Global Building, PT RAB - Detail Filtered By :Project No, Type Project No : PBT.003 Project Name : Bangunan Pertokoan Job No Description Detail Type Item/Cost No Description Volume Unit Price Price Total 1 Pemasangan Bouwplank Material PB Bagus Paku Beton Bagu 1.45 Dus 50,000 72,500 BNG-RAM Benang Rami 45.5 Glg 6,500 295,750 PP - Brn Papan Borneo 0.65 m3 1,030,000 669,500 Kso-Brn Kaso Borneo 0.55 m3 1,650,000 907,500 1,945,250 Cost DC-013 Mandor 0.35 hr 100,000 35,000 DC-012 Kepala Tukang 1.15 hr 80,000 92,000 DC-026 Tukang Kayu 5 hr 70,000 350,000 DC-001 Kenek (Asisten T 15 hr 50,000 750,000 1,227,000 Total Of Pemasangan Bouwplank 3,172,250 2 Galian Tanah Lunak Material BNG-RAM Benang Rami 16 Glg 6,500 104,000 104,000 Cost DC-013 Mandor 2.33 hr 100,000 233,000 DC-012 Kepala Tukang 6.68 hr 80,000 534,400 DC-002 Tukang Gali 32.22 hr 90,000 2,899,800 3,667,200 Total Of Galian Tanah Lunak 3,771,200 3 Galian Tanah Keras Material BNG-RAM Benang Rami 16 Glg 6,500 104,000 104,000 Cost DC-013 Mandor 2.67 hr 100,000 267,000 DC-012 Kepala Tukang 8 hr 80,000 640,000 DC-002 Tukang Gali 50 hr 90,000 4,500,000 5,407,000 Total Of Galian Tanah Keras 5,511,000 4 Galian Tanah yang dipadatkan Material BNG-RAM Benang Rami 16 Glg 6,500 104,000 104,000 Cost DC-012 Kepala Tukang 10 hr 80,000 800,000 DC-013 Mandor 40 hr 100,000 4,000,000 DC-002 Tukang Gali 60 hr 90,000 5,400,000 10,200,000 Total Of Galian Tanah yang dipadatkan 10,304,000 5 Pemadatan Tanah Pondasi Material TMB-TNH Timbrisan Tanah 0.2 bh 60,000 12,000 12,000 Cost DC-012 Kepala Tukang 0.4 hr 80,000 32,000 ACCURATE Accounting System Report Printed on 13 Dec 2019 - 22:05

Transcript of RAB - Detail€¦ · 5 Pemadatan Tanah Pondasi Material TMB-TNH Timbrisan Tanah 0.2 ... Project No...

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price Total1 Pemasangan Bouwplank Material PB Bagus Paku Beton Bagus 1.45 Dus 50,000 72,500

    BNG-RAM Benang Rami 45.5 Glg 6,500 295,750PP - Brn Papan Borneo 0.65 m3 1,030,000 669,500Kso-Brn Kaso Borneo 0.55 m3 1,650,000 907,500

    1,945,250Cost DC-013 Mandor 0.35 hr 100,000 35,000

    DC-012 Kepala Tukang 1.15 hr 80,000 92,000DC-026 Tukang Kayu 5 hr 70,000 350,000DC-001 Kenek (Asisten Tukang) 15 hr 50,000 750,000

    1,227,000Total Of Pemasangan Bouwplank 3,172,2502 Galian Tanah Lunak Material BNG-RAM Benang Rami 16 Glg 6,500 104,000

    104,000Cost DC-013 Mandor 2.33 hr 100,000 233,000

    DC-012 Kepala Tukang 6.68 hr 80,000 534,400DC-002 Tukang Gali 32.22 hr 90,000 2,899,800

    3,667,200Total Of Galian Tanah Lunak 3,771,2003 Galian Tanah Keras Material BNG-RAM Benang Rami 16 Glg 6,500 104,000

    104,000Cost DC-013 Mandor 2.67 hr 100,000 267,000

    DC-012 Kepala Tukang 8 hr 80,000 640,000DC-002 Tukang Gali 50 hr 90,000 4,500,000

    5,407,000Total Of Galian Tanah Keras 5,511,0004 Galian Tanah yang dipadatkan Material BNG-RAM Benang Rami 16 Glg 6,500 104,000

    104,000Cost DC-012 Kepala Tukang 10 hr 80,000 800,000

    DC-013 Mandor 40 hr 100,000 4,000,000DC-002 Tukang Gali 60 hr 90,000 5,400,000

    10,200,000Total Of Galian Tanah yang dipadatkan 10,304,0005 Pemadatan Tanah Pondasi Material TMB-TNH Timbrisan Tanah 0.2 bh 60,000 12,000

    12,000Cost DC-012 Kepala Tukang 0.4 hr 80,000 32,000

    ACCURATE Accounting System ReportPrinted on 13 Dec 2019 - 22:05

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price TotalDC-002 Tukang Gali 3 hr 90,000 270,000DC-013 Mandor 0.14 hr 100,000 14,000

    316,000Total Of Pemadatan Tanah Pondasi 328,0006 Urugan Pasir Pondasi Material P-Urg Pasir Urug 60 m3 110,000 6,600,000

    6,600,000Cost DC-013 Mandor 0.62 hr 100,000 62,000

    DC-012 Kepala Tukang 3 hr 80,000 240,000DC-002 Tukang Gali 20 hr 90,000 1,800,000

    2,102,000Total Of Urugan Pasir Pondasi 8,702,0007 Spesi 1:3/m3 Material P-Btn Pasir Beton 13 m3 220,000 2,860,000

    SH-40 Semen Holcim - 40 kg 60 zak 59,000 3,540,0006,400,000

    Total Of Spesi 1:3/m3 6,400,0008 Spesi 1:4/m3 Material P-Btn Pasir Beton 13.5 m3 220,000 2,970,000

    SG-40 Semen Gresik - 40 kg 60 zak 60,000 3,600,0006,570,000

    Total Of Spesi 1:4/m3 6,570,0009 Spesi 1:6/m3 Material SG-40 Semen Gresik - 40 kg 44 zak 60,000 2,640,000

    P-Btn Pasir Beton 14 m3 220,000 3,080,0005,720,000

    Total Of Spesi 1:6/m3 5,720,00010 Beton 1:2:3/m3 dengan Batu Split Material Bt-Splt Batu Split 7.5 m3 105,000 787,500

    P-Btn Pasir Beton 5.6 m3 220,000 1,232,000SG-40 Semen Gresik - 40 kg 65 zak 60,000 3,900,000

    5,919,500Cost DC-015 Pacul Aduk 0.23 bh 36,000 8,280

    DC-014 Ember Pengaduk 2 bh 4,500 9,000DC-016 Sekop 0.23 bh 46,000 10,580DC-012 Kepala Tukang 0.65 hr 80,000 51,600DC-013 Mandor 1.77 hr 100,000 177,000DC-025 Vibrator 5 bh 36,000 180,000DC-003 Tukang Batu Kasar 2.68 hr 70,000 187,460DC-001 Kenek (Asisten Tukang) 8.69 hr 50,000 434,500

    ACCURATE Accounting System ReportPrinted on 13 Dec 2019 - 22:05

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price TotalDC-023 Concrete Mixer 5 bh 120,000 600,000

    1,658,420Total Of Beton 1:2:3/m3 dengan Batu Split 7,577,92011 Beton 1:3:5/m3 Material Bt-Splt Batu Split 9 m3 105,000 945,000

    P-Btn Pasir Beton 5.5 m3 220,000 1,210,000SG-40 Semen Gresik - 40 kg 46 zak 60,000 2,760,000

    4,915,000Cost DC-015 Pacul Aduk 0.2 bh 36,000 7,200

    DC-014 Ember Pengaduk 2 bh 4,500 9,000DC-016 Sekop 0.2 bh 46,000 9,200DC-013 Mandor 0.19 hr 100,000 18,800DC-012 Kepala Tukang 0.53 hr 80,000 42,640DC-025 Vibrator 4 bh 36,000 144,000DC-003 Tukang Batu Kasar 2.67 hr 70,000 186,690DC-001 Kenek (Asisten Tukang) 8 hr 50,000 400,000DC-023 Concrete Mixer 4 bh 120,000 480,000

    1,297,530Total Of Beton 1:3:5/m3 6,212,53012 Beton 1:2:3/m3 dengan Batu Split Material Bt-Splt Batu Split 7.5 m3 105,000 787,500

    P-Btn Pasir Beton 5.6 m3 220,000 1,232,000SG-40 Semen Gresik - 40 kg 65 zak 60,000 3,900,000

    5,919,500Cost DC-015 Pacul Aduk 0.23 bh 36,000 8,280

    DC-014 Ember Pengaduk 2 bh 4,500 9,000DC-016 Sekop 0.23 bh 46,000 10,580DC-012 Kepala Tukang 0.65 hr 80,000 51,600DC-013 Mandor 1.77 hr 100,000 177,000DC-025 Vibrator 5 bh 36,000 180,000DC-003 Tukang Batu Kasar 2.68 hr 70,000 187,460DC-001 Kenek (Asisten Tukang) 8.69 hr 50,000 434,500DC-023 Concrete Mixer 5 bh 120,000 600,000

    1,658,420Total Of Beton 1:2:3/m3 dengan Batu Split 7,577,92013 Beton 1:3:5/m3 Material Bt-Splt Batu Split 9 m3 105,000 945,000

    P-Btn Pasir Beton 5.5 m3 220,000 1,210,000

    ACCURATE Accounting System ReportPrinted on 13 Dec 2019 - 22:05

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price TotalSG-40 Semen Gresik - 40 kg 46 zak 60,000 2,760,000

