Sustainable Energy: Minimise & Conserve Consumption Razali Hj Abd. Hadi Head Cluster: ENERGY JUNE 23, 2020 10.30AM

Transcript of Razali Hj Abd. Hadi...Initiatives and Program Activity (Physical - Mechanical) Upgrade the...

Page 1: Razali Hj Abd. Hadi...Initiatives and Program Activity (Physical - Mechanical) Upgrade the air-conditioning system in FSPU, and Chancellery building Replacement of air-cool split unit

Sustainable Energy: Minimise & Conserve Consumption

Razali Hj Abd. HadiHead Cluster: ENERGY

JUNE 23, 2020 10.30AM

Page 2: Razali Hj Abd. Hadi...Initiatives and Program Activity (Physical - Mechanical) Upgrade the air-conditioning system in FSPU, and Chancellery building Replacement of air-cool split unit

CLUSTER 2

ENERGY AND CLIMATE CHANGE

CLUSTER 2

ENERGY AND CLIMATE CHANGE

Page 3: Razali Hj Abd. Hadi...Initiatives and Program Activity (Physical - Mechanical) Upgrade the air-conditioning system in FSPU, and Chancellery building Replacement of air-cool split unit

Introduction on Energy and Climate Change

Energy and Climate Change cluster aims to synergize efforts in energy efficiencyinitiatives as well as energy reduction and low carbon emissions program.

UiTM is commited to provide solutions for climate change issues and developeffective policies to meet the energy standards in protecting the nature and energyresources.

Page 4: Razali Hj Abd. Hadi...Initiatives and Program Activity (Physical - Mechanical) Upgrade the air-conditioning system in FSPU, and Chancellery building Replacement of air-cool split unit

Energy and Climate Change Function

• To create awareness on effective energy consumption

• To promote activities and initiatives on energy efficiency in the campus

• To propose deployment of renewabale energy solutions and energy savingappliants for the university.

• To monitor the effectiveness and impact of the energy efficient for continousimprovement effort

• To strengthen university - community engagement in adapting sustainabilityagenda through energy efficiency good practices.

Page 5: Razali Hj Abd. Hadi...Initiatives and Program Activity (Physical - Mechanical) Upgrade the air-conditioning system in FSPU, and Chancellery building Replacement of air-cool split unit

Categories & Indicators

Use of energy-efficient appliances (2%) (EC.1)

Implementation of intelligent buildings (3%) (EC.2)

On-campus renewable energy production (3%) (EC.3)

Total Energy Consumption/Campus Population (3%) (EC.4)

Renewable energy production/energy consumption (2%) (EC.5)

Green Building Implementation Element (3%) (EC.6)

Program for the reduction of greenhouse gas emissions (2%) (EC.7)

Total Carbon Footprint/Campus Population (3%)(EC.8)

Page 6: Razali Hj Abd. Hadi...Initiatives and Program Activity (Physical - Mechanical) Upgrade the air-conditioning system in FSPU, and Chancellery building Replacement of air-cool split unit

Initiatives and Program

Installation of photocell in the

engineering complex corridor

Email posters on energy savings to

university community and

energy audit courses to staff

Conduct energy audits in the engineering

complex, Chancellery, Data Center and PTAR

Collecting a list of energy efficient

equipments in the campus

Retrieval of data logger at the

substation

Installation of energy-efficient

street light in Dataran Cendekia

Activity (Physical -Electrical)

Page 7: Razali Hj Abd. Hadi...Initiatives and Program Activity (Physical - Mechanical) Upgrade the air-conditioning system in FSPU, and Chancellery building Replacement of air-cool split unit

Initiatives and Program

Activity (Physical -Mechanical)

Upgrade the air-conditioning system

in FSPU, and Chancellery

building

Replacement of air-cool split unit with

energy efficient air-conditioning

(inverter system) (539 units)

The replacement system of clean water pipe at the main line of UiTM

(Main Ring), as well as other equipment such as valve and the mutilated pipe

fitting.Adjust water

pressure during the semester leave to

prevent water wastage due to broken pipe or

leaking.

Air conditioning Unit replacement Air

Cooled and Water Cooled Package –

which has been worn (12 years and above), and passed the phase

70% Beyond Economic Repair

(BER)

Page 8: Razali Hj Abd. Hadi...Initiatives and Program Activity (Physical - Mechanical) Upgrade the air-conditioning system in FSPU, and Chancellery building Replacement of air-cool split unit

Data collection from stakeholders

0.00

1,000,000.00

2,000,000.00

3,000,000.00

4,000,000.00

5,000,000.00

6,000,000.00

7,000,000.00

JAN

FEB

MA

C

AP

R

MEI

JUN

JUL

OG

O

SEP

OK

T

NO

V

DIS

Energy Consumption

Total kWh kWH 2017

Total kWh kWH 2018

Solar data collection from Green Energy Research Centre

Guideline regulation from Energy Commission, Malayia

Page 9: Razali Hj Abd. Hadi...Initiatives and Program Activity (Physical - Mechanical) Upgrade the air-conditioning system in FSPU, and Chancellery building Replacement of air-cool split unit

Initiative Towards Low Carbon Building Green Energy Research Center in UiTM

Solar Roof at Walkway Solar Roof Panel at carpark

Page 10: Razali Hj Abd. Hadi...Initiatives and Program Activity (Physical - Mechanical) Upgrade the air-conditioning system in FSPU, and Chancellery building Replacement of air-cool split unit

Energy Efficient Appliances Usage In The Campus

LED Downlight

Precision Aircond in Data CenterLED Lighting

Inverter Aircond

Page 11: Razali Hj Abd. Hadi...Initiatives and Program Activity (Physical - Mechanical) Upgrade the air-conditioning system in FSPU, and Chancellery building Replacement of air-cool split unit

LoRaWAN internet of things (iot)

LoRaWan LED Smart Streetlight

Energy Monitoring using ION Meter in the substations

Page 12: Razali Hj Abd. Hadi...Initiatives and Program Activity (Physical - Mechanical) Upgrade the air-conditioning system in FSPU, and Chancellery building Replacement of air-cool split unit

Training For The Technical Staff

Page 13: Razali Hj Abd. Hadi...Initiatives and Program Activity (Physical - Mechanical) Upgrade the air-conditioning system in FSPU, and Chancellery building Replacement of air-cool split unit

Activities – Awareness, Monitoring, Meeting etc