing of AC E- and B-Field data used to produce auto- and cross-spectral data products.
RBSP MCR EFW- 18 JHUAPL, Jan 30,31 2007
RBSP-EFW
Boom Deployment Systems• TRL 8, based on ISEE, CRRES, Polar, FAST, Cluster-II,
and THEMIS heritage.• Changes will include thinner cable, different accommodating
SC.Sensor Electronics (Preamp and BEB)
• TRL 8, based on Polar, Cluster-II, and THEMIS heritage.• Changes will include thinner cable, possible cable driver.
IDPU Power, DSP, DPU, and Burst Memory• TRL 7-8, based on Polar, FAST and THEMIS heritage.• Changes will include interfaces to other instruments and SC,
adjustments to filter frequencies and ADC rates, flight software changes.
Technical Readiness
RBSP MCR EFW- 19 JHUAPL, Jan 30,31 2007
RBSP-EFW
New SPB cable design• A new, smaller harness design was proposed for RBSP• Electrical and Mechanical tests under way to verify the new
design meets requirements and reliability• Mass and volume implications if it can’t be used
Parts• Heritage electronics design from THEMIS uses Grade 3
parts• Some parts may fail up-screening to Level 2, requiring a
redesign• Start parts screening early in Phase B
Concept Risks
RBSP MCR EFW- 20 JHUAPL, Jan 30,31 2007
RBSP-EFW
Spin-Axis Pointing• Impact of different illumination on DC and AC systematic
errors (EFW and EMFISIS).
Axial Boom Accommodation and SC Stability• Dual Axial booms to be accommodated along central axis of
RBSP SC.• Potential for solar array shadowing issues• AXB effects on RF Antenna pattern (in work) • Well-known and understood issues of dynamic stability
(spin/transverse MOI requirements).
System-Level Issues
RBSP MCR EFW- 21 JHUAPL, Jan 30,31 2007
RBSP-EFW
• Develop Management Plan (Organization, Cost, Schedule, etc.).• Participate in Requirements definition and flow-down efforts.• Participate in Spin Axis Pointing trade study.• Participate in Spacecraft Accommodation Studies, including:
• Ongoing Axial boom trades: Telecom antenna issue, Offpointing• SC charging and ESC specification.• C&DH system interface• Boom mounting and dynamics• Thermal interface
• Perform EFW Design Trade Studies, including:• Choose custom Gore cable for SPBs (mass vs. electrical response).• Define EFW frequency response and noise level requirements (joint
with EMFISIS).• Choose processor for DPU (8085 or FPGA-based).• Choose preamp floating supply range (100 vs. 200 volts).• Define capabilities of on-board Burst and Spectral Product systems.• Define EFW-EMFISIS interface.
Phase A Activities
RBSP MCR EFW- 22 JHUAPL, Jan 30,31 2007
RBSP-EFW
Instrument Level I&T (occurs at UCB):• Preamp Thermal Qualification and Acceptance Test:
– Performed informally on previous missions (Polar, Cluster, FAST), and formally as part of parts qualification on THEMIS.
– Preamps generate little internal heat, and are either isolated from SC heat sources (SPB), or attached to efficient radiators (AXB).
– Thus, preamp enclosure and PWB exposed to relatively extreme temperature swings during eclipse:
– THEMIS Tmin of -135 C for 3-hour eclipse.– 1 C/min rate of cooling.
– Batch of complete ETUs (8 on THEMIS) run through >=7 hot-cold cycles to verify design meets or exceeds performance requirements.
– Each Flight Preamp run through >=7 hot-cold cycles to verify that the unit meets or exceeds performance requirements.
Integration and Test Plan (1)
RBSP MCR EFW- 23 JHUAPL, Jan 30,31 2007
RBSP-EFW
Instrument Level I&T, con’t (occurs at UCB):• Boom Unit (SPB, AXB) Vibe, Functional and TVAC Testing:
– Vibe tests as per GEVS requirements:– Levels as per launch vehicle environment and SC modeling.– Tests performed in Bay Area (Quanta Labs, for example).
– Performance Tests (Science and Engineering).– Performed at Ambient; Hot and Cold TVAC.– Limited DC and AC Functional Tests (gain, offset, phase at DC
and selected frequencies).– Mechanical and actuator performance:
» Motor, SMA, or frangiBolt current at min, max, and nominal supply voltages.
» Deployed length measurement and length indicator calibration.» Run-out (straightness) and 1st-mode estimation (AXB only).