    4,915,000Cost DC-015 Pacul Aduk 0.2 bh 36,000 7,200

    DC-014 Ember Pengaduk 2 bh 4,500 9,000DC-016 Sekop 0.2 bh 46,000 9,200DC-013 Mandor 0.19 hr 100,000 18,800DC-012 Kepala Tukang 0.53 hr 80,000 42,640DC-025 Vibrator 4 bh 36,000 144,000DC-003 Tukang Batu Kasar 2.67 hr 70,000 186,690DC-001 Kenek (Asisten Tukang) 8 hr 50,000 400,000DC-023 Concrete Mixer 4 bh 120,000 480,000

    1,297,530Total Of Beton 1:3:5/m3 6,212,53014 Beton 1:1, 5:2, 5/m3 dengan Koral Beton Material P-Btn Pasir Beton 5.6 m3 220,000 1,232,000

    Bt-Krl Batu Koral 8 m3 220,000 1,760,000SG-40 Semen Gresik - 40 kg 70 zak 60,000 4,200,000

    7,192,000Cost DC-015 Pacul Aduk 0.2 bh 36,000 7,200

    DC-014 Ember Pengaduk 2 bh 4,500 9,000DC-016 Sekop 0.2 bh 46,000 9,200DC-013 Mandor 0.18 hr 100,000 17,800DC-025 Vibrator 4 bh 36,000 144,000DC-003 Tukang Batu Kasar 2.67 hr 70,000 186,760DC-001 Kenek (Asisten Tukang) 8 hr 50,000 400,000DC-023 Concrete Mixer 4 bh 120,000 480,000DC-012 Kepala Tukang 0.56 hr 80,000 44,800

    1,298,760Total Of Beton 1:1, 5:2, 5/m3 dengan Koral Beton 8,490,76015 Beton 1:2:3/m3, dengan Koral Material P-Btn Pasir Beton 5.6 m3 220,000 1,232,000

    Bt-Krl Batu Koral 7.6 m3 220,000 1,672,000SG-40 Semen Gresik - 40 kg 64 zak 60,000 3,840,000

    6,744,000Cost DC-015 Pacul Aduk 0.2 bh 36,000 7,200

    DC-014 Ember Pengaduk 2 bh 4,500 9,000DC-016 Sekop 0.2 bh 46,000 9,200

    ACCURATE Accounting System ReportPrinted on 13 Dec 2019 - 22:05

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price TotalDC-013 Mandor 0.2 hr 100,000 20,000DC-025 Vibrator 4 bh 36,000 144,000DC-003 Tukang Batu Kasar 3.67 hr 70,000 256,690DC-001 Kenek (Asisten Tukang) 8.5 hr 50,000 425,000DC-012 Kepala Tukang 5.43 hr 80,000 434,400DC-023 Concrete Mixer 4 bh 120,000 480,000

    1,785,490Total Of Beton 1:2:3/m3, dengan Koral 8,529,49016 Beton 1:3:5/m3 dengan Batu Koral Material P-Btn Pasir Beton 8 m3 220,000 1,760,000

    Bt-Krl Batu Koral 10 m3 220,000 2,200,000SG-40 Semen Gresik - 40 kg 50 zak 60,000 3,000,000

    6,960,000Cost DC-015 Pacul Aduk 0.2 bh 36,000 7,200

    DC-014 Ember Pengaduk 2 bh 4,500 9,000DC-013 Mandor 0.2 hr 100,000 20,000DC-012 Kepala Tukang 0.5 hr 80,000 40,000DC-025 Vibrator 4 bh 36,000 144,000DC-003 Tukang Batu Kasar 3 hr 70,000 210,000DC-001 Kenek (Asisten Tukang) 8 hr 50,000 400,000DC-023 Concrete Mixer 4 bh 120,000 480,000DC-016 Sekop 20 bh 46,000 920,000

    2,230,200Total Of Beton 1:3:5/m3 dengan Batu Koral 9,190,20017 Beton Ready Mix K.225/m3 Material BTN-RM225 Beton Ready Mix K.225 10.5 m3 380,000 3,990,000

    3,990,000Cost DC-014 Ember Pengaduk 2 bh 4,500 9,000

    DC-015 Pacul Aduk 0.25 bh 36,000 9,000DC-016 Sekop 0.25 bh 46,000 11,500DC-013 Mandor 0.2 hr 100,000 20,000DC-012 Kepala Tukang 0.4 hr 80,000 32,000DC-003 Tukang Batu Kasar 2 hr 70,000 140,000DC-001 Kenek (Asisten Tukang) 5 hr 50,000 250,000DC-025 Vibrator 10 bh 36,000 360,000DC-024 Pompa Beton 10 bh 86,000 860,000

    1,691,500

    ACCURATE Accounting System ReportPrinted on 13 Dec 2019 - 22:05

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price TotalTotal Of Beton Ready Mix K.225/m3 5,681,50018 Beton Readu Mix K.175/m3 Material BTN-RM175 Beton Ready Mix K.175 10.5 330,000 3,465,000

    3,465,000Cost DC-014 Ember Pengaduk 2 bh 4,500 9,000

    DC-013 Mandor 0.1 hr 100,000 10,000DC-012 Kepala Tukang 0.3 hr 80,000 24,000DC-015 Pacul Aduk 3 bh 36,000 108,000DC-016 Sekop 3 bh 46,000 138,000DC-003 Tukang Batu Kasar 2 hr 70,000 140,000DC-001 Kenek (Asisten Tukang) 5 hr 50,000 250,000DC-025 Vibrator 10 bh 36,000 360,000DC-024 Pompa Beton 10 bh 86,000 860,000

    1,899,000Total Of Beton Readu Mix K.175/m3 5,364,00019 Pondasi Batu Kali 1:4/m3 Material Kwt-Btn Kawat Beton 0.2 Kg 10,500 2,100

    BNG-RAM Benang Rami 2 Glg 6,500 13,000Bamb Bambu 3 Btg 10,500 31,500Bt-Kl Batu Kali 13 m3 220,000 2,860,000

    2,906,600Cost DC-013 Mandor 0.1 hr 100,000 10,000

    DC-012 Kepala Tukang 0.3 hr 80,000 24,000DC-014 Ember Pengaduk 10 bh 4,500 45,000DC-015 Pacul Aduk 2 bh 36,000 72,000DC-016 Sekop 2 bh 46,000 92,000DC-003 Tukang Batu Kasar 4 hr 70,000 280,000DC-001 Kenek (Asisten Tukang) 10 hr 50,000 500,000

    1,023,000Total Of Pondasi Batu Kali 1:4/m3 3,929,60020 Pondasi Batu Kali 1:5/m3 Material Kwt-Btn Kawat Beton 0.2 Kg 10,500 2,100

    Bamb Bambu 3 Btg 10,500 31,500BNG-RAM Benang Rami 12 Glg 6,500 78,000Bt-Kl Batu Kali 13 m3 220,000 2,860,000

    2,971,600Cost DC-013 Mandor 0.1 hr 100,000 10,000

    DC-012 Kepala Tukang 0.3 hr 80,000 24,000

    ACCURATE Accounting System ReportPrinted on 13 Dec 2019 - 22:05

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price TotalDC-014 Ember Pengaduk 10 bh 4,500 45,000DC-015 Pacul Aduk 2 bh 36,000 72,000DC-016 Sekop 2 bh 46,000 92,000DC-003 Tukang Batu Kasar 5 hr 70,000 350,000DC-001 Kenek (Asisten Tukang) 10 hr 50,000 500,000

    1,093,000Total Of Pondasi Batu Kali 1:5/m3 4,064,60021 Pas. Rollag Bata 1:4/m3 Material BNG-RAM Benang Rami 0.5 Glg 6,500 3,250

    Bamb Bambu 5 Btg 10,500 52,500Bt-Bt Batu Bata 6,820 Pcs 600 4,092,000

    4,147,750Cost DC-014 Ember Pengaduk 0.5 bh 4,500 2,250

    DC-015 Pacul Aduk 0.2 bh 36,000 7,200DC-013 Mandor 0.08 hr 100,000 8,000DC-016 Sekop 0.2 bh 46,000 9,200DC-012 Kepala Tukang 3 hr 80,000 240,000DC-003 Tukang Batu Kasar 4 hr 70,000 280,000DC-001 Kenek (Asisten Tukang) 12 hr 50,000 600,000

    1,146,650Total Of Pas. Rollag Bata 1:4/m3 5,294,40022 Pas. Rollag Bata 1:5/m3 Material Bamb Bambu 0.02 Btg 10,500 210

    BNG-RAM Benang Rami 0.5 Glg 6,500 3,250Bt-Bt Batu Bata 6,820 Pcs 600 4,092,000

    4,095,460Cost DC-014 Ember Pengaduk 0.5 bh 4,500 2,250

    DC-015 Pacul Aduk 0.2 bh 36,000 7,200DC-013 Mandor 0.08 hr 100,000 8,000DC-016 Sekop 0.2 bh 46,000 9,200DC-012 Kepala Tukang 0.3 hr 80,000 24,000DC-003 Tukang Batu Kasar 4 hr 70,000 280,000DC-001 Kenek (Asisten Tukang) 12 hr 50,000 600,000

    930,650Total Of Pas. Rollag Bata 1:5/m3 5,026,11023 Bekisting Poer/m2 2xpakai dgn Papan 2/20 Material BNG-RAM Benang Rami 0.5 Glg 6,500 3,250

    PKT 1-4cm Paku Kayu/Triplek 1-4cm 2.2 Kg 38,000 83,600

    ACCURATE Accounting System ReportPrinted on 13 Dec 2019 - 22:05

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price TotalPKT 5-12cm Paku Kayu/Triplek 5-12cm 3 Kg 35,000 105,000Kso-Ksl Kaso Kamper Singkil 1.8 m3 2,550,000 4,590,000Kso-Mrn Kaso Meranti 0.1 m3 1,650,000 165,000PP - Mrn Papan Meranti 0.2 m3 1,180,000 236,000

    5,182,850Cost DC-013 Mandor 0.05 hr 100,000 5,000

    DC-012 Kepala Tukang 0.15 hr 80,000 12,000DC-001 Kenek (Asisten Tukang) 2 hr 50,000 100,000DC-006 Tukang Kayu Kasar 8 hr 70,000 560,000

    677,000Total Of Bekisting Poer/m2 2xpakai dgn Papan 2/20 5,859,85024 Bekisting Poer/m2 2xpakai dengan Triplex 9mm Material BNG-RAM Benang Rami 0.6 Glg 6,500 3,900

    PKT 5-12cm Paku Kayu/Triplek 5-12cm 2.2 Kg 35,000 77,000PKT 1-4cm Paku Kayu/Triplek 1-4cm 5 Kg 38,000 190,000Kso-Brn Kaso Borneo 0.3 m3 1,650,000 495,000Trip 15mm Triplek 15mm 3 lbr 180,000 540,000Kso-Ksl Kaso Kamper Singkil 0.25 m3 2,550,000 637,500

    1,943,400Cost DC-013 Mandor 0.05 hr 100,000 5,000

    DC-012 Kepala Tukang 0.2 hr 80,000 16,000DC-006 Tukang Kayu Kasar 0.8 hr 70,000 56,000DC-001 Kenek (Asisten Tukang) 2 hr 50,000 100,000

    177,000Total Of Bekisting Poer/m2 2xpakai dengan Triplex 9mm 2,120,40025 Bekisting Sloof/m2 2xpakai dengan Papan 2/20 Material Kwt-Btn Kawat Beton 0.25 Kg 10,500 2,625

    PKT 1-4cm Paku Kayu/Triplek 1-4cm 1 Kg 38,000 38,000Kso-Brn Kaso Borneo 0.03 m3 1,650,000 41,250PKT 5-12cm Paku Kayu/Triplek 5-12cm 1.2 Kg 35,000 42,000Kso-Ksl Kaso Kamper Singkil 0.06 m3 2,550,000 147,900PP - Brn Papan Borneo 0.19 m3 1,030,000 191,580BNG-RAM Benang Rami 0.56 Glg 6,500 3,659.5

    467,014.5Cost DC-012 Kepala Tukang 0.2 hr 80,000 16,000

    DC-006 Tukang Kayu Kasar 1 hr 70,000 70,000DC-001 Kenek (Asisten Tukang) 2 hr 50,000 100,000

    ACCURATE Accounting System ReportPrinted on 13 Dec 2019 - 22:05

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price TotalDC-013 Mandor 0.07 hr 100,000 6,800

    192,800Total Of Bekisting Sloof/m2 2xpakai dengan Papan 2/20 659,814.526 Bekisting Sloof/m2 2xpakai dengan Papan 2/20 Material Kwt-Btn Kawat Beton 0.3 Kg 10,500 3,150

    BNG-RAM Benang Rami 0.5 Glg 6,500 3,250PKT 1-4cm Paku Kayu/Triplek 1-4cm 1 Kg 38,000 38,000PKT 5-12cm Paku Kayu/Triplek 5-12cm 1.1 Kg 35,000 38,500Kso-Ksl Kaso Kamper Singkil 0.02 m3 2,550,000 45,900Kso-Brn Kaso Borneo 0.06 m3 1,650,000 99,000PP - Ksl Papan Kamper Singkil 0.16 m3 2,530,000 399,740

    627,540Cost DC-013 Mandor 0.08 hr 100,000 8,000

    DC-012 Kepala Tukang 0.2 hr 80,000 16,000DC-006 Tukang Kayu Kasar 1 hr 70,000 70,000DC-001 Kenek (Asisten Tukang) 2 hr 50,000 100,000

    194,000Total Of Bekisting Sloof/m2 2xpakai dengan Papan 2/20 821,54027 Bekisting Sloof/m2 2xpakai dgn Triplex 9mm Material BNG-RAM Benang Rami 0.5 Glg 6,500 3,250

    PKT 5-12cm Paku Kayu/Triplek 5-12cm 2.2 Kg 35,000 77,000PKT 1-4cm Paku Kayu/Triplek 1-4cm 4 Kg 38,000 152,000Kso-Ksm Kaso Kamper Samarinda 0.06 m3 3,550,000 213,000Trip 12mm Triplek 12mm 2 lbr 145,000 290,000Kso-Brn Kaso Borneo 0.2 m3 1,650,000 330,000

    1,065,250Cost DC-013 Mandor 0.06 hr 100,000 5,800

    DC-006 Tukang Kayu Kasar 0.9 hr 70,000 63,000DC-001 Kenek (Asisten Tukang) 2 hr 50,000 100,000DC-012 Kepala Tukang 2 hr 80,000 160,000

    328,800Total Of Bekisting Sloof/m2 2xpakai dgn Triplex 9mm 1,394,05028 Bekisting Sloof/m2 2xpakai dgn Tiplex 12mm Material BNG-RAM Benang Rami 0.5 Glg 6,500 3,250

    PKT 5-12cm Paku Kayu/Triplek 5-12cm 2.5 Kg 35,000 87,500Kso-Brn Kaso Borneo 0.06 m3 1,650,000 99,000PKT 1-4cm Paku Kayu/Triplek 1-4cm 4 Kg 38,000 152,000Trip 12mm Triplek 12mm 2 lbr 145,000 290,000

    ACCURATE Accounting System ReportPrinted on 13 Dec 2019 - 22:05

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price TotalKso-Ksl Kaso Kamper Singkil 0.2 m3 2,550,000 510,000

    1,141,750Cost DC-013 Mandor 0.6 hr 100,000 60,000

    DC-006 Tukang Kayu Kasar 1 hr 70,000 70,000DC-001 Kenek (Asisten Tukang) 2 hr 50,000 100,000DC-012 Kepala Tukang 2 hr 80,000 160,000

    390,000Total Of Bekisting Sloof/m2 2xpakai dgn Tiplex 12mm 1,531,75029 Bekisting Kolom/m2 2xpakai dgn Papan 2/20 Material BNG-RAM Benang Rami 0.5 Glg 6,500 3,250

    PKT 5-12cm Paku Kayu/Triplek 5-12cm 0.9 Kg 35,000 31,500PKT 1-4cm Paku Kayu/Triplek 1-4cm 1.96 Kg 38,000 74,290Kso-Ksl Kaso Kamper Singkil 0.09 m3 2,550,000 229,500Kso-Ksm Kaso Kamper Samarinda 0.07 m3 3,550,000 234,300PP - Ksm Papan Kamper Samarinda 0.2 m3 3,530,000 706,000

    1,278,840Cost DC-013 Mandor 0.07 hr 100,000 6,700

    DC-012 Kepala Tukang 0.2 hr 80,000 16,000DC-006 Tukang Kayu Kasar 1 hr 70,000 70,000DC-001 Kenek (Asisten Tukang) 2 hr 50,000 100,000

    192,700Total Of Bekisting Kolom/m2 2xpakai dgn Papan 2/20 1,471,54030 Bekisting Kolom/m2 2xpakai dgn Triplex 9mm Material BNG-RAM Benang Rami 0.5 Glg 6,500 3,250

    PKT 5-12cm Paku Kayu/Triplek 5-12cm 0.92 Kg 35,000 32,060PKT 1-4cm Paku Kayu/Triplek 1-4cm 3 Kg 38,000 114,000Trip 18mm Triplek 18mm 2 lbr 200,000 400,000Kso-Ksl Kaso Kamper Singkil 0.4 m3 2,550,000 1,020,000Kso-Ksm Kaso Kamper Samarinda 0.01 m3 3,550,000 31,950

    1,601,260Cost DC-013 Mandor 0.07 hr 100,000 6,700

    DC-012 Kepala Tukang 0.2 hr 80,000 16,000DC-006 Tukang Kayu Kasar 1 hr 70,000 70,000DC-001 Kenek (Asisten Tukang) 2 hr 50,000 100,000

    192,700Total Of Bekisting Kolom/m2 2xpakai dgn Triplex 9mm 1,793,96031 Bekisting Kolom/m2 2xpakai dgn Triplex 12mm Material BNG-RAM Benang Rami 0.5 Glg 6,500 3,250

    ACCURATE Accounting System ReportPrinted on 13 Dec 2019 - 22:05

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price TotalPKT 5-12cm Paku Kayu/Triplek 5-12cm 0.92 Kg 35,000 32,060PKT 1-4cm Paku Kayu/Triplek 1-4cm 2.55 Kg 38,000 96,900Kso-Ksl Kaso Kamper Singkil 0.09 m3 2,550,000 229,500Trip 12mm Triplek 12mm 1.91 lbr 145,000 276,950Kso-Brn Kaso Borneo 3 m3 1,650,000 4,950,000

    5,588,660Cost DC-012 Kepala Tukang 0.2 hr 80,000 16,000

    DC-006 Tukang Kayu Kasar 1 hr 70,000 70,000DC-001 Kenek (Asisten Tukang) 2 hr 50,000 100,000DC-013 Mandor 0.07 hr 100,000 6,800

    192,800Total Of Bekisting Kolom/m2 2xpakai dgn Triplex 12mm 5,781,46032 Bekisting Balok/m2 2x pakai dengan Papan 2/20 Material BNG-RAM Benang Rami 0.5 Glg 6,500 3,250