Integration and Test Plan (2)
RBSP MCR EFW- 24 JHUAPL, Jan 30,31 2007
RBSP-EFW
Instrument Level I&T, con’t. (occurs at UCB):• Sensor and Boom Electronics Board (BEB) Calibration
(Science Cal, or SciCal).– Detailed calibration of Sensor and BEB operation and
verification of required performance.– Instrument transfer function vs. frequency (gain, phase,
offset).– Bias current and voltage frequency response and offset
control calibration.– Noise levels.
• IDPU Functional, Vibe and TVAC Testing:– Electrical Performance Tests.– Commanding and Instrument Modes Tests.– U.Iowa Interface Board (UII) Testing.– Boom Deploy Testing (Simulated and Actual).
– Power control and consumption.– Software control of SPB boom deploy.
Integration and Test Plan (3)
RBSP MCR EFW- 25 JHUAPL, Jan 30,31 2007
RBSP-EFW
Suite and SC level I&T: • Fields Phasing and Timing Test:
– Establishes relative phase and/or time delay between EFW and EMFISIS fields channels.
• Electrostatic Cleanliness verification:– All instruments and spacecraft subsystems.
• Functional Tests:– Commanding:
– Instrument Modes (Survey, Burst, Common Burst, etc.).– Instrument Commissioning and Boom Deploy.– TM Playback.
– Compatibility:– conducted and radiated EMI/EMC.– commanding and functionality (“playing well with other
instruments and the spacecraft”).– Note that significant “self-test” capability exists in current design;
ie. Minimal GSE required for performance testing at Suite and SC level.
Integration and Test Plan (4)
RBSP MCR EFW- 26 JHUAPL, Jan 30,31 2007
RBSP-EFW
Boom deployment during commissioning requires real time commanding and close coordination with the spacecraft
Once in nominal operations, only periodic internal calibrations and occasional mode changes as we pass into different environments are required• No significant command bandwidth required• Need the ability to send up time-tagged commands (like
STEREO).• Calibration mode will effect data provided to EMPFISIS and
may also charge the spacecraft which would impact low energy particle measurements.
Operations will be run from a UCB SOC• same facility used for FAST, HESSI, CHIPS, STEREO,
THEMIS
Mission Operations Concept
RBSP MCR EFW- 27 JHUAPL, Jan 30,31 2007
RBSP-EFWMass and Power
Requirements
MASS
UnitMass
kg QuantityTotal
kgContingency
%
Mass with Contingency
kgSPB 2.20 4 8.80 15% 10.12AXB 2.04 2 4.08 15% 4.69IDPU 4.70 1 4.70 25% 5.88Harness 2.00 1 2.00 25% 2.50
Total 19.58 23.19
POWER
UnitPower
WContingency
%
Power with Contingency
WBEB 1.33 25% 1.66DFB 1.06 25% 1.33DCB/PCB 2.60 25% 3.25LVPS 2.46 25% 3.07 67% efficient
Total 7.45 9.31
RBSP MCR EFW- 28 JHUAPL, Jan 30,31 2007
RBSP-EFW Data Products and TM Rates
RBSP MCR EFW- 29 JHUAPL, Jan 30,31 2007
RBSP-EFW
Burst Telemetry Mode 3 Interferometric (Duration 0.3 s; playback every 2.4 hours adj.)Measurement Range Time
ResolutionRange
Sensitivity FOV/Dimension
V1s, V2s, V3s, V4sspin plane, single probepotentials
100 V to10 mV/m
1-30 k-samples/s 5 mV@300 Hz
yz gse plane
V5s, V6sspin axis, singleprobe potentials
100 V to10 mV
1-30 k-samples/s 10 mV@300 Hz
x gse plane
Search Coil: wavemagnetic field
1pT to 3 nTfrom Iowasensors
1-30 k-samples/s 10-9 nT2/Hz 3 axes
Burst size 4.32 MBytes for 1 second: velocity resolution size 4,200 km/s
Data Products and TM Rates
RBSP MCR EFW- 30 JHUAPL, Jan 30,31 2007
RBSP-EFW
SC Charging and Electrostatic Cleanliness (ESC)• SC potential symmetrization, in addition to charging control.• All exposed surfaces sufficiently conducting and tied
together electrically.• See THEMIS ESC Specification for example of
implementation and verification plan.Spin Axis Pointing
• RBSP spin axis shall be oriented to ensure illumination of the two EFW axial sensors.
• RBSP spin axis shall be oriented to ensure limited shadowing of the four EFW spin plane sensors.
Velocity and B-Field Accuracy• Determination of spacecraft vector velocity and local vector B-field
must be such that the -VxB E-field estimate is accurate to 0.1 mV/m above 2 (TBR) Re altitude.
Unique Requirements