    PKT 5-12cm Paku Kayu/Triplek 5-12cm 5.5 Kg 35,000 192,500Kso-Ksm Kaso Kamper Samarinda 0.06 m3 3,550,000 213,000PP - Ksm Papan Kamper Samarinda 0.09 m3 3,530,000 300,050Kso-Mrn Kaso Meranti 0.37 m3 1,650,000 607,200PP - Mrn Papan Meranti 0.16 m3 1,180,000 184,080

    1,500,080Cost DC-013 Mandor 0.1 hr 100,000 10,000

    DC-012 Kepala Tukang 0.3 hr 80,000 24,000DC-006 Tukang Kayu Kasar 2 hr 70,000 140,000DC-001 Kenek (Asisten Tukang) 3 hr 50,000 150,000

    324,000Total Of Bekisting Balok/m2 2x pakai dengan Papan 2/20 1,824,08033 Bekisting Balok/m2 2xpakai dgn Triplex 9mm Material BNG-RAM Benang Rami 0.5 Glg 6,500 3,250

    PP - Brn Papan Borneo 0.07 m3 1,030,000 72,100PKT 1-4cm Paku Kayu/Triplek 1-4cm 2.2 Kg 38,000 83,600PKT 5-12cm Paku Kayu/Triplek 5-12cm 2.5 Kg 35,000 87,500PP - Ksm Papan Kamper Samarinda 0.04 m3 3,530,000 158,850Trip 18mm Triplek 18mm 2 lbr 200,000 400,000Kso-Brn Kaso Borneo 0.56 m3 1,650,000 920,700

    1,726,000Cost DC-013 Mandor 0.1 hr 100,000 9,500

    DC-012 Kepala Tukang 0.36 hr 80,000 28,480

    ACCURATE Accounting System ReportPrinted on 13 Dec 2019 - 22:05

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price TotalDC-006 Tukang Kayu Kasar 1.25 hr 70,000 87,500DC-001 Kenek (Asisten Tukang) 2.5 hr 50,000 125,000

    250,480Total Of Bekisting Balok/m2 2xpakai dgn Triplex 9mm 1,976,48034 Bekisting Balok/m2 2xpakai dgn Triplex 12mm Material BNG-RAM Benang Rami 0.5 Glg 6,500 3,250

    PKT 5-12cm Paku Kayu/Triplek 5-12cm 4.5 Kg 35,000 157,500PP - Brn Papan Borneo 0.23 m3 1,030,000 239,990Trip 15mm Triplek 15mm 2.11 lbr 180,000 379,620Kso-Brn Kaso Borneo 0.42 m3 1,650,000 701,250

    1,481,610Cost DC-013 Mandor 0.1 hr 100,000 9,800

    DC-001 Kenek (Asisten Tukang) 2.85 hr 50,000 142,500DC-006 Tukang Kayu Kasar 2.38 hr 70,000 166,250DC-012 Kepala Tukang 0.28 hr 80,000 22,800

    341,350Total Of Bekisting Balok/m2 2xpakai dgn Triplex 12mm 1,822,96035 Bekisting Plat/m2 2xpakai dengan Papan 2/20 Material BNG-RAM Benang Rami 0.68 Glg 6,500 4,420

    PKT 5-12cm Paku Kayu/Triplek 5-12cm 6.57 Kg 35,000 229,810Kso-Mrn Kaso Meranti 0.19 m3 1,650,000 316,800PP - Mrn Papan Meranti 1.69 m3 1,180,000 1,988,300

    2,539,330Cost DC-013 Mandor 0.1 hr 100,000 9,800

    DC-012 Kepala Tukang 0.3 hr 80,000 23,840DC-006 Tukang Kayu Kasar 1.39 hr 70,000 96,950DC-001 Kenek (Asisten Tukang) 2.98 hr 50,000 149,250

    279,840Total Of Bekisting Plat/m2 2xpakai dengan Papan 2/20 2,819,17036 Bekisting Plat/m2 2xpakai dengan Papan 2/20 Material BNG-RAM Benang Rami 0.5 Glg 6,500 3,250

    PKT 5-12cm Paku Kayu/Triplek 5-12cm 2.17 Kg 35,000 76,090PP - Brn Papan Borneo 0.13 m3 1,030,000 128,750Kso-Brn Kaso Borneo 0.21 m3 1,650,000 349,800Trip 18mm Triplek 18mm 2.29 lbr 200,000 457,600

    1,015,490Cost DC-012 Kepala Tukang 0.25 hr 80,000 20,000

    DC-001 Kenek (Asisten Tukang) 2 hr 50,000 100,000

    ACCURATE Accounting System ReportPrinted on 13 Dec 2019 - 22:05

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price TotalDC-006 Tukang Kayu Kasar 1.5 hr 70,000 105,000DC-013 Mandor 0.07 hr 100,000 6,800

    231,800Total Of Bekisting Plat/m2 2xpakai dengan Papan 2/20 1,247,29037 Bekisting Plat/m2 2xpakai dgn Triplex 12mm Material BNG-RAM Benang Rami 0.5 Glg 6,500 3,250

    PKT 5-12cm Paku Kayu/Triplek 5-12cm 2.17 Kg 35,000 76,090PP - Brn Papan Borneo 0.13 m3 1,030,000 128,750Kso-Brn Kaso Borneo 0.19 m3 1,650,000 310,200Trip 18mm Triplek 18mm 2.28 lbr 200,000 455,600

    973,890Cost DC-013 Mandor 0.09 hr 100,000 8,600

    DC-012 Kepala Tukang 0.27 hr 80,000 21,440DC-003 Tukang Batu Kasar 1.86 hr 70,000 129,920DC-001 Kenek (Asisten Tukang) 3.8 hr 50,000 190,000

    349,960Total Of Bekisting Plat/m2 2xpakai dgn Triplex 12mm 1,323,85038 Bekisting Tangga/m2 2xpakai dgn Papan 2/20 Material BNG-RAM Benang Rami 0.8 Glg 6,500 5,200

    Kso-Brn Kaso Borneo 0.01 m3 1,650,000 16,500PP - Ksl Papan Kamper Singkil 0.03 m3 2,530,000 63,250Kso-Ksm Kaso Kamper Samarinda 0.05 m3 3,550,000 170,400PP - Brn Papan Borneo 0.17 m3 1,030,000 173,040PKT 5-12cm Paku Kayu/Triplek 5-12cm 5 Kg 35,000 175,000PP - Ksm Papan Kamper Samarinda 0.1 m3 3,530,000 335,350

    938,740Cost DC-013 Mandor 0.18 hr 100,000 18,000

    DC-012 Kepala Tukang 0.65 hr 80,000 52,000DC-006 Tukang Kayu Kasar 3 hr 70,000 210,000DC-001 Kenek (Asisten Tukang) 6.5 hr 50,000 325,000

    605,000Total Of Bekisting Tangga/m2 2xpakai dgn Papan 2/20 1,543,74039 Bekisting Tangga/m2 2xpakai dengan Triplex 9mm Material BNG-RAM Benang Rami 0.6 Glg 6,500 3,900

    PKT 5-12cm Paku Kayu/Triplek 5-12cm 6.57 Kg 35,000 229,810Kso-Ksm Kaso Kamper Samarinda 0.07 m3 3,550,000 234,300PP - Ksm Papan Kamper Samarinda 0.09 m3 3,530,000 331,820Trip 12mm Triplek 12mm 3.39 lbr 145,000 491,405

    ACCURATE Accounting System ReportPrinted on 13 Dec 2019 - 22:05

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price Total1,291,235

    Cost DC-012 Kepala Tukang 0.5 hr 80,000 40,000DC-013 Mandor 1.69 hr 100,000 169,000DC-006 Tukang Kayu Kasar 2.8 hr 70,000 196,000DC-001 Kenek (Asisten Tukang) 6.5 hr 50,000 325,000

    730,000Total Of Bekisting Tangga/m2 2xpakai dengan Triplex 9mm 2,021,23540 Bekisting Tangga/m2 2xpakai dengan Triplex 12mm Material BNG-RAM Benang Rami 6.5 Glg 6,500 42,250

    PKT 5-12cm Paku Kayu/Triplek 5-12cm 2.18 Kg 35,000 76,195PP - Mrn Papan Meranti 0.13 m3 1,180,000 147,500Kso-Mrn Kaso Meranti 0.11 m3 1,650,000 174,900Trip 12mm Triplek 12mm 2.36 lbr 145,000 341,910

    782,755Cost DC-013 Mandor 0.26 hr 100,000 25,600

    DC-012 Kepala Tukang 0.64 hr 80,000 50,800DC-006 Tukang Kayu Kasar 3.21 hr 70,000 224,910DC-001 Kenek (Asisten Tukang) 6.54 hr 50,000 326,800

    628,110Total Of Bekisting Tangga/m2 2xpakai dengan Triplex 12mm 1,410,86541 Bekisting Beton Praktis/m2 Material PKT 5-12cm Paku Kayu/Triplek 5-12cm 1.5 Kg 35,000 52,500

    PP - Brn Papan Borneo 2.58 m3 1,030,000 2,657,400Kwt-Btn Kawat Beton 4.4 Kg 10,500 46,200

    2,756,100Cost DC-013 Mandor 0.05 hr 100,000 5,200

    DC-012 Kepala Tukang 0.16 hr 80,000 12,480DC-001 Kenek (Asisten Tukang) 1.56 hr 50,000 78,100DC-006 Tukang Kayu Kasar 1.56 hr 70,000 109,340

    205,120Total Of Bekisting Beton Praktis/m2 2,961,22042 Pembesian Polos/kg Material Kwt-Btn Kawat Beton 0.2 Kg 10,500 2,100

    BB 10mm Besi Beton Diameter 10mm - 12m 12 btg 69,000 828,000830,100

    Cost DC-013 Mandor 0.01 hr 100,000 800DC-012 Kepala Tukang 0.03 hr 80,000 2,240DC-021 Bar Binder 10 bh 350 3,500

    ACCURATE Accounting System ReportPrinted on 13 Dec 2019 - 22:05

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price TotalDC-020 Bar Cutter 10 bh 350 3,500DC-005 Tukang Besi 0.13 hr 70,000 8,960DC-001 Kenek (Asisten Tukang) 2.75 hr 50,000 137,500

    156,500Total Of Pembesian Polos/kg 986,60043 Pembesian Ulir/kg Material Kwt-Btn Kawat Beton 0.17 Kg 10,500 1,732.5

    BB 16mm Besi Beton Diameter 16mm - 12m12.5 btg 130,000 1,625,0001,626,732.5

    Cost DC-013 Mandor 0.01 hr 100,000 700DC-012 Kepala Tukang 0.02 hr 80,000 1,600DC-021 Bar Binder 10 bh 350 3,500DC-020 Bar Cutter 10 bh 350 3,500DC-005 Tukang Besi 0.15 hr 70,000 10,850DC-001 Kenek (Asisten Tukang) 0.26 hr 50,000 13,000

    33,150Total Of Pembesian Ulir/kg 1,659,882.51 Pemasangan Bataco Semen 1:3/m2 Material BNG-RAM Benang Rami 6.9 Glg 6,500 44,850

    Kso-Brn Kaso Borneo 0.35 m3 1,650,000 577,500Bt-Btk Batu Batako 1,400 Pcs 2,500 3,500,000SG-40 Semen Gresik - 40 kg 100 zak 60,000 6,000,000

    10,122,350Cost DC-014 Ember Pengaduk 0.35 bh 4,500 1,575

    DC-012 Kepala Tukang 0.2 hr 80,000 16,000DC-013 Mandor 0.35 hr 100,000 35,000DC-015 Pacul Aduk 1.25 bh 36,000 45,000DC-016 Sekop 1.25 bh 46,000 57,500DC-006 Tukang Kayu Kasar 6.5 hr 70,000 455,000DC-001 Kenek (Asisten Tukang) 15 hr 50,000 750,000

    1,360,075Total Of Pemasangan Bataco Semen 1:3/m2 11,482,4252 Pemasangan Bataco Semen 1:4/m2 Material BNG-RAM Benang Rami 6 Glg 6,500 39,000

    Kso-Brn Kaso Borneo 0.24 m3 1,650,000 396,000Bt-Btk Batu Batako 1,400 Pcs 2,500 3,500,000

    3,935,000Cost DC-012 Kepala Tukang 0.2 hr 80,000 16,000

    ACCURATE Accounting System ReportPrinted on 13 Dec 2019 - 22:05

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price TotalDC-003 Tukang Batu Kasar 5.6 hr 70,000 392,000DC-001 Kenek (Asisten Tukang) 20 hr 50,000 1,000,000DC-013 Mandor 0.55 hr 100,000 55,000

    1,463,000Total Of Pemasangan Bataco Semen 1:4/m2 5,398,0003 Pemasangan Bataco Semen 1:5/m2 Material BNG-RAM Benang Rami 6.5 Glg 6,500 42,250

    Bt-Btk Batu Batako 1,400 Pcs 2,500 3,500,0003,542,250

    Cost DC-014 Ember Pengaduk 2.5 bh 4,500 11,250DC-013 Mandor 0.35 hr 100,000 35,000DC-015 Pacul Aduk 1.5 bh 36,000 54,000DC-016 Sekop 1.5 bh 46,000 69,000DC-012 Kepala Tukang 1.5 hr 80,000 120,000DC-003 Tukang Batu Kasar 6.8 hr 70,000 476,000DC-001 Kenek (Asisten Tukang) 20 hr 50,000 1,000,000

    1,765,250Total Of Pemasangan Bataco Semen 1:5/m2 5,307,5004 Pemasangan Bataco Semen 1:6/m2 Material BNG-RAM Benang Rami 6 Glg 6,500 39,000

    Bt-Btk Batu Batako 1,400 Pcs 2,500 3,500,0003,539,000

    Cost DC-013 Mandor 0.33 hr 100,000 33,000DC-012 Kepala Tukang 1 hr 80,000 80,000DC-003 Tukang Batu Kasar 5 hr 70,000 350,000DC-001 Kenek (Asisten Tukang) 20 hr 50,000 1,000,000

    1,463,000Total Of Pemasangan Bataco Semen 1:6/m2 5,002,0005 Pemasangan Bataco Semen 1:6/m2 Material BNG-RAM Benang Rami 6 Glg 6,500 39,000

    Bt-Btk Batu Batako 1,400 Pcs 2,500 3,500,0003,539,000

    Cost DC-013 Mandor 0.33 hr 100,000 33,000DC-012 Kepala Tukang 1 hr 80,000 80,000DC-003 Tukang Batu Kasar 5 hr 70,000 350,000DC-001 Kenek (Asisten Tukang) 20 hr 50,000 1,000,000

    1,463,000Total Of Pemasangan Bataco Semen 1:6/m2 5,002,000

    ACCURATE Accounting System ReportPrinted on 13 Dec 2019 - 22:05

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price Total6 Pemasangan Bata 1/2 batu Material BNG-RAM Benang Rami 18 Glg 6,500 117,000

    Bt-Bt Batu Bata 22,500 Pcs 600 13,500,000SG-40 Semen Gresik - 40 kg 300 zak 60,000 18,000,000

    31,617,000Cost DC-014 Ember Pengaduk 6 bh 4,500 27,000

    DC-013 Mandor 1 hr 100,000 100,000DC-015 Pacul Aduk 3 bh 36,000 108,000DC-016 Sekop 3 bh 46,000 138,000DC-012 Kepala Tukang 4.5 hr 80,000 360,000DC-003 Tukang Batu Kasar 15 hr 70,000 1,050,000DC-001 Kenek (Asisten Tukang) 60 hr 50,000 3,000,000

    4,783,000Total Of Pemasangan Bata 1/2 batu 36,400,0007 Pasang Celcon Blok T.10 cm Material BNG-RAM Benang Rami 9 Glg 6,500 58,500

    Kso-Brn Kaso Borneo 0.3 m3 1,650,000 495,000CB Celcon Blok 1,350 7,500 10,125,000

    10,678,500Cost DC-014 Ember Pengaduk 3 bh 4,500 13,500

    DC-015 Pacul Aduk 1.5 bh 36,000 54,000DC-016 Sekop 1.5 bh 46,000 69,000DC-012 Kepala Tukang 1.5 hr 80,000 120,000DC-013 Mandor 4.95 hr 100,000 495,000DC-003 Tukang Batu Kasar 8.4 hr 70,000 588,000DC-001 Kenek (Asisten Tukang) 30 hr 50,000 1,500,000

    2,839,500Total Of Pasang Celcon Blok T.10 cm 13,518,0008 Pasang Celcon Blok T.7,5 cm Material BNG-RAM Benang Rami 15 Glg 6,500 97,500

    Kso-Brn Kaso Borneo 0.5 m3 1,650,000 825,000CB Celcon Blok 2,125 7,500 15,937,500

    16,860,000Cost DC-015 Pacul Aduk 2.5 bh 36,000 90,000

    DC-016 Sekop 2.5 bh 46,000 115,000DC-014 Ember Pengaduk 5 bh 4,500 22,500DC-013 Mandor 0.82 hr 100,000 82,500DC-012 Kepala Tukang 2.5 hr 80,000 200,000

    ACCURATE Accounting System ReportPrinted on 13 Dec 2019 - 22:05

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price TotalDC-003 Tukang Batu Kasar 12.5 hr 70,000 875,000DC-001 Kenek (Asisten Tukang) 37.5 hr 50,000 1,875,000

    3,260,000Total Of Pasang Celcon Blok T.7,5 cm 20,120,0001 Kuda-kuda Material PKT 5-12cm Paku Kayu/Triplek 5-12cm 80 Kg 35,000 2,800,000

    BB 10mm Besi Beton Diameter 10mm - 12m280 btg 69,000 19,320,000Bk-Bor Balok Kayu Borneo 6/12 13.5 m3 2,305,000 31,117,500

    53,237,500Cost DC-013 Mandor 5 hr 100,000 500,000

    DC-012 Kepala Tukang 15 hr 80,000 1,200,000DC-001 Kenek (Asisten Tukang) 80 hr 50,000 4,000,000DC-006 Tukang Kayu Kasar 80 hr 70,000 5,600,000

    11,300,000Total Of Kuda-kuda 64,537,5002 Gording Material PKT 5-12cm Paku Kayu/Triplek 5-12cm 40 Kg 35,000 1,400,000

    Bk-Bor Balok Kayu Borneo 6/12 15 m3 2,305,000 34,575,00035,975,000

    Cost DC-013 Mandor 2 hr 100,000 200,000DC-012 Kepala Tukang 8 hr 80,000 640,000DC-001 Kenek (Asisten Tukang) 40 hr 50,000 2,000,000DC-006 Tukang Kayu Kasar 40 hr 70,000 2,800,000

    5,640,000Total Of Gording 41,615,0003 Kuda - kuda Expo Material BB 10mm Besi Beton Diameter 10mm - 12m 20 btg 69,000 1,380,000

    PKT 5-12cm Paku Kayu/Triplek 5-12cm 60 Kg 35,000 2,100,000BB 10mm Besi Beton Diameter 10mm - 12m260 btg 69,000 17,940,000

    21,420,000Cost DC-013 Mandor 5 hr 100,000 500,000

    DC-012 Kepala Tukang 15 hr 80,000 1,200,000DC-001 Kenek (Asisten Tukang) 60 hr 50,000 3,000,000DC-003 Tukang Batu Kasar 60 hr 70,000 4,200,000

    8,900,000Total Of Kuda - kuda Expo 30,320,0004 Pasang Kaso Material PKT 5-12cm Paku Kayu/Triplek 5-12cm 2.5 Kg 35,000 87,500

    Kso-Brn Kaso Borneo 0.1 m3 1,650,000 165,000

    ACCURATE Accounting System ReportPrinted on 13 Dec 2019 - 22:05

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price Total252,500

    Cost DC-013 Mandor 0.01 hr 100,000 1,000DC-012 Kepala Tukang 0.2 hr 80,000 16,000DC-003 Tukang Batu Kasar 0.88 hr 70,000 61,600DC-001 Kenek (Asisten Tukang) 2 hr 50,000 100,000

    178,600Total Of Pasang Kaso 431,1005 Papan Talang Datar Material PKT 5-12cm Paku Kayu/Triplek 5-12cm 1.2 Kg 35,000 42,000

    P-Bsa Pasir Biasa 0.45 m3 220,000 99,000141,000

    Cost DC-012 Kepala Tukang 0.23 hr 80,000 18,000DC-013 Mandor 0.45 hr 100,000 45,000DC-006 Tukang Kayu Kasar 2.25 hr 70,000 157,500DC-001 Kenek (Asisten Tukang) 4.5 hr 50,000 225,000

    445,500Total Of Papan Talang Datar 586,5006 Seng Talang Datar Material PKT 5-12cm Paku Kayu/Triplek 5-12cm 0.8 Kg 35,000 28,000

    Sng - Dtr Seng Datar/Lurus 11 Lbr 47,500 522,500550,500

    Cost DC-013 Mandor 0.08 hr 100,000 7,600DC-012 Kepala Tukang 0.3 hr 80,000 24,000DC-028 Tukang Seng 2 hr 60,000 120,000DC-001 Kenek (Asisten Tukang) 3 hr 50,000 150,000

    301,600Total Of Seng Talang Datar 852,1007 Listplank Papan Material PKT 5-12cm Paku Kayu/Triplek 5-12cm 2.2 Kg 35,000 77,000

    PP - Mrn Papan Meranti 2.29 m3 1,180,000 2,699,8402,776,840

    Cost DC-013 Mandor 0.5 hr 100,000 50,000DC-012 Kepala Tukang 1.5 hr 80,000 120,000DC-001 Kenek (Asisten Tukang) 7.5 hr 50,000 375,000DC-006 Tukang Kayu Kasar 8 hr 70,000 560,000

    1,105,000Total Of Listplank Papan 3,881,8408 Pasang Genteng Beton Badan Besar Material Gtg-BBB Genteng Beton Badan Besar 250 Pcs 6,500 1,625,000

    ACCURATE Accounting System ReportPrinted on 13 Dec 2019 - 22:05

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price Total1,625,000

    Cost DC-013 Mandor 0.1 hr 100,000 10,000DC-006 Tukang Kayu Kasar 0.7 hr 70,000 49,000DC-001 Kenek (Asisten Tukang) 1.5 hr 50,000 75,000DC-012 Kepala Tukang 1.2 hr 80,000 96,000

    230,000Total Of Pasang Genteng Beton Badan Besar 1,855,0009 Pasang Genteng Beton Badan Sedang Material Gtg-BBS Genteng Beton Badan Sedang 150 Pcs 6,000 900,000

    900,000Cost DC-013 Mandor 0.04 hr 100,000 4,000

    DC-012 Kepala Tukang 0.15 hr 80,000 12,000DC-006 Tukang Kayu Kasar 0.7 hr 70,000 49,000DC-001 Kenek (Asisten Tukang) 1.5 hr 50,000 75,000

    140,000Total Of Pasang Genteng Beton Badan Sedang 1,040,00010 Pasang Genteng Keramik Badan Material Gtg-KB Genteng Keramik Badan 150 Pcs 11,500 1,725,000

    1,725,000Cost DC-013 Mandor 0.04 hr 100,000 4,000

    DC-012 Kepala Tukang 0.15 hr 80,000 12,000DC-006 Tukang Kayu Kasar 0.7 hr 70,000 49,000DC-001 Kenek (Asisten Tukang) 1.5 hr 50,000 75,000

    140,000Total Of Pasang Genteng Keramik Badan 1,865,0001 Plesteran Bata Material SG-40 Semen Gresik - 40 kg 1.5 zak 60,000 90,000

    90,000Cost DC-013 Mandor 0.4 hr 100,000 40,000

    DC-012 Kepala Tukang 7 hr 80,000 560,000DC-003 Tukang Batu Kasar 20 hr 70,000 1,400,000DC-001 Kenek (Asisten Tukang) 30 hr 50,000 1,500,000

    3,500,000Total Of Plesteran Bata 3,590,0002 Plesteran Beton Material SG-50 Semen Gresik - 50 kg 2.5 zak 70,000 175,000

    175,000Cost DC-013 Mandor 0.2 hr 100,000 20,000

    DC-012 Kepala Tukang 2.8 hr 80,000 224,000

    ACCURATE Accounting System ReportPrinted on 13 Dec 2019 - 22:05

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price TotalDC-001 Kenek (Asisten Tukang) 17.5 hr 50,000 875,000DC-003 Tukang Batu Kasar 14.9 hr 70,000 1,043,000

    2,162,000Total Of Plesteran Beton 2,337,0003 Acian Plesteran Material SH-50 Semen Holcim - 50 kg 0.4 zak 70,000 28,000

    28,000Cost DC-012 Kepala Tukang 1 hr 80,000 80,000

    DC-004 Tukang Batu Halus 4 hr 75,000 300,000DC-001 Kenek (Asisten Tukang) 15 hr 50,000 750,000DC-013 Mandor 0.28 hr 100,000 27,500

    1,157,500Total Of Acian Plesteran 1,185,5004 Sekonengan Air Material SH-50 Semen Holcim - 50 kg 0.24 zak 70,000 16,800

    16,800Cost DC-013 Mandor 0.12 hr 100,000 12,000

    DC-012 Kepala Tukang 0.8 hr 80,000 64,000DC-004 Tukang Batu Halus 1.6 hr 75,000 120,000DC-001 Kenek (Asisten Tukang) 8 hr 50,000 400,000

    596,000Total Of Sekonengan Air 612,8005 Pasang Keramik Dinding 20x20m2 Material Ker-20M Keramik 20x20 Muda 75 m3 49,000 3,675,000

    STR-50 Semen Tiga Roda - 50 kg 75 zak 70,500 5,287,5008,962,500

    Cost DC-014 Ember Pengaduk 2 bh 4,500 9,000DC-013 Mandor 0.1 hr 100,000 10,000DC-012 Kepala Tukang 0.25 hr 80,000 20,000DC-015 Pacul Aduk 1 bh 36,000 36,000DC-004 Tukang Batu Halus 10 hr 75,000 750,000DC-001 Kenek (Asisten Tukang) 20 hr 50,000 1,000,000

    1,825,000Total Of Pasang Keramik Dinding 20x20m2 10,787,5006 Pasang Keramik Dinding 30x30 Material Ker-30F Keramik 30x30 Fancy 75 m3 51,000 3,825,000

    SG-40 Semen Gresik - 40 kg 100 zak 60,000 6,000,0009,825,000

    Cost DC-013 Mandor 0.1 hr 100,000 10,000

    ACCURATE Accounting System ReportPrinted on 13 Dec 2019 - 22:05

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price TotalDC-014 Ember Pengaduk 10 bh 4,500 45,000DC-015 Pacul Aduk 5 bh 36,000 180,000DC-012 Kepala Tukang 2.5 hr 80,000 200,000DC-004 Tukang Batu Halus 7.5 hr 75,000 562,500DC-001 Kenek (Asisten Tukang) 17.5 hr 50,000 875,000

    1,872,500Total Of Pasang Keramik Dinding 30x30 11,697,5007 Profilan Plesteran Material SG-50 Semen Gresik - 50 kg 25 zak 70,000 1,750,000

    1,750,000Cost DC-014 Ember Pengaduk 10 bh 4,500 45,000

    DC-013 Mandor 1 hr 100,000 100,000DC-015 Pacul Aduk 5 bh 36,000 180,000DC-012 Kepala Tukang 2.5 hr 80,000 200,000DC-001 Kenek (Asisten Tukang) 50 hr 50,000 2,500,000DC-004 Tukang Batu Halus 40 hr 75,000 3,000,000

    6,025,000Total Of Profilan Plesteran 7,775,0001 Rangka Plafond Kaso Material BUT-SKRP Baut Sekrup 3mm-2,5cm 100 Pcs 600 60,000

    Kwt-Pln Kawat Plafond 30 mm 5,500 165,000PKT 5-12cm Paku Kayu/Triplek 5-12cm 20 Kg 35,000 700,000Kso-Brn Kaso Borneo 15 m3 1,650,000 24,750,000

    25,675,000Cost DC-013 Mandor 0.25 hr 100,000 25,200

    DC-012 Kepala Tukang 0.75 hr 80,000 60,000DC-007 Tukang Kayu Halus 5 hr 80,000 400,000DC-001 Kenek (Asisten Tukang) 10 hr 50,000 500,000

    985,200Total Of Rangka Plafond Kaso 26,660,2002 Plafond Tripleks Material PKT 5-12cm Paku Kayu/Triplek 5-12cm 10 Kg 35,000 350,000

    Trip 18mm Triplek 18mm 10 lbr 200,000 2,000,0002,350,000

    Cost DC-013 Mandor 0.06 hr 100,000 6,000DC-012 Kepala Tukang 0.2 hr 80,000 16,000DC-001 Kenek (Asisten Tukang) 1 hr 50,000 50,000DC-007 Tukang Kayu Halus 1 hr 80,000 80,000

    ACCURATE Accounting System ReportPrinted on 13 Dec 2019 - 22:05

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price Total152,000

    Total Of Plafond Tripleks 2,502,0003 Plafond Gypsum Material PK Gypsum Paku Gypsum (Warna Putih) 0.5 Kg 20,000 10,000

    GBT9 Gypsum Board T.9mm 4 Lbr 70,000 280,000290,000

    Cost DC-012 Kepala Tukang 0.2 hr 80,000 16,000DC-001 Kenek (Asisten Tukang) 1 hr 50,000 50,000DC-007 Tukang Kayu Halus 1 hr 80,000 80,000DC-013 Mandor 0.07 hr 100,000 7,000

    153,000Total Of Plafond Gypsum 443,0004 List Sudut Profil Kayu 3x3cm Material PKT 5-12cm Paku Kayu/Triplek 5-12cm 0.77 Kg 35,000 26,950

    LPK 3x3 List Profil Kayu 3x3cm 3.5 Btg 50,000 175,000201,950

    Cost DC-012 Kepala Tukang 0.2 hr 80,000 16,000DC-001 Kenek (Asisten Tukang) 1.5 hr 50,000 75,000DC-007 Tukang Kayu Halus 1.5 hr 80,000 120,000DC-013 Mandor 0.07 hr 100,000 6,800

    217,800Total Of List Sudut Profil Kayu 3x3cm 419,7505 List Sudut Profile Kayu 5x5cm Material PKT 5-12cm Paku Kayu/Triplek 5-12cm 0.85 Kg 35,000 29,750

    LPK 5x5 List Profil Kayu 5x5cm 4.5 Btg 60,000 270,000299,750

    Cost DC-013 Mandor 0.08 hr 100,000 7,700DC-012 Kepala Tukang 0.35 hr 80,000 28,000DC-001 Kenek (Asisten Tukang) 1.5 hr 50,000 75,000DC-007 Tukang Kayu Halus 1.5 hr 80,000 120,000

    230,700Total Of List Sudut Profile Kayu 5x5cm 530,4506 List Sudut Profil Kayu 7,5 x 7,5cm Material PKT 5-12cm Paku Kayu/Triplek 5-12cm 0.65 Kg 35,000 22,750

    LPK 7,5x7,5 List Profil Kayu 7,5x7,5cm 6.5 Btg 90,000 585,000607,750

    Cost DC-013 Mandor 0.09 hr 100,000 8,600DC-001 Kenek (Asisten Tukang) 2.5 hr 50,000 125,000DC-007 Tukang Kayu Halus 2.5 hr 80,000 200,000

    ACCURATE Accounting System ReportPrinted on 13 Dec 2019 - 22:05

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price TotalDC-012 Kepala Tukang 0.56 hr 80,000 44,800

    378,400Total Of List Sudut Profil Kayu 7,5 x 7,5cm 986,1507 List Profil Gypsum 5x5 cm Material PKT 5-12cm Paku Kayu/Triplek 5-12cm 7.5 Kg 35,000 262,500

    LPG 5x5 List Profil Gypsum 5x5cm 7.5 Btg 45,000 337,500600,000

    Cost DC-013 Mandor 0.09 hr 100,000 8,700DC-012 Kepala Tukang 0.45 hr 80,000 36,000DC-001 Kenek (Asisten Tukang) 2.5 hr 50,000 125,000DC-004 Tukang Batu Halus 2.5 hr 75,000 187,500

    357,200Total Of List Profil Gypsum 5x5 cm 957,2008 List Profil Gypsum 7,5x10cm Material PKT 5-12cm Paku Kayu/Triplek 5-12cm 0.8 Kg 35,000 28,000

    LPG 7,5x10 List Profil Gypsum 7,5x10cm 7.6 Btg 55,000 418,000446,000

    Cost DC-013 Mandor 0.1 hr 100,000 10,000DC-012 Kepala Tukang 0.6 hr 80,000 48,000DC-001 Kenek (Asisten Tukang) 3 hr 50,000 150,000DC-007 Tukang Kayu Halus 3 hr 80,000 240,000

    448,000Total Of List Profil Gypsum 7,5x10cm 894,0009 List Profil Gypsum 7,5x7,5cm Material PKT 5-12cm Paku Kayu/Triplek 5-12cm 0.65 Kg 35,000 22,750

    LPG 7,5x7,5 List Profil Gypsum 7,5x7,5cm 7.5 Btg 50,000 375,000397,750

    Cost DC-013 Mandor 0.08 hr 100,000 7,800DC-012 Kepala Tukang 0.4 hr 80,000 32,000DC-001 Kenek (Asisten Tukang) 2 hr 50,000 100,000DC-007 Tukang Kayu Halus 2 hr 80,000 160,000

    299,800Total Of List Profil Gypsum 7,5x7,5cm 697,5501 Urugan Tanah Lantai Cost DC-010 Tukang 10 hr 75,000 750,000

    750,000Total Of Urugan Tanah Lantai 750,0002 Pemadatan Tanah Lantai Cost DC-010 Tukang 10 hr 75,000 750,000

    750,000

    ACCURATE Accounting System ReportPrinted on 13 Dec 2019 - 22:05

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price TotalTotal Of Pemadatan Tanah Lantai 750,0003 Urugan Pasir Lantai Material P-Urg Pasir Urug 30 m3 110,000 3,300,000

    3,300,000Cost DC-013 Mandor 0.5 hr 100,000 50,000

    DC-012 Kepala Tukang 5 hr 80,000 400,000DC-001 Kenek (Asisten Tukang) 10 hr 50,000 500,000DC-010 Tukang 10 hr 75,000 750,000

    1,700,000Total Of Urugan Pasir Lantai 5,000,0004 Pasang Plastik Sheet Cost DC-013 Mandor 0.5 hr 100,000 50,000

    DC-012 Kepala Tukang 5 hr 80,000 400,000DC-001 Kenek (Asisten Tukang) 10 hr 50,000 500,000DC-010 Tukang 10 hr 75,000 750,000

    1,700,000Total Of Pasang Plastik Sheet 1,700,0005 Beton Rabat Bawah Material SH-40 Semen Holcim - 40 kg 30 zak 59,000 1,770,000

    BB U32 Besi Beton Ulir U.32 350 Kg 8,500 2,975,000P-Bsa Pasir Biasa 20 m3 220,000 4,400,000

    9,145,000Cost DC-013 Mandor 0.5 hr 100,000 50,000

    DC-012 Kepala Tukang 5 hr 80,000 400,000DC-001 Kenek (Asisten Tukang) 10 hr 50,000 500,000DC-010 Tukang 10 hr 75,000 750,000

    1,700,000Total Of Beton Rabat Bawah 10,845,0006 Pasang Pelapis Lantai Bangunan Utama Material Ker-30F Keramik 30x30 Fancy 100 m3 51,000 5,100,000

    Ker-20P Keramik 30x30 Putih 150 m3 44,000 6,600,000Ker-30Mb Keramik 30x30 Marble 250 m3 47,000 11,750,000

    23,450,000Cost DC-013 Mandor 0.5 hr 100,000 50,000

    DC-012 Kepala Tukang 5 hr 80,000 400,000DC-004 Tukang Batu Halus 10 hr 75,000 750,000DC-001 Kenek (Asisten Tukang) 10 hr 50,000 500,000

    1,700,000Total Of Pasang Pelapis Lantai Bangunan Utama 25,150,000

    ACCURATE Accounting System ReportPrinted on 13 Dec 2019 - 22:05

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price Total1 Meni Besi/m2 Material Ks-Ct Kuas Cat 10 Pcs 10,500 105,000

    AMB Amplas Besi 50 Lbr 3,500 175,000MB Meni Besi 100 Kg 25,000 2,500,000

    2,780,000Cost DC-013 Mandor 0.5 hr 100,000 50,000

    DC-012 Kepala Tukang 5 hr 80,000 400,000DC-008 Tukang Cat 10 hr 65,000 650,000

    1,100,000Total Of Meni Besi/m2 3,880,0002 Meni Kayu/m2 Material Ks-Ct Kuas Cat 10 Pcs 10,500 105,000

    AMK Amplas Kayu 50 Lbr 3,500 175,000MK Meni Kayu 40 Kg 25,000 1,000,000

    1,280,000Cost DC-013 Mandor 0.5 hr 100,000 50,000

    DC-012 Kepala Tukang 5 hr 80,000 400,000DC-008 Tukang Cat 10 hr 65,000 650,000

    1,100,000Total Of Meni Kayu/m2 2,380,0003 Residu Kayu/m2 Material Ks-Ct Kuas Cat 10 Pcs 10,500 105,000

    RK Residu Kayu 20 kg 7,500 150,000255,000

    Cost DC-013 Mandor 0.6 hr 100,000 60,000DC-010 Tukang 2 hr 75,000 150,000DC-001 Kenek (Asisten Tukang) 10 hr 50,000 500,000

    710,000Total Of Residu Kayu/m2 965,0004 Cat Besi Material Ks-Ct Kuas Cat 10 Pcs 10,500 105,000

    AMB Amplas Besi 100 Lbr 3,500 350,000DB Dempul Besi 20 kg 17,500 350,000CE Dul 2,5lt Cat Eks Dulux 2,5lt 20 klg 159,000 3,180,000CI Mow 20lt Cat Int Mowilex 20lt 20 klg 616,000 12,320,000

    16,305,000Cost DC-013 Mandor 3.3 hr 100,000 330,000

    DC-012 Kepala Tukang 8 hr 80,000 640,000DC-008 Tukang Cat 40 hr 65,000 2,600,000

    ACCURATE Accounting System ReportPrinted on 13 Dec 2019 - 22:05

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price Total3,570,000

    Total Of Cat Besi 19,875,0005 Cat Kayu/m2 Material Ks-Ct Kuas Cat 5 Pcs 10,500 52,500

    AMK Amplas Kayu 50 Lbr 3,500 175,000PK Plamur Kayu 10 kg 17,500 175,000CK Dul Cat Kayu Dulux 15 klg 50,000 750,000

    1,152,500Cost DC-013 Mandor 1 hr 100,000 100,000

    DC-012 Kepala Tukang 5 hr 80,000 400,000DC-008 Tukang Cat 10 hr 65,000 650,000

    1,150,000Total Of Cat Kayu/m2 2,302,5006 Cat Tembok Dalam/m2 Material Ks-Ct Kuas Cat 0.5 Pcs 10,500 5,250

    AMT Amplas Tembok 10 lbr 3,500 35,000ARC Alat Roll Cat 1 Pcs 60,600 60,600PTemb Plamur Tembok 5 kg 13,500 67,500CE Dul 2,5lt Cat Eks Dulux 2,5lt 2 klg 159,000 318,000

    486,350Cost DC-013 Mandor 0.2 hr 100,000 20,000

    DC-012 Kepala Tukang 1 hr 80,000 80,000DC-008 Tukang Cat 2 hr 65,000 130,000

    230,000Total Of Cat Tembok Dalam/m2 716,3507 Cat Tembok Luar/m2 Material AMT Amplas Tembok 10 lbr 3,500 35,000

    ARC Alat Roll Cat 1 Pcs 60,600 60,600PTemb Plamur Tembok 5 kg 13,500 67,500CE Mow 2,5lt Cat Eks Mowilex 2,5lt 2 klg 158,000 316,000

    479,100Cost DC-013 Mandor 0.2 hr 100,000 20,000

    DC-012 Kepala Tukang 1 hr 80,000 80,000DC-008 Tukang Cat 5 hr 65,000 325,000

    425,000Total Of Cat Tembok Luar/m2 904,1001 Pemipaan PVC AW untuk Aliran Air Bersih/m' Material L-PVC Lem PVC 10 Tbe 10,500 105,000

    Pip-PVC AW 1/2 Pipa PVC AW 1/2" 10 Btg 31,000 310,000

    ACCURATE Accounting System ReportPrinted on 13 Dec 2019 - 22:05

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price TotalPip-PVC AW 3/4 Pipa PVC AW 3/4" 10 Btg 33,500 335,000Pip-PVC AW 1 Pipa PVC AW 1" 10 Btg 36,000 360,000

    1,110,000Cost DC-015 Pacul Aduk 0.1 bh 36,000 3,600

    DC-013 Mandor 0.05 hr 100,000 5,000DC-012 Kepala Tukang 0.1 hr 80,000 8,000DC-002 Tukang Gali 2 hr 90,000 180,000DC-009 Tukang Pipa 5 hr 75,000 375,000

    571,600Total Of Pemipaan PVC AW untuk Aliran Air Bersih/m' 1,681,6002 Pemipaan PVC D dia untuk Aliran Air Kotor Material L-PVC Lem PVC 10 Tbe 10,500 105,000

    Pip-PVC T.D 1,5 Pipa PVC Type D 1,5" 10 Btg 36,000 360,000Pip-PVC T.D 2 Pipa PVC Type D 2" 10 Btg 38,500 385,000Pip-PVC T.D 3 Pipa PVC Type D 3" 10 Btg 60,000 600,000Pip-PVC T.D 4 Pipa PVC Type D 4" 10 Btg 80,000 800,000Pip-PVC T.D 5 Pipa PVC Type D 5" 10 Btg 90,000 900,000Pip-PVC T.D 6 Pipa PVC Type D 6" 10 Btg 115,000 1,150,000

    4,300,000Cost DC-013 Mandor 0.06 hr 100,000 5,600

    DC-012 Kepala Tukang 0.17 hr 80,000 13,360DC-015 Pacul Aduk 1 bh 36,000 36,000DC-009 Tukang Pipa 0.5 hr 75,000 37,500DC-001 Kenek (Asisten Tukang) 1 hr 50,000 50,000DC-002 Tukang Gali 2 hr 90,000 180,000

    322,460Total Of Pemipaan PVC D dia untuk Aliran Air Kotor 4,622,4601 Pengaturan Titik Lampu Dalam/m Material Klem Klem Pipa 250 bh 500 125,000

    KB-TNYM 3x16 Kabel Toevoer NYM 3x16mm 10 mm 36,000 360,000Pip-LC Pipa Listrik Clipsal 50 Btg 10,500 525,000Pip-FL Pipa Flexible Listrik 50 Mtr 10,500 525,000KB-NYY 3x3,5 Kabel NYY 3x3,5 Hitam 10 mm 55,000 550,000KB-NYM 2x1,5 Kabel NYM 2x1,5 Putih 10 Glg 130,000 1,300,000KB-NYM 2x2,5 Kabel NYM 2x2,5 Putih 10 Glg 180,000 1,800,000SKLR-TGL Saklar Tunggal 50 Pcs 45,000 2,250,000SKLR-GND Saklar Ganda 50 Pcs 55,000 2,750,000

    ACCURATE Accounting System ReportPrinted on 13 Dec 2019 - 22:05

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price TotalSKLR-HTL Saklar Hotel 50 Pcs 55,000 2,750,000KB-NYM 3x1,5 Kabel NYM 3x1,5 Putih 10 Glg 282,000 2,820,000

    15,755,000Cost DC-012 Kepala Tukang 4.25 hr 80,000 340,000

    DC-011 Tukang Listrik 15 hr 75,000 1,125,000DC-001 Kenek (Asisten Tukang) 25 hr 50,000 1,250,000

    2,715,000Total Of Pengaturan Titik Lampu Dalam/m 18,470,0002 Pengaturan Titik Lampu Taman Material Pip-LC Pipa Listrik Clipsal 20 Btg 10,500 210,000

    KB-NYM 2x1,5 Kabel NYM 2x1,5 Putih 20 Glg 130,000 2,600,000KB-NYM 2x2,5 Kabel NYM 2x2,5 Putih 20 Glg 180,000 3,600,000KB-NYM 3x1,5 Kabel NYM 3x1,5 Putih 20 Glg 282,000 5,640,000KB-NYM 3x2,5 Kabel NYM 3x2,5 Putih 20 Glg 388,000 7,760,000Klem Klem Pipa 20 bh 500 10,000KB-TNYM 3x16 Kabel Toevoer NYM 3x16mm 20 mm 36,000 720,000SKLR-TGL Saklar Tunggal 20 Pcs 45,000 900,000SKLR-GND Saklar Ganda 20 Pcs 55,000 1,100,000KB-NYY 3x3,5 Kabel NYY 3x3,5 Hitam 20 mm 55,000 1,100,000

    23,640,000Cost DC-012 Kepala Tukang 1.6 hr 80,000 128,000

    DC-001 Kenek (Asisten Tukang) 6 hr 50,000 300,000DC-011 Tukang Listrik 4 hr 75,000 300,000DC-002 Tukang Gali 4 hr 90,000 360,000

    1,088,000Total Of Pengaturan Titik Lampu Taman 24,728,0001 Pemasangan Pagar Material SH-50 Semen Holcim - 50 kg 15 zak 70,000 1,050,000

    P-Bsa Pasir Biasa 25 m3 220,000 5,500,000Bt-Btk Batu Batako 5,000 Pcs 2,500 12,500,000

    19,050,000Cost DC-013 Mandor 0.2 hr 100,000 20,000

    DC-012 Kepala Tukang 1 hr 80,000 80,000DC-004 Tukang Batu Halus 5 hr 75,000 375,000DC-001 Kenek (Asisten Tukang) 10 hr 50,000 500,000

    975,000Total Of Pemasangan Pagar 20,025,000

    ACCURATE Accounting System ReportPrinted on 13 Dec 2019 - 22:05

  • Global Building, PT

    RAB - Detail

    Filtered By :Project No, Type

    Project No : PBT.003Project Name : Bangunan Pertokoan

    Job No Description Detail Type Item/Cost No Description Volume Unit Price Price Total2 Pemasangan Saluran Terbuka Material Bt-Bt Batu Bata 1,000 Pcs 600 600,000

    SG-50 Semen Gresik - 50 kg 15 zak 70,000 1,050,000Bt-Kl Batu Kali 80 m3 220,000 17,600,000

    19,250,000Cost DC-013 Mandor 1 hr 100,000 100,000

    DC-012 Kepala Tukang 2 hr 80,000 160,000DC-004 Tukang Batu Halus 5 hr 75,000 375,000DC-001 Kenek (Asisten Tukang) 10 hr 50,000 500,000

    1,135,000Total Of Pemasangan Saluran Terbuka 20,385,0003 Pemasangan Bouwplank Material BNG-RAM Benang Rami 4.55 Glg 6,500 29,575

    PP - Brn Papan Borneo 0.07 m3 1,030,000 66,950Kso-Brn Kaso Borneo 0.06 m3 1,650,000 90,750PB Bagus Paku Beton Bagus 0.14 Dus 50,000 7,250

    194,525Cost DC-012 Kepala Tukang 0.12 hr 80,000 9,200

    DC-026 Tukang Kayu 0.5 hr 70,000 35,000DC-001 Kenek (Asisten Tukang) 1.5 hr 50,000 75,000DC-013 Mandor 0.04 hr 100,000 3,500

    122,700Total Of Pemasangan Bouwplank 317,